Search NASA⌕ Search

SEARCH · Search NASA

Results for “workforce”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Overview of NASA's Propulsion 21 Effort

Propulsion 21 technologies contribute to reducing CO2 and NO(x) emissions and noise. Integrated Government/Industry/University research efforts have produced promising initial technical results. Graduate students from 5 partnering universities will benefit from this collaborative research--> educating the future engineering workforce. Phase 2 Efforts scheduled to be completed 3QFY06.

Long-Davis, Mary Jo↗

Comprehensive Shuttle Foam Debris Reduction Strategies

The Columbia Accident Investigation Board (CAIB) was clear in its assessment of the loss of the Space Shuttle Columbia on February 3, 2003. Foam liberated from the External Tank (ET) impacting the brittle wing leading edge (WLE) of the orbiter causing the vehicle to disintegrate upon re-entry. Naturally, the CAB pointed out numerous issues affecting this exact outcome in hopes of correcting systems of systems failures any one of which might have altered the outcome. However, Discovery s recent return to flight (RTF) illustrates the primacy of erosion of foam and the risk of future undesirable outcomes. It is obvious that the original RTF focused approach to this problem was not equal to a comprehensive foam debris reduction activity consistent with the high national value of the Space Shuttle assets. The root cause is really very simple when looking at the spray-on foam insulation for the entire ET as part of the structure (e.g., actual stresses > materials allowable) rather than as some sort of sizehime limited ablator. This step is paramount to accepting the CAB recommendation of eliminating debris or in meeting any level of requirements due to the fundamental processes ensuring structural materials maintain their integrity. Significant effort has been expended to identify root cause of the foam debris In-Flight Anomaly (FA) of STS-114. Absent verifiable location specific data pre-launch (T-0) and in-flight, only a most probable cause can be identified. Indeed, the literature researched corroborates NASNTM-2004-2 13238 disturbing description of ill defined materials characterization, variable supplier constituents and foam processing irregularities. Also, foam is sensitive to age and the exposed environment making baseline comparisons difficult without event driven data. Conventional engineering processes account for such naturally occurring variability by always maintaining positive margins. Success in a negative margin range is not consistently achieved. Looking at the ET S spray-on foam insulation as part of the structural system (e.g., glass half full mentality) will create an environment where ET debris levels as low as reasonably achievable (ALARA) can be realized. ALARA is a NASA requirements philosophy deployed for the complex, mission altering radiation exposure requirements for life safety of astronauts. In the Shuttle s case, reasonableness is established by exhaustive engineering rigor, allowable debris size/quantity, technology maturity and programmatic constraints. A more robust urethane foam thermal protection system (TPS) will enhance the hctionality of the new Ares I Crew Launch Vehicle (CLV) Upper Stage. This paper will outline the strategy for a comprehensive effort to reduce ET foam debris and outline steps leading to an improved foam TPS. The NASA must remain committed to such an approach no matter what becomes of the next flight s actual debris field lest we fall back into a false sense of security. This commitment along with full implementation of all the other CAB recommendations such as orbiter hardening will significantly improve the Shuttle system, the engineering workforce, future capabilities & alternate policy offramps, national human resource protection, high value national asset protection and increase the level of service to the overall NASA mission.

Semmes, Edmund B.↗

Space Shuttle Strategic Planning Status

The Space Shuttle Program is aggressively flying the Space Shuttle manifest for assembling the International Space Station and servicing the Hubble Space Telescope. Completing this flight manifest while concurrently transitioning to the Exploration architecture creates formidable challenges; the most notable of which is retaining critical skills within the Shuttle Program workforce. The Program must define a strategy that will allow safe and efficient fly-out of the Shuttle, while smoothly transitioning Shuttle assets (both human and facility) to support early flight demonstrations required in the development of NASA's Crew Exploration Vehicle (Orion) and Crew and Cargo Launch Vehicles (Ares I). The Program must accomplish all of this while maintaining the current level of resources. Therefore, it will be necessary to initiate major changes in operations and contracting. Overcoming these challenges will be essential for NASA to fly the Shuttle safely, accomplish the Vision for Space Exploration, and ultimately meet the national goal of maintaining a robust space program. This paper will address the Space Shuttle Program s strategy and its current status in meeting these challenges.

