Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Europa Clipper Payload Verification and Validation: Test and Analysis Program Design

NASA’s Europa Clipper mission – which is planned to launch in the mid-2020s – is designed to investigate the habitability of the jovian moon Europa with a state-of-the-art suite of over 10 sensors and instruments. Now past its project critical design review, Europa Clipper is starting the execution of its verification and validation (V&V) program. The payload V&V function in particular is responsible for designing and coordinating a thorough test and analysis program that will confirm the proper functioning and performance of our payload instruments. Given the large number of instruments to manage, we have developed a suite of standardized tests and analyses that are designed to cover all of the common interfaces across instruments, while allowing for flexibility to support the unique needs of individual instruments. This suite of activities, coordinated and/or performed by the payload team, forms the bulk of our payload verification and validation campaign. This paper provides a detailed summary of the full set of V&V activities in that suite, covering the four categories of activities: analysis of lower-level evidence, analysis via simulation, testing in the system testbeds, and testing in assembly, test, and launch operations (ATLO). We will describe the purpose of each activity type, how the activities are developed, and the review process for each type of activity. We then define the complete list of activities written for each instrument and how subtleties specific to certain instruments are managed. The discussion will provide a comprehensive understanding of the activities in the payload V&V purview and how various interfaces with different levels of the project are managed. This paper also describes key metrics the payload team uses to track V&V progress and some insights into the teaming design and division of labor we use to ensure consistency and completeness across the entire payload suite. Finally, the paper will offer a snapshot of the status of the Payload V&V program prior to instrument delivery and offer insights into the upcoming phase of instrument delivery and the start of ATLO.

Lee, Dennis↗

The solution of the three-dimensional viscous-compressible Navier-Stokes equations on a vector computer

The development of a vectorized computer code for the solution of the three-dimensional viscous-compressible Navier-Stokes equations is described. The code is applied on the CDC STAR-100 vector computer which is capable of achieving high result rates when a high degree of parallelism is present in the computations. The computational technique is an explicit time-split MacCormack predictor-corrector algorithm. Since a large volume of data is processed and virtual memory utilized, a data management scheme based on interleaving is used. The program has been applied to obtain the solution of the laminar supersonic flow about a family of three-dimensional corners. The equations of motion are expressed in a generalized form relative to a uniform rectangular computational domain. The metric coefficient and boundary conditions must be supplied for the corresponding physical domain. For calculations with 30,000 grid points, a computational rate of 0.00015 seconds per grid point per time step is observed.

Smith, R. E.↗

Investigation of outside visual cues required for low speed and hover

Knowledge of the visual cues required in the performance of stabilized hover in VTOL aircraft is a prerequisite for the development of both cockpit displays and ground-based simulation systems. Attention is presently given to the viability of experimental test flight techniques as the bases for the identification of essential external cues in aggressive and precise low speed and hovering tasks. The analysis and flight test program conducted employed a helicopter and a pilot wearing lenses that could be electronically fogged, where the primary variables were field-of-view, large object 'macrotexture', and fine detail 'microtexture', in six different fields-of-view. Fundamental metrics are proposed for the quantification of the visual field, to allow comparisons between tests, simulations, and aircraft displays.

Hoh, R. H.↗

Analytical Assessment of the Reciprocating Feed System

A preliminary analysis tool has been created in Microsoft Excel to determine deliverable payload mass, total system mass, and performance of spacecraft systems using various types of propellant feed systems. These mass estimates are conducted by inserting into the user interface the basic mission parameters (e.g., thrust, burn time, specific impulse, mixture ratio, etc.), system architecture (e.g., propulsion system type and characteristics, propellants, pressurization system type, etc.), and design properties (e.g., material properties, safety factors, etc.). Different propellant feed and pressurization systems are available for comparison in the program. This gives the user the ability to compare conventional pressure fed, reciprocating feed system (RFS), autogenous pressurization thrust augmentation (APTA RFS), and turbopump systems with the deliverable payload, inert mass, and total system mass being the primary comparison metrics. Analyses of several types of missions and spacecraft were conducted and it was found that the RFS offers a performance improvement, especially in terms of delivered payload, over conventional pressure fed systems. Furthermore, it is competitive with a turbopump system at low to moderate chamber pressures, up to approximately 1,500 psi. Various example cases estimating the system mass and deliverable payload of several types of spacecraft are presented that illustrate the potential system performance advantages of the RFS. In addition, a reliability assessment of the RFS was conducted, comparing it to simplified conventional pressure fed and turbopump systems, based on MIL-STD 756B; these results showed that the RFS offers higher reliability, and thus substantially longer periods between system refurbishment, than turbopump systems, and is competitive with conventional pressure fed systems. This is primarily the result of the intrinsic RFS fail-operational capability with three run tanks, since the system can operate with just two run tanks.

