Search NASA⌕ Search

SEARCH · Search NASA

Results for “safety certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Development and Deployment of Robonaut 2 to the International Space Station

The development of the Robonaut 2 (R2) system was a joint endeavor with NASA and General Motors, producing robots strong enough to do work, yet safe enough to be trusted to work near humans. To date two R2 units have been produced, designated as R2A and R2B. This follows more than a decade of work on the Robonaut 1 units that produced advances in dexterity, tele-presence, remote supervision across time delay, combining mobility with manipulation, human-robot interaction, force control and autonomous grasping. Design challenges for the R2 included higher speed, smaller packaging, more dexterous fingers, more sensitive perception, soft drivetrain design, and the overall implementation of a system software approach for human safety, At the time of this writing the R2B unit was poised for launch to the International Space Station (ISS) aboard STS-133. R2 will be the first humanoid robot in space, and is arguably the most sophisticated robot in the world, bringing NASA into the 21st century as the world's leader in this field. Joining the other robots already on ISS, the station is now an exciting lab for robot experiments and utilization. A particular challenge for this project has been the design and certification of the robot and its software for work near humans. The 3 layer software systems will be described, and the path to ISS certification will be reviewed. R2 will go through a series of ISS checkout tests during 2011. A taskboard was shipped with the robot that will be used to compare R2B's dexterous manipulation in zero gravity with the ground robot s ability to handle similar objects in Earth s gravity. R2's taskboard has panels with increasingly difficult tasks, starting with switches, progressing to connectors and eventually handling softgoods. The taskboard is modular, and new interfaces and experiments will be built up using equipment already on ISS. Since the objective is to test R2 performing tasks with human interfaces, hardware abounds on ISS and the crew will be involved to help select tasks that are dull, dirty or dangerous. Future plans for R2 include a series of upgrades, evolving from static IVA (Intravehicular Activity) operations, to mobile IVA, then EVA (Extravehicular Activity).

Ambrose, Robert O.↗

Verification of the Generalized Aerospace Simulation in Simulink (R)

NASA uses six-degrees-of-freedom (6-DOF) simulations tools to design, test, develop Guidance Navigation and Control (GN&C) software, and certify vehicle performance prior to flight. Therefore, it is critical that the 6-DOF tools used for vehicle design and certification are validated. The focus of this work is the vali-dation of the NASA Marshall Space Flight Center 6-DOF “GeneraLized Aero-space Simulation in Simulink” (GLASS) framework tool. The GLASS tool framework is currently used to support NASA GN&C insight for the Human Landing System (HLS) project, simulating vehicle dynamics during lunar descent and as-cent. The GLASS framework utilizes the off-the-shelf Mathworks ® Simscape Multibody® toolbox to model vehicle multi-body dynamics. NASA’s Engineering and Safety Center (NESC) provides a set of 6-DOF simulation verification “check cases” that are available to any user needing to verify 6-DOF tools. The check cases contain seventeen atmospheric and twenty-six orbital test scenarios are provided to validate equations of motion, environmental models (e.g., atmosphere, gravitation, and geodesy) and tool propagators. This paper compares GLASS 6-DOF simulation results against the NESC check cases’ results via simulation-to-simulation comparisons. The comparisons demonstrate that GLASS simulation results are “in family” with the outputs of the applicable NASA NESC check cases and verifies the GLASS core framework dynamics and the correct implementation of the check case scenario models.

6-Dof↗

Hypermedia and intelligent tutoring applications in a mission operations environment

Hypermedia, hypertext and Intelligent Tutoring System (ITS) applications to support all phases of mission operations are investigated. The application of hypermedia and ITS technology to improve system performance and safety in supervisory control is described - with an emphasis on modeling operator's intentions in the form of goals, plans, tasks, and actions. Review of hypermedia and ITS technology is presented as may be applied to the tutoring of command and control languages. Hypertext based ITS is developed to train flight operation teams and System Test and Operation Language (STOL). Specific hypermedia and ITS application areas are highlighted, including: computer aided instruction of flight operation teams (STOL ITS) and control center software development tools (CHIMES and STOL Certification Tool).

