Search NASA⌕ Search

SEARCH · Search NASA

Results for “vehicles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Mission and space vehicle sizing data for a chemical propulsion/aerobraking option

This paper presents sizing data for various combinations of Mars missions and chemical-propulsion/aerobraking vehicles. Data is compared for vehicles utilizing opposition (2-year mission) and conjunction (3-year mission) trajectories for 1999 and 2001 opportunities, for various sizes of vehicles. Payload capabilities for manned and unmanned missions vehicles and for propulsive-braking and aerobraking cases are shown. The effect of scaling up a reference vehicle Is compared to the case of utilizing two identical vehicles, for growth In payload capability. The rate of cumulative build up of weight on the surface of Mars is examined for various mission/vehicle combinations, and is compared to the landed-weight requirements for sortie missions, moving-base missions, and fixed-base missions. Also, the required buildup of weight in low Earth orbit (LEO) for various mission/vehicle combinations Is presented and discussed.

John Butler↗

Mission and space vehicle concepts

This paper discusses a number of top-level considerations which affect Mars and vehicle selection. Indications are provided of the nature and severity of the impact of these considerations on missions and vehicles. The paper identifies and discusses various types of missions, such as Mars fly-bys, Mars orbiting and landing missions, and missions to the moons of Mars. Mission trajectories and opportunities are discussed briefly. The paper also discusses the different types of vehicles required in a Mars program. Discussion includes several potential Earth-to-Orbit (ETO) vehicles, Mars surface vehicles, and 2 types of Orbit-to-Orbit (OTO) vehicles. Indications are provided as to preference for some of the concepts discussed.

John Butler↗

Space vehicle concepts

This paper presents several concepts of chemical-propulsion Space Vehicles (SVs) for manned Mars landing missions. For vehicle sizing purposes, several specific missions were chosen from opportunities in the late 1990's and early 2000's, and a vehicle "system" concept is then described which is applicable to the full range of missions and opportunities available. In general, missions utilizing planetary opposition alignments can he done with smaller vehicles than those utilizing planetary opposition alignments (reference I) The conjunction missions have a total mission time of about 3 years, including a required stay-time of about 60 days. Both types of missions might be desirable during a Mars program, the opposition type for early low-risk missions and/or for later unmanned cargo missions, and the conjunction type for more extensive science/exploration missions and/or for Mars base activities. Since the opposition missions appeared to drive the SV size more severely, there were probably more cases examined for them. Some of the concepts presented utilize all-propulsive braking, some utilize an all aerobraking approach, and some are hybrids. Weight statements are provided for various cases. The aerobraking cases have significant advantages in size and weight. Cryogenic propellants were used for the main propulsive elements in all cases, due to their significant weight advantage over storable propellants (reference 1). Extensive use is made of existing propulsive elements and other systems. Most of the work was done on O-g vehicle concepts, but partial-g and 1-g concepts are also provided and discussed. A recommendation is added that efforts be made to find ways to offset the long-term O-g effects on the crew, other than providing a g-field for the total SV or spacecraft, since this causes significant design and operations impacts. Several options for habitable elements are shown, such as large-diameter modules and Space Station (SS) types of modules. The latter were used as a reference because of their cost advantage as existing elements Several options are shown for the Mars landing vehicle, and a landing "system" is recommended which makes use of a large aeroshell to allow landing of payloads of various sizes and shapes over the course of a multi-year program. Because of the large size and weight of the SV it will be necessary to launch individual elements and assemble them in low Earth orbit (LEO). A configuration of one potential assembly concept is provided.

