Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

REopt Model Overview and Example Use Cases [Slides]

REopt(R) is a mixed-integer optimization model that minimizes the lifecycle cost of serving energy loads at a site. This work provides and introduction to the model along with its key workflow, techno-economic inputs, key outputs, and key caveats for readers to understand REopt the when, why, how of using this model. This resource also includes helpful links related to REopt model and the data sources it uses during the optimization.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reimagining Energy Efficiency Resource Standards

Energy Efficiency Resource Standards (EERS) are a long-standing policy used to advance state goals and priorities, such as reliability, affordability and decarbonization. They ensure cost-effective energy efficiency is used to lower energy consumption, reduce peak demand, and enable grid flexibility. Adapting EERS through strategic design, and integrating EERS into broader energy plans and policies, can help states optimize their approach to meet modern and evolving power system needs and achieve sustainable energy outcomes. This report examines how states consider energy efficiency in the context of four policy priorities: providing grid benefits, addressing load growth, reducing emissions, and promoting affordability. It provides examples of states that are pursuing these priorities, reviews the role of energy efficiency in them and identifies opportunities to further promote energy efficiency alongside the priorities. Decisionmakers and stakeholders can draw directly from these examples and findings to design an EERS that maximizes co-benefits, captures synergies, and promotes consideration of the all the possible solutions to advance their goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mission planning aspects of Skylab Earth Resources Experiment

Review of the mission planning techniques that have been developed to optimize the data return from the Earth Resources Experiments Package on Skylab. The techniques are designed to cope with a variety of missions, systems and weather constraints, and sensor development and science applications data requirements. The planning techniques developed for Skylab are applicable to similar later-generation orbital programs, both manned and unmanned.

Deatkine, D.↗

A genetic technique for planning a control sequence to navigate the state space with a quasi-minimum-cost output trajectory for a non-linear multi-dimnensional system

There are many multi-stage optimization problems that are not easily solved through any known direct method when the stages are coupled. For instance, we have investigated the problem of planning a vehicle's control sequence to negotiate obstacles and reach a goal in minimum time. The vehicle has a known mass, and the controlling forces have finite limits. We have developed a technique that finds admissible control trajectories which tend to minimize the vehicle's transit time through the obstacle field. The immediate applications is that of a space robot which must rapidly traverse around 2-or-3 dimensional structures via application of a rotating thruster or non-rotating on-off for such vehicles is located at the Marshall Space Flight Center in Huntsville Alabama. However, it appears that the development method is applicable to a general set of optimization problems in which the cost function and the multi-dimensional multi-state system can be any nonlinear functions, which are continuous in the operating regions. Other applications included the planning of optimal navigation pathways through a transversability graph; the planning of control input for under-water maneuvering vehicles which have complex control state-space relationships; the planning of control sequences for milling and manufacturing robots; the planning of control and trajectories for automated delivery vehicles; and the optimization and athletic training in slalom sports.

Hein, C.↗

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

Joint Expansion Planning of Power and Water Distribution Networks

This research considers the joint expansion planning of power and water distribution networks, which are interdependent at various levels. We consider the dependency arising through the power consumption of pumps and develop models for integrating new components into existing networks. Then, we formulate the joint expansion planning as a Mixed Integer Nonlinear Program (MINLP). Applying this MINLP to a small-scale test network, we illustrate the advantages offered by joint expansion planning, such as increased flexibility and reduced costs and redundancy, over independently expanding power and water distribution networks.

expansion planning↗

Residential solar-heating/cooling system

Report documents progress of residential solar-heating and cooling system development program at 5-month mark of anticipated 17-month program. System design has been completed, and development and component testing has been initiated. Report includes diagrams, operation overview, optimization studies of subcomponents, and marketing plans for system.