Norbraten, Gordon L.↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides the National Aeronautics and Space Administration's (NASA's) challenging missions that expand humanity's boundaries and open new routes to the space frontier. With the Agency's commitment to complete the International Space Station (ISS) and to retire the venerable Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in 2005 to analyze options for safe, simple, cost-efficient launch solutions that could deliver human-rated space transportation capabilities in a timely manner within fixed budget guidelines. The Exploration Launch Projects (ELP) Office, chartered by the Constellation Program in October 2005, has been conducting systems engineering studies and business planning to successively refine the design configurations and better align vehicle concepts with customer and stakeholder requirements, such as significantly reduced life-cycle costs. As the Agency begins the process of replacing the Shuttle with a new generation of spacecraft destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo launch systems for maximum operational efficiencies. To sustain the long-term exploration of space, it is imperative to reduce the $4 billion NASA typically spends on space transportation each year. This paper gives toplevel information about how the follow-on Ares I Crew Launch Vehicle (CLV) is being designed for improved safety and reliability, coupled with reduced operations costs. These methods include carefully developing operational requirements; conducting operability design and analysis; using the latest information technology tools to design and simulate the vehicle; and developing a learning culture across the workforce to ensure a smooth transition between Space Shuttle operations and Ares vehicle development.

Dumbacher, Daniel L.↗

Financial Comparisons across Different Business Models in the Canadian Airline Industry

This paper examines the accounting and stock price performance of two Canadian airlines, WestJet and Air Canada, over a five year period, taking into account the aftermath of the systemic shock to the airline industry produced by the September 11, 2001 (9-11), terrorist attacks and subsequent events such as the 2002 SARS outbreak, the wars in Afghanistan and Iraq, and the accompanying rise in jet fuel prices. Our study focuses on the viability of low-cost versus conventional-cost business models in Canada under the current business environment and the ability of airlines to withstand and effectively respond to catastrophic industry events. Furthermore, we link the effectiveness of the airlines responses to these events to specific elements of their respective business models. We test our hypothesis through a case study. We focus on WestJet as a typical low-cost airline and compare its accounting and stock performance to Air Canada, a legacy carrier and rival in several business sectors. We find WestJet to be much less affected by catastrophic industry events. By decomposing each airline s return volatility, we observe that WestJet s systematic and unsystematic risk increased only slightly during the industry's post-9-11 turmoil when compared to Air Canada. In addition, we find that both WestJet s accounting and stock performance have been highly superior to those of Air Canada. We argue that WestJet s business model provides the firm with significantly more financial and operational flexibility than its legacy rival, Air Canada. WestJet's lower operating costs, high consumer trust, product offering, corporate structure, workforce and work practices, as well as operational procedures are all factors that appear to contribute to its relative success.

Flouris, Triant↗

Educating and Inspiring Young People for the Next Generation of Exploration

With the graying of the nation's scientific workforce and the decline in students pursuing science, technological, engineering, and math related-studies, real challenges lie ahead if America is to continue to sustain the Vision for Space Exploration in the foreseeable future. Likewise, challenges exist in the economic arena as the United States seeks to maintain its preeminence among the technological leaders of the world. Currently, less than 6 percent of high school seniors are pursuing engineering degrees, down from 36 percent a decade ago. Today, China produces six times as many engineers as does the United States and Japan, at half our population, develops twice as many engineers. Despite spending more per capita on public education than any other nation, except Switzerland, U.S. students of high school age are failing to compete with many foreign countries. These trends do not bode well for America's future competitiveness in space and other technically driven areas, such as defense.

Armstrong, Robert C., Jr.↗

Seven Key Principles of Program and Project Success: A Best Practices Survey

The National Aeronautics and Space Administration (NASA) Organization Design Team (ODT), consisting of 20 seasoned program and project managers and systems engineers from a broad spectrum of the aerospace industry, academia, and government, was formed to support the Next Generation Launch Technology (NGLT) Program and the Constellation Systems Program. The purpose of the ODT was to investigate organizational factors that can lead to success or failure of complex government programs, and to identify tools and methods for the design, modeling, and analysis of new and more-efficient program and project organizations. The ODT conducted a series of workshops featuring invited lectures from seasoned program and project managers representing 25 significant technical programs spanning 50 years of experience. The result was the identification of seven key principles of program success that can be used to help design and operate future program organizations. This paper presents the success principles and examples of best practices that can significantly improve the design of program, project, and performing technical line organizations, the assessment of workforce needs and organization performance, and the execution of programs and projects.

