Integrity Monitoring and Assessment, Prediction, Repair, and Corrosion Control of the Hanford Storage Tanks — 25213

BACKGROUND AND PROJECT TASKS Proposed work addresses focus area 1: Waste Retrieval, Transport and Closure, with particular focus on increasing volume available for tank storage 1) Refurbish/fortify existing double shell storage tanks (Tank Refurbish – Polymer Grout) 2) Robust monitoring tools for internal corrosion (Integrity Monitoring -Reference Electrodes) 3) Mitigate external corrosion (Degradation Prevention - Cathodic Protection) 4) Determine viability of constructing new tanks, and storage room creation by way of evaporation (Cost Benefit Analysis)

Shukla, Pavan K. [Savannah River National Laborato↗

Replacement of Fly Ash with Natural Pozzolans in Cementitious Waste Forms: Progress Report

The Department of Energy Environmental Management (DOE EM) Office is currently responsible for treating radioactive and mixed waste, environmental restoration, and closing contaminated tanks and facilities resulting from radioactive isotope production for defense applications during the Cold War. Cementitious reagents are the most widely used materials for (1) chemically stabilizing and encapsulating radionuclides and hazardous metals contaminated with radionuclides and Resource Conservation and Recovery Act (RCRA) hazardous metals and (2) solidifying radioactive and mixed wastewater for final disposal. Cementitious grouts and flowable concretes are also the most widely used materials for DOE waste tank and facility closures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macromolecules & Manufacturing Science

Outline • SRNL Overview • Mission overview • Polymers enabling the mission • R&D Highlights • Polymers in radiation environments • Tooling in shielded cells • Packaging for nuclear material shipments • Polymers supporting tank waste remediation • Ref electrode • Epoxy and polymer grout • Polymers for fusion energy • Deuterium labelling • Polymers for additive manufacturing • Coalescence and blends: experimental and predictive • Process modelling and sorting through big data (peregrine and latticeJ)

Chatham, Camden [Savannah River National Laborator↗

Flow Regimes for Gas Migration in Liquid Stemming Columns

Some underground engineering projects require the design of an effective stemming column to confine pressurized gases within boreholes. While solid materials such as grout plugs are commonly used, their exothermic curing can damage diagnostic tools, particularly under harsh in situ conditions involving elevated pressure and temperature.

42 ENGINEERING↗

SUMMARY OF 2009 RHEOLOGY MODIFIER PROGRAM

The overall objective of the EM-31 Rheological Modifiers and Wetting Agents program is to utilize commercially available rheology modifiers to increase the solids fraction of radioactive sludge based waste streams, resulting in an increase in throughput and decreasing the overall processing time. The program first investigates the impact of rheology modifiers on slurry simulants and then utilizes the most effective rheology modifiers on radioactive slurries. The work presented in this document covers the initial investigation of rheology modifier testing with simulants. This task is supported by both the Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL). The SRNL EM-31 task, for this year, was to investigate the use of rheology modifiers on simulant Defense Waste Processing Facility (DWPF) melter feeds. The task is to determine, based on the impact of the rheology modifier, if there are rheology modifiers that could reduce the water content of the slurry going to the DWPF melter, hence increasing the melt rate by decreasing the water loading. The rheology modifier in essence would allow a higher solids content slurry to have the same type of rheology or pumpability of a lower solids slurry. The modifiers selected in this report were determined based on previous modifiers used in high level waste melter feed simulants, on-going testing performed by counterparts at PNNL, and experiences gain through use of modifiers in other Department of Energy (DOE) processes such as grout processing. There were 12 rheology modifiers selected for testing, covering both organic and inorganic types and they were tested at four different concentrations for a given melter feed. Five different DWPF melter feeds were available and there was adequate material in one of the melter feeds to increase the solids concentration, resulting in a total of six simulants for testing. The mass of melter feed available in each simulant was not adequate for testing each rheology modifier, hence based on the changes in rheology for a given rheology modifier, rheology modifiers were either dropped or added between simulants. Three rheology modifiers were used on all simulants. The results from this testing indicate that citric acid or polycarboxylate based rheology modifiers are the most effective in reducing the yield stress, by as much as 70% at the higher rheology modifier additions and were effective on most of the tested simulants. These rheology modifiers are organic, hence the can also be used as reductants in melter operations. The most effective non-organic rheology modifiers, sodium metasilicate reduced the yield stress by 10%. It is recommended that both citric acid and commercially available polycarboxylate rheology modifiers be further investigated. Different molecular weight polycarboxylates and different types of polycarboxylates used in other industries must be considered. These polycarboxylates are extensively utilized in the cement, ceramic, and water treatment processes, hence readily available. Future work on DWPF melter feeds involving rheology modifiers should include, assuming the present method of processing sludge through DPWF does not change, is: (1) Investigate the use of polycarboxylate in various processes and procure polycarboxylates for testing. Limit rheology modifier selection and future testing between four and eight different types. (2) Test rheology modifiers on at least two different chemical types or bounding DWPF SME product simulants. Test to include the impact of boiling and the effectiveness in reducing water content via rheology versus weight percent curves. (3) Based on selected modifiers, perform testing on actual radioactive melter feed based on results from simulant testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of a hydrostatic azimuth thrust bearing for a large steerable antenna