Eddleman, David E.↗

Reliability Considerations for Composite Overwrapped Pressure Vessels on Spacecraft

Composite Overwrapped Pressure Vessels (COPVs) are used to store gases under high pressure onboard spacecraft. These are used for a variety of purposes such as propelling liquid fuel etc, Kevlar, glass, Carbon and other more recent fibers have all been in use to overwrap the vessels. COPVs usually have a thin metallic liner with the primary purpose of containing the gases and prevent any leakage. The liner is overwrapped with filament wound composite such as Kevlar, Carbon or Glass fiber. Although the liner is required to perform in the leak before break mode making the failure a relatively benign mode, the overwrap can fail catastrophically under sustained load due to stress rupture. It is this failure mode that is of major concern as the stored energy of such vessels is often great enough ta cause loss of crew and vehicle. The present paper addresses some of the reliability concerns associated specifically with Kevlar Composite Overwrapped Pressure Vessels. The primary focus of the paper is on how reliability of COPV's are established for the purpose of deciding in general their flight worthiness and continued use. Analytical models based on existing design data will be presented showing how to achieve the required reliability metric to the end of a specific period of performance. Uncertainties in the design parameters and how they affect reliability and confidence intervals will be addressed as well. Some trade studies showing how reliability changes with time during a program period will be presented.

Murthy, Pappu L. N.↗

Flight Validation of a Metrics Driven L(sub 1) Adaptive Control

The paper addresses initial steps involved in the development and flight implementation of new metrics driven L1 adaptive flight control system. The work concentrates on (i) definition of appropriate control driven metrics that account for the control surface failures; (ii) tailoring recently developed L1 adaptive controller to the design of adaptive flight control systems that explicitly address these metrics in the presence of control surface failures and dynamic changes under adverse flight conditions; (iii) development of a flight control system for implementation of the resulting algorithms onboard of small UAV; and (iv) conducting a comprehensive flight test program that demonstrates performance of the developed adaptive control algorithms in the presence of failures. As the initial milestone the paper concentrates on the adaptive flight system setup and initial efforts addressing the ability of a commercial off-the-shelf AP with and without adaptive augmentation to recover from control surface failures.

Dobrokhodov, Vladimir↗

Airborne Science Mission Capabilities of the NASA DC-8 and Possible Alternative Aircraft

Age-related concerns associated with operating the 50-year-old NASA Airborne Science Program DC-8 Flying Laboratory aircraft are raising concerns about the prospects of someday retiring the NASA DC-8. Given that eventuality, this study examines how current and anticipated science requirements can be incorporated with aeronautical performance and cost metrics for assessing, comparing, and down-selecting candidate replacement aircraft. A literature review of NASA DC-8 missions and interviews with current DC-8 science users provides context for the initial phase of this study and offers a pathway for collecting aircraft specifications. Performance models are developed and calibrated against published range-payload data for various mission fuel and payload weight combinations. The models are extended to three airborne science missions, with payload weights ranging from 30,000-52,000 lb and mission ranges up to 5,050 nmi. Results point towards the 767-200ER aircraft as a top contender offering a bit more experimenter floor-space, payload capacity, and range than the NASA DC-8, and to the U.S. Navy P-8 aircraft as a viable option offering perhaps not too much less of those items, with the relative benefit of using less fuel per mission.

Thomas A Ozoroski↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi-Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the life-cycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reachback support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-ofthe- art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi- Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the lifecycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reach-back support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-of-the-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

PRIMO - The P&A Project Optimizer

In support of the Methane Emissions Reduction Program (MERP) and under the National Methane Emissions Reduction Initiative (NEMRI), the National Energy Technology Laboratory (NETL) and NETL site support contractors are developing and releasing an open-source decision-support tool (“PRIMO”) to help organizations determine which marginal conventional wells (MCWs) or other low-producing wells make the best candidates for plugging utilizing MERP funds, while also optimizing subsequent plugging and abandonment (P&A) campaigns for both program impact and efficiency. The framework—which is fully customizable—provides three main capabilities: 1. Ranking candidate wells (based on user preferences) 2. Identifying high-impact, high-efficiency P&A project candidates (with transparently computed scores for relevant metrics) 3. Comparing competing P&A projects quantitatively (through transparently computed project impact and efficiency scores) As such, PRIMO is a versatile, fully customizable tool that is meant to support organizations in making data-based, transparent, and defensible well selection and P&A project design decisions. For questions, comments or feedback, please contact primo@netl.doe.gov.