Michael Tucker↗

Water facilities in retrospect and prospect: An illuminating tool for vehicle design

Water facilities play a fundamental role in the design of air, ground, and marine vehicles by providing a qualitative, and sometimes quantitative, description of complex flow phenomena. Water tunnels, channels, and tow tanks used as flow-diagnostic tools have experienced a renaissance in recent years in response to the increased complexity of designs suitable for advanced technology vehicles. These vehicles are frequently characterized by large regions of steady and unsteady 3-D flow separation and ensuing vortical flows. The visualization and interpretation of the complicated fluid motions about isolated vehicle components and complete configurations in a time and cost effective manner in hydrodynamic test facilities is a key element in the development of flow control concepts, and, hence, improved vehicle designs. A historical perspective of the role of water facilities in the vehicle design process is presented. The application of water facilities to specific aerodynamic and hydrodynamic flow problems is discussed, and the strengths and limitations of these important experimental tools are emphasized.

Erickson, Gary E.↗

Manned Mars Explorer project: Guidelines for a manned mission to the vicinity of Mars using Phobos as a staging outpost; schematic vehicle designs considering chemical and nuclear electric propulsion

The Manned Mars Explorer (MME) project responds to the fundamental problems of sending human beings to Mars in a mission scenario and schematic vehicle designs. The mission scenario targets an opposition class Venus inbound swingby for its trajectory with concentration on Phobos and/or Deimos as a staging base for initial and future Mars vicinity operations. Optional vehicles are presented as a comparison using nuclear electric power/propulsion technology. A Manned Planetary Vehicle and Crew Command Vehicle are used to accomplish the targeted mission. The Manned Planetary Vehicle utilizes the mature technology of chemical propulsion combined with an advanced aerobrake, tether and pressurized environment system. The Crew Command Vehicle is the workhorse of the mission performing many different functions including a manned Mars landing, and Phobos rendezvous.

Nolan, Sean↗

Project Argo: The design and analysis of an all-propulsive and an aeroassisted version of a manned space transportation vehicle

Project Argo is the design of a manned Space Transportation Vehicle (STV) that would transport payloads between LEO (altitude lying between 278 to 500 km above the Earth) and GEO (altitude is approximately 35,800 km above the Earth) and would be refueled and refurbished at the Space Station Freedom. Argo would be man's first space-based manned vehicle and would provide a crucial link to geosynchronous orbit where the vast majority of satellites are located. The vehicle could be built and launched shortly after the space station and give invaluable space experience while serving as a workhorse to deliver and repair satellites. Eventually, if a manned space station is established in GEO, then Argo could serve as the transport between the Space Station Freedom and a Geostation. If necessary, modifications could be made to allow the vehicle to reach the moon or possibly Mars. Project Argo is unique in that it consists of the design and comparison of two different concepts to accomplish the same mission. The first is an all-propulsive vehicle which uses chemical propulsion for all of its major maneuvers between LEO and GEO. The second is a vehicle that uses aeroassisted braking during its return from GEO to LEO by passing through the upper portions of the atmosphere.

Source record↗

Experiences in teleoperation of land vehicles

Teleoperation of land vehicles allows the removal of the operator from the vehicle to a remote location. This can greatly increase operator safety and comfort in applications such as security patrol or military combat. The cost includes system complexity and reduced system performance. All feedback on vehicle performance and on environmental conditions must pass through sensors, a communications channel, and displays. In particular, this requires vision to be transmitted by close-circuit television with a consequent degradation of information content. Vehicular teleoperation, as a result, places severe demands on the operator. Teleoperated land vehicles have been built and tested by many organizations, including Sandia National Laboratories (SNL). The SNL fleet presently includes eight vehicles of varying capability. These vehicles have been operated using different types of controls, displays, and visual systems. Experimentation studying the effects of vision system characteristics on off-road, remote driving was performed for conditions of fixed camera versus steering-coupled camera and of color versus black and white video display. Additionally, much experience was gained through system demonstrations and hardware development trials. The preliminary experimental findings and the results of the accumulated operational experience are discussed.