The problems inherent in the design and construction of a hydrostatic azimuth thrust bearing for a tracking antenna of very large size were studied. For a load of 48,000,000 lbs., it is concluded that the hydrostatic bearing concept is feasible, provided that a particular multiple pad arrangement, high oil viscosity, and a particular load spreading arrangement are used. Presently available computer programs and techniques are deemed to be adequate for a good portion of the design job but new integrated programs will have to be developed in the area of the computation of the deflections of the supporting bearing structure. Experimental studies might also be indicated to ascertain the life characteristics of grouting under cyclic loading, and the optimization of hydraulic circuits and pipe sizes to insure the long life operation of pumps with high viscosity oil while avoiding cavitation.

Rumbarger, J.↗

NASTRAN analysis of a wheel-rail loading on its foundation

One type of azimuth bearing for a large ground antenna (100 m) will consist of steel wheels, mounted at four corners of the alidade, rolling on a circular flat rail which provides the vertical restraints; a radial constraining bearing at the center of the alidade provides the horizontal restraints. One important design feature is the compressive stresses in the grout or concrete foundation under the wheel-rail load. A finite element analysis check was made of a particular design that consists of a steel rail resting on a concrete foundation. Symmetry was assumed as much as possible in order to minimize the models, but meaningful element sizes were used. Recently developed isoparametric hexahedron elements available in the NASTRAN computing program, which minimizes the number of elements required while maintaining the accuracy of the computed stresses, were used with two versions of NASTRAN. Test cases to check with the analytical solutions were made. A side loading was also applied to calculate the increase in the concrete stresses.

Katow, M. S.↗

Stress distribution in a semi-infinite body symmetrically loaded over a circular area

Algorithms are developed for computing stresses in a semi-infinite body when loaded by a uniform pressure acting over a circular area. The algorithm allows easy determination of any stress component in a semi-infinite body having a known Poisson's ratio. Example curves are plotted for Portland cement grout and metal representative values.

Mcginness, H.↗

Vegetable crop management with remote sensing

Repetitive aerial photography with color infrared (ACIR) and black-and-white infrared (B and WIR) films was taken of potato and tomato fields in southwest Florida during the spring season of 1975. Color differences observed in the photographs revealed different levels of soil moisture in the fields, improper ditch arrangements, poor stands of plants, and areas where late blight (Phytophthora infestans) (Mont.)d.By and early blight (Alternaria solani) (Ell. and Mart.) Jones and Grout. were defoliating potato plants. Photographs of fields before planting also indicated areas where excessive rock formations existed which would make field preparation costly. Preplanting photographs also pinpointed areas with different water table levels.

Blazquez, C. H.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

A test was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by SSL. The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge testing at two string voltages (100 V, 150 V) and four array current (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 μs to 2.9 ms. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission application.

Wright, K. H.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

Testing was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by Space Systems/Loral, LLC (SSL). The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge (ESD) testing at two string voltages (100 V, 150 V) and four array currents (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 micro-seconds to 2.75 milli-seconds. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission.

Wright, Kenneth H., Jr.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

A test was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by SSL. The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge testing at two string voltages (100 V, 150 V) and four array current (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 micros to 2.9 ms. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission application.

Wright, Kenneth H., Jr.↗

Deep Charging Evaluation of Satellite Power and Communication System Components

Deep charging, in contrast to surface charging, focuses on electron penetration deep into insulating materials applied over conductors. A classic example of this scenario is an insulated wire. Deep charging can pose a threat to material integrity, and to sensitive electronics, when it gives rise to an electrostatic discharge or arc. With the advent of Electric Orbit Raising, which requires spiraling through Earth's radiation belts, satellites are subjected to high energy electron environments which they normally would not encounter. Beyond Earth orbit, missions to Jupiter and Saturn face deep charging concerns due to the high energy radiation environments. While predictions can be made about charging in insulating materials, it is difficult to extend those predictions to complicated geometries, such as the case of an insulating coating around a small wire, or a non-uniform silicone grouting on a bus bar. Therefore, to conclusively determine the susceptibility of a system to arcs from deep charging, experimental investigations must be carried out. This paper will describe the evaluation carried out by NASA's Marshall Space Flight Center on subscale flight-like samples developed by Space Systems/Loral, LLC. Specifically, deep charging evaluations of solar array wire coupons, a photovoltaic cell coupon, and a coaxial microwave transmission cable, will be discussed. The results of each evaluation will be benchmarked against control sample tests, as well as typical power system levels, to show no significant deep charging threat existed for this set of samples under the conditions tested.

