Search NASA⌕ Search

SEARCH · Search NASA

Results for “wind technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Duration Test Report for the Ventera VT10 Wind Turbine

This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small wind turbines. Five turbines were tested at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of round one of this project. Duration testing is one of up to five tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality. Test results will provide manufacturers with reports that can be used to fulfill part of the requirements for small wind turbine certification. The test equipment included a grid-connected Ventera Energy Corporation VT10 wind turbine mounted on an 18.3-m (60-ft) self-supporting lattice tower manufactured by Rohn.

17 WIND ENERGY↗

Swift Wind Turbine Testing

The purpose of this project was to independently test the Swift wind turbine according to the AWEA Small Wind Turbine Performance and Safety Standard. This project was part of the U.S. Department of Energy’s (DOE’s) Independent Testing project. The project was established to help providers of small wind turbines the opportunity to validate the product to AWEA standards. The National Wind Technology Center (NWTC) conducted testing that included duration, safety and function, power performance, and acoustic. Successful operation of the turbine was confirmed in the results of the testing. Duration requirements were met, there were no safety issues, power performance was established, and the acoustic level was verified to be low compared to other similar turbines. Data results can be assembled and submitted to the Small Wind Certification Council (SWCC) for certification of the turbine to AWEA standards.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test

The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability. The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 2 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.

17 WIND ENERGY↗

First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains: Workshop Proceedings

This report summarizes the proceedings of the First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains, held from June 13 to 14, 2013, at the National Renewable Energy Laboratory's National Wind Technology Center, located south of Boulder, Colorado. The workshop was sponsored by the U.S. Department of Energy and cohosted by the National Renewable Energy Laboratory and Clemson University under ongoing collaboration via a cooperative research and development agreement. The purpose of the workshop was to provide a forum to discuss the research, testing needs, and state-of-the-art apparatuses involved in grid compliance testing of utility-scale wind turbine generators. This includes both dynamometer testing of wind turbine drivetrains ('ground testing') and field testing grid-connected wind turbines. Four sessions followed by discussions in which all attendees of the workshop were encouraged to participate comprised the workshop.

17 WIND ENERGY↗

The Cost of Floating Offshore Wind Energy in California Between 2019 and 2032

California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.

17 WIND ENERGY↗

Mechanisms of Low-Level Jet Formation in the U.S. Mid-Atlantic Offshore

Low level jets (LLJs) in the atmosphere exhibit a local windspeed maximum inthe boundary layer and are commonly observed both over land and in coastal environments. Because LLJs present strong positive shear beneath the maximum (or "jet nose") and negative shear above the nose, they pose a challenge to future offshore wind technology through their impacts on turbine performance and wakes. Summertime LLJs in the Great Plains have been attributed to frictional decoupling triggering an inertial oscillation, whilecoastal LLJs in California or the North Sea have additional driving mechanisms such as baroclinic forcing. By comparison, LLJs in the coastal US Mid-Atlantic have received less attention, with conflicting evidence about the mechanism that triggers these high shear events. Motivated by future wind energy development in the region, this work elucidates the atmospheric mechanisms of LLJ formation in the US Mid-Atlantic. Using observational data from two floating LiDAR buoys deployed bythe New York State Energy Research and Development Authority in the NY Bight, we identify four sustained LLJ events whose windspeeds and directions are well predicted by a WRF simulation (Weather Research and Forecasting Model). From analysis of the WRF data, we find that the four case studies provide evidence of concurrent inertial oscillation, reduced vertical mixing, and baroclinicity. In addition, we use simple atmospheric dynamics and a single-column-model to compare the relative contribution of each of these mechanisms to triggering the LLJ. By improving understanding and predictability of coastal mid-Atlantic LLJs, this work reduces uncertaintiesof wind energy deployment in the region, aiding the US's transition toward renewable energy.

