Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

CSP Systems Analysis - Final Project Report

The CSP Systems Analysis project was a three-year effort supporting the Concentrating Solar Power (CSP) Subprogram within the Solar Energy Technologies Office of the U.S. Department of Energy (DOE). The goal of the CSP Systems Analysis project was to provide timely and accurate CSP cost data to the DOE and predict performance and cost for emerging technologies that may impact research directions and industry investment. The project consisted of six, mostly independent tasks. Major accomplishments over the three-year period of performance were as follows. The NREL team maintained current cost estimates for CSP technologies by annual updates to the cost input parameters within NREL's System Advisor Model (SAM). SAM is a performance and cost simulation software that includes technology models for the primary CSP technologies. During the period from 2016 to 2018, the estimated cost within SAM's default CSP molten-salt power tower technology dropped from 13.0 to 11.1 cent/kWh (real dollars without incentives). Power cycle models for the supercritical carbon dioxide (sCO2) Brayton Cycle were developed and made an option within SAM's molten-salt power tower model. These models were subsequently used to evaluate the cost reduction potential of alternative salts. The partial-cooling model was found to provide the greatest cost-reduction potential due to its combination of efficiency and temperature differential across the turbine and thermal energy storage (TES) system. These studies were documented in two journal articles. NREL's optical modeling software SolTrace and SolarPILOT were made more versatile and released as open-source software to the CSP community. These tools help researchers and developers to model and optimize the optical performance of CSP collector systems. The new features were highlighted in a recorded webinar that can be accessed from the NREL SAM website. New models for solar-thermal systems, that is, applications for solar industrial process heat, were developed, validated, and installed within SAM. The analysis includes a 2018 review of linear collectors in the market that are tailored for solar process heat applications. In 2018 the NREL team also developed an annual simulation for a direct steam generation system integrated with a latent-heat TES system. This analysis was submitted for journal publication. The NREL team continued to support the exchange of information and development of CSP guidelines within the international CSP community of SolarPACES. Much of the work under this project was presented at SolarPACES, including the development of a modeling checklist to help CSP stakeholders standardize the models used for estimating CSP performance and cost. The CSP Systems Analysis project also supported DOE requests for tracking and reporting programmatic targets for the CSP Subprogram.

14 SOLAR ENERGY↗

Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Rock Springs Uplift, Wyoming (Final Report)

