Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Opportunistic Planning and Execution for Planetary Exploration

We are developing technologies to increase the autonomous capabilities of future rover missions. Our objectives are to make rovers easier to command and to enable them to make more effective use of rover resources when problems arise or when things go better than expected. We will demonstrate OASIS (Onboard Analysis Science Investigation System) which combined planning and scheduling techniques with machine learning to enable rovers to perform robust and opportunistic science operations.

autonomous planning↗

NEEMO - NASA's Extreme Environment Mission Operations: On to a NEO

During NEEMO missions, a crew of six Aquanauts lives aboard the National Oceanic and Atmospheric Administration (NOAA) Aquarius Underwater Laboratory the world's only undersea laboratory located 5.6 km off shore from Key Largo, Florida. The Aquarius habitat is anchored 62 feet deep on Conch Reef which is a research only zone for coral reef monitoring in the Florida Keys National Marine Sanctuary. The crew lives in saturation for a week to ten days and conducts a variety of undersea EVAs (Extra Vehicular Activities) to test a suite of long-duration spaceflight Engineering, Biomedical, and Geoscience objectives. The crew also tests concepts for future lunar exploration using advanced navigation and communication equipment in support of the Constellation Program planetary exploration analog studies. The Astromaterials Research and Exploration Science (ARES) Directorate and Behavioral Health and Performance (BHP) at NASA/Johnson Space Center (JSC), Houston, Texas support this effort to produce a high-fidelity test-bed for studies of human planetary exploration in extreme environments as well as to develop and test the synergy between human and robotic curation protocols including sample collection, documentation, and sample handling. The geoscience objectives for NEEMO missions reflect the requirements for Lunar Surface Science outlined by the LEAG (Lunar Exploration Analysis Group) and CAPTEM (Curation and Analysis Planning Team for Extraterrestrial Materials) white paper [1]. The BHP objectives are to investigate best meas-ures and tools for assessing decrements in cogni-tive function due to fatigue, test the feasibility study examined how teams perform and interact across two levels, use NEEMO as a testbed for the development, deployment, and evaluation of a scheduling and planning tool. A suite of Space Life Sciences studies are accomplished as well, ranging from behavioral health and performance to immunology, nutrition, and EVA suit design results of which will directly support the investigation of open questions and operational concepts that will enable NASA to continue its plan for planetary exploration.

Bell, M. S.↗

Automated Scheduling of Federated Observations in the NOS Testbed

The advancement of remote and in-situ sensing technology, combined with the emergence of New Space ventures, is producing a variety of new measurements for Earth Science phenomena. New observation techniques must combine and leverage these federated systems. In developing this new paradigm, NASA’s Earth Science Technology Office is developing the New Observing Strategies (NOS) Testbed to validate and demonstrate new operations concepts. As a part of this effort, we have developed a planning and scheduling system to support automated retasking

Chien, Steve↗

The XRISM Science Data Center: Optimizing the Scientific Return from a Unique X-ray Observatory

The X-Ray Imaging and Spectroscopy Mission, XRISM, is currently scheduled to launch in 2022 with the objective of building on the brief, but significant, successes of the ASTRO-H (Hitomi) mission in solving outstanding astrophysical questions using high resolution X-ray spectroscopy. The XRISM Science Operations Team (SOT) consists of the JAXA-led Science Operations Center (SOC) and NASA-led Science Data Center (SDC), which work together to optimize the scientific output from the Resolve high-resolution spectrometer and the Xtend wide-field imager through planning and scheduling of observations, processing and distribution of data, development and distribution of software tools and the calibration database (CaldB), support of ground and in-flight calibration, and support of XRISM users in their scientific investigations of the energetic universe. Here, we summarize the roles and responsibilities of the SDC and its current status and future plans. The Resolve instrument poses particular challenges due to its unprecedented combination of high spectral resolution and throughput, broad spectral coverage, and relatively small field-of-view and large pixel-size. We highlight those challenges and how they are being met.