Source record↗

Satellite switched FDMA advanced communication technology satellite program

The satellite switched frequency division multiple access system provided a detailed system architecture that supports a point to point communication system for long haul voice, video and data traffic between small Earth terminals at Ka band frequencies at 30/20 GHz. A detailed system design is presented for the space segment, small terminal/trunking segment at network control segment for domestic traffic model A or B, each totaling 3.8 Gb/s of small terminal traffic and 6.2 Gb/s trunk traffic. The small terminal traffic (3.8 Gb/s) is emphasized, for the satellite router portion of the system design, which is a composite of thousands of Earth stations with digital traffic ranging from a single 32 Kb/s CVSD voice channel to thousands of channels containing voice, video and data with a data rate as high as 33 Mb/s. The system design concept presented, effectively optimizes a unique frequency and channelization plan for both traffic models A and B with minimum reorganization of the satellite payload transponder subsystem hardware design. The unique zoning concept allows multiple beam antennas while maximizing multiple carrier frequency reuse. Detailed hardware design estimates for an FDMA router (part of the satellite transponder subsystem) indicate a weight and dc power budget of 353 lbs, 195 watts for traffic model A and 498 lbs, 244 watts for traffic model B.

Atwood, S.↗

SPASIM: A Spacecraft Simulator

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform conceptual design (Phase A) trade-off and sensitivity analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing operational planning (what-if scenarios) and optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation or stored in a file so they can be used by other programs. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs that were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hypertext document. This is an easy-to-use and expandable tool which is based on MATLAB(R) and SIMULINK(R). It runs on Silicon Graphics Inc. workstations and personal computers with Windows 95(TM) or NT(TM).

Liceaga, Carlos A.↗

First Look at Landsat-7 Mission Performance: Technical and Operational Results to Date

A primary goal of the current Landsat-7 mission, launched on April 15, 1999, is to acquire and refresh on a seasonal basis, calibrated ata sets of multispectral digital imagery of the landmass of the Earth The Enhanced Thematic Mapper Plus (ETM+) imager flown on Landsat-7 provides ground spatial resolutions in the panchromatic, reflective and emissive bands of 15, 30 and 60 meters, respectively, for a nominal scene 183 km wide by 170 km long. This mission not only builds on the invaluable 27-year continuous archive of thematic images of the Earth provided by previous Landsat satellites, it also inaugurates a new era of robust data acquisition with an emphasis on global change science. The newly developed Long Term Acquisition Plan (LTAP) is being used to optimize the systematic collection of data from all parts of the globe, populating the U.S.-held archive at the USGS EROS Data Center (EDC) with over 90,000 Landsat scene per year . An additional 73,000 Images are expected to be acquired each year by several international ground stations, for a total downlink of Landsat7 data in excess of 100 terabytes per year. Nearly 20,000 scan of Landsat-7 ETM+ data have already been acquired in the first 100 days of the mission. Early results derived from assessments of the ETM+ instrument, the spacecraft, and the ground processing systems indicate that the image quality is outstanding, clearly the best ever provided by any Landsat mission. Sensor radiometric background stability after the first 100 days in orbit is approximately 0.1 percent. Stability of the Full Aperture Solar Calibrator is approximately 0.3 percent, and mid-scale per pixel noise is approximately 0.6 percent. A ground processing system has been implemented at EDC which is capable of capturing, processing and archiving 250 Landsat scenes 9 per day, and delivering 100 scene products to seems each day. The cost of a systematically-processed Level 1 product has been dropped dramatically to $600, end there is no longer any copyright protection an the data. The net result is that the use of Landsat ETM+ data is expected to grow dramatically, and this growth is expected to benefit all facets of the land remote sensing community.

Williams, Darrel L.↗

Planning Paths Through Singularities in the Center of Mass Space

The center of mass space is a convenient space for planning motions that minimize reaction forces at the robot's base or optimize the stability of a mechanism. A unique problem associated with path planning in the center of mass space is the potential existence of multiple center of mass images for a single Cartesian obstacle, since a single center of mass location can correspond to multiple robot joint configurations. The existence of multiple images results in a need to either maintain multiple center of mass obstacle maps or to update obstacle locations when the robot passes through a singularity, such as when it moves from an elbow-up to an elbow-down configuration. To illustrate the concepts presented in this paper, a path is planned for an example task requiring motion through multiple center of mass space maps. The object of the path planning algorithm is to locate the bang- bang acceleration profile that minimizes the robot's base reactions in the presence of a single Cartesian obstacle. To simplify the presentation, only non-redundant robots are considered and joint non-linearities are neglected.