To establish the potential of safe, long-term commercial-scale carbon capture & storage (CCS) in southwestern Wyoming, the University of Wyoming formed a CCS coordination team (CCT) to complete a Phase I CarbonSAFE pre-feasibility study adjacent to the region’s largest coal-fired power plant, the Jim Bridger Plant (JBP). The study’s primary objective was to evaluate the potential of storing 50+ million metric tons of anthropogenic carbon dioxide (CO 2 ) in stacked reservoirs over a period of 25 years. In addition, this integrated study evaluated related aspects of carbon capture utilization & storage (CCUS) at the study site, including: (1) the CO 2 character of post-combustion flue gas from JBP and the technical capacity for retrofitting proven commercial-scale CO 2 capture technology relative to CO 2 source character and technological constraints; (2) utilization of the existing CO 2 pipeline network in the immediate vicinity of JBP for enhanced oil recovery (CO 2 -EOR) and utilizing that network as part of a regional hub for CO 2 storage from other anthropogenic sources; (3) assessment of the challenges and benefits of meeting all of CarbonSAFE programmatic Phase I goals relative to Wyoming’s carbon management regulatory framework; and (4) assessment of the community and environmental factors that may impact CCS at JBP. With respect to storage, we analyzed the potential of stacked Mesozoic reservoirs at the study site, focusing on the Entrada and Nugget sandstones. The reservoir response to injection simulations varied greatly between formations, though they both were capable of CO 2 storage. The Entrada Sandstone is relative thin (~40’) and heterogeneous; storage using one injection and production well was limited to 1.2 Mt over 25 years at the study site. The Nugget Sandstone is much thicker (> 400’) and generally homogeneous; storage using one injection and production well approached 15.0 Mt over 25 years; this scenario suggests that the storage potential in the Nugget Sandstone is close to the estimated P90 calculation of 9.6 Mt/mi 2 as models indicate a storage potential of 8.3 Mt/mi 2 at saturation. Both reservoirs’ storage capacity benefited greatly from coupling an injection well with an offset production well; total storage capacity increased and reservoir pressure stayed below critical thresholds. This indicates that implementing a pressure management strategy at the study site would optimize storage and decrease risk. Seals associated with the targeted reservoirs were shown to be capable of retaining the potential storage volumes, and the site benefits from multiple seal redundancies (i.e. > 7,000’ of seal formations). Furthermore, assessment of different reservoir variables (e.g., fluid composition, pressure, etc.) indicates all reservoirs at the study site are isolated. Storage assessments from Mesozoic reservoirs were coupled with simulations from the site’s Paleozoic reservoirs (the Weber Sandstone and Madison Limestone), which were the focus of previous study. The fully integrated stacked reservoir pre-feasibility studies suggest that the Nugget and Madison formations alone could safely store 50 million metric tons of CO 2 within the study site. Furthermore, both formations are true saline reservoirs near JBP, making them ideal target reservoirs for CO 2 sequestration. Analysis of Wyoming’s laws and regulations confirm that the State has a favorable policy environment for CCS/CCUS. The project’s economic models estimated that the following revenues collectively are sufficient to finance the project over its lifespan if CO 2 utilization is coupled with CCS via the following strategies: (1) sales of CO 2 for EOR (approximately $69 million/year); (2) use of CO 2 tax credits such as amended §45Q and §48A (approximately $484 million total); and (3) sales of low-carbon electricity and marketable carbon offset/credits into carbon-constrained markets (approximately $11-$17 million/year) to West Coast consumers. These revenue estimates are broadly consistent with other studies that concluded arbitrage in JBP retail electricity sales between California and Wyoming could help to support the cost of deploying CCS at JBP. The models also indicate that maintaining a successful business case for long-term CCS -- wherein associated capture, transportation and operational costs are fully addressed at JBP -- is reliant on numerous external factors that complicate predictions. This study suggests that this site meets the CarbonSAFE program’s requirements of being able to feasibly store 50+ million metric tons of CO 2 over 25 years within the site’s stacked reservoirs, especially if coupled with pressure management strategies. This study suggests that the Nugget Sandstone and the Madison Limestone are two of the best reservoirs in the State with respect to overall storage capacity. In addition, the site’s proximity to existing CO 2 transportation networks, CO 2 -EOR opportunities, ability to sell to markets that value low-carbon electricity, Wyoming’s existing carbon regulatory framework, and a public that is well-educated with respect to energy markets and issues collectively increase the potential for implementing commercial-scale CCS adjacent to the JBP. With respect to the available technical and non-technical site data, and the reservoir quality at the study site, we suggest that this site is capable of moving directly into Phase III of the CarbonSAFE program.

01 COAL, LIGNITE, AND PEAT↗

Background and Roadmap for a Distributed Computing and Data Ecosystem

The drivers for using distributed computing and data resources are emerging from many science domains and have been documented through several recent Department of Energy (DOE) workshop reports. The increased usage and availability of geographically distributed computing and storage resources also highlight the need for easy-to-use tools and procedures that can support the paradigm of distributed computing and data management transparently. Aiming to meet each laboratory’s programmatic needs, a variety of computing resources are available throughout the DOE complex under various access policies, operating systems, and hardware configurations. However, today no straightforward mechanisms or policies exist for a given researcher or group of researchers to easily access resources at different locations across the DOE laboratory system. At the same time, DOE research programs have supported the research and development of technologies and tools that could enable researchers to access distributed data and computing resources globally. Academic and industry activities have also developed mechanisms for the distributed federation of resources. We observe that such existing capabilities can be harnessed to create mechanisms that enable researchers to work seamlessly across facilities.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Dell Frenzi Park, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada (Cultural Resources Inventory Report)