Bilardo, Vincent J.↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

MODSIM World 2007 Conference and Expo: Select Papers and Presentations from the Education and Training Track

This NASA Conference Publication features select papers and PowerPoint presentations from the Education and Training Track of MODSIM World 2007 Conference and Expo. Invited speakers and panelists of national and international renown, representing academia, industry and government, discussed how modeling and simulation (M&S) technology can be used to accelerate learning in the K-16 classroom, especially when using M&S technology as a tool for integrating science, technology, engineering and mathematics (STEM) classes. The presenters also addressed the application ofM&S technology to learning and training outside of the classroom. Specific sub-topics of the presentations included: learning theory; curriculum development; professional development; tools/user applications; implementation/infrastructure/issues; and workforce development. There was a session devoted to student M&S competitions in Virginia too, as well as a poster session.

Pinelli, Thomas E.↗

The Governor's Challenge: "Building a Stronger Virginia Today": Transportation Visions and Solutions

Using STM(Science, Technology, Engineering, Math) education, this emerging workforce will have the chance to creatively solve one of Virginia's biggest challenges: TRANSPORTATION. - Students will be asked to develop alternative transportation systems for the state. This competition will enable teams to work with business mentors to design creative solutions for regional gridlocks and develop other transportation systems to more easily and expediently reach all parts of the Commonwealth.

Baker, Susan↗

Building on 50 Years of Mission Operations Experience for a New Era of Space Exploration

The U.S. National Space Policy, I the 14-nation Global Exploration Strategy,2 and the National Aeronautics and Space Administration's (NASA) 2006 Strategic Plan3 provide foundational direction for far-ranging missions, from safely flying the Space Shuttle and completing construction of the International Space Station by 2010, to fielding a next generation space transportation system consisting of the Ares I Crew Launch Vehicle!Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle!Altair Lunar Lander (fig. 1). Transportation beyond low-Earth orbit will open the frontier for a lunar outpost, where astronauts will harness in-situ resources while exploring this 4 billion-year-old archaeological site, which may hold answers to how the Earth and its satellite were formed. Ultimately, this experience will pave the way for the first human footprint on Mars. In October 2007, NASA" announced assignments for this lunar exploration work.4 The Marshall Space Flight Center is responsible for designing, developing, testing, and evaluating the Ares I and Ares V, which are Space Shuttle derived launch vehicles, along with a number of lunar tasks. The Marshall Center's Engineering Directorate provides the skilled workforce and unique manufacturing, testing, and operational infrastructure needed to deliver space transportation solutions that meet the requirements stated in the Constellation Architecture Requirements Document (CARD). While defining design reference missions to the Station and the Moon, the CARD includes goals that include reducing recurring and nonrecurring costs, while increasing safety and reliability. For this reason, future systems are being designed with operability considerations and lifecycle expenses as independent variables in engineering trade studies.

Onken, Jay F.↗

Environmental Program

NASA's White Sands Test Facility has six core environmental compliance capabilities: remote hazardous testing of reactive, explosive and toxic materials and fluids; hypergolic fluids materials and systems testing; oxygen materials and system testing; hypervelocity impact testing; flight hardware processing; and, propulsion testing. The facility's permit status and challenges are reviewed. Historic operations and practices dating from the 1960s through the early 1980s resulted in contamination of the facility's groundwater. An environmental restoration effort has been employed to protect public health and the health of the workforce. The restoration seeks to properly handle hazardous materials and waste processes; determine the nature and extent of the contamination; stop the migration of contaminated groundwater; stabilize the plume front which has been assessed as the greatest risk to public health; and, clean-up the environment to restore it to preexisting conditions. The Plume Front Treatment System is operational and seeks to stop the westward movement of the plume to protect drinking water and irrigation well. Specifically, the treatment system will extract contaminated water from the aquifer, remove chemical using the best available technology, and return (inject) the treated water back to the aquifer. The Mid-Plume Interception Treatment System also seeks to stop the migration of containment, as well as to evaluate new technologies to accelerate cleanup, such as bioremediation.

