Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

SIRTF high earth orbit mission conceptual structural design and analysis

The Space Infrared Telescope Facility (SIRTF) is a cryogenically cooled, space based, one meter class telescope for infrared astronomy. A recent mission option study has moved SIRTF from a previous low earth orbit (900 km) shuttle launched design to a high earth orbit (100,000 km) Titan IV/Centaur launched design. The mission option study requirements and trades relating to the structural configuration and the chosen SIRTF design are described. Also discussed is a dynamic stress analysis of the new SIRTF baseline structural design which has been performed using finite element modeling and simulated launch interface loads.

Chang, LI↗

High-gain backup antenna design for Pioneer Venus Orbiter spacecraft

The development and performance is described of a high-gain antenna designed to serve on the Pioneer Venus Orbiter spacecraft as a backup to the principal high-gain antenna unit in the unlikely event the mechanically despun antenna mechanism malfunctioned. The final design, a center-fed standing wave array of six sleeve dipoles enclosed in a fiber glass radome, performed successfully, as did all the antennas, on the Pioneer Orbiter spacecraft which was launched on May 20, 1978, as part of the Pioneer Venus mission. Photographs of experimental models giving details of design and construction are included, as well as graphs showing measured pattern and impedance matching characteristics of the subject antenna.

Glaser, J. I.↗

An insight into the features of the OAO-C thermal design.

The Orbiting Astronomical Observatory (OAO)-C was successfully launched into a 400-nautical mile circular orbit on Aug. 21, 1972. For this spacecraft, a unique sensitivity approach to the thermal design was developed which resulted in a predictable design - the merits of which should be considered for application on future spacecraft. The OAO-C is also serving as a test bed for the evaluation of thermal control hardware. To provide flight data for space program applications, experiments for a new coating and four different heat pipe designs are on this spacecraft. The data derived from OAO-C will be extremely valuable for such future programs as the Large Space Telescope (LST) and the Earth Observation Satellite (EOS).

Fine, H.↗

Development of preliminary design concept for a multifunction display and control system for the Orbiter crew station. Task 4: Design concept recommendation

Application of multifunction display and control systems to the NASA Orbiter spacecraft offers the potential for reducing crew workload and improving the presentation of system status and operational data to the crew. A design concept is presented for the application of a multifunction display and control system (MFDCS) to the Orbital Maneuvering System and Electrical Power Distribution and Control System on the Orbiter spacecraft. The MFDCS would provide the capability for automation of procedures, fault prioritization and software reconfiguration of the MFDCS data base. The MFDCS would operate as a stand-alone processor to minimize the impact on the current Orbiter software. Supervisory crew command of all current functions would be retained through the use of several operating modes in the system. Both the design concept and the processes followed in defining the concept are described.

Spiger, R. J.↗

Design considerations for on-orbit servicing

An overview of the general design of space vehicles serviced in orbit is presented. The basic space vehicle systems, subsystems, modules components, and associated appendages comprise the elements to be considered. Primary emphasis is given to the multi-disciplinary considerations in the development of requirements, and in particular, design of the space vehicle to facilitate orbital sevice by the extra-vehicular crew person(s).

Fisher, H. T.↗

Orbital Replacement Units (ORUs) design considerations

The packaging of avionics and mechanisms in containers, called orbital replacement units, which permits in-orbit repair and replacement is the key to man's expanded ventures into space with increasingly costly assets. In designing ORUs, the designer must accommodate the environments of launch and space. The subjects of ORU attachment, thermal, electrical connectors, and size and configuration, are addressed.

Edward Falkenhayn↗

Nodding feed antenna for communications with satellites in synchronous orbit

The design, fabrication, and performance of a parabolic, ground receiving antenna system with a feed that nods in one axis producing a maximum beam deviation 1.1 deg from boresight is described. The antenna design was: (1)to lower the weight (and the subsequent cost) of the supporting structure and the actuator motors for a tracking antenna by moving just the feed; (2) to use a manual tracking system eliminating the need for expensive electronic controls or computers; (3) to provide for several hours of unattended operation; and (4)to permit operation of the antenna by unskilled personnel. Also described are some physical and orbital phenomenon that effect the operation or design of the antenna. One is the motion of a nearly geostationary satellite due to gravitational forces from the sun, the moon, and other stellar bodies. Others are the rotation of the nodding axis and the feed polarization as a function of the location of the station on the earth. A comparison of per unit cost was made for one unit and a quantity of 100.

Smetana, J.↗

The guide to Design For On-orbit Spacecraft Servicing (DFOSS) manual: Producing a consensus document

Increasing interaction and changing economies at the national and international levels have accelerated the call for standardization in space systems design. The benefits of standardization--compatibility, interchangeability, and lower costs--are maximized when achieved through consensus. Reaching consensus in standardization means giving everyone who will be affected by a standard an opportunity to have input into creating that standard. The DFOSS manual was initiated with the goal of developing standards through consensus. The present Proposed Guide derives from work begun by the Space Automation and Robotics Center (SpARC), a NASA Center for the Commercial Development of Space, and has continued as a standards project through the American Institute of Aeronautics and Astronautics (AIAA). The Proposed Guide was released by AIAA in Jan. 1992 for sale during a one-year, trial-use period. DFOSS is a response to the need for one document that contains all the guidelines required by on-orbit spacecraft servicing designers for astronaut extravehicular activity and/or telerobotic servicing. The manual's content is driven by spacecraft design considerations, and its composition has been achieved by interaction and cooperation among government, industry, and research organizations. While much work lies ahead to maximize the potential of DFOSS, the Proposed Guide represents evidence of the benefits of industry-wide consensus, points the way for broader application, and provides an example for similar projects.

