Search NASA⌕ Search

SEARCH · Search NASA

Results for “power system optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Parallel Harmony Search Based Distributed Energy Resource Optimization

This paper presents a harmony search based parallel optimization algorithm to minimize voltage deviations in three phase unbalanced electrical distribution systems and to maximize active power outputs of distributed energy resources (DR). The main contribution is to reduce the adverse impacts on voltage profile during a day as photovoltaics (PVs) output or electrical vehicles (EVs) charging changes throughout a day. The IEEE 123- bus distribution test system is modified by adding DRs and EVs under different load profiles. The simulation results show that by using parallel computing techniques, heuristic methods may be used as an alternative optimization tool in electrical power distribution systems operation.

Ceylan, Oguzhan↗

Optimization Model and Algorithm for Capacity Planning and Operation of Reliable and Carbon-neutral Power Systems with High Penetration of Renewable Generation

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Predictive modeling of a subcritical pulverized-coal power plant for optimization: Parameter estimation, validation, and application

As renewable power generation deployment increases, fossil fuel plants are increasingly required to operate more flexibly. Many coal-fired power plants were originally designed to operate at base load and do not operate optimally at partial load. Predictive first-principles plant-wide models can be employed to identify opportunities for flexibility improvements and diagnose low-load operating issues. This paper describes the application of the Institute for the Design of Advanced Energy Systems Integrated Platform (IDAES) to model and optimize flexible power plant operations. The key benefits of using IDAES are that it provides an open-source, fully equation-oriented modeling framework for efficient modular model construction, reuse, and customization, together with a mathematical optimization framework leveraging powerful, state-of-the-art solvers. The process systems engineering workflow from predictive process simulation to parameter estimation, model validation, and plant optimization is applicable to a variety of existing and next-generation energy systems as well as other chemical and environmental processes. Here, to demonstrate this capability, a physics-based, steady-state model was developed to improve full- and part-load performance of the Escalante Generating Station, a 245 MWe (net) subcritical pulverized coal-fired power plant owned and operated by Tri-State Generation and Transmission Association. Specifically, sixty-nine model parameters were simultaneously estimated from several months of operating data enabling prediction of flow rates, temperatures, pressures, and steam quality throughout the plant. The validated model was leveraged by Escalante to reduce the minimum operating load from 90 MW to 50 MW by diagnosing a low-load water-hammer issue, enabling coal usage and emissions reductions during periods of low power demand. Additionally, opportunities for heat rate reduction (i.e., efficiency improvement) through a steeper sliding-pressure approach to load-following and optimization of other boiler operating variables were also identified and quantified. For example, a potential efficiency improvement of 0.7 percentage points was observed at half-load operation.

01 COAL, LIGNITE, AND PEAT↗

Selection of Alternator Voltage for Dynamic Radioisotope Power Systems

In this paper, we present a study to select an appropriate alternator voltage of the free-piston Stirling convertors (FPSC) for efficient and light Dynamic Radioisotope Power Systems (DRPS). With a system thermal-to-electrical efficiency 3-4 times greater than radioisotope thermoelectric generator (RTG) systems and a higher power density than Brayton systems in the power range of interest for radioisotope-powered systems, Stirling-based DRPS is uniquely suited to benefit upcoming NASA missions. Much effort has been invested in the design and optimization of the thermal, mechanical, and materials aspects of FPSCs, but the electrical aspect has been more nebulous. Therefore, in this paper, a preliminary study will be presented to select the appropriate Stirling alternator voltage to develop a light and efficient system using available flight components. Power conversion systems face a trade between efficiency and system volume/mass with the optimal trade being determined by the application. Neglecting non-idealities related to insulation thickness and winding packing factor and assuming a constant winding area, alternator efficiency is independent of alternator voltage. Because wire size and alternator current can be traded against turn count and alternator voltage without impacting efficiency, the guidance on the optimal design comes from analysis of the controller power electronics and the remainder of the system. Properties of available flight-qualified electrical components, such as rated voltage/current and on-resistance, typically come in discrete values instead of a continuous range of values. With multiple components being required to form the power conversion stage of the controller, each limited to incremental values, a continuous optimization is of little benefit. Instead of a continuous optimization, a random process using properties of the available components can be used to develop a Pareto design front indicating the optimized trade space. The most advantageous trade between system efficiency and mass for the system at hand can then be selected from the range of feasible designs. In the final paper, the design process, assumptions, and preliminary results will be presented.