XRISM↗

Plan, formulate, and discuss a NASTRAN finite element model of the AH-64A helicopter airframe

A discussion of modeling plan objectives, followed by a description of the AH-64A aircraft including all general features, major components, and primary and structure definitions are presented. Following the aircraft description, a discussion of the modeling guidelines and model checkout procedure are provided. The NASTRAN finite element analysis is set up to be suitable to predict both static internal loads and vibrations. Finally, the results, schedule, and planned versus actual manhours for this work are presented.

Christ, Richard A.↗

On Expected Value Strong Controllability

The Probabilistic Simple Temporal Network (PSTN) generalizes Simple Temporal Networks with Uncertainty (STNUs) by introducing probability distributions over the timing of uncontrollable timepoints. PSTNs are controllable if there is a strategy to execute the controllable timepoints while bounding the risk of violating any constraint to a small value. If this risk bound can't be satisfied, PSTNs are not considered controllable. We introduce the Expected Value Probabilistic SimpleTemporal Network (EPSTN), which extends PSTNs by including a benefit to the satisfaction of temporal constraints. We study the problem of Expected Value Strong Controllability (EvSC) of EPSTNs, which seeks a schedule maximizing the expected value of satisfied constraints. We solve the EvSC problem by extending a previously developed linear program, combined with search over constraints to violate at execution time. We describe conditions under which the solution to this linear program is the maximum expected value schedule. We then show how to search for constraints to discard, using the linear program at the core of the search. While the general problem is shown to be exponential, we conclude by providing several methods to bound the complexity of search.

Planning↗

AIRSAR South American deployment: Operation plan, version 3.0

The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.

Kobrick, M.↗

System analysis study of space platform and station accommodations for life sciences research facilities. Volume 1: Executive summary. Phase A: Conceptual design and programmatics

The study was conducted in 3 parts over a 3 year period. The study schedule and the documentation associated with each study part is given. This document summarized selected study results from the conceptual design and programmatics segment of the effort. The objectives were: (1) to update requirements and tradeoffs and develop a detailed design and mission requirements document; (2) to develop conceptual designs and mission descriptions; and (3) to develop programmatic, i.e., work breakdown structure and work breakdown structure dictionary, estimated cost, and implementing plans and schedules.

Source record↗

Current Status, Performance and Plans for the NASA Airborne Visible and Infrared Imaging Spectrometer (AVIRIS)

The status of the Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) is reported at the beginning of the current flight season. Sensor performance based on laboratory measurements and trend data as well as a review of end of 1995 season performance is given as a measure of expected performance during the 1996 season which began in March of 1996. Recent improvements to the sensor's internal calibration source and measurements of instrument parameters are described. The effects of these enhancements on the reported data are also discussed along with and update onflight schedules and plans for 1996 flight operations.

Airborne↗

Time and truth in plans

Some of the logical components of a rule based planning and scheduling system are described. The researcher points out a deficiency in the conventional truth maintenance approach to this class of problems and suggests a new mechanism which overcomes the problem. This extension of the idea of justification truth maintenance may seem at first to be a small philosophical step. However, it embodies a process of basic human reasoning which is so common and automatic as to escape conscious detection without careful introspection. It is vital to any successful implementation of a rule based planning reasoner.

Hazelton, Lyman R., Jr.↗

Operations planning for Space Station Freedom - And beyond

The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

Gibson, Stephen S.↗

Abstract-Reasoning Software for Coordinating Multiple Agents

A computer program for scheduling the activities of multiple agents that share limited resources has been incorporated into the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been reported in several previous NASA Tech Briefs articles. In the original intended application, the agents would be multiple spacecraft and/or robotic vehicles engaged in scientific exploration of distant planets. The program could also be used on Earth in such diverse settings as production lines and military maneuvers. This program includes a planning/scheduling subprogram of the iterative repair type that reasons about the activities of multiple agents at abstract levels in order to greatly improve the scheduling of their use of shared resources. The program summarizes the information about the constraints on, and resource requirements of, abstract activities on the basis of the constraints and requirements that pertain to their potential refinements (decomposition into less-abstract and ultimately to primitive activities). The advantage of reasoning about summary information is that time needed to find consistent schedules is exponentially smaller than the time that would be needed for reasoning about the same tasks at the primitive level.