Ames, Troy↗

Space Shuttle Ascent Flight Design Process: Evolution and Lessons Learned

The Space Shuttle Ascent Flight Design team is responsible for defining a launch to orbit trajectory profile that satisfies all programmatic mission objectives and defines the ground and onboard reconfiguration requirements for this high-speed and demanding flight phase. This design, verification and reconfiguration process ensures that all applicable mission scenarios are enveloped within integrated vehicle and spacecraft certification constraints and criteria, and includes the design of the nominal ascent profile and trajectory profiles for both uphill and ground-to-ground aborts. The team also develops a wide array of associated training, avionics flight software verification, onboard crew and operations facility products. These key ground and onboard products provide the ultimate users and operators the necessary insight and situational awareness for trajectory dynamics, performance and event sequences, abort mode boundaries and moding, flight performance and impact predictions for launch vehicle stages for use in range safety, and flight software performance. These products also provide the necessary insight to or reconfiguration of communications and tracking systems, launch collision avoidance requirements, and day of launch crew targeting and onboard guidance, navigation and flight control updates that incorporate the final vehicle configuration and environment conditions for the mission. Over the course of the Space Shuttle Program, ascent trajectory design and mission planning has evolved in order to improve program flexibility and reduce cost, while maintaining outstanding data quality. Along the way, the team has implemented innovative solutions and technologies in order to overcome significant challenges. A number of these solutions may have applicability to future human spaceflight programs.

Picka, Bret A.↗

NASA Electric Vertical Takeoff and Landing (eVTOL) Aircraft Technology for Public Services – A White Paper