Free-Piston Stirling Convertor Controller, Dynamic↗

Impact of Spatial Variation in Flexibility on System Operations in Electric Power Systems

With the expansion of renewable energy resources in the electric power systems, having flexibility in the setup will allow to maintain the system's reliability and prevailing operations. Such flexibility can be extracted from utility operated and/or consumer owned devices, such as, storage devices, electric vehicles, etc. For the demand side, generally consumer preferences, incentives, etc. enact on the availability of the flexibility; besides, both the spatial and temporal dimension dictates the degree of the flexibility. Consequently, the optimal dispatch of the grid resources might appear intractable as the considerable amount of flexibility are obliquely stemming from the ungovernable consumer devices. Thus characterizing the consequences of diverged feasible flexibility in the system is crucial for operations. In this paper, a procedure is developed to quantify the degree of flexibility of power systems in terms of resource dispatch reconfiguration. Specifically, we develop optimization problems to attain equivalent resource configurations for the power systems to evaluate the spatial volatility of the network and asses the flexibility of the system. The developed process is then validated using numerical simulations for IEEE-30 bus test system.

Sadnan, Rabayet↗

Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches

In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fuzzy logic control and optimization system

A control system (300) for optimizing a power plant includes a chemical loop having an input for receiving an input signal (369) and an output for outputting an output signal (367), and a hierarchical fuzzy control system (400) operably connected to the chemical loop. The hierarchical fuzzy control system (400) includes a plurality of fuzzy controllers (330). The hierarchical fuzzy control system (400) receives the output signal (367), optimizes the input signal (369) based on the received output signal (367), and outputs an optimized input signal (369) to the input of the chemical loop to control a process of the chemical loop in an optimized manner.

97 MATHEMATICS AND COMPUTING↗

GRIDAPPSD/distopf (33583-E)

DistOPF is an open-source Python package providing a three-phase, asymmetric optimal power flow (OPF) tool specifically designed for distribution systems. The key inventive features include: - Asymmetrical 3-phase OPF modeling for distribution systems with unbalanced phases - Comprehensive control optimization supporting both active (P) and reactive (Q) power control variables - Built-in visualization and validation tools - Standard test system benchmarking platform for algorithm development and comparison - Modular CSV-based input system using Pandas DataFrames for flexible model specification - Standard power distribution model importer enabling direct conversion from CIM and OpenDSS format to optimization-ready models - Multiple solve interface compatibility (PYOMO, CVXPY, SciPy) with automatic solver selection based on problem type

Gray, Nathan [Pacific Northwest National Laborator↗

Risk-Based Distributionally Robust Optimal Power Flow With Dynamic Line Rating

In this paper, we propose a risk-based data-driven distributionally robust approach to investigating the optimal power flow with dynamic line rating. The risk terms, including penalties for load shedding, wind generation curtailment and line overload, are embedded into the objective function. To robustify the solution, we consider a distributional uncertainty set based on the second-order moment, that captures the correlation between wind generation outputs and line ratings, and also the Wasserstein distance, that hedges against data perturbations. We show that the proposed model can be reformulated as a convex conic program. Approximations of the proposed model are suggested, which leads to a significant reduction of the number of the constraints. For practical large-scale test systems, a distributionally robust optimal power flow model with Wasserstein-distance-based distributional uncertainty set and its convex reformulation are also provided. Simulation results on the 5-bus, the IEEE 118-bus and the Polish 2736-bus test systems validate the effectiveness of the proposed models.