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) proposes to remove the ball courts and grade the area known as Dell Frenzi Park in the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada. The park is within the Mercury Historic District (Nevada State Historic Preservation Office (SHPO) Resource No. D230). This project is an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. § 300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. The NNSA/NFO has consulted with the SHPO and the Advisory Council on Historic Preservation regarding the demolition of and modification to resources in Mercury as part of a modernization project, and has developed the Mercury Programmatic Agreement (PA) with the SHPO that specifies the approach that NNSA/NFO will take to meet its statutory obligations toward historic preservation within the district. The district is located in Sections 10–12, 14, and 15, T15S R53E, Mount Diablo Benchmark (BM) (projected) in Area 23 of the NNSS. In 2010, the Nevada Test Site became the NNSS, and will be referred to as such throughout this report as appropriate. This report is part of the Report Series: Evaluation, Finding of Effect, and Mitigation Documentation for Dell Frenzi Park, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

54 ENVIRONMENTAL SCIENCES↗

Mid Atlantic CHP Technical Assistance Partnership (Final Technical Report)

The Mid Atlantic CHP Technical Assistance Partnership (MACHPTAP), managed by The Pennsylvania State University College of Engineering, served the six states in the Mid-Atlantic region (Pennsylvania, New Jersey, Delaware, Maryland, Virginia and West Virginia) plus the District of Columbia. The objective of the Combined Heat and Power Technical Assistance Partnerships (CHP TAPs) was to provide essential support to continue the market development of CHP’s suite of technologies to further the installation of highly efficient and cost effective CHP. The MACHPTAP’s work included education and outreach as well as technical assistance to a variety of stakeholders including end-users (commercial, industrial, institutional and more), state decision makers, electric and gas utilities, trade associations and non-profit organizations. This assistance included evaluating the economic, energy, reliability and environmental value of proposed systems. The CHP TAPs represented multi-state regions and are the CHP experts in the region who provide fact-based, un-biased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related State best practice policies. Specifically, the MACHPTAP objectives were accomplished through taskings in four specific areas: Technical Assistance to end Users which involved engaging potential end-users to identify, evaluate, and technically support prospective CHP projects; Engagement and Education of End Users where the MACHPTAP engaged and educated end users about CHP, its benefits, and DOE resources available, and strategically hosted or participated in webinars, workshops and conferences; Policymaker Education where the MACHPTAP hosted or participated in webinars, one-on-one meetings, workshops, and other forums; and Program Administration, Management and Reporting, which included monthly and quarterly reporting, program meetings and coordination of activities with other regional TAPs. Accomplishments in the four specific project areas included providing direct Technical Assistance to 289 prospective CHP end users, conducting or participating in 82 End User Education events and hosting or participating in 73 Policy Maker Education events. During the contract period, 107 CHP installations were commissioned in the Mid Atlantic region, with a total generation capacity of over 160 megawatts, with an additional 34 sites with a capacity of over 100 megawatts currently in the planning/design/construction phase. Programmatically, all monthly metrics reports and quarterly reports were submitted in a timely manner.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Buildings 23-531, -532, -535, and -536 in Block 17, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install air conditioning units under the windows of dorm and recreation rooms at three dormitories (23-531, -532, -535), and make interior modifications to the Mechanical Building 23-536 in the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada. These buildings, referred to in this report as the 23-531 Series Dormitory Complex, are within the Mercury Historic District. This upgrade project is an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. §300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. The NNSA/NFO has consulted with the Nevada SHPO and the Advisory Council on Historic Preservation regarding the upgrade and modification to resources in Mercury, and has developed the Mercury Programmatic Agreement (PA) with the SHPO that specifies the approach that NNSA/NFO will take to meet its statutory obligations toward historic preservation within the district. The Mercury Historic District is located in Sections 10–12, 14, and 15, T15S R53E Mount Diablo BM (projected) in Area 23 of the NNSS. In 2010, the Nevada Test Site became the NNSS, and will be referred to as such throughout this report as appropriate. This is part of the report series "Evaluation, Finding of Effect, and Mitigation Documentation for 23-531 Series Dormitory Complex, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada".