atmospheric boundary layers↗

Reference floating wind array designs for three representative regions

This work presents the systematic development of three open-source reference floating wind array designs. The designs are tailored to representative site conditions for three regions of the United States: Humboldt Bay off the coast of California, the Gulf of Maine, and the Gulf of America. We adopted existing reference designs for the individual 15 MW turbines, semisubmersible floating platforms, substations, mooring systems, and power cables – integrating and adapting them as needed for each location. We adapted existing dynamic cable designs to use larger conductor sizes to meet the arrays' power transmission requirements, and we set up redundant mooring systems for each substation. The layout of each array is a uniform-grid design optimized to approximately minimize the levelized cost of energy (LCOE) within a square lease area while satisfying spatial constraints. These constraints ensure adequate clearances between adjacent turbines and between underwater components during the layout optimization to prevent clashing and ensure that all components reside within the lease boundaries. Substations are included to allow accounting for intra-array cable costs. They are placed within the uniform grid to maintain the navigability of the arrays. For each feasible layout considered, annual energy production and cable routing costs are calculated and updated in the LCOE objective function. After the optimization, we refined the cable routing with a mix of algorithmic and manual methods to ensure that the cables avoid mooring system components and approach the substation with adequate clearances. We confirmed the suitability of each reference array's layout by comparing the wake losses at each wind heading angle to the wind rose, observing that the optimized layouts largely avoid wake losses in the predominant wind directions. These reference arrays provide open-source baseline designs to enable future research and innovation of floating wind technology at the array scale.

17 WIND ENERGY↗

Aeroservoelastic Control Law Development for the Integrated Adaptive Wing Technology Maturation Wind-Tunnel Test

The NASA Advanced Air Transport Technology (AATT) Project seeks to “explore and develop technologies and concepts for improved energy efficiency and environmental compatibility for fixed wing subsonic transports” [1]. The IAWTM project is a subproject within AATT and is a joint Boeing/NASA effort to, in part, demonstrate the active control systems necessary to employ high-aspect ratio wings for improved aerodynamic efficiency. The aircraft configuration under study for the IAWTM project is a generic jet transport based on the NASA Common Research Model (CRM) whose wing aspect ratio has been increased to 13.5 (as opposed to nominal CRM aspect ratio of 9) and whose development is given in Ref. [2]. A semi-span model of the high-aspect-ratio CRM with 10 trailing edge control surfaces is currently being fabricated and will be delivered to the NASA Langley Transonic Dynamics Tunnel (TDT). There, several tests will be conducted to demonstrate maneuver load alleviation (MLA), gust load alleviation (GLA), active flutter suppression (AFS), and drag reduction, all at transonic conditions. A layout of the wind tunnel model is shown in Fig. 1. The wind-tunnel model is a spar/pod wing design with a relatively rigid fuselage attached to a mounting structure (seen in Fig. 1), which in turn is attached to a load balance behind the tunnel wall. Shims exist that can be attached to force the load to go through the fuselage rather than through the balance so as not to damage the balance in the event of flutter. The spar/pod design is similar to that used in the Boeing truss-braced wing aeroelastic model tested in the TDT in 2013 [3]. There is a central spar running the span of the wing to which the pods are attached that form the aerodynamic shape of the wing. The pods are constructed of ribs for attachment to the spar and skins to create the outer mold line. There are ten active control surfaces that will be used for the test objectives discussed above. Three of these (two outboard ailerons and one inboard aileron) are high-speed electrohydraulic actuators, and the remaining seven are low-speed mini-plane flaps, which have slower servo motors that will be used primarily for drag and maneuver load reductions. Control laws must be developed for each test (MLA, GLA, AFS, and drag reduction) and must be able to work in tandem when two or more control strategies are being tested simultaneously (e.g., when control laws to mitigate maneuver loads and gust loads operate simultaneously). The development of these control laws requires accurate mathematical representations of the aerodynamics, structural dynamics, and control surface dynamics of the system. Taken together, this mathematical representation—which is often in state-space form— is the ASE model. Three low-order ASE models of differing fidelities were developed for the IAWTM test and will be presented here. The differences in fidelity appeared in the aerodynamic modeling—one model assumed purely linear aerodynamics, while the other two models used different techniques to linearize the aerodynamics about a nonlinear mean. Furthermore, simple observer-based full-state feedback controllers for each test (MLA, GLA, AFS, and drag reduction) were designed from these low-order ASE models and implemented in a higher-order, nonlinear computational ASE simulation to assess the effectiveness of each controller. Observers were designed from each of the three lower-order ASE models, and each (linear) observer was then used as an estimate of the nonlinear dynamics of the system. Using the estimated states and the full-state feedback controller, control surface commands were fed back to the higher-order, nonlinear ASE system. The insight gained during this development will be applied to control law development for the physical IAWTM wind-tunnel test.