Mcgovern, Douglas E.↗

Flight control issues of the next generation space transportation launch vehicles

Some of the issues that affect the flight control and guidance system designs for vertical-takeoff and horizontal-takeoff vehicles were investigated. A two-stage all-rocket vehicle was used to represent the vertical-takeoff system and a generic aerospace plane concept to represent the horizontal-takeoff vehicle. Two flight control issues for the vertical-takeoff rocket were uncovered. The first was the large gimbal angle range required for pitch trim when using parallel mated vehicles. The second was control during staging. Two issues were also identified for the air-breathing vehicle. The first is that the drag losses due to aerodynamic trim are a significant fraction of the total ideal velocity required to achieve orbit. The second issue is that since the vehicle flies at high dynamic pressure for most of the ascent, the guidance system design will be more difficult to ensure accurate insertion than that for the vertical-takeoff rocket system.

Powell, Richard W.↗

Utilizing air-turborocket and rocket propulsion for a single-stage-to-orbit vehicle

With appropriate technology advances, a horizontal-takeoff single-stage-to-orbit (SSTO) launch vehicle could be designed which utilizes a combination of air-turborocket (ATR) and rocket propulsion systems. Such a vehicle is currently under study at Langley, and this paper presents the results of that study. Estimated vehicle weight characteristics, engine characteristics, geometry, aerodynamics, performance, structures, and subsystems are summarized. Trade studies performed on the reference vehicle to optimize the initial thrust-to-weight ratio (T/W) and the T/W after transition to the rocket phase with respect to vehicle weights are also presented. Throughout the vehicle presentation, special attention is given to the design issues, sensitivities, and performance parameters involved.

Lepsch, Roger A., Jr.↗

Grid generation and flow computation about a Martian entry vehicle

A number of vehicles are currently being proposed for a manned mission to Mars. One of these vehicles has a modified blunt-nosed cone configuration. Experimental results were obtained for this vehicle in 1968. They show lift-over-drag ratios comparable to those needed for Mars entry. Computations are performed to verify the earlier results and to further describe the flight characteristics of this vehicle. An analytical method is used to define the surface of this vehicle. A single-block volume grid is generated around the vehicle using the algebraic Two-Boundary Grid Generation algorithm (TBGG) and transfinite interpolation. Euler solutions are then obtained from a Langley Aerodynamic Upward Relaxation Algorithm (LAURA) at Mach 6.0 and angles of attack of 0, 6, and 12 deg. The lift coefficient determined from the LAURA code agree very well with the experimental results. The drag and pitching moment coefficients, however, are underestimated by the code since viscous effects are not considered. Contour plots of the flowfield show no evidence of separation for angles of attack up to 12 deg.

Stewart, J. E.↗

Preliminary subsystem designs for the Assured Crew Return Vehicle (ACRV)

Described herein is a series of design studies concerning the Assured Crew Return Vehicle (ACRV). Study topics include a braking and landing system for the ACRV, ACRV growth options, and the design impacts of ACRV's role as a medical emergency vehicle. Four alternate designs are presented for the ACRV braking and landing system. Options presented include ballistic and lifting body reentries; the use of high-lift, high-payload aerodynamic decelerators, as well as conventional parachutes; landing systems designed for water landings, land landings or both; and an aerial recovery system. Uses of the ACRV or a similarly designed vehicle in several roles for possible future space missions are discussed, along with the required changes to the ACRV to allow it to perform these missions optimally. The impacts on the design of the ACRV due to its role as an emergency vehicle were studied and are presented here. This study included the design of a stretcher-like system to transport an ill or injured crewmember safely within the ACRV; a compilation of necessary medical equipment and decisions on how or where to store it; and recommendations about internal and external vehicle characteristics that will ease the transport of the ill or injured crewmember and allow for swift and easy ingress/egress of the vehicle.