Fischer, Holger↗

An Overview of NASA's Contributions to Energy Technology

The National Aeronautics and Space Administration (NASA) is well known for its many contributions to advancing technology for the aviation and space industries. It may be surprising to some that it has also made a major impact in advancing energy technologies. This paper presents a historic overview of some of the energy programs that NASA was involved in, as well as presenting some current energy-related work that is relevant to both aerospace and non-aerospace needs. In the past, NASA developed prototype electric cars, low-emission gas turbines, wind turbines, and solar-powered villages, to name a few of the major energy projects. The fundamental expertise in fluid mechanics, heat transfer, thermodynamics, mechanical and electrical engineering, and other related fields, found in NASA s workforce, can easily be applied to develop creative solutions to energy problems in space, aviation, or terrestrial systems.

Lyons, Valerie J.↗

When Failure Means Success: Accepting Risk in Aerospace Development

Over the last three decades, NASA has been diligent in qualifying systems for human space flight. As the Agency transitions from operating the Space Shuttle, its employees must learn to accept higher risk levels to generate the data needed to certify its next human space flight system. The Marshall Center s Engineering workforce is developing the Ares I crew launch vehicle and designing the Ares V cargo launch vehicle for safety, reliability, and cost-effective operations. This presentation will provide a risk retrospective, using first-hand examples from the Delta Clipper-Experimental Advanced (DC-XA) and the X-33 single-stage-to-orbit flight demonstrators, while looking ahead to the upcoming Ares I-X uncrewed test flight. The DC-XA was successfully flown twice in 26 hours, setting a new turnaround-time record. Later, one of its 3 landing gears did not deploy, it tipped over, and was destroyed. During structural testing, the X-33 s advanced composite tanks were unable to withstand the forces to which it was subjected and the project was later cancelled. These are examples of successful failures, as the data generated are captured in databases used by vehicle designers today. More recently, the Ares I-X flight readiness review process was streamlined in keeping with the mission's objectives, since human lives are not at stake, which reflects the beginning of a cultural change. Failures are acceptable during testing, as they provide the lessons that actually lead to mission success. These and other examples will stimulate the discussion of when to accept risk in aerospace projects.

Dumbacher, Daniel L.↗

Building on 50 Years of Systems Engineering Experience for a New Era of Space Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States (US) capability for both crew and heavy cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion crew exploration vehicle, while the heavy-lift Ares V will carry the Altair lunar lander, as well as the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. NASA's Marshall Space Flight Center manages the Shuttle's propulsion elements and is managing the design and development of the Ares rockets, along with a host of other engineering assignments in the field of scientific space exploration. Specifically, the Marshall Center's Engineering Directorate houses the skilled workforce and unique facilities needed to build capable systems upon the foundation laid by the Mercury, Gemini, Apollo, and Shuttle programs. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level testing activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation, as well as the main propulsion test article analysis to be conducted in the Static Test Stand. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new era of scientific discovery now dawning beyond planet Earth.

Dumbacher, Daniel L.↗

NASA Applied Sciences' DEVELOP Program Fosters the Next Generation of Earth Remote Sensing Scientists

Satellite remote sensing technology and the science associated with the evaluation of the resulting data are constantly evolving. To meet the growing needs related to this industry, a team of personnel that understands the fundamental science as well as the scientific applications related to remote sensing is essential. Therefore, the workforce that will excel in this field requires individuals who not only have a strong academic background, but who also have practical hands-on experience with remotely sensed data, and have developed knowledge of its real-world applications. NASA's DEVELOP Program has played an integral role in fulfilling this need. DEVELOP is a NASA Science Mission Directorate Applied Sciences training and development program that extends the benefits of NASA Earth science research and technology to society.

Childs, Lauren M.↗

Student Opportunities with NASA

The presentation is intended to interest the next generation in joining the NASA workforce and to inspire them to pursue careers in science and technology and with NASA.

Bird, John J.↗