Search NASA⌕ Search

SEARCH · Search NASA

Results for “information loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

High-pressure high-temperature phase diagram of gadolinium studied using a boron-doped heater anvil

A boron-doped designer heater anvil is used in conjunction with powder x-ray diffraction to collect structural information on a sample of quasi-hydrostatically loaded gadolinium metal up to pressures above 8 GPa and 600 K. The heater anvil consists of a natural diamond anvil that has been surface modified with a homoepitaxially grown chemical-vapor-deposited layer of conducting boron-doped diamond, and is used as a DC heating element. Internally insulating both diamond anvils with sapphire support seats allows for heating and cooling of the high-pressure area on the order of a few tens of seconds. This device is then used to scan the phase diagram of the sample by oscillating the temperature while continuously increasing the externally applied pressure and collecting in situ time-resolved powder diffraction images. In the pressure-temperature range covered in this experiment, the gadolinium sample is observed in its hcp, αSm, and dhcp phases. Under this temperature cycling, the hcp → αSm transition proceeds in discontinuous steps at points along the expected phase boundary. From these measurements (representing only one hour of synchrotron x-ray collection time), a single-experiment equation of state and phase diagram of each phase of gadolinium is presented for the range of 0–10 GPa and 300–650 K.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Intelligent Energy Optimizer for Residential Buildings

Demand-side management in the buildings is essential for meeting grid flexibility needs in a highly renewable energy scenario. Appliance load monitoring helps decision making for demand-side management by providing the information on operation status/power consumption from different appliances in the buildings. Nonintrusive load monitoring (NILM) is an attractive option for appliance load monitoring using because it has lower cost for sensors and helps mitigate privacy concerns. In this study, the team used an event detection technique followed by two different methods for event classification. The results from k-means clustering showed that the events from a single appliance are often distributed in multiple clusters. Thus, the unsupervised method of NILM using k-means clustering used in this study was not very suitable for load disaggregation. The results from NILM showed that the F1 score for event classification was 0.77 for a heat pump water heater and very low for other appliances using the rule-based classification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Isolating Added Mass Load Components of CPAS Main Clusters

The current simulation for the Capsule Parachute Assembly System (CPAS) lacks fidelity in representing added mass for the 116 ft Do ringsail Main parachute. The availability of 3-D models of inflating Main canopies allowed for better estimation the enclosed air volume as a function of time. This was combined with trajectory state information to estimate the components making up measured axial loads. A proof-of-concept for an alternate simulation algorithm was developed based on enclosed volume as the primary independent variable rather than drag area growth. Databases of volume growth and parachute drag area vs. volume were developed for several flight tests. Other state information was read directly from test data, rather than numerically propagated. The resulting simulated peak loads were close in timing and magnitude to the measured loads data. However, results are very sensitive to data curve fitting and may not be suitable for Monte Carlo simulations. It was assumed that apparent mass was either negligible or a small fraction of enclosed mass, with little difference in results.

Ray, Eric S.↗

Deep Factorization Machine Learning for Disaggregation of Transmission Load Profiles with High Penetration of Behind-The-Meter Solar

The ever-growing integration of distributed energy resources (DERs), especially behind-the-meter (BTM) solar generations, poses imperative operational challenges to system operators such as regional transmission organizations (RTOs). It is important for RTOs to effectively and accurately extract actual load profiles at the transmission level for a single node with significant BTM solar injection. This paper first illustrates the necessity of disaggregating the daily actual load profile of a single node. Furthermore, by segmenting nodes with selected timeseries features, nodes with significant BTM solar generation are identified. Lastly, a bi-level framework is proposed, comprising reference node disaggregation and DeepFM nodal disaggregation, aimed at disaggregating the nodal load profiles from which system operators require more information. By adopting a hybrid Deep Factorization Machine (DeepFM) model, the model achieve accurate results by extracting both linear and nonlinear relations between nodes in the same region and the zonal load and nodal load profile. To overcome the lack of ground truth, this paper segments the load profile into daytime, nighttime, and zero-crossing points and utilizes the latter two for evaluation purposes. The proposed disaggregation procedure is validated using real world, minute-level, normalized, and anonymized nodal data in the PJM service territory.