Schneider, T. A.↗

Well Abandonment at Various Sites, John F. Kennedy Space Center, Florida

Between January 29 and March 9, 2016, a total of 23 monitoring wells were properly abandoned-in-place at five KSC sites (OPF-1&2, OPF-3, RDG, SRB, and HSB). The total abandonment encompassed 489.06 linear feet. The wells abandoned were constructed of PVC with diameters ranging from 1-inch to 2-inches. The shallowest well abandoned was measured to be 11.6 ft bls (OPF) and the deepest well abandoned was documented to be 51.45 feet bls (HSB). All aboveground completions were removed and each area was re-graded and/or grouted to surface to match existing surroundings. All materials (concrete pads, well casings, etc.) were disposed of accordingly.

MW↗

In-situ Lunar Launch and Landing Pad Construction with Regolith-Thermoset Polymer Composite Materials

Lunar launch and landing pads are necessary to mitigate risks to lander/ascent vehicles and surrounding surface assets from rocket plume ejected regolith. The current state of the art of landing and launching from the lunar surface is to land/launch on unprepared regolith surfaces. Though this has been a relatively successful approach, significant risks exist for the Artemis Program due to higher thrust levels leading to increased ejecta and cratering, presence of co-located assets in the ejecta path, and potential strict surface levelness requirements. Regolith-thermoset polymer composite materials were developed and evaluated for off Earth launch and landing pad applications. Performance under hot fire conditions was assessed for two simulated Starship lunar launch/landing environments, one targeting thermal conditions and the second targeting pressure conditions. Paver test articles were prepared at 20% and 11% polymer mass fractions. Sintered paver test articles were prepared with 20% polymer grouting filling the seams between pavers. Though significant erosion was experienced during the more extreme thermal testing conditions, all test articles successfully mitigated regolith ejecta from plume effects. A concept for preparing and emplacing the materials was developed and tested in laboratory conditions. The testing evaluated the feasibility of using twin and single screw extruder technology to mix, convey and deposit materials. Both the twin and single screw extruders were capable of processing and extruding the composite with a maximum of 90% mass fraction of regolith achieved by the twin screw extruder.A primary risk for application of regolith-thermoset polymer composites as lunar launch/landingpad is the mass of polymer required to be landed on the moon. Calculations were performed that show that a 100 m diameter, 0.025 m thick pad with polymer mass fraction of 15% will require a payload mass of 72 mt to the Lunar surface. This is below the planned Starship payload capacity to the lunar surface of 100 mt. The regolith-thermoset polymer composite based construction approach proved feasibility in three critical areas: performance under launch/landing conditions, demonstration of a mixing and depositing strategy, and fitting within the planned lunar payload capacity. It is recommended that materials and systems be developed to TRL 6 for a small-scale lunar demonstration of emplacement of a launch/landing pad via a CLPS mission to support Artemis Program roadmap gap closure activities.

ISRU↗

Small Column Ion Exchange Design and Safety Strategy

Small Column Ion Exchange (SCIX) is a transformational technology originally developed by the Department of Energy (DOE) Environmental Management (EM-30) office and is now being deployed at the Savannah River Site (SRS) to significantly increase overall salt processing capacity and accelerate the Liquid Waste System life-cycle. The process combines strontium and actinide removal using Monosodium Titanate (MST), Rotary Microfiltration, and cesium removal using Crystalline Silicotitanate (CST, specifically UOP IONSIV{reg_sign}IE-911 ion exchanger) to create a low level waste stream to be disposed in grout and a high level waste stream to be vitrified. The process also includes preparation of the streams for disposal, e.g., grinding of the loaded CST material. These waste processing components are technically mature and flowsheet integration studies are being performed including glass formulations studies, application specific thermal modeling, and mixing studies. The deployment program includes design and fabrication of the Rotary Microfilter (RMF) assembly, ion-exchange columns (IXCs), and grinder module, utilizing an integrated system safety design approach. The design concept is to install the process inside an existing waste tank, Tank 41H. The process consists of a feed pump with a set of four RMFs, two IXCs, a media grinder, three Submersible Mixer Pumps (SMPs), and all supporting infrastructure including media receipt and preparation facilities. The design addresses MST mixing to achieve the required strontium and actinide removal and to prevent future retrieval problems. CST achieves very high cesium loadings (up to 1,100 curies per gallon (Ci/gal) bed volume). The design addresses the hazards associated with this material including heat management (in column and in-tank), as detailed in the thermal modeling. The CST must be size reduced for compatibility with downstream processes. The design addresses material transport into and out of the grinder and includes provisions for equipment maintenance including remote handling. The design includes a robust set of nuclear safety controls compliant with DOE Standard (STD)-1189, Integration of Safety into the Design Process. The controls cover explosions, spills, boiling, aerosolization, and criticality. Natural Phenomena Hazards (NPH) including seismic event, tornado/high wind, and wildland fire are considered. In addition, the SCIX process equipment was evaluated for impact to existing facility safety equipment including the waste tank itself. SCIX is an innovative program which leverages DOE's technology development capabilities to provide a basis for a successful field deployment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recovery Act Progress Update: HWCTR Tapping

Closure activity at the half-century old heavy water components reactor. Decommissioning is kicked off with the grouting of the basin to further protect the environment from radioactive waste.