Josiah M Waite↗

Use of Solar and Wind as a Physical Hedge against Price Variability within a Generation Portfolio

This study provides a framework to explore the potential use and incremental value of small- to large-scale penetration of solar and wind technologies as a physical hedge against the risk and uncertainty of electricity cost on multi-year to multi-decade timescales. Earlier studies characterizing the impacts of adding renewable energy (RE) to portfolios of electricity generators often used a levelized cost of energy or simplified net cash flow approach. In this study, we expand on previous work by demonstrating the use of an 8760 hourly production cost model (PLEXOS) to analyze the incremental impact of solar and wind penetration under a wide range of penetration scenarios for a region in the Western U.S. We do not attempt to 'optimize' the portfolio in any of these cases. Rather we consider different RE penetration scenarios, that might for example result from the implementation of a Renewable Portfolio Standard (RPS) to explore the dynamics, risk mitigation characteristics and incremental value that RE might add to the system. We also compare the use of RE to alternative mechanisms, such as the use of financial or physical supply contracts to mitigate risk and uncertainty, including consideration of their effectiveness and availability over a variety of timeframes.

14 SOLAR ENERGY↗

Multi-Megawatt-Scale Power-Hardware-in-the-Loop Interface for Testing Ancillary Grid Services by Converter-Coupled Generation: Preprint

Power-hardware-in-the-loop (PHIL) is a simulation tool that can support electrical systems engineers in the development and experimental validation of novel, advanced control schemes that ensure the robustness and resiliency of electrical grids that have high penetrations of low-inertia variable renewable resources. With PHIL, the impact of the device under test on a generation or distribution system can be analyzed using a real-time simulator (RTS). PHIL allows for the interconnection of the RTS with a 7 megavolt ampere (MVA) power amplifier to test multi-megawatt renewable assets available at the National Wind Technology Center (NWTC). This paper addresses issues related to the development of a PHIL interface that allows testing hardware devices at actual scale. In particular, the novel PHIL interface algorithm and high-speed digital interface, which minimize the critical loop delay, are discussed.

17 WIND ENERGY↗

Distributed Wind Research Program Workshop Report

The U.S. Department of Energy’s (DOE’s) Wind Energy Technologies Office (WETO) Distributed Wind Research Program seeks to enable wind technology as an affordable, accessible, and compatible distributed energy resource (DER) option for individuals, businesses, and communities. WETO’s Distributed Wind Research Program includes national laboratory projects and partnerships with industry and academia. WETO organized the Distributed Wind Research Program Workshop to bring together laboratory and industry project stakeholders to achieve the following objectives: Educate - Create a shared high-level understanding for the breadth of WETO’s distributed wind research Collaborate - Facilitate coordination and collaboration between funding recipients to leverage resources Innovate - Understand future research challenges and opportunities. This workshop convened over 80 participants from various organizations. Workshop participants were asked for their individual feedback based on their own expertise and experience.

17 WIND ENERGY↗

Gearbox Instrumentation for the Investigation of Bearing Axial Cracking

Failures in gearbox bearings have been the primary source of reliability issues for wind turbine drivetrains, leading to costly downtime and unplanned maintenance. The most common failure mode is attributed to so-called axial cracks or white-etching cracks, which primarily affect the intermediate and high-speed-stage bearings. The high-speed-shaft and bearing loads and sliding will be measured with a specially instrumented gearbox installed in a 1.5-megawatt turbine at the National Wind Technology Center in an upcoming test campaign. Additional instrumentation will also measure the tribological environment of these bearings, including bearing temperatures, lubricant temperature and water content, air temperature and humidity, and stray electrical current across the bearings. This paper fully describes the instrumentation package and summarizes initial results.

17 WIND ENERGY↗

Wind Turbine Generator System Acoustic Noise Test Report for the ARE 442 Wind Turbine

This test was conducted on the ARE 442 as part of the U.S. Department of Energy's (DOE's) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Wind Technology Center (NWTC) as a part of this project. Acoustic noise testingis one of up to five tests that may be performed on the turbines, including duration, safety and function, power performance, and power quality tests. The acoustic noise test was conducted to the IEC 61400-11 Edition 2.1.