42 ENGINEERING↗

Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase

The late rise in global concern for environmental issues such as global warming and air pollution is accentuating the need for environmental assessments in the construction industry. Promptly evaluating the environmental loads of the various design alternatives during the early stages of a construction project and adopting the most environmentally sustainable candidate is therefore of large importance. Yet, research on the early evaluation of a construction project's environmental load in order to aid the decision making process is hitherto lacking. In light of this dilemma, this study proposes a model for estimating the environmental load by employing only the most basic information accessible during the early design phases of a project for the pre-stressed concrete (PSC) beam bridge, the most common bridge structure. Firstly, a life cycle assessment (LCA) was conducted on the data from 99 bridges by integrating the bills of quantities (BOQ) with a life cycle inventory (LCI) database. The processed data was then utilized to construct a case based reasoning (CBR) model for estimating the environmental load. The accuracy of the estimation model was then validated using five test cases; the model's mean absolute error rates (MAER) for the total environmental load was calculated as 7.09%. Such test results were shown to be superior compared to those obtained from a multiple-regression based model and a slab area base-unit analysis model. Henceforth application of this model during the early stages of a project is expected to highly complement environmentally friendly designs and construction by facilitating the swift evaluation of the environmental load from multiple standpoints. - Highlights: • This study is to develop the model of assessing the environmental impacts on LCA. • Bills of quantity from completed designs of PSC Beam were linked with the LCI DB. • Previous cases were used to estimate the environmental load of new case by CBR model. • CBR model produces more accurate estimations (7.09%) than other conventional models. • This study supports decision making process in the early stage of a new construction case.

54 ENVIRONMENTAL SCIENCES↗

Earth Independent Medical Operations (EIMO)

Inherent in interplanetary space travel are unprecedented challenges that could threaten mission success and negatively impact crew health and performance. Return to definitive care is essentially untenable and resources will be constrained with practically no re-supply capability. Access to ground-based medical expertise will be significantly delayed under nominal conditions with exacerbation during conjunction or prolonged dust storms. Taken together, these challenges necessitate the development of a progressively autonomous medical operational support system to assist the crew medical officer (CMO). While support from ground based medical experts will remain indispensable for pre-mission planning, the approach to management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. To progressively enable EIMO, a series of meetings were convened with subject matter experts from within NASA, academia and industry to facilitate mapping of the path to support autonomous medical operations. Topics explored in these meetings included the scope of data (storage capacity, usage, transmission rate and bandwidth, computing capacity), CMO training, supply and resource management and task load balance. Recommendations from these meetings will inform the EIMO Concept of Operations and definition of the associated requirements culminating in updates to the NASA 3001 standards. The EIMO project team will work with stakeholders to conceptualize a clinical decision support system (CDSS) to assist the CMO in response to medical contingencies when terrestrial support is delayed or otherwise unavailable. The CDSS will be a system of systems that will utilize data from numerous input vectors. Successful deployment of the CDSS will facilitate medical decision making while decreasing the cognitive load leading to an improvement in task load balancing. Additional benefits of the envisioned CDSS include assistance with inventory management, locating resources, storage/retrieval of medical records, highlighting trends in recorded data, in addition to providing a consult for diagnosis and treatment. More advanced features might include passive monitoring to identify early warning signs of behavioral or medical anomalies to possibly pre-empt onset of conditions that would compromise crew health and performance.

Benjamin Easter↗

LANL MLU TRUPACT Loading Survey Document

The following SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment being performed by the LANL MLU team. The survey was performed in TA-5, on October 19th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Multi-scale Approach to Statistical and Model-based Structural Health Monitoring with Application to Embedded Sensing for Wind Energy [Dissertation]