MERP↗

Development of Scalable Coastal and Offshore Macroalgal Farming

The US DOE/ARPA-E MARINER program funded a four-year project to determine an optimal way to grow kelps in large, nearshore and offshore arrays for the eventual purpose of biofuel production with the goal of keeping the cost below $\$$80 USD per dry metric ton of kelp. This project specifically looked at how Saccharina latissima can be grown in the Gulf of Alaska to reach that goal. There were three major aspects of the research: 1) optimizing nursery production and seeding lines for outplanting, 2) designing an economical, modular outplanting structure and 3) developing methods to efficiently harvest the product. Farm designs were based on catenary structures and the use of spreader bars with variable spacing of grow lines and line types. The spacing of the grow lines makes a difference in the yield. Grow line spacing of ≥1.5m showed about a 50% increase in kg/m. There was no statistical difference in the growth of Saccharina latissima whether in the middle or the outside of the array, but the line type and perhaps line thickness can make a difference in yield. Sagging caused by the weight of the mature fronds resulted in lower growth at depth. Various harvesting approaches for mature kelps were tested by collaborating farmers. One promising innovation is the use of large bags for holding the freshly harvested fronds. Although the weight of the fronds on the growlines causes the lines to sink, the bags packed with the harvested fronds float, allowing for easy loading to the transfer vessel. Another advance in harvesting is a specially built harvest vessel, the Harvest Buddy, allowing a more mechanized and faster way to harvest. A significant aspect of this project was the TTO/T2M. Several different outreach activities were performed by the Alaska Fisheries Development Foundation and GreenWave. A techno-economic assessment (TEA) using our data has pointed to solutions to reach the $\$$80 goal. A second phase of this project involved the co-culture of two different species of kelps. Interest in farming kelps has grown beyond using kelp for food, feed or biofuels. There is considerable interest in generating biomass from seaweed for use in bioplastics and other products that would substitute for petroleum-derived products. For these uses to be viable, large amounts of biomass are needed. Very large kelp farms can be expensive to build and maintain, leading to the need to optimize the biomass per unit area. Although close spacing of growlines can lead to poor growth, a viable approach may be to grow two species of kelps together: one that hangs down and one that is buoyant, growing up. This system would increase the spacing in three dimensions. In Alaska, Saccharina latissima is commonly grown hanging down from longlines. One of the buoyant Alaskan kelps is Nereocystis luetkeana. Because there are commercial uses for wild-harvested Nereocystis in Alaska, we undertook a preliminary trial in Kodiak, Alaska that grew both Saccharina and Nereocystis in the same longline array. Closely spaced lines were seeded the first week of February 2023 and set at 3m below the surface. The arrays were harvested in late June 2023. Despite having 45% fewer grow-lines, the total yield of the Nereocystis on the combined arrays was statistically similar to the Nereocystis only arrays. Total yields were greatest on the combined arrays, followed by the Nereocystis only and Saccharina only arrays. These results may have significance for large scale macroalgal production.

09 BIOMASS FUELS↗

An investigation to improve selenodetic control on the lunar limb utilizing Apollo 15 trans-earth photography

A study is made using actual metric photography taken by Apollo 15 after the trans earth injection when the spacecraft left the lunar orbit. After measurements on 12 frames were reduced for 11 known control and unknown points on the eastern limb, a least squares adjustment program provided the simultaneous solution for the selected points. The results indicate an improvement in selenodetic control may be achieved over a limited portion of the lunar limb; however, the solution could be further improved by strengthening the geometry of intersecting rays through additional observations of the same area using film from the succeeding Apollo missions.