Doggett, William R.↗

JPL Facilities and Software for Collaborative Design: 1994 - Present

The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

project design center↗

A Trajectory Generation Approach for Payload Directed Flight

Presently, flight systems designed to perform payload-centric maneuvers require preconstructed procedures and special hand-tuned guidance modes. To enable intelligent maneuvering via strong coupling between the goals of payload-directed flight and the autopilot functions, there exists a need to rethink traditional autopilot design and function. Research into payload directed flight examines sensor and payload-centric autopilot modes, architectures, and algorithms that provide layers of intelligent guidance, navigation and control for flight vehicles to achieve mission goals related to the payload sensors, taking into account various constraints such as the performance limitations of the aircraft, target tracking and estimation, obstacle avoidance, and constraint satisfaction. Payload directed flight requires a methodology for accurate trajectory planning that lets the system anticipate expected return from a suite of onboard sensors. This paper presents an extension to the existing techniques used in the literature to quickly and accurately plan flight trajectories that predict and optimize the expected return of onboard payload sensors.

Ippolito, Corey A.↗

Orbit Determination of Spacecraft in Earth-Moon L1 and L2 Libration Point Orbits

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS P1 spacecraft executed numerous stationkeeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar L1 orbit. The ARTEMIS P2 spacecraft entered a L1 Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous stationkeeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions. In order to effectively perform lunar Lissajous stationkeeping maneuvers, the ARTEMIS operations team has provided orbit determination solutions with typical accuracies on the order of 0.1 km in position and 0.1 cm/s in velocity. The ARTEMIS team utilizes the Goddard Trajectory Determination System (GTDS), using a batch least squares method, to process range and Doppler tracking measurements from the NASA Deep Space Network (DSN), Berkeley Ground Station (BGS), Merritt Island (MILA) station, and United Space Network (USN). The team has also investigated processing of the same tracking data measurements using the Orbit Determination Tool Kit (ODTK) software, which uses an extended Kalman filter and recursive smoother to estimate the orbit. The orbit determination results from each of these methods will be presented and we will discuss the advantages and disadvantages associated with using each method in the lunar Lissajous regions. Orbit determination accuracy is dependent on both the quality and quantity of tracking measurements, fidelity of the orbit force models, and the estimation techniques used. Prior to Lissajous operations, the team determined the appropriate quantity of tracking measurements that would be needed to meet the required orbit determination accuracies. Analysts used the Orbit Determination Error Analysis System (ODEAS) to perform covariance analyses using various tracking data schedules. From this analysis, it was determined that 3.5 hours of DSN TRK-2-34 range and Doppler tracking data every other day would suffice to meet the predictive orbit knowledge accuracies in the Lissajous region. The results of this analysis are presented. Both GTDS and ODTK have high-fidelity environmental orbit force models that allow for very accurate orbit estimation in the lunar Lissajous regime. These models include solar radiation pressure, Earth and Moon gravity models, third body gravitational effects from the Sun, and to a lesser extent third body gravitational effects from Jupiter, Venus, Saturn, and Mars. Increased position and velocity uncertainties following each maneuver, due to small execution performance errors, requires that several days of post-maneuver tracking data be processed to converge on an accurate post-maneuver orbit solution. The effects of maneuvers on orbit determination accuracy will be presented, including a comparison of the batch least squares technique to the extended Kalman filter/smoother technique. We will present the maneuver calibration results derived from processing post-maneuver tracking data. A dominant error in the orbit estimation process is the uncertainty in solar radiation pressure and the resultant force on the spacecraft. An estimation of this value can include many related factors, such as the uncertainty in spacecraft reflectivity and surface area which is a function of spacecraft orientation (spin-axis attitude), uncertainty in spacecraft wet mass, and potential seasonal variability due to the changing direction of the Sun line relative to the Earth-Moon Lissajous reference frame. In addition, each spacecraft occasionally enters into Earth or Moon penumbra or umbra and these shadow crossings reduche solar radiation force for several hours. The effects of these events on orbit determination accuracy will be presented. In order to plan for upcoming stationkeeping maneuvers, the maneuver planning team must take the current orbit estimate, propagate it forward to the planned maneuver time, and determine the optimal maneuver to maintain the Lissajous orbit for one or more revolutions. The propagation is performed using a Runge-Kutta 7/8 integrator and typically the position and velocity uncertainty increases with propagation time, increasing the overall uncertainty of the orbit state at the maneuver execution time. The effect of orbit knowledge uncertainty on stationkeeping operations will be presented.

