Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing phase”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

ECI Final Report: Closing of Critical Technology Gaps for Rotating Detonation Rocket Engines

NASA has successfully fired several configurations of a dual regenerative 10K lbf class Rotating Detonation Rocket Engines using cryogenic liquid methane, liquid hydrogen, and RP-1 as fuel and liquid or gaseous oxygen as the oxidizer. In addition, 3 hot fire test phases were conducted to evaluate parametrically varying combustor geometries using a subscale 500-1K lbf class thruster RDRE. Several studies were successfully completed to evaluate the impacts of contraction ratio, annulus L’, heat transfer through calorimetry, and varying injector designs. Laser powder bed fusion GRCop-42, GRX-810, and C-103 alloys were used for the outer bodies, inner bodies, nozzles, and injector variations. The development of RDRE technology is only now possible with additive manufacturing techniques and these specialized alloys. Critical design parameters, design rules of thumb, and operability limitations have been identified. Major lessons learned in the development of critical components have also been documented. All critical technology gaps have been demonstrated at one scale or another and closed. A major finding of this work is that the combustion efficiency of the RDRE is far superior to that of the traditional liquid rocket engine requiring an order of magnitude lower chamber volume and residence time to react. Because of this, the design trade space opens up significantly. More compact chamber geometries are now possible with potential mass savings and significant length savings possible to flight geometries. In addition, the ceiling for the technology, in terms of Isp, has not yet been reached. It is likely that an additional ~10% better Isp over equivalent state-of-the-art combustion devices may be achieved over the next decade should the technology continue to be developed. This technology has been shown to be viable for near term infusion (2-5 years) into space missions and enable cost effective space access for US industry. This final report documents all major findings from this early career initiative (ECI) project and lays out what is needed post ECI.

Thomas Teasley↗

Heat transfer phase change paint tests of 0.0175-scale models (nos. 21-0 and 46-0) of the Rockwell International space shuttle orbiter in the AEDC tunnel B hypersonic wind tunnel (test OH25A)

Tests were conducted in a hypersonic wind tunnel using various truncated space shuttle orbiter configurations in an attempt to establish the optimum model size for other tests examining body shock-wing leading edge interference effects. The tests were conducted at Mach number 8 using the phase change paint technique. A test description, tabulated data, and tracings of isotherms made from photographs taken during the test are presented.

Dye, W. H.↗

Autonomous Airborne Refueling Demonstration: Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small.

Dibley, Ryan P.↗

Autonomous Airborne Refueling Demonstration, Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the NASA Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small

Dibley, Ryan P.↗

The data systems tests - The final phase

The U.S.A. has conducted a series of data systems tests (DSTs) as a precursor to its participation in FGGE, the Global Weather Experiment. The paper briefly describes the impact those tests have had on the FGGE observing system and on the data management plans. In particular, the final phase of the DST programs is described, wherein a number of investigators have been selected to work with the DST data sets in research studies directed toward the GARP objectives. Thus, an important first step has been taken in providing feedback to the potential FGGE research community.

Greaves, J. R.↗

NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

Barta, Daniel J.↗

S-band maser phase delay stability tests

The results of the S-band traveling wave maser phase delay stability measurements performed at DSS 62 are presented. These tests were required for the Pioneer-Venus wind experiment.

Urech, J. M.↗

Space Station Freedom environmental control and life support system phase 3 simplified integrated test detailed report

A description of the phase 3 simplified integrated test (SIT) conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) in 1989 is presented. This was the first test in the phase 3 series integrated environmental control and life support systems (ECLSS) tests. The basic goal of the SIT was to achieve full integration of the baseline air revitalization (AR) subsystems for Space Station Freedom. Included is a description of the SIT configuration, a performance analysis of each subsystem, results from air and water sampling, and a discussion of lessons learned from the test. Also included is a full description of the preprototype ECLSS hardware used in the test.