17 WIND ENERGY↗

Structural Testing of the Blade Reliability Collaborative Effect of Defect Wind Turbine Blades

Two 8.3-meter (m) wind turbine blades intentionally constructed with manufacturing flaws were tested to failure at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) south of Boulder, Colorado. Two blades were tested; one blade was manufactured with a fiberglass spar cap and the second blade was manufactured with a carbon fiber spar cap. Test loading primarily consisted of flap fatigue loading of the blades, with one quasi-static ultimate load case applied to the carbon fiber spar cap blade. Results of the test program were intended to provide the full-scale test data needed for validation of model and coupon test results of the effect of defects in wind turbine blade composite materials. Testing was part of the Blade Reliability Collaborative (BRC) led by Sandia National Laboratories (SNL). The BRC seeks to develop a deeper understanding of the causes of unexpected blade failures (Paquette 2012), and to develop methods to enable blades to survive to their expected operational lifetime. Recent work in the BRC includes examining and characterizing flaws and defects known to exist in wind turbine blades from manufacturing processes (Riddle et al. 2011). Recent results from reliability databases show that wind turbine rotor blades continue to be a leading contributor to turbine downtime (Paquette 2012).

17 WIND ENERGY↗

Floating Offshore Wind in Oregon: Potential for Jobs and Economic Impacts in Oregon Coastal Counties from Two Future Scenarios

This analysis examines the employment and potential economic impacts of large-scale deployment of offshore wind technology off the coast of Oregon. This analysis examines impacts within the seven Oregon coastal counties: Clatsop, Tillamook, Lincoln, Lane, Douglas, Coos, and Curry. The impacts highlighted here can be used in county, state, and regional planning discussions and can be scaled to get a general sense of the economic development opportunities associated with other deployment scenarios.

17 WIND ENERGY↗

Phase 1 Integrated Systems Test and Characterization Report for the 5-Megawatt Dynamometer and Controllable Grid Interface

This report details the commissioning of the 5-MW dynamometer and Controllable Grid Interface (CGI) at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL). The purpose of these characterization tests was to verify the dynamometers performance over the widest possible range of operating conditions, verify interconnection with and fault generation capability of the CGI, gain insight into system-level behavior, and establish confidence in measurement data.

17 WIND ENERGY↗

Achieving CO 2 reductions in Colombia: Effects of carbon taxes and abatement targets

In this paper we investigate CO 2 emission scenarios for Colombia and the effects of implementing carbon taxes and abatement targets on the energy system. By comparing baseline and policy scenario results from two integrated assessment partial equilibrium models TIAM-ECN and GCAM and two general equilibrium models Phoenix and MEG4C, we provide an indication of future developments and dynamics in the Colombian energy system. Currently, the carbon intensity of the energy system in Colombia is low compared to other countries in Latin America. However, this trend may change given the projected rapid growth of the economy and the potential increase in the use of carbon-based technologies. Climate policy in Colombia is under development and has yet to consider economic instruments such as taxes and abatement targets. This paper shows how taxes or abatement targets can achieve significant CO 2 reductions in Colombia. Though abatement may be achieved through different pathways, taxes and targets promote the entry of cleaner energy sources into the market and reduce final energy demand through energy efficiency improvements and other demand-side responses. The electric power sector plays an important role in achieving CO 2 emission reductions in Colombia, through the increase of hydropower, the introduction of wind technologies, and the deployment of biomass, coal and natural gas with CO 2 capture and storage (CCS). Uncertainty over the prevailing mitigation pathway reinforces the importance of climate policy to guide sectors toward low-carbon technologies. This paper also assesses the economy-wide implications of mitigation policies such as potential losses in GDP and consumption. As a result, an assessment of the legal, institutional, social and environmental barriers to economy-wide mitigation policies is critical yet beyond the scope of this paper.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-Megawatt-Scale Power-Hardware-in-the-Loop Interface for Testing Ancillary Grid Services by Converter-Coupled Generation

Power-hardware-in-the-loop (PHIL) is a simulation tool that can support electrical systems engineers in the development and experimental validation of novel, advanced control schemes that ensure the robustness and resiliency of electrical grids that have high penetrations of low-inertia variable renewable resources. With PHIL, the impact of the device under test on a generation or distribution system can be analyzed using a real-time simulator (RTS). PHIL allows for the interconnection of the RTS with a 7 megavolt ampere (MVA) power amplifier to test multi-megawatt renewable assets available at the National Wind Technology Center (NWTC). This paper addresses issues related to the development of a PHIL interface that allows testing hardware devices at actual scale. In particular, the novel PHIL interface algorithm and high-speed digital interface, which minimize the critical loop delay, are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