54 ENVIRONMENTAL SCIENCES↗

TA-V Sub-Area Plan: Overview & Summary

The TA-V Sub-Area Plan is currently under development. A major input into the plan will be the results of a strategic planning study to be conducted in FY 2016 that will investigate the long-term programmatic future for TA-V. Anticipated planning issues to be explored include: (1) Nature of future programs and facility needs; (2) Recapitalization needed to sustain key facilities and resources; (3) Validation of existing land use as a remote nuclear research and radiation testing site; (4) Physical security requirements including the need to sustain or reconfigure the existing Perimeter Intrusion Detection and Assessment System (PIDAS); (5) Environmental remediation and restoration strategy; and (6) Site design improvements needed to enhance the quality of the working environment.

99 GENERAL AND MISCELLANEOUS↗

The 2015 Nonlinear Mechanics and Dynamics Research Institute

The Nonlinear Mechanics and Dynamics (NOMAD) Research Institute is a six week long collaborative research program for graduate students from across the world. The 2015 NOMAD Research Institute was hosted jointly by Sandia National Laboratories and the University of New Mexico, and featured 24 graduate students working on seven different research projects. These projects included: developing experimental strategies for studying the dynamics of nonlinear systems, a numerical round robin for predicting the response of a jointed system, quantification of uncertainty in a lap joint, assessment of experimental substructuring methods, a study of stress waves propagating through jointed interfaces, structural design optimization with joints, and the nonlinear system identification of MEMS devices. This report details both the technical research and the programmatic organization of the 2015 NOMAD Research Institute.

42 ENGINEERING↗

Theory and Operation of the Ringdown Parasitic Extractor Tool

This report is a guide to the use of the Sandia-developed Ringdown Parasitic Extractor (RPE) software tool. It explains the theory behind performing parasitic extraction from current ringdown waveforms and describes how to use the tool to achieve good results. Further dissemination only as authorized to U.S. Government agencies and their contractors; other requests shall be approved by the originating facility or higher DOE programmatic authority.

97 MATHEMATICS AND COMPUTING↗

Asynchronous Graphs (Final Report)

The most performant massive-scale distributed graph analytic engines were essentially unusable for anything but the analytic they were tuned to solve. The project team had previously developed HavoqGT and used this project to demonstrate it as a flexible graph framework, aiming to extend algorithmic capabilities, improve underlying data structures, and develop novel communication paradigms to enable new data analysis missions. Highlights of the technology developed include (a) a new distributed communication paradigm dubbed You’ve Got Mail (YGM), (b) a performant exact and fuzzy HPC graph pattern matching approach, and (c) a distributed biased random walk simulation capability. The project was successful on several measurable fronts, including advancing computer science (reflected by publishing 14 peer-reviewed research papers yielding 4 publication awards and over 16 conference presentations), contributing tangibly to LLNL recruiting rare talent, and obtaining follow-on funding. These technologies were transferred to several FY19-20 programmatic projects and will continue to be leveraged by new research projects for several years.

97 MATHEMATICS AND COMPUTING↗

Film Growth Dynamics During Pulsed Sputter Deposition (LDRD Final Report)