Riotte, W.↗

Data-Mining Toolset Developed for Determining Turbine Engine Part Life Consumption

The current practice in aerospace turbine engine maintenance is to remove components defined as life-limited parts after a fixed time, on the basis of a predetermined number of flight cycles. Under this schedule-based maintenance practice, the worst-case usage scenario is used to determine the usable life of the component. As shown, this practice often requires removing a part before its useful life is fully consumed, thus leading to higher maintenance cost. To address this issue, the NASA Glenn Research Center, in a collaborative effort with Pratt & Whitney, has developed a generic modular toolset that uses data-mining technology to parameterize life usage models for maintenance purposes. The toolset enables a "condition-based" maintenance approach, where parts are removed on the basis of the cumulative history of the severity of operation they have experienced. The toolset uses data-mining technology to tune life-consumption models on the basis of operating and maintenance histories. The flight operating conditions, represented by measured variables within the engine, are correlated with repair records for the engines, generating a relationship between the operating condition of the part and its service life. As shown, with the condition-based maintenance approach, the lifelimited part is in service until its usable life is fully consumed. This approach will lower maintenance costs while maintaining the safety of the propulsion system. The toolset is a modular program that is easily customizable by users. First, appropriate parametric damage accumulation models, which will be functions of engine variables, must be defined. The tool then optimizes the models to match the historical data by computing an effective-cycle metric that reduces the unexplained variability in component life due to each damage mode by accounting for the variability in operational severity. The damage increment due to operating conditions experienced during each flight is used to compute the effective cycles and ultimately the replacement time. Utilities to handle data problems, such as gaps in the flight data records, are included in the toolset. The tool was demonstrated using the first stage, high-pressure turbine blade of the PW4077 engine (Pratt & Whitney, East Hartford, CT). The damage modes considered were thermomechanical fatigue and oxidation/erosion. Each PW4077 engine contains 82 first-stage, high-pressure turbine blades, and data from a fleet of engines were used to tune the life-consumption models. The models took into account not only measured variables within the engine, but also unmeasured variables such as engine health parameters that are affected by degradation of the engine due to aging. The tool proved effective at predicting the average number of blades scrapped over time due to each damage mode, per engine, given the operating history of the engine. The customizable tools are available to interested parties within the aerospace community.

Litt, Jonathan S.↗

An evolving Mars telecommunications network to enable exploration and increase science data return

The coming decade of Mars exploration involves a variety of unique telecommunications challenges. Increasing spatial and spectral resolution of in situ science instruments drive the need for increased bandwidth. At the same time, many innovative and low-cost in situ mission concepts are enabled by energy-efficient relay communications. In response to these needs, the Mars Exploration Program has established a plan for an evolving orbital infrastructure that can provide enhancing and enabling telecommunications services to future Mars missions. We will present the evolving capabilities of this network over the coming decade in terms of specific quantitative metrics such as data volume per sol and required lander energy per Gb of returned data for representative classes of Mars exploration spacecraft.

Mars Telecommunication↗

Technology readiness levels for the new millennium program

NASA's New Millennium Program (NMP) seeks to advance space exploration by providing an in-space validating mechanism to verify the maturity of promising advanced technologies that cannot be adequately validated with Earth-based testing alone. In meeting this objective, NMP uses NASA Technology Readiness Levels (TRL) as key indicators of technology advancement and assesses development progress against this generalized metric. By providing an opportunity for in-space validation, NMP can mature a suitable advanced technology from TRL 4 (component and/or breadboard validation in laboratory environment) to a TRL 7 (system prototype demonstrated in an Earth-based space environment). Spaceflight technology comprises a myriad of categories, types, and functions, and as each individual technology emerges, a consistent interpretation of its specific state of technological advancement relative to other technologies is problematic.

technology readiness TRL New Millennium Program NM↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Two-Stage Distributionally Robust Conic Linear Programming over 1-Wasserstein Balls

Here, this paper studies two-stage distributionally robust conic linear programming under constraint uncertainty over type-1 Wasserstein balls. We present optimality conditions for the dual of the worst-case expectation problem, which characterizes worst-case uncertain parameters for its inner maximization problem. This condition offers an alternative proof, a counterexample, and an extension to previous works. Additionally, the condition highlights the potential advantage of a specific distance metric for out-of-sample performance, as exemplified in a numerical study on a facility location problem with demand uncertainty. Furthermore, cutting-plane-based algorithms, equipped with a unified scenario generation framework, are proposed for addressing both unbounded support and second-stage dual feasible regions, with a finite convergence proof under less stringent assumptions.

Wasserstein↗