Clement, Bradley↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted under NASA funding for the Boeing N+2 Supersonic Experimental Validation project to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 -to 2020 timeframe (NASA N+2 generation). The primary goal of the project was to develop a low-boom configuration optimized for minimum sonic boom signature (65 to 70 PLdB). This was a very aggressive goal that could be achieved only through integrated multidisciplinary optimization tools validated in relevant ground and, later, flight environments. The project was split into two phases. Phase I of the project covered the detailed aerodynamic design of a low boom airliner as well as the wind tunnel tests to validate that design (ref. 1). This report covers Phase II of the project, which continued the design methodology development of Phase I with a focus on the propulsion integration aspects as well as the testing involved to validate those designs. One of the major airplane configuration features of the Boeing N+2 low boom design was the overwing nacelle. The location of the nacelle allowed for a minimal effect on the boom signature, however, it added a level of difficulty to designing an inlet with acceptable performance in the overwing flow field. Using the Phase I work as the starting point, the goals of the Phase 2 project were to design and verify inlet performance while maintaining a low-boom signature. The Phase II project was successful in meeting all contract objectives. New modular nacelles were built for the larger Performance Model along with a propulsion rig with an electrically-actuated mass flow plug. Two new mounting struts were built for the smaller Boom Model, along with new nacelles. Propulsion integration testing was performed using an instrumented fan face and a mass flow plug, while boom signatures were measured using a wall-mounted pressure rail. A side study of testing in different wind tunnels was completed as a precursor to the selection of the facilities used for validation testing. As facility schedules allowed, the propulsion testing was done at the NASA Glenn Research Center (GRC) 8 x 6-Foot wind tunnel, while boom and force testing was done at the NASA Ames Research Center (ARC) 9 x 7-Foot wind tunnel. During boom testing, a live balance was used for gathering force data. This report is broken down into nine sections. The first technical section (Section 2) covers the general scope of the Phase II activities, goals, a description of the design and testing efforts, and the project plan and schedule. Section 3 covers the details of the propulsion system concepts and design evolution. A series of short tests to evaluate the suitability of different wind tunnels for boom, propulsion, and force testing was also performed under the Phase 2 effort, with the results covered in Section 4. The propulsion integration testing is covered in Section 5 and the boom and force testing in Section 6. CFD comparisons and analyses are included in Section 7. Section 8 includes the conclusions and lessons learned.

Magee, Todd E.↗

Supporting Increased Autonomy for a Mars Rover

This paper presents an architecture and a set of technology for performing autonomous science and commanding for a planetary rover. The MER rovers have outperformed all expectations by lasting over 1100 sols (or Martian days), which is an order of magnitude longer than their original mission goal. The longevity of these vehicles will have significant effects on future mission goals, such as objectives for the Mars Science Laboratory rover mission (scheduled to fly in 2009) and the Astrobiology Field Lab rover mission (scheduled to potentially fly in 2016). Common objectives for future rover missions to Mars include the handling of opportunistic science, long-range or multi-sol driving, and onboard fault diagnosis and recovery. To handle these goals, a number of new technologies have been developed and integrated as part of the CLARAty architecture. CLARAty is a unified and reusable robotic architecture that was designed to simplify the integration, testing and maturation of robotic technologies for future missions. This paper focuses on technology comprising the CLARAty Decision Layer, which was designed to support and validate high-level autonomy technologies, such as automated planning and scheduling and onboard data analysis.

autonomous science↗

Analyzing Launch Operations using the Spaceport Throughput Analysis Resource (STAR)