Novel materials synthesis and development using physical vapor deposition require our fundamental understanding of plasma conditions and film growth dynamics. A central theme is to control materials microstructure. Over the last few decades, the difficulty of thick heavy metal coatings has been one of the major bottlenecks limiting our studies of the important family of inertial-confinement-fusion (ICF) designs with colliding-shell targets. Our previous attempts to fabricate such coatings by conventional DC magnetron sputtering (DCMS) has had limited success due to the inherent complexity and our limited understanding of the deposition process. In this project, we have investigated the physics of a novel and promising pulsed sputter deposition process. We expanded the scientific foundation of sputter deposition processes through a combination of well-posed experiments and state-of-the-art characterizations. The following important scientific milestones have been achieved: (1) Successfully installed and tested a high-power impulse magnetron sputtering (HiPIMS) system; (2) Deployed a novel set of in-situ diagnostics during pulsed deposition, including a multibeam optical stress sensor (MOSS) system for real-time stress measurement, and Langmuir probe for the measurements of plasma physical properties. This allows us to monitor dynamically plasma conditions, ion flux and energy distributions, and film stress; (3) Investigated and obtained a fundamental understanding of HIPIMS on microstructure and stress control; (4) Successfully synthesized and demonstrated record-breaking strength nanocrystalline-nanotwinned (nnt) metals; (5) Successfully obtained high-quality, leak-proof Cr metal shells via HiPIMS method. The outcomes of this project could have transformational scientific and programmatic impacts, enabling novel materials synthesis and an experimental campaign with colliding shell target designs. The basic understanding of the deposition process has important implications to a broad range of industrial applications.

36 MATERIALS SCIENCE↗

Washington State Highway Bridge Seismic Screening Tool (BSST) (Technical Report)

The Regional Resiliency Assessment Program (RRAP) is a cooperative assessment of specific critical infrastructure within a designated geographic area and a regional analysis of the surrounding infrastructure that addresses a range of infrastructure resilience issues that could have regionally and nationally significant consequences. In 2017, the U.S. Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency (CISA) sponsored the Washington State Transportation Systems RRAP project in coordination with the Washington Emergency Management Division (EMD), Washington State Department of Transportation (WSDOT), and other regional stakeholders. This project is focused on assessing the impacts of a Cascadia Subduction Zone (CSZ) earthquake on state transportation systems and, in particular, how those impacts may affect the ability of emergency response efforts to move supplies into the region. The intended outcome of this analysis is the prioritization of transportation routes and modes for additional planning, investment, hardening, or other activities to enhance their resilience - and therefore, to enhance their ability to support response and recovery efforts following a CSZ earthquake. An important part of this transportation system-level assessment has been to assess the seismic vulnerability of the state highway system. In doing so, the RRAP project team developed a Bridge Seismic Screening Tool (BSST) to assess, at a system-level, the potential impacts that a CSZ earthquake could have on state highway bridges. The first step in the BSST is to assess the seismic vulnerability of highway bridge infrastructure in Washington State following a CSZ earthquake to determine a projected or potential damage state. Damage states are then used to determine approximate reopening times for bridge crossings.2 This document provides details on the methodological development of the BSST, the implementation of that tool to analyze the projected damage incurred in a CSZ earthquake scenario, and the determination of corresponding reopening times of interstate and state highway bridges following such an event. The BSST was implemented programmatically using a Microsoft Excel macro-enabled workbook; instructions on use of this tool are provided in the accompanying report, Washington State Highway Bridge Seismic Screening Tool (BSST) - User Manual.

42 ENGINEERING↗

Potential Impacts of Accelerated Climate Change (Annual Report of Work)

This research project is part of the U.S. Nuclear Regulatory Commission’s (NRC’s) Probabilistic Flood Hazard Assessment (PFHA) research plan in support of developing a risk-informed licensing framework for flood hazards and design standards at proposed new facilities and significance determination tools for evaluating potential deficiencies related to flood protection at operating facilities. The PFHA plan aims to build upon recent advances in deterministic, probabilistic, and statistical modeling of extreme precipitation events to develop regulatory tools and guidance for NRC staff with regard to PFHA for nuclear facilities. The tools and guidance developed under the PFHA plan will support and enhance the NRC’s capacity to perform thorough and efficient reviews of license applications and license amendment requests. They will also support risk-informed significance determination of inspection findings, unusual events, and other oversight activities. For Year 1, specifically, Pacific Northwest National Laboratory (PNNL) staff: Prepared an annual report that summarizes recent scientific findings, reports on activities of federal agencies with direct responsibility for climate change science, and provide a qualitative assessment of these findings relevant to NRC concerns on a regional level (i.e., increasing air and water temperatures, decreasing water availability, increasing frequency and intensity of storms and flooding, and sea level rise). Participated in annual webinars with NRC staff at NRC Headquarters in Rockville, Maryland. Presented updates summarizing recent scientific findings at the NRC PFHA Workshop Headquarters in Rockville, Maryland. PNNL staff have identified neither technical nor programmatic issues in proceeding with Year 2 activities. PNNL staff updated this report in March and April 2019.