distributionally robust optimization↗

Abstract: Air, Thermal and Water Management for PEM Fuel Cell Systems

PEM fuel cells are excellent candidates for transportation applications due to their high efficiencies. PEM fuel cell Balance of Plant (BOP) components, such as air, thermal, and water management sub-systems, can have a significant effect on the overall system performance, but have traditionally not been addressed in research and development efforts. Recognizing this, the U.S. Department of Energy and Honeywell International Inc. are funding an effort that emphasizes the integration and optimization of air, thermal and water management sub-systems. This effort is one of the major elements to assist the fuel cell system developers and original equipment manufacturers to achieve the goal of an affordable and efficient power system for transportation applications. Past work consisted of: (1) Analysis, design, and fabrication of a motor driven turbocompressor. (2) A systematic trade study to select the most promising water and thermal management systems from five different concepts (absorbent wheel humidifier, gas to gas membrane humidifier, porous metal foam humidifier, cathode recycle compressor, and water injection pump.) This presentation will discuss progress made in the research and development of air, water and thermal management sub-systems for PEM fuel cell systems in transportation applications. More specifically, the presentation will discuss: (1) Progress of the motor driven turbocompressor design and testing; (2) Progress of the humidification component selection and testing; and (3) Progress of the thermal management component preliminary design. The programs consist of: (1) The analysis, design, fabrication and testing of a compact motor driven turbocompressor operating on foil air bearings to provide contamination free compressed air to the fuel cell stack while recovering energy from the exhaust streams to improve system efficiency. (2) The analysis, design, fabrication and testing of selected water and thermal management systems and components to improve system efficiency and reduce packaging size.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Zambia : long-term generation expansion study - executive summary.

The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The analysis involved the hydro operations studies of the Zambezi river basin and the systems planning studies for the least-cost generation expansion planning. Two well-known and widely accepted computer models were used in the analysis: PC-VALORAGUA model for the hydro operations and optimization studies and the WASP-III Plus model for the optimization of long-term system development. The WASP-III Plus model is a part of the Argonne National Laboratory's Energy and Power Evaluation Model (ENPEP). The analysis was conducted in close collaboration with the Zambia Electricity Supply Corporation (ZESCO). On the initiative from The World Bank, the sponsor of the study, ZESCO formed a team of experts that participated in the analysis and were trained in the use of computer models. Both models were transferred to ZESCO free of charge and installed on several computers in the ZESCO corporate offices in Lusaka. In September-October 1995, two members of the ZESCO National Team participated in a 4-week training course at Argonne National Laboratory near Chicago, U.S.A., focusing on the long-term system expansion planning using the WASP and VALORAGUA models. The hydropower operations studies were performed for the whole Zambezi river basin, including the full installation of the Kariba power station, and the Cahora Bassa hydro power station in Mozambique. The analysis also included possible future projects such as Itezhi-Tezhi, Kafue Gorge Lower, and Batoka Gorge power stations. As hydropower operations studies served to determine the operational characteristics of the existing and future hydro power plants, it was necessary to simulate the whole Zambezi river basin in order to take into account all interactions and mutual influences between the hydro power plants. In addition, it allowed for the optimization of reservoir management and optimization of hydro cascades, resulting in the better utilization of available hydro potential. Numerous analyses were performed for different stages of system development. These include system configurations that correspond to years 1997, 2001, 2015 and 2020. Additional simulations were performed in order to determine the operational parameters of the three existing hydro power stations Victoria Falls, Kariba, and Kafue Gorge Upper, that correspond to the situation before and after their rehabilitation. The rehabilitation works for these three major power stations, that would bring their operational parameters and availability back to the design level, are planned to be carried out in the period until 2000. The main results of the hydro operations studies are presented in Table ES-1. These results correspond to VALORAGUA simulations of system configurations in the years 2001 and 2015. The minimum, average, and maximum electricity generation is based on the simulation of monthly water inflows that correspond to the chronological series of unregulated water inflows at each hydro profile in the period from April 1961 to March 1990. The recommended hydrology dataset provided in the Hydrology Report of the SADC Energy Project AAA 3.8 was used for this study.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Local Feature Sufficiency Exploration for Predicting Security-constrained Generation Dispatch in Multi-Area Power Systems