History has shown that our personal life is highly dependent on the technology that people have developed. A strategic scan of the aerospace environment at the beginning of the 21st century strongly suggests that the world might be approaching a new age of airpower—the era of electrified/hybrid aircraft propulsion. Undeniably, starting from the Montgolfier Brothers balloon flight in 1783, to the Wright Brothers piston engine flight in 1903, and the jet engine of the 1960s, or the space age of today, one can say that leaps in propulsion technology have marked the different ages of human flight. The technological advancements, brought at the beginning of 21st century by the revolution in data exchange, computational power, sensors, wireless communication, internet, and autonomy, contributed to the vision of this new age of propulsion we are approaching. Historically, conventional vertical takeoff and landing (VTOL) aircraft have been equipped with propulsion units relying on complex internal combustion machines (turbines, piston engines, for example), and complex mechanical arrangements (gearboxes, shafts, variable pitch propeller). By contrast, electric VTOL aircraft (eVTOL)1 rely on simpler propulsion units (electric motors and in some cases fixed-pitch propellers). This promotes redundancy and improves tolerance to failures, in turn improving safety. The use of simpler electric propulsion units should also allow significant acquisition and operating cost reductions. Whether full-electric (relying solely on batteries) or hybrid-electric (relying on a combination of batteries, fuel-powered engines, and generators.), eVTOLs are also expected to generate less noise and air pollution than conventional aircraft with similar payloads. According to the 2019 Annual Review of IATA (International Air Transport Association) [ref.1], due to an expected increase in air transport traffic by 5% every year and a doubling of air transport passenger numbers to 8.2 billion by 2037 significant challenges are posed to the aviation industry. Furthermore, this report does not factor in the expected demand for short-range (intra-city) air transportation, which is in development and yet to be operational. The increased demand to fly creates a responsibility to expand in a sustainable manner and an endeavor to develop more environmentally-friendly aircraft. eVTOL aircraft, either piloted or autonomous, is gathering considerable interest worldwide. Modern and novel full-electric or hybrid-electric eVTOL configurations enable a new paradigm shift in air transportation as the aviation industry remains committed to its goals of carbon-neutral growth from 2020 onwards and cutting CO2 emissions to half 2005 levels by 2050. While electric power has been used for decades, recent developments in mobile electric/hybrid propulsion coupled with advanced materials and autonomous systems may create the possibility to transition into the next age of air mobility propelled by electric/hybrid VTOL aircraft technology. Although eVTOL aircraft might seem like an incremental improvement or even a counterintuitive regression with regard to past VTOL development, it has in fact the potential to transform air mobility across a wide range of government applications. Previous transformations in aviation generated dramatic leaps in performance, but the cost was commensurate with performance, limiting quantity produced. This next age appears to take a different approach. Performance may not increase, but at this moment technology is poised for future urban mobility that will spawn commercial passenger drone services, that is, autonomous (pilotless) air taxis and thereby add a new dimension to the urban transportation mix of the future [ref. 2]. Advances in electric propulsion, autonomous flight technology, and 5G communication networks will enable this fast new-growing market to become a reality. It is now time to envision the introduction of electric/hybrid eVTOL aircraft for Public Services2. We believe that in the next decades eVTOL aircraft will have the potential to become an essential tool to Public Service agencies around the world in applications such as firefighting, public safety, search and rescue, disaster relief and law enforcement. This is due to several major factors. • First, with the increasing popularity of small, unmanned aircraft vehicles (UAVs) or drones, many companies today are focusing on the development of passenger UAVs designed to accommodate up to five passengers or equivalent cargo payload. Many such configurations are electric or hybrid-electric designs with VTOL capabilities. Several of these projects have started a flight test program and many more are expected to be in the experimental and development phase in 2020. Such revolutionary vehicles could be in commercial operations by 2030. These eVTOL systems could be ready for selected Public Services missions even sooner. • Second, although these advanced eVTOL vehicles under development still need access to fuel (hybrid) and/or electric charging capability, they can take off and land from almost anywhere. Therefore, such vehicles, both manned and unmanned can be successfully integrated for the critical missions of the Public Services with extra deployment flexibilities. • Third, advancement in electric propulsion systems in the automotive industry together with NASA’s leading efforts in electrification of aircraft propulsion systems, FAA’s ongoing active eVTOL certification programs, and EASA’s proposed framework for the certification of electric/hybrid small category VTOL aircraft in Europe [ref. 3] will help accelerate industry electric propulsion system development and integration. • Finally, eVTOL vehicles could be deployed for Public Services sooner than air taxi or other commercial applications, since Public Services missions may be more easily approved based on specific mission criteria, localized airworthiness authority for public-use aircraft3, and are normally operating under centralized airspace management and control by the theater command. Moreover, public perception and acceptance are generally less of a concern when operations save lives and benefit the wider community. The prioritized introduction of eVTOL aircraft in Public Services is ambitious, but we believe it is achievable in the coming decades if fundamental enablers (people and technologies) are engaged in defining the objectives and needs of these missions. The revolution that is currently taking place in eVTOL aircraft represents an unprecedented opportunity to develop a safer, more affordable, more available and more environmentally friendly future of vertical flight. To ensure that these novel aircraft meet the future expectations of Public Services, it is essential to take a collaborative and multi-disciplinary approach to their development, across engineering disciplines, policy-making, program management, business case development, manufacturing, and flight demonstrations. It should be noted that the term eVTOL (in the near term) used throughout this publication implies aircraft capable of transporting up to 5 persons which may or may not include a pilot if operated fully autonomously, assuming an average of 200 pounds (91 kg) per person or equivalent payload and a range up to 60 miles plus a suitable reserve. Hybrid or hydrogen powered eVTOLs would have greater range. For example, a “3-seat” eVTOL aircraft may only be able to carry two fully equipped firemen, and payload capacity is more relevant when used for the supply mission. Moreover, this paper concentrates on the “last-mile” solutions with a deployment time of no more than 6 hours. Although not specifically discussed in this document, it is understood that the future of Transformative Vertical Flight in general and Public Services, in particular, will also involve smaller UAVs that will undoubtedly play a crucial role in future aerial operations. For example, smaller unmanned aircraft may be used to dispatch medical supplies, portable filtration systems or perform the Search task of future Search and Rescue (SAR) operations. Close collaboration between the aircraft industry, the Civil Aviation Authorities (CAA), e.g., Federal Aviation Administration (FAA), European Aviation Safety Agency (EASA), Transport Canada Civil Aviation (TCCA) and the Department of Defense (DoD) certifiers, will help identify Public Services requirements, define expectations and limit development cost and timescales. Take the US Air Force Agility Prime as an example, the majority of the eVTOL application opportunities and mission elements identified are in line with the NASA TVF WG-4 objectives and use cases. Together, it forms a strong partnership to accelerate the development, certification, and practical deployment for public service missions. The US Air Force Agility Prime has been a collaboration partner on this white paper, and provided valuable input and recommendations. Most of the eVTOL public service mission elements discussed in this paper and additional use cases envisioned by the NASA TVF WG-4 team are shared by the Agility Prime program. The focus and efforts of the Agility Prime in product and system development, industry and government partnership, accelerated certifications as well as early test and deployment are totally in sync with the path forward recommended by this white paper. This kind of collaboration and partnership will help enable the practical use of the eVTOL for public service missions, benefit the eVTOL public acceptance, and accelerate the eVTOL industry revolution.