Nyman, Janice↗

Project ECHO: Electronic Communications from Halo Orbit

The design of a communications relay to provide constant access between the Earth and the far side of the Moon is presented. Placement of the relay in a halo orbit about the L2 Earth-Moon Lagrange point allows the satellite to maintain constant simultaneous communication between Earth and scientific payloads on the far side of the Moon. The requirements of NASA's Discovery-class missions adopted and modified for this design are: total project cost should not exceed $150 million excluding launch costs, launch must be provided by Delta-class vehicle, and the satellite should maintain an operational lifetime of 10 to 15 years. The spacecraft will follow a transfer trajectory to the L2 point, after launch by a Delta II 7925 vehicle in 1999. Low-level thrust is used for injection into a stationkeeping-free halo orbit once the spacecraft reaches the L2 point. The shape of this halo orbit is highly elliptical with the maximum excursion from the L2 point being 35000 km. A spun section and despun section connected through a bearing and power transfer assembly (BAPTA) compose the structure of the spacecraft. Communications equipment is placed on the despun section to provide for a stationary dual parabolic offset-feed array antenna system. The dual system is necessary to provide communications coverage during portions of maximum excursion on the halo orbit. Transmissions to the NASA Deep Space Network 34 m antenna include six channels (color video, two voice, scientific data from lunar payloads, satellite housekeeping and telemetry and uplinked commands) using the S- and X-bands. Four radioisotope thermoelectric generators (RTG's) provide a total of 1360 W to power onboard systems and any two of the four Hughes 13 cm ion thrusters at once. Output of the ion thrusters is approximately 17.8 mN each with xenon as the propellant. Presence of torques generated by solar pressure on the antenna dish require the addition of a 'skirt' extending from the spun section of the satellite for balance. Total mass of the satellite is approximately 900 kg at a cost of $130 million FY99.

Borrelli, Jason↗

Conceptual design of a manned orbital transfer vehicle

With the advent of the manned space station, man now requires a spacecraft based on the space station with the ability to deploy, recover, and repair satellites quickly and economically. Such a craft would prolong and enhance the life and performance of many satellites. A basic design was developed for an orbital tansfer vehicle (OTV). The basic design criteria are discussed. The design of the OTV and systems were researched in the following areas: avionics, crew systems, electrical power systems, environmental control/life support systems, navigation and orbital maneuvers, propulsion systems, reaction control systems (RCS), servicing systems, and structures. The basic concepts in each of the areas are summarized.

Davis, Richard↗

Automated Design of the Europa Orbiter Tour

In this paper we investigate tours of the Jovian satellites Europa, Ganymede, and Callisto for the Europa Orbiter Mission. The principal goal of the tour design is to lower arrival V(sub infinity) for the final Europa encounter while meeting all of the design constraints. Key constraints arise from considering the total time of the tour and the radiation dosage of a tour. These tours may employ 14 or more encounters with the Jovian satellites, hence there is an enormous number of possible sequences of these satellites to investigate. We develop a graphical method that greatly aids the design process.

Heaton, Andrew F.↗

Solar Sail Optimal Orbit Transfers to Synchronous Orbits

A constant outward radial thrust acceleration can be used to reduce the radius of a circular orbit of specified period. Heliocentric circular orbits are designed to match the orbital period of Earth or Mars for various radial thrust accelerations and are defined as synchronous orbits. Minimum-time solar sail orbit transfers to these synchronous heliocentric orbits are presented.

Powers, Robert B.↗

Automated Design of the Europa Orbiter Tour

In this paper we investigate tours of the Jovian satellites Europa Ganymede, and Callisto for the Europa Orbiter Mission. The principal goal of the tour design is to lower arrival V_ for the final Europa encounter while meeting all of the design constraints. Key constraints arise from considering the total time of the tour and the radiation dosage of a tour. These tours may employ 14 or more encounters with the Jovian satellites. hence there is an enormous number of possible sequences of these satellites to investigate. We develop a graphical method that greatly aids the design process.

Heaton, Andrew F.↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003, and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) -2 days were +/-0.12 deg(3 sigma) for Spirit and +/-0.14 deg(3 sigma) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was 0.028 deg(3 sigma) for Spirit and 0.035 deg(3 sigma) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Contingency Trajectory Design for a Lunar Orbit Insertion Maneuver Failure by the Lunar Atmosphere Dust Environment Explorer (LADEE) Spacecraft

The purpose of this extended abstract is to present results from a failed lunar-orbit insertion (LOI) maneuver contingency analysis for the Lunar Atmosphere Dust Environment Explorer (LADEE) mission, managed and operated by NASA Ames Research Center in Moffett Field, CA. The LADEE spacecrafts nominal trajectory implemented multiple sub-lunar phasing orbits centered at Earth before eventually reaching the Moon (Fig. 1) where a critical LOI maneuver was to be performed [1,2,3]. If this LOI was missed, the LADEE spacecraft would be on an Earth-escape trajectory, bound for heliocentric space. Although a partial mission recovery is possible from a heliocentric orbit (to be discussed in the full paper), it was found that an escape-prevention maneuver could be performed several days after a hypothetical LOI-miss, allowing a return to the desired science orbit around the Moon without leaving the Earths sphere-of-influence (SOI).

Lunar Orbit Insertion↗