Woodard, Mark↗

Performance Assessment of Baseline Cells for the High Efficiency Space Power Systems Project

The Enabling Technology Development and Demonstration (ETDD) Program High Efficiency Space Power Systems (HESPS) Project, formerly the Exploration Technology Development Program (ETDP) Energy Storage Project is tasked with developing advanced lithium-ion cells for future NASA Exploration missions. Under this project, components under development via various in-house and contracted efforts are delivered to Saft America for scale-up and integration into cells. Progress toward meeting project goals will be measured by comparing the performance to these cells with cells of a similar format with Saft s state-of-the-art aerospace chemistry. This report discusses the results of testing performed on the first set of baseline cells delivered by Saft to the NASA Glenn Research Center. This build is a cylindrical "DD" geometry with a 10 Ah nameplate capacity. Testing is being performed to establish baseline cell performance at conditions relevant to ETDD HESPS Battery Key Performance Parameter (KPP) goals including various temperatures, rates, and cycle life conditions. Data obtained from these cells will serve as a performance baseline for future cell builds containing optimized ETDD HESPSdeveloped materials. A test plan for these cells was developed to measure cell performance against the high energy cell KPP goals. The goal for cell-level specific energy of the high energy technology is 180 Wh/kg at a C/10 discharge rate and 0 C. The cells should operate for at least 2000 cycles at 100 percent DOD with 80 percent capacity retention. Baseline DD cells delivered 152 Wh/kg at 20 C. This number decreased to 143.9 Wh/kg with a 0 C discharge. This report provides performance data and summarizes results of the testing performed on the DD cells.

Schneidegger, Brianne T.↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

Mixed Integer Programming↗

Sensitivity of Maize Yield in Smallholder Systems to Climate Scenarios in Semi-Arid Regions of West Africa: Accounting for Variability in Farm Management Practices

Climate change is estimated to exacerbate existing challenges faced by smallholder farmers in Sub-Sahara Africa. However, limited studies quantify the extent of variation in climate change impact under these systems at the local scale. The Decision Support System for Agro-technological Transfer (DSSAT) was used to quantify variation in climate change impacts on maize yield under current agricultural practices in semi-arid regions of Senegal (Nioro du Rip) and Ghana (Navrongo and Tamale). Multi-benchmark climate models (Mid-Century, 2040–2069 for two Representative Concentration Pathways, RCP4.5 and RCP8.5), and multiple soil and management information from agronomic surveys were used as input for DSSAT. The average impact of climate scenarios on grain yield among farms ranged between −9% and −39% across sites. Substantial variation in climate response exists across farms in the same farming zone with relative standard deviations from 8% to 117% at Nioro du Rip, 13% to 64% in Navrongo and 9% to 37% in Tamale across climate models. Variations in fertilizer application, planting dates and soil types explained the variation in the impact among farms. This study provides insight into the complexities of the impact of climate scenarios on maize yield and the need for better representation of heterogeneous farming systems for optimized outcomes in adaptation and resilience planning in smallholder systems.

Freduah, Bright S.↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