Johnny T. Doo↗

The role of the research simulator in the systems development of rotorcraft

Over the last 20 years, flight simulators became widely accepted as training tools. Moreover, research simulators were used extensively by the fixed-wing industry: in the design, testing, and certification of new aircraft. The rotorcraft industry, however, was slow to use man-in-the-loop simulation to solve its design problems, primarily because of the difficulty of modeling complex rotorcraft for realtime simulation and because of the need for a wide-angle visual system for low-level flight. A joint U.S. Army and NASA program was initiated to provide this simulation capability for exploitation by both government and industry. The potential application of the research simulator to future rotorcraft systems design, development, product improvement evaluations, and safety analysis is discussed.

Statler, I. C.↗

Manned testing in a simulated space environment

A view of the facility and operational requirements involved in performing a manned thermal vacuum test is presented. The requirements fall into two major categories. The first category deals with placing the suited crewmen in a hazardous environment and assuring their safety. The second category deals with the constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment. Design areas that deal with man rating a chamber, including fire suppression, emergency repress, emergency power, backups, reliable instrumentation and data systems, communications, television monitoring, biomedical monitoring, material compatibilities, and equipment supporting the Extravehicular Mobility Unit (EMU) are discussed. The operational issues that are peculiar to manned testing such as test rules, test procedures, test protocol, emergency drills, availability of hyperbaric facilities, test team training and certification engineering concerns for a safe mechanical and instrumentation buildup, hazard analysis, and Failure Modes and Effects Analysis are discussed. The constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment are addressed.

Fender, Donna L.↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

CASPEr: an Approach to Characterize the Performance of Onboard Airplane Energy State and Automation Mode Prediction Functions

The Commercial Aviation Safety Team (CAST) has identified a set of safety enhancements to mitigate the risks of loss of control in-flight (LOCI) accidents and incidents involving commercial transport airplanes. In support of this, NASA has been developing technologies intended to enhance flight crew awareness of airplane systems, attitude, and energy state. This report describes preliminary ideas for a methodology to assess the goodness of onboard airplane energy state and automation mode prediction functions. The methodology is intended to contribute to the goal of moving these prediction technologies to the readiness level required for transition to industry and reduce the technology certification risks. In addition, this report describes a simulation-based approach named CASPEr (Characterization of Airplane State Prediction Error) to characterize the performance of these predictive functions over a wide range of operational conditions. The first exploratory version of this approach is described. The bulk of the report documents the initial results of tests to characterize the performance of an airplane trajectory prediction function. Future reports will give additional performance characterization results for this function and a complete description of the proposed methodology to assess such functions.