Source record↗

Dynamic response of a hammerhead launch vehicle wind-tunnel model

A wind-tunnel test of a 1/10th-scale Atlas-Centaur I large payload fairing launch vehicle model was conducted in the NASA Langley Transonic Dynamics Tunnel. The wind tunnel model was an aeroelastically-scaled version of the flight vehicle and was capable of simulating either of the first two bending vibration modes of the full-scale vehicle by a partial mode technique. The primary purpose of the test was to gather data concerning buffet response which could be used to clear the vehicle for flight. Additionally, angle-of-attack studies were conducted and several payload fairing configurations were tested to assess the buffet response and dynamic stability of off-design flight conditions and geometric parameters. No dynamic instabilities were found for any of the configurations tested. The buffet response data for the nominal flight configuration indicate that the unsteady buffet loads represent 5 to 10 percent of the total design load; therefore, the buffet loads are not a large factor affecting the overall vehicle design. Payload fairing length-to-diameter ratio variations were found to have small effects on the buffet response of the model, except in the case of the smallest length-to-diameter models for the second bending mode simulation. The effects of angle of attack on buffet response were found to be small. The model was more sensitive to Mach number changes than to angle of attack. The buffet response results from this wind tunnel test were influenced by the tunnel facility vibration levels. An attempt was made to experimentally reduce the effect of the facility mechanical vibration for the nominal flight configuration by testing with vertical rods used to stiffen the sting support. The first flight of the Atlas-Centaur I vehicle successfully occurred on July 25, 1990, and a comparison of flight measurements with wind tunnel data is presented. The flight data was found to be well within the 3 sigma level of the wind tunnel data.

Cole, Stanley R.↗

Conceptual design of two-stage-to-orbit hybrid launch vehicle

The object of this design class was to design an earth-to orbit vehicle to replace the present NASA space shuttle. The major motivations for designing a new vehicle were to reduce the cost of putting payloads into orbit and to design a vehicle that could better service the space station with a faster turn-around time. Another factor considered in the design was that near-term technology was to be used. Materials, engines and other important technologies were to be realized in the next 10 to 15 years. The first concept put forth by NASA to meet these objectives was the National Aerospace Plane (NASP). The NASP is a single-stage earth-to-orbit air-breathing vehicle. This concept ran into problems with the air-breathing engine providing enough thrust in the upper atmosphere, among other things. The solution of this design class is a two-stage-to-orbit vehicle. The first stage is air-breathing and the second stage is rocket-powered, similar to the space shuttle. The second stage is mounted on the top of the first stage in a piggy-back style. The vehicle takes off horizontally using only air-breathing engines, flies to Mach six at 100,000 feet, and launches the second stage towards its orbital path. The first stage, or booster, will weigh approximately 800,000 pounds and the second stage, or orbiter will weigh approximately 300,000 pounds. The major advantage of this design is the full recoverability of the first stage compared with the present solid rocket booster that are only partially recoverable and used only a few times. This reduces the cost as well as providing a more reliable and more readily available design for servicing the space station. The booster can fly an orbiter up, turn around, land, refuel, and be ready to launch another orbiter in a matter of hours.

Source record↗

The use of visual cues for vehicle control and navigation

At least three levels of control are required to operate most vehicles: (1) inner-loop control to counteract the momentary effects of disturbances on vehicle position; (2) intermittent maneuvers to avoid obstacles, and (3) outer-loop control to maintain a planned route. Operators monitor dynamic optical relationships in their immediate surroundings to estimate momentary changes in forward, lateral, and vertical position, rates of change in speed and direction of motion, and distance from obstacles. The process of searching the external scene to find landmarks (for navigation) is intermittent and deliberate, while monitoring and responding to subtle changes in the visual scene (for vehicle control) is relatively continuous and 'automatic'. However, since operators may perform both tasks simultaneously, the dynamic optical cues available for a vehicle control task may be determined by the operator's direction of gaze for wayfinding. An attempt to relate the visual processes involved in vehicle control and wayfinding is presented. The frames of reference and information used by different operators (e.g., automobile drivers, airline pilots, and helicopter pilots) are reviewed with particular emphasis on the special problems encountered by helicopter pilots flying nap of the earth (NOE). The goal of this overview is to describe the context within which different vehicle control tasks are performed and to suggest ways in which the use of visual cues for geographical orientation might influence visually guided control activities.