This dissertation presents a systems-level approach to multi-scale structural health monitoring (SHM) with specific focus on wind turbine rotor blades, combining innovative sensing platforms for incipient damage detection with state estimation for structural performance assessment. The practical implementation of this approach rests in three areas: hardware development and deployment for embedded data acquisition; demonstration of incipient damage detection using embedded systems for active-sensing SHM, including an in depth assessment of sensor diagnostics; and development of a nonlinear observer for state and loads estimation applied to a geometrically nonlinear beam model. Structural Health Monitoring is generally defined as the development of an in-situ damage assessment capability, and when combined predictive loading and failure models, enables risk-informed models for decision-making. These decision models require contributions from a wide variety of technology areas. Sensing systems (in many cases, capable of providing multiple data types) must be developed specifically to provide the data necessary for structural damage detection and performance assessment. A means of sensor diagnostics is necessary to provide confidence in the recorded data. Statistical modeling and classification feed the development of optimal detectors necessary to ascertain the presence, location, and severity of damage. Methods of state estimation are needed to map kinematic measurements to physical performance metrics. A probabilistic representation of future loads applied to a structural model enables an assessment of the structure’s future performance. Finally, a cost model is combined with a probabilistic risk assessment, given the detectors’ output and the structure’s estimated future performance, to render the risk-minimizing decision. This dissertation presents key contributions among the underpinnings of this ultimate decision model: (1) embedded sensor development and deployment; (2) sensor diagnostics for active-sensing methods; (3) an assessment of incipient damage detection performance for large-scale composite structures; and (4) the development and application of a state observer, demonstrated in the specific case of a geometrically nonlinear beam model.

17 WIND ENERGY↗

A study of the Lute Metering Structure

Two Metering Structure configurations were investigated. The first case was the traditional style metering structure which is larger than the outside diameter of the primary mirror. The second case investigated was the center support concept in which the outside diameter of the structure is less than the inside diameter of the primary mirror. Beryllium was used as the baseline material for this study. Four other materials were considered as candidates for the metering structure. These materials are: Graphite Epoxy, Aluminum, Titanium, and Invar. The loading conditions used for this study were estimated to be: Quasi Static: 6.0 G (all three directions); and Random Vibration: 30.0 G (applied 1 axis at a time). Taking advantage of symmetry, it was necessary to apply the lateral loading to only one axis. These loads were applied to both concepts and to all material configurations. The loadings as described above were based on the best available information and is felt to be adequate for this study since it was consistently used for all configurations. A load factor 2.00 was applied to both quasi static and random vibration loads. The allowable stresses are conservatively based yield strength of the material, except for the struts which are controlled by elastic stability. The stresses determined from each individual loading direction were conservatively combined by the absolute sum method.

Foreman, James W.↗

Insulation bonding test system

A method and a system for testing the bonding of foam insulation attached to metal is described. The system involves the use of an impacter which has a calibrated load cell mounted on a plunger and a hammer head mounted on the end of the plunger. When the impacter strikes the insulation at a point to be tested, the load cell measures the force of the impact and the precise time interval during which the hammer head is in contact with the insulation. This information is transmitted as an electrical signal to a load cell amplifier where the signal is conditioned and then transmitted to a fast Fourier transform (FFT) analyzer. The FFT analyzer produces energy spectral density curves which are displayed on a video screen. The termination frequency of the energy spectral density curve may be compared with a predetermined empirical scale to determine whether a igh quality bond, good bond, or debond is present at the point of impact.

Beggs, J. M.↗

Using Synchronization as an Indicator of Controllability in a Fleet of Water Heaters

Peak reduction is an important concern that can help reduce the growing stress on distribution grid and allow to defer investments in new capacity. However, the growing concern for customer privacy and comfort may impact the performance of load control for residential devices. Water heaters represent a convenient way of reducing peak due to their ability to store thermal energy for future use. In this paper, we developed a methodology to help utilities gain more insight with respect to the impact of load control efforts for shaving peak with no necessary information about the water heaters except the device status (on/off). To this end, we use a fleet of water heaters in a controlled residential neighborhood in Atlanta, GA. Our findings show that convergence in device status can serve as a proxy for peak shifting during hours of the evening peak.

demand response↗

A Revised International Standard for Gearboxes in Wind Turbine Systems

Gearbox and wind turbine design and application standards have contributed significantly to improvements in reliability over the past two decades. The International Electrotechnical Commission (IEC) 61400-4 standard of wind turbine gearbox design is currently being revised by a joint working group (JWG) of experts in IEC TC 88 (wind energy) and International Organization for Standardization (ISO) TC60 (gears) to further that effort. Experts from ISO TC4 (rolling bearings) and ISO TC28 (lubricants) have actively participated. This revision has implemented lessons learned from industry use of edition 1 since its publication in 2012. The main document, IEC 61400-4, was pared down to essential design requirements and application-specific recommendations along with a design verification framework. The JWG leveraged concurrent development of other standards, such as IEC 61400-8 on wind turbine structures, to replace edition 1 content. These are described along with how this works with the IEC Renewable Energy certification scheme for wind turbines (IECRE-WE). The JWG recognized the interest in maintaining informative parts of edition 1 including annexes on wind turbine architecture and loads, bearing and gear arrangements, bearing selection, lubrication system descriptions and lubricant performance recommendations. This information was retained in two technical reports: IEC/TR 61400-4-2 Lubrication and IEC/TR 61400-4-3 Explanatory Notes. Additionally, a technical specification, IEC/TS 61400-4-1, was drafted to provide a reliability calculation method for comparing different design options or conditions. Salient elements of these documents are described. All four documents were recently distributed for IEC/ISO review, ballot, and comment. Publication is expected in 2023.