Torres-Pomales, Wilfredo↗

NH11B-1726: FrankenRaven: A New Platform for Remote Sensing

Small, modular aircraft are an emerging technology with a goal to maximize flexibility and enable multi-mission support. This reports the progress of an unmanned aerial system (UAS) project conducted at the NASA Ames Research Center (ARC) in 2016. This interdisciplinary effort builds upon the success of the 2014 FrankenEye project to apply rapid prototyping techniques to UAS, to develop a variety of platforms to host remote sensing instruments. In 2016, ARC received AeroVironment RQ-11A and RQ-11B Raven UAS from the US Department of the Interior, Office of Aviation Services. These aircraft have electric propulsion, a wingspan of roughly 1.3m, and have demonstrated reliability in challenging environments. The Raven airframe is an ideal foundation to construct more complex aircraft, and student interns using 3D printing were able to graft multiple Raven wings and fuselages into FrankenRaven aircraft. Aeronautical analysis shows that the new configuration has enhanced flight time, payload capacity, and distance compared to the original Raven. The FrankenRaven avionics architecture replaces the mil-spec avionics with COTS technology based upon the 3DR Pixhawk PX4 autopilot with a safety multiplexer for failsafe handoff to 2.4 GHz RC control and 915 MHz telemetry. This project demonstrates how design reuse, rapid prototyping, and modular subcomponents can be leveraged into flexible airborne platforms that can host a variety of remote sensing payloads and even multiple payloads. Modularity advances a new paradigm: mass-customization of aircraft around given payload(s). Multi-fuselage designs are currently under development to host a wide variety of payloads including a zenith-pointing spectrometer, a magnetometer, a multi-spectral camera, and a RGB camera. After airworthiness certification, flight readiness review, and test flights are performed at Crows Landing airfield in central California, field data will be taken at Kilauea volcano in Hawaii and other locations.

remote sensing↗

Developing Approaches for Certification of Uninspectable Fracture Critical AM Components

Introduction - Human-rated spaceflight hardware is subject to the Fracture Control requirements in NASA-STD5019, which are intended to control the risk of component failure due to undetected cracks or defects. - All hardware in this mission class is classified for Fracture Control – Exempt, Non-fracture Critical, or Fracture Critical - Fracture Critical: A classification that identifies a part where failure due to the presence of a crack is a catastrophic hazard ➔ Pressure vessels, engine components, primary structure, etc. - Axiom 1: Material and manufacturing process produce structures and components with cracks or defects. - Axiom 2: The presence of a crack or defect of sufficient size reduces the strength and life of the structure. - Damage Tolerance: demonstration that a component can survive the service life (with a safety factor) in the presence of an undetected flaw or damage. - Components are manufactured from aerospace quality materials using controlled processes. - Components are inspected for damage (cracks, flaws, defects, etc.). - Components are shown by test or analysis to be tolerant to undetected flaws.

Will Tilson↗

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

Crewed Space Vehicle Battery Safety Requirements

This requirements document is applicable to all batteries on crewed spacecraft, including vehicle, payload, and crew equipment batteries. It defines the specific provisions required to design a battery that is safe for ground personnel and crew members to handle and/or operate during all applicable phases of crewed missions, safe for use in the enclosed environment of a crewed space vehicle, and safe for use in launch vehicles, as well as in unpressurized spaces adjacent to the habitable portion of a space vehicle. The required provisions encompass hazard controls, design evaluation, and verification. The extent of the hazard controls and verification required depends on the applicability and credibility of the hazard to the specific battery design and applicable missions under review. Evaluation of the design and verification program results shall be completed prior to certification for flight and ground operations. This requirements document is geared toward the designers of battery systems to be used in crewed vehicles, crew equipment, crew suits, or batteries to be used in crewed vehicle systems and payloads (or experiments). This requirements document also applies to ground handling and testing of flight batteries. Specific design and verification requirements for a battery are dependent upon the battery chemistry, capacity, complexity, charging, environment, and application. The variety of battery chemistries available, combined with the variety of battery-powered applications, results in each battery application having specific, unique requirements pertinent to the specific battery application. However, there are basic requirements for all battery designs and applications, which are listed in section 4. Section 5 includes a description of hazards and controls and also includes requirements.