54 ENVIRONMENTAL SCIENCES↗

Systems Engineering Project - Tritium

The purpose of this project is to apply a systems engineering method to a programmatic improvement or implementation of a system found within the Weapons and Complex Integration (WCI) Nuclear Materials Technology Program (NMTP) at Lawrence Livermore National Laboratory (LLNL). This project identifies an opportunity for improvement of the Tritium Processing Station (TPS) based on key stakeholder requirements. This document will cover the generation of the selected concept, system operational context and use cases, the production of verifiable engineering requirements, functional decomposition, and an assessment of risk via a failure mode and effect analysis (FMEA).

42 ENGINEERING↗

Parallel-in-Time Multigrid Methods for Hyperbolic Problems, with a Focus on the Shallow Water Equations

The coming massive parallelism of exascale computing presents a pressing challenge for the many DOE simulations of time-dependent partial differential equations, which typically use traditional sequential time stepping methods. Since this traditional approach is inherently serial, it presents a sequential bottleneck when moving to exascale computing, because future performance gains will come through greater concurrency, not faster clock speeds. Thus, the goal of this work is to research parallelism in time, i.e., methods that compute multiple time values simultaneously, not sequentially. The focus will be on hyperbolic problems of programmatic interest to DOE, with the goal of enabling scalable simulations of time-dependent hyperbolic problems on future architectures. The difficulty lies in the fact that hyperbolic problems are well-known to be difficult for parallel-in-time methods, with the most common parallel-in-time method, Parareal, diverging in many cases. Here, the chosen methodology for scalably solving these hyperbolic space-time equations is multigrid-reductionin-time (MGRIT), because multigrid (when it works) is a powerful, optimal, and scalable solver for discretized PDEs. To further research in this area, this project will explore a model hyperbolic problem (the shallow water equations) in the context of recent advances (e.g., by Wingate and Haut) in constructing improved coarse time-grid time-propagators by using the slow asymptotic structure of the equations. In particular, we will investigate if such coarse time-propagators offer significant advantages in an MGRIT setting, and explore any broader insights gained into parallel-in-time for hyperbolic problems.

97 MATHEMATICS AND COMPUTING↗

Carbon Cycling, Environmental & Rural Economic Impacts of Collecting & Processing Specific Woody Feedstocks in Biofuels

Woody biomass will be an essential feedstock for a large-scale cellulosic biofuel industry. The life cycle carbon accounting for the production of biofuels from woody feedstocks is complex and has engendered significant controversy. Issues such as below ground carbon, carbon debt, varied regional forest practices, multiple parallel forest product lines, and development of realistic counterfactual scenarios all contribute to the complexity. DOE funded CORRIM to develop comprehensive and definitive lifecycle inventories and assessments on the production of fuels from woody feedstocks. CORRIM brought together expertise in forest practices, short rotation woody crops, bioconversion of woody biomass, process modeling, and life cycle assessment to successfully accomplish this goal. The CORRIM team has developed data on forest productivity, fuel usage, and fuel production for six regionally specific forest systems. These six forest systems include three current commercial systems; southern pine plantations, Douglas-fir plantations, naturally regenerated Northeastern (NE) spruce/fir, and three ‘short rotation woody crops’, poplar, eucalyptus and willow, which are at different stages of demonstration in the US. The fuel production systems include cellulosic ethanol and bio-oil based hydrocarbons. The project was successfully reviewed at the BETO Program review in March 2015, 2017, and 2019 and has resulted currently in 19 publications and reports and 35 presentations at both national and international conferences, with more in the pipeline. See publications and presentations for links to each document. Finally, and most importantly, CORRIM has gone beyond the scope of the original DOE proposal to work closely with GREET at Argonne National Laboratory (ANL) to incorporate all the life cycle data and scenario models into their modeling system. GREET is the most widely used and definitive information source for evaluating lifecycle carbon emissions for fuels. The incorporation of CORRIM data from this project guarantees the results of the research will be extensively used and widely disseminated. Technical process improvements and policy relevant accomplishments are detailed in the relevant programmatic sections in the full report including citations therein. Highlights are summarized here for easy reference.