NASA’s Kennedy Space Center (KSC) and Cape CanaveralSpace Force Station (CCSFS) are the world’s preeminent multi-user spaceport, providing facilities and launch capabilities to the agency, NASA’s commercial partners, and other government agencies. KSC works to ensure an environment in which NASA’s programs and other users can safely and effectively carry out their operations. Approximately 100 launches are expected to take place in 2024. KSC needs to meet the needs of customers who request launches based on their own schedules, but who may not be aware of KSC-wide resource limitations and external constraints on launch operations. KSC-wide resources include telecommunications, range tracking, commodities such as Helium and Nitrogen, and special equipment needed to support launches. External constraints include seasonal launch operations. Since space vehicles are complex and launch operations are uncertain, unexpected events can also cause delays in operations. The Spaceport Throughput AnalysisResource (STAR) assesses whether a specific set of pro-posed launches and associated activities can be performed given the resources KSC currently has available, and external constraints imposed on KSC operations. STAR integrates short-horizon scheduling and simulation of launches using a monte-carlo approach driven by configurable probabilities of different classes of event outcomes, including de-lays and worst-case use of resources. The resulting analyses inform stakeholders of key constraints preventing customers from being able to perform their missions as desired, and give insight into how to improve spaceport throughput. The rest of the paper is organized as follows. In 2 we de-scribe the problem STAR is intended to solve. In Section3 we formally describe the scheduling problem ingredients. In Section 4 we describe how manifests are simulated. InSection 5 we describe the constraints problem that is solved when rescheduling. In Section 6 we describe what information is recorded during manifest simulation in order to evaluate delays. In Section 7 we describe the specific problem solved for KSC. In Section 8 we describe the challenges of knowledge engineering for STAR.

Planning Scheduling Analysis↗

Mission simulation as an approach to develop requirements for automation in Advanced Life Support Systems

This paper examines mission simulation as an approach to develop requirements for automation and robotics for Advanced Life Support Systems (ALSS). The focus is on requirements and applications for command and control, control and monitoring, situation assessment and response, diagnosis and recovery, adaptive planning and scheduling, and other automation applications in addition to mechanized equipment and robotics applications to reduce the excessive human labor requirements to operate and maintain an ALSS. Based on principles of systems engineering, an approach is proposed to assess requirements for automation and robotics using mission simulation tools. First, the story of a simulated mission is defined in terms of processes with attendant types of resources needed, including options for use of automation and robotic systems. Next, systems dynamics models are used in simulation to reveal the implications for selected resource allocation schemes in terms of resources required to complete operational tasks. The simulations not only help establish ALSS design criteria, but also may offer guidance to ALSS research efforts by identifying gaps in knowledge about procedures and/or biophysical processes. Simulations of a planned one-year mission with 4 crewmembers in a Human Rated Test Facility are presented as an approach to evaluation of mission feasibility and definition of automation and robotics requirements.

NASA Discipline Number 61-10↗

Automating Stowage Operations for the International Space Station

A challenge for any proposed mission is to demonstrate convincingly that the proposed systems will in fact deliver the science promised. Funding agencies and mission design personnel are becoming ever more skeptical of the abstractions that form the basis of the current state of the practice with respect to approximating science return. To address this, we have been using automated planning and scheduling technology to provide actual coverage campaigns that provide better predictive performance with respect to science return for a given mission design and set of mission objectives given implementation uncertainties. Specifically, we have applied an adaptation of ASPEN and SPICE to the Eagle-Eye domain that demonstrates the performance of the mission design with respect to coverage of science imaging targets that address climate change and disaster response. Eagle-Eye is an Earth-imaging telescope that has been proposed to fly aboard the International Space Station (ISS).

box packing↗

A criterion autoscheduler for long range planning

A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubble Space Telescope. A meta-level scheduler called the Criterion Autoscheduler for Long range planning (CASL) was created to guide SPIKE's schedule generation according to the agenda of the planning scientists. It is proposed that sufficient flexibility exists in a schedule to allow high level planning heuristics to be applied without adversely affected crucial constraints such as spacecraft efficiency. This hypothesis is supported by test data which is described.

Sponsler, Jeffrey L.↗