Roberts, B. C.↗

Joint Test Report For Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

National Aeronautics and Space Administration (NASA) and Air Force Space Command (AFSPC) have similar missions and therefore similar facilities and structures in similar environments. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. The most common topcoats used in coating systems are polyurethanes that contain isocyanates. Isocyanates are classified as potential human carcinogens and are known to cause cancer in animals. The primary objective of this effort was to demonstrate and validate alternatives to aliphatic isocyanate polyurethanes resulting in one or more isocyanate-free coatings qualified for use at AFSPC and NASA installations participating in this project. This joint Test Report (JTR) documents the results of the laboratory and field testing as well as any test modifications made during the execution of the testing. The technical stakeholders agreed upon test procedure modifications documented in this document. This JTR is made available as a reference for future pollution prevention endeavors by other NASA centers, the Department of Defense and commercial users to minimize duplication of effort. All coating system candidates were tested using approved NASA and AFSPC standard coating systems as experimental controls. This study looked at eight alternative coating systems and two control coating systems and was divided into Phase I Screening Tests, Phase II Tests, and Field Testing. The Phase I Screening Tests were preliminary tests performed on all the selected candidate coating systems. Candidate coating systems that did not meet the acceptance criteria of the screening tests were eliminated from further testing. Phase I Screening Tests included: Ease of Application, Surface Appearance, Dry-To-Touch (Sanding), Accelerated Storage Stability, Pot Life (Viscosity), Cure Time (Solvent Rubs), Cleanability, Knife Test, Tensile (pull-off) Adhesion, and X-Cut Adhesion by Wet Tape After a review of the Phase I test results, four of the alternative coating systems showed substandard performance in relation to the Control Systems and were eliminated from the Phase II testing. Due to the interest of stakeholders and time constraints, however, all eight alternatives were subjected to the following Phase II tests, along with field testing at Stennis Space Center (SSC), Mississippi: Hypergol Compatibility, Liquid Oxygen Compatibility, 18-Month Marine Exposure (Gloss Retention, Color Retention, Blistering, Visual Corrosion, Creepage from Scribe, Heat Adhesion), and Field Exposure (6- and 12-month Evaluation for Coating Condition, Color Retention, Gloss Retention). The remaining four alternative coating systems determined to be the best viable alternatives were carried on to Phase II testing that included: Removability, Repairability, Abrasion Resistance, Gravelometer, Fungus Resistance, Accelerated Weathering, Mandrel Bend Flexibility, and Cyclic Corrosion Resistance. Of the systems that continued to Phase II, three (3) alternative coating systems meet the performance requirements as identified by stakeholders. Two (2) other systems, that were not included in Phase II testing, performed well enough on the 18-Month Marine Exposure, the primary requirement for NASA technical standard NASA-STD-5008, Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment, that they were also considered to be successful candidates. In total, five (5) alternative coating systems were approved for inclusion in the NASA-STD- 5008 Qualified Products List (QPL). The standard is intended to provide a common framework for consistent practices across NASA and is often used by other entities. The standard's QPL does not connote endorsement of the products by NASA, but lists those products that have been tested and meet the requirements as specified.

Lewis, Pattie↗

Design, analysis, and testing of the Phase 1 CSI Evolutionary Model erectable truss

This report addressed the design, analysis, and testing of the erectable truss structure for the Phase 1 CSI Evolutionary Model (CEM) testbed. The Phase 1 CEM testbed is the second testbed to form part of an ongoing program of focused research at NASA/LaRC in the development of Controls-Structures Integration (CSI) technology. The Phase 1 CEM contains the same overall geometry, weight, and sensor locations as the Phase 0 CEM, but is based in an integrated controller and structure design, whereby both structure and controller design variables are sized simultaneously. The Phase 1 CEM design features seven truss sections composed of struts with tailored mass and stiffness properties. A common erectable joint is used and the strut stiffness is tailored by varying the cross-sectional area. To characterize the structure, static tests were conducted on individual struts and 10-bay truss assemblies. Dynamic tests were conducted on 10-bay truss assemblies as well as the fully-assembled CEM truss. The results indicate that the static and dynamic properties of the structure are predictable, well-characterized, and within the performance requirements established during the Phase 1 CEM integrated controller/structure design analysis.

Gronet, M. J.↗

Computer program simulates design, test, and analysis phases of sensitivity experiments

Modular program with a small main program and several specialized subroutines provides a general purpose computer program to simulate the design, test and analysis phases of sensitivity experiments. This program allows a wide range of design-response function combinations and the addition, deletion, or modification of subroutines.

Alexander, M. J.↗

Microgravity two-phase flow experiment and test results

A two-phase flow system was tested in the NASA KC-135 reduced gravity test facility. Its innovative flow configuration results in an unusual ease of control and significantly reduced power and heat rejection requirements, while permitting flow regimes, pressure drops, and boiling and condensing heat transfer to be examined. Numerous design features were incorporated that minimize the impact of the KC-135 environment on system condition. Among other results, flight testing indicates no significant effect of gravity on pressure drop for the conditions examined, and that many conditions can be examined definitively only in the long-term reduced gravity afforded by a space experiment.

Hill, Wayne S.↗

Phase retrieval camera for testing NGST optics

The NGST Phase Retrieval Camera (PRC) is a portable wavefront sensor useful for optical testing in high-vibration environments. Primary applications of the PRC are testing and experimenting with NGST technology demonstrator mirrors, along with exploring other wavefront sensing and control problems not easily studied using WCT. An overview of the hardware and testing results will be presented.