gearbox↗

A Revised International Standard for Gearboxes in Wind Turbine Systems: Preprint

Gearbox and wind turbine design and application standards have contributed significantly to improvements in reliability over the past two decades. The International Electrotechnical Commission (IEC) 61400-4 standard of wind turbine gearbox design is currently being revised by a joint working group (JWG) of experts in IEC TC 88 (wind energy) and International Organization for Standardization (ISO) TC60 (gears) to further that effort. Experts from ISO TC4 (rolling bearings) and ISO TC28 (lubricants) have actively participated. This revision has implemented lessons learned from industry use of edition 1 since its publication in 2012. The main document, IEC 61400-4, was pared down to essential design requirements and application-specific recommendations along with a design verification framework. The JWG leveraged concurrent development of other standards, such as IEC 61400-8 on wind turbine structures, to replace edition 1 content. These are described along with how this works with the IEC Renewable Energy certification scheme for wind turbines (IECRE-WE). The JWG recognized the interest in maintaining informative parts of edition 1 including annexes on wind turbine architecture and loads, bearing and gear arrangements, bearing selection, lubrication system descriptions and lubricant performance recommendations. This information was retained in two technical reports: IEC/TR 61400-4-2 Lubrication and IEC/TR 61400-4-3 Explanatory Notes. Additionally, a technical specification, IEC/TS 61400-4-1, was drafted to provide a reliability calculation method for comparing different design options or conditions. Salient elements of these documents are described. All four documents were recently distributed for IEC/ISO review, ballot, and comment. Publication is expected in 2023.

ENGINEERING,WIND ENERGY↗

The 'Site of Things': Remediation in the Information Age - 18088

More than just a payload, machines now haul data as well. Wood Environment and Infrastructure's maiden voyage into civil engineering automation at the Port Granby Project Long-Term Waste Management Facility demonstrated enormous potential for the remediation industry. The Port Granby Project will relocate approximately 450,000 cubic meters of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new, engineered aboveground mound to be built about a kilometer north of the current site. Sounds simple, right? Just move a bunch of dirt up the road? Hardly, this is marginally contaminated soil situated near Lake Ontario in a beautiful little village an hour east of Toronto. We must relocate safely, meaning limiting the number of staff in the field and efficiently to deliver according to our agreed upon budget and schedule. As if that wasn't enough we were asked to keep track of where each truckload of dirt was excavated from (with a high degree of accuracy), where it was placed in the new engineered disposal facility, how much it weighed and the amount of radioactivity in each load... a virtual chain of custody for each load. Presented is an overview of the Information Technology that supports the Port Granby Project and how the Data Management System (DMS) is being leveraged to make the project safer, more effective and efficient. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Load altering attack-tolerant defense strategy for load frequency control system

Cyber attacks are emerging threats to every information-oriented energy management system. By violating the cyber systems, the hacker can disrupt the security and stability due to the strong coupling between the cyber and physical facilities. In this paper, one type of cyber attacks designated as the load altering attack is studied for the power system frequency control, and corresponding defense strategies are proposed to improve the frequency control performance. Considering the difficulty of the application of model-based controller into large-scale power systems, a novel model-free defense framework is for the first time presented. Under this framework, both active defense and passive defense strategies are designed. The former assumes that the defender has the initiative to learn different attack scenarios. Adaptive defense strategies are implemented using the online attack identification information and off-line trained strategy pool. The latter assumes that the defender passively tolerates various attack scenarios via the pre-trained off-line strategy. Both approaches prove to be effective through validation based on the IEEE benchmark systems. The proposed defense framework and defense strategies can be extended to other energy control systems to enhance their attack tolerance capability.

24 POWER TRANSMISSION AND DISTRIBUTION↗