09 BIOMASS FUELS↗

Initial Radiation of Nuclear Power Plant Components (CRADA NFE-17-06892 Final Report)

As advanced reactor concepts are developed, instrumentation and control (I&C) cables and sensors will play a significant role in assuring their operation is well understood, and safety-related process information can be collected reliably over the course of their design life. As a first step to develop acceptance criteria and define the limits of currently available nuclear I&C cable and sensor technology, a collaboration between Oak Ridge National Laboratory and Analysis and Measurement Services (AMS) Corporation was initiated under the Gateway for Accelerated Innovation in Nuclear (GAIN) Program. This collaborative effort focused on providing technical information related to the combined thermal and radiation aging of nuclear power plant (NPP) cables, companion NPP cable insulation samples, and two prototype temperature and two pressure sensors. This work was carried out using the instrumented gamma irradiation system that is part of the High Flux Isotope Reactor Gamma Irradiation Facility (HFIR GIF). This system provided the opportunity for the condition of the prototype sensors to be tracked during the irradiation in order to determine their functional limits with greater granularity when compared to a simple irradiation insertion at the HFIRGIF. Experimental assemblies for sensor irradiation were successfully completed, and sensor irradiation to accumulated dose of 3000 kGy at a rate of approximately 6 kGy/hr was carried out. Two prototype temperature assemblies were continuously monitored during exposure to 3000 kGy and found to have no observable degradation from the irradiation. Two pressure sensors were first irradiated to 1000 kGy. At which point, one of the sensors was found to operate normally; however, a second sensor failed the operability test. The operable pressure sensor output was then continuously monitored from 1000 kGy to 3000 kGy. The sensor output exhibited steady trendable drift versus the accumulated radiation dose. At the conclusion of the irradiation, the four test sensors were released for laboratory calibration checks. The calibration check of the temperature sensors found no significant change after irradiation compared to baseline measurements before irradiation; however, both pressure sensors failed the post-test calibration checks and both sensors were not functioning properly. These results will help inform sensor manufacturers and I&C design engineers of potential limitations of these types of sensors for use in high radiation environments associated with the compact configuration of new Small Modular Reactors (SMRs) such as NuScale’s reactor power module. Irradiations on NPP cables and companion samples were not completed due to programmatic delays, however a path forward that was based on lessons learned from this project was defined to accommodate future, comparable instrumented gamma irradiations at the HFIR GIF.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Meteorological Tower Network Expansion Pilot Project Siting Considerations to Ensure Data Quality and Representativeness of Three New Meteorological Towers at Los Alamos National Laboratory

Associated with the Meteorological Tower Network Expansion Pilot Project by the Environmental Protection and Compliance (EPC) Compliance Programs (CP) Meteorology and Air Quality (MAQ) team, the purpose of this technical report is to establish requisite justification for the siting of three 10-meter high instrumented meteorological towers at three new locations on the Los Alamos National Laboratory (LANL) site. These towers and their associated instrumentation are similar in scope to the existing 10-meter meteorological tower that is collecting meteorological data in Mortandad Canyon (MDCN). The conclusions and recommendations in this technical report will inform LANL management, EPC-CP MAQ staff, and other LANL divisions of the criteria employed for the selection of the final location for siting these three new towers. Meeting such comprehensive criteria will ensure that all data acquired will be spatially representative for meeting the diverse Safety Basis (SB), emergency management, and operations organizations programmatic needs and analytical data input requirements to its codes.

54 ENVIRONMENTAL SCIENCES↗