NGST↗

System Identification of Flexible Aircraft: Lessons Learned from the X-56A Phase 1 Flight Tests

The X-56A Multi-Utility Technology Testbed (MUTT) is a subscale airplane that was de-signed as an experimental flight research platform for improving aeroelastic modeling and control technologies. The Phase 1 flight tests, conducted from 2017 to 2019 at the NASA Arm-strong Flight Research Center (AFRC), included 39 flights and approximately 1000 research maneuvers, some of which demonstrated stable closed-loop flight beyond the open-loop flutter speed. This paper summarizes the system identification effort to extract nondimensional stability and control derivatives from the flight test data for constructing aeroelastic models of the flight dynamics. Topics discussed include instrumentation, experiment design, model postulation and reduction, parameter estimation, and others. Throughout the paper, unique challenges for the identification of flexible aircraft, practical aspects of the analysis, and lessons learned are presented.

Jared A Grauer↗

Results of phase change heat transfer test OH51 using 0.006-scale space shuttle orbiter models 46-0 and 90-0 and partial wing 0.0175-scale model 64-0 in the LaRC 31-inch CFHT

Test OH51 was a phase change paint test conducted in the LaRC 31-inch CFHT utilizing models 46-0, 64-0, and 90-0. Model 46-0 represented the space shuttle configuration 139 Orbiter. Model 90-0 represented the configuration 140 Orbiter. Model 64-0 represented the forward 45% portion of the Orbiter wing. The partial wing was tested with a shock generator located at various positions relative to the wing. The test was conducted at Mach 10.0, angles of attack from 27.5 deg through 37.5 deg, and Reynolds numbers of 0.5 and 1.5 million per foot.

Cummings, J. W.↗

Deep Space Habitability Design Guidelines Based on the NASA NextSTEP Phase 2 Ground Test Program

This report summarizes habitation design guidelines for deep space habitats, which were derived from the NASA Next Space Technologies for Exploration Partnerships (NextSTEP) Phase 2 Habitat Ground Test Program. All data presented in this document have been contractor-deidentified and approved for public release. The report prioritizes capabilities and recommends allocating those capabilities to either the Habitation and Logistics Outpost (HALO) or the International Habitat (I-Hab). A review of the design guidelines is presented in the main body of the report, along with a list of the 170 specific design guidelines with references to the specific data sources from which they were derived.

Gernhardt, Michael↗

International Space Station Program Phase 3 Integrated Atmosphere Revitalization Subsystem Test

Testing of the International Space Station (ISS) U.S. Segment baseline configuration of the Atmosphere Revitalization Subsystem (ARS) by NASA's Marshall Space Flight Center (MSFC) was conducted as part of the Environmental Control and Life Support System (ECLSS) design and development program. This testing was designed to answer specific questions regarding the control and performance of the baseline ARS subassemblies in the ISS U.S. Segment configuration. These questions resulted from the continued maturation of the ISS ECLSS configuration and design requirement changes since 1992. The test used pressurized oxygen injection, a mass spectrometric major constituent analyzer, a Four-Bed Molecular Sieve Carbon Dioxide Removal Assembly, and a Trace Contaminant Control Subassembly to maintain the atmospheric composition in a sealed chamber at ISS specifications for 30 days. Human metabolic processes for a crew of four were simulated according to projected ISS mission time lines. The performance of a static feed water electrolysis Oxygen Generator Assembly was investigated during the test preparation phases; however, technical difficulties prevented its use during the integrated test. The Integrated ARS Test (IART) program built upon previous closed-door and open-door integrated testing conducted at MSFC between 1987 and 1992. It is the most advanced test of an integrated ARS conducted by NASA to demonstrate its end-to-end control and overall performance. IART test objectives, facility design, pretest analyses, test and control requirements, and test results are presented.

Perry, J. L.↗

Results of phase change paint heat transfer test utilizing 0.040-scale 50% forebody models (no. 82-0) of the Rockwell International Space Shuttle Orbiter in AEDC VKF hypersonic tunnel B (test OH54B)

Aerodynamic heating phase change paint tests for the space shuttle orbiter are reported. The model was a 0.040 scale representation of the forward 50% of the orbiter. Surface roughness effects on boundary layer transition were investigated. The roughness was simulated by steel balls 0.020 and 0.025 inch in diameter and a 0.25 in. diameter hole simulating the forward ET attach socket. A nominal Mach number of was tested with unit Reynolds number varying from 0.75 x 1 million ft through 3.5x 1 million ft. Angle of attack was varied from 20 degrees to 40 degrees.

Dye, W. H.↗