Deriving generation dispatch is essential for efficient and secure operation of electric power systems. This is usually achieved by solving a security-constrained optimal power flow(SCOPF) problem, which is by nature non-convex, nonlinear and thus computational intensive. The state-of-the-art optimization approaches are not able to solve this problem for large-scale power systems within power system operation time window (usually 5 minutes). In this work, we developed supervised learning approaches to determine security-constrained generation dispatch within much shorter time window. More importantly, the physical constrain of only accessing to local measurements and other information in most utilities’ real-time operation can not be ignored for the predictive models.The feasibility and accuracy of utilizing only local features(measurements and grid information in one area) to predict optimal local generation dispatch (dispatch of all generators in the corresponding area) in multi-area power systems has been explored. The results showed optimal local generation dispatch can be predicted with local features with high accuracy, which is comparable to the results obtained with global features.

Sun, Yixuan↗

IDAES-PSE Software Tools for Optimizing Energy Systems and Market Interactions

Modern power grids coordinate electricity production and consumption via multi-scale wholesale energy markets. Historically, levelized cost metrics were the de facto standard for techno-eco-nomic analyses of energy systems and comparison of technology options. However, these metrics neglect the complexity of energy infrastructure including the time-varying value of electricity. An emerging alternative is multi-period optimization, which considers the locational marginal price of electricity as input data (parameters). In this work, we present a general interface for multi-period optimization with time-varying energy prices to facilitate rapid analysis and comparison of potential energy systems models. The PriceTakerModel class is written in the IDAES-PSE platform and allows users to generate a multi-period, price-taker model instance, as well as automatically generate common operational constraints for their model, such as start-up and shutdown. We show this interface successfully generates multi-period price-taker models, facilitates model discrimination, and aids in analyzing various technologies for deployment in unique energy markets.

Laky, Daniel↗

Power Flow Geometry and Approximation

Here, the power flow equations are important in numerous power systems problems of practical interest which consider alternating current power flow (ACPF) physics. Perhaps the most well studied being the alternating current optimal power flow problem (ACOPF), seeking to optimize the operation of an electric power system. Due to their non-linearity, problems which include the power flow equations are typically challenging, particularly in optimization. Interestingly, the set of solutions to the power flow equations forms a smooth manifold. As a result, differential geometry can be used to describe and analyze this set of equations. This approach has proven effective in several engineering applications (e.g., solving ACOPF and analyzing the solution space boundary). Central to the success of this approach is an understanding of the power flow manifold's geometry. In this work, we develop the geometric and topological properties of this manifold using concepts from differential geometry. After demonstrating the convenience of this manifold's representation as a function's graph, computational methods are emphasized: we develop retractions, error bounds for linear approximation, and formulas for evaluating the Riemannian metric (including associated objects such as geodesics and the curvature tensor). Scalar curvature and the second fundamental form play a new role in quantifying the quality of linear approximations, like the popular direct current approximation. All functions are implemented in Julia and available in an online repository. Proofs are included for completeness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring Machine Learning Techniques For Dynamic Modeling on Future Exascale Systems

Future exascale systems must be optimized for both power and performance at scale in order to achieve DOE’s goal of a sustained petaflop within 20 Megawatts by 2022 [1]. Massive parallelism of the future systems combined with complex memory hierarchies will form a barrier to efficient application and architecture design. These challenges are exacerbated with emerging complex architectures such as GPGPUs and Intel Xeon Phi as parallelism increases orders of magnitude and system power consumption can easily triple or quadruple. Therefore, we need techniques that can reduce the search space for optimization, isolate power-performance bottlenecks, identify root causes for software/hardware inefficiency, and effectively direct runtime scheduling.

Song, Shuaiwen↗