Hart, Sandra G.↗

STS Derivative Cargo Vehicles for the 1990's decade and beyond

Shuttle-derived vehicle options are described in the context of supporting earth-LEO space transportation for the lunar and Mars missions. An evolutionary model is delineated which can provide heavy-lift capabilities for these missions with a system based on STS booster elements. The Shuttle-C unmanned launch system and the Mars heavy-lift launch vehicles (HLLV) are examined as reference vehicles with launch configurations illustrated for lunar and Martian transportation scenarios. The Shuttle-C prelunar vehicle can be modified for lunar transportation as the Shuttle-C Block I which can then be extended to a two-stage HLLV by adding a third stage in the form of a Mars transfer vehicle. The development of a liquid-rocket booster is proposed to replace the STS solid booster for added mission flexibility. The use of shuttle-derived vehicles is concluded to be an effective means for supporting the lunar and Mars initiatives while minimizing near-term costs.

Shelton, Billy W.↗

Cargo transfer vehicle RCS propellant contamination issues

The purpose of this report is to address Cargo Transfer Vehicle (CTV) RCS contamination issues and contribute to the resources necessary to optimize the vehicle and propulsion systems required in the CTV of the National Launch System (NLS) Heavy Lift Launch Vehicle (HLLV). This study reviews the thruster-induced contaminants; their transportation from the thrust chamber to the vehicle, payload, and SSF; and the mechanism by which damage is inflicted on their components. The effect of both monopropellant and bipropellant RCS rocket exhaust plumes on a spacecraft and related functional surfaces has been the subject of considerable study over the years. It is recognized that the RCS rocket produces contaminants which can significantly degrade the performance of optical windows, solar cells, thermal-protective coatings, and other external vehicle components. This is particularly true when the rocket is operating in the pulse mode. The exhaust plume impingement pressure and heat-transfer phenomena also complicate the environment to which the vehicle and its functional surfaces are exposed, but are not addressed in this study. Bipropellant contamination presented several modes of damage to incident surfaces, which can pose a long-term deleterious consequence to CTV payloads and the Space Station Freedom (SSF). Monopropellant contamination did not pose any significant long-term issues other than the possibility of aniline deposition. The use of either bipropellant and monopropellant propulsion systems can have a design impact on the CTV propulsion system with respect to maneuvering operations in the proximity of SSF.

Ballard, Richard O.↗

Antares: A low cost modular launch vehicle for the future

The single-stage-to-orbit launch vehicle Antares is a revolutionary concept based on identical modular units, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg (22,000 lb) into low Earth orbit (LEO). When coupled with a standard Centaur upper stage, it is capable of placing 4000 kg (8800 lb) into geosynchronous Earth orbit (GE0). The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles can be attached depending on the payload and mission requirements. With a seven-vehicle configuration, the Antares' modular concept provides a heavy lift capability of approximately 70,000 kg (154,000 lb) to LEO. This expandability allows for a wide range of payload options, such as large Earth satellites, Space Station Freedom material, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Source record↗

Systems integration of lunar Campsite vehicles

This paper describes the configuration design and subsystems integration resolution for lunar Campsite vehicles and the crew vehicles (CVs) which support them. This concept allows early return to the moon while minimizing hardware development. Once in place, the Campsite can be revisited for extended periods. Configuration and operations issues are addressed, and explanations of the parametric subsystem analysis, as well as descriptions of the hardware concept and performance data, are provided. Within an assumed set of launch and mission constraints, a common vehicle stage design for both the Campsite and the CV landers was the chief design driver. Accommodation of a heat-shielded, ballistic crew transportation/return vehicle, scars for later system growth and upgrades, landing the crew in close proximity to the Campsite, and appropriate kinds of robotic systems were all secondary design drivers. Physical integration of the crew module and airlock, structural system, thermal radiators, power production and storage systems, external life support consumables, and payloads are covered. The vehicle performance data were derived using a Boeing lunar transportation sizing code to optimize vehicle stage sizes and commonality. Configuration trades were conducted and detailed sketches were produced.

Capps, Stephen↗