Jeevarajan, Judith A.↗

The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles

Future generations of NASA and U.S. Air Force vehicles will require lighter mass while being subjected to higher loads and more extreme service conditions over longer time periods than the present generation. Current approaches for certification, fleet management and sustainment are largely based on statistical distributions of material properties, heuristic design philosophies, physical testing and assumed similitude between testing and operational conditions and will likely be unable to address these extreme requirements. To address the shortcomings of conventional approaches, a fundamental paradigm shift is needed. This paradigm shift, the Digital Twin, integrates ultra-high fidelity simulation with the vehicle s on-board integrated vehicle health management system, maintenance history and all available historical and fleet data to mirror the life of its flying twin and enable unprecedented levels of safety and reliability.

Glaessgen, Edward H.↗

Human Spaceflight Safety for the Next Generation on Orbital Space Systems

The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been chartered to facilitate the development of a United States (U.S.) commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low Earth orbit (LEO) and the International Space Station (ISS) as soon as possible. Once the capability is matured and is available to the Government and other customers, NASA expects to purchase commercial services to meet its ISS crew rotation and emergency return objectives. The primary role of the CCP is to enable and ensure safe human spaceflight and processes for the next generation of earth orbital space systems. The architecture of the Program delineates the process for investment performance in safe orbital systems, Crew Transportation System (CTS) certification, and CTS Flight Readiness. A series of six technical documents build up the architecture to address the top-level CTS requirements and standards. They include Design Reference Missions, with the near term focus on ISS crew services, Certification and Service Requirements, Technical Management Processes, and Technical and Operations Standards Evaluation Processes.

Mango, Edward J.↗

Inspection of the Math Model Tools for On-Orbit Assessment of Impact Damage Report

In Spring of 2005, the NASA Engineering Safety Center (NESC) was engaged by the Space Shuttle Program (SSP) to peer review the suite of analytical tools being developed to support the determination of impact and damage tolerance of the Orbiter Thermal Protection Systems (TPS). The NESC formed an independent review team with the core disciplines of materials, flight sciences, structures, mechanical analysis and thermal analysis. The Math Model Tools reviewed included damage prediction and stress analysis, aeroheating analysis, and thermal analysis tools. Some tools are physics-based and other tools are empirically-derived. Each tool was created for a specific use and timeframe, including certification, real-time pre-launch assessments, and real-time on-orbit assessments. The tools are used together in an integrated strategy for assessing the ramifications of impact damage to tile and RCC. The NESC teams conducted a peer review of the engineering data package for each Math Model Tool. This report contains the summary of the team observations and recommendations from these reviews.

Harris, Charles E.↗

Inspection of the Math Model Tools for On-Orbit Assessment of Impact Damage Report

In Spring of 2005, the NASA Engineering Safety Center (NESC) was engaged by the Space Shuttle Program (SSP) to peer review the suite of analytical tools being developed to support the determination of impact and damage tolerance of the Orbiter Thermal Protection Systems (TPS). The NESC formed an independent review team with the core disciplines of materials, flight sciences, structures, mechanical analysis and thermal analysis. The Math Model Tools reviewed included damage prediction and stress analysis, aeroheating analysis, and thermal analysis tools. Some tools are physics-based and other tools are empirically-derived. Each tool was created for a specific use and timeframe, including certification, real-time pre-launch assessments. In addition, the tools are used together in an integrated strategy for assessing the ramifications of impact damage to tile and RCC. The NESC teams conducted a peer review of the engineering data package for each Math Model Tool. This report contains the summary of the team observations and recommendations from these reviews.

Harris, Charles E.↗

NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