Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

01 COAL, LIGNITE, AND PEAT↗

Next Generation Bipolar Plates for Automotive PEM Fuel Cells

The results of a successful U.S. Department of Energy (DoE) funded two-year $2.9 MM program lead by GrafTech International Inc. (GrafTech) are reported and summarized. The program goal was to develop the next generation of high temperature proton exchange membrane (PEM) fuel cell bipolar plates for use in transportation fuel cell applications operating at temperatures up to 120 °C. The bipolar plate composite developed during the program is based on GrafTech’s GRAFCELL resin impregnated flexible graphite technology and makes use of a high temperature Huntsman Advanced Materials resin system which extends the upper use temperature of the composite to the DoE target. High temperature performance of the new composite is achieved with the added benefit of improvements in strength, modulus, and dimensional stability over the incumbent resin systems. Other physical properties, including thermal and electrical conductivity of the new composite are identical to or not adversely affected by the new resin system. Using the new bipolar plate composite system, machined plates were fabricated and tested in high temperature single-cell fuel cells operating at 120 °C for over 1100 hours by Case Western Reserve University. Final verification of performance was done on embossed full-size plates which were fabricated and glued into bipolar plates by GrafTech. Stack testing was done on a 10-cell full-sized stack under a simulated drive cycle protocol by Ballard Power Systems. Freeze-thaw performance was conducted by Ballard on a separate 5-cell stack and shown to be within specification. A third stack was assembled and shipped to Argonne National Laboratory for independent performance verification. Manufacturing cost estimate for the production of the new bipolar plate composite at current and high volume production scenarios was performed by Directed Technologies Inc. (DTI). The production cost estimates were consistent with previous DoE cost estimates performed by DTI for the DoE on metal plates. The final result of DTI’s analysis for the high volume manufacturing scenario ($6.85 /kW) came in slightly above the DoE target of $3 to $5/kW. This estimate was derived using a “Best Case Scenario” for many of the production process steps and raw material costs with projections to high volumes. Some of the process improvements assumed in this “Best Case Scenario” including high speed high impact forming and solvent-less resins, have not yet been implemented, but have a high probability of potential success.

08 HYDROGEN↗

NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling

The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.

Zhou, Jia↗

Photofission Validation Measurements for Active Interrogation Standards

Executive Summary PNNL has been developing technical standards for the detection of special nuclear material (SNM) in cargo containers using active interrogation approaches. Since the use of kilogram-scale quantities of SNM is impractical for standards testing, the work focused on designing surrogates that provided similar signature as the SNM. There are many active interrogation approaches to detect SNM; the standards development considered photofission, differential die-away and nuclear resonance fluorescence. Of these approaches, photofission currently carries the most interest. However, uncertainties in the photofission cross sections are as large as 50%, so that validation measurements are necessary to provide confidence that the surrogate will perform similarly to the SNM. This document describes approaches for conducting those validation measurements as well as provides a rough order-of-magnitude cost estimate for performing them. Photofission provides many observables for the detection of SNM. The standards development considered prompt neutrons, delayed neutrons and delayed gamma rays as possible detected particles. The surrogates, which consist primarily of depleted uranium (DU), were designed to reproduce the strength of these particles for a targeted quantity of 2 kg of HEU. Different surrogates are required for different measurement approaches because of the difference in cross section between 235 U and 238 U. For the standards validations, the relative strength of the detected particles for HEU and DU must be measured. To avoid measurements with kilogram-sized SNM, the validation approach is focused on two comparisons. In the first comparison, the relative rates for approximately 10 g samples of DU and HEU will be measured. This comparison will provide the basis for validating the relative strength of the detected particles for HEU and DU. In the second comparison, the relative rates for the approximately 10 g and 1 kg sample of DU will be measured. This comparison will enable the validation of secondary processes that occur after photofission that impact the measurement for kilogram-scale samples. For instance, for 2 kg of HEU, as much as 50% of the fission induced in the sample is induced from fission neutrons generated through photofission. There is a limited range of facilities in the U.S. that have both the necessary accelerator capability and the ability and willingness to handle SNM. Two such facilities, the Idaho Accelerator Center at Idaho State University and the Nuclear Engineering Program at the University of Michigan, have both expressed an interest in participating in such measurements. Both would need to amend their licensing to handle the 10 g of HEU proposed for these measurements. The rough order-of-magnitude cost estimate for all three validation measurements is $1.1M, spread over three years. Each of the three measurements could be performed separately, at approximately one-third of that cost. There are a number of critical assumptions in these cost estimate that will need to be confirmed before a more reliable cost estimate can be established. PNNL will manage the effort to ensure that the overall objective of the validation measurements can be achieved and will fabricate the 10 g samples of HEU and DU. Most the labor for the measurements will be provided by two collaborating universities as research opportunities for students. The successful completion of these validation measurements will reduce the uncertainties in the proposed standards from about 50% to 5%. The measurements would also provide some much-needed nuclear data on photofission.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Space Tug Docking Study. Volume 5: Cost Analysis

The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

Source record↗

Parametric study of potential early commercial power plants Task 3-A MHD cost analysis

The development of costs for an MHD Power Plant and the comparison of these costs to a conventional coal fired power plant are reported. The program is divided into three activities: (1) code of accounts review; (2) MHD pulverized coal power plant cost comparison; (3) operating and maintenance cost estimates. The scope of each NASA code of account item was defined to assure that the recently completed Task 3 capital cost estimates are consistent with the code of account scope. Improvement confidence in MHD plant capital cost estimates by identifying comparability with conventional pulverized coal fired (PCF) power plant systems is undertaken. The basis for estimating the MHD plant operating and maintenance costs of electricity is verified.

Source record↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sizing and Lifecycle Cost Analysis of an Ares V Composite Interstage

The Interstage Element of the Ares V launch vehicle was sized using a commercially available structural sizing software tool. Two different concepts were considered, a metallic design and a composite design. Both concepts were sized using similar levels of analysis fidelity and included the influence of design details on each concept. Additionally, the impact of the different manufacturing techniques and failure mechanisms for composite and metallic construction were considered. Significant details were included in analysis models of each concept, including penetrations for human access, joint connections, as well as secondary loading effects. The designs and results of the analysis were used to determine lifecycle cost estimates for the two Interstage designs. Lifecycle cost estimates were based on industry provided cost data for similar launch vehicle components. The results indicated that significant mass as well as cost savings are attainable for the chosen composite concept as compared with a metallic option.

Mann, Troy↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Laboratory simulations of the mixed solvent extraction recovery of dominate polymers in electronic waste

Highlights: • Mixed plastics in e-waste are separated with a solvent extraction method. • Recovery procedure obtained an acceptable recovery rate with high purity. • The recovered plastics are greatly energy-saving compared with virgin polymers. • Cost-saving can be potentially achieved for specific composition of plastics. - Abstract: The recovery of four dominant plastics from electronic waste (e-waste) using mixed solvent extraction was studied. The target plastics included polycarbonate (PC), polystyrene (PS), acrylonitrile butadiene styrene (ABS), and styrene acrylonitrile (SAN). The extraction procedure for multi-polymers at room temperature yielded PC, PS, ABS, and SAN in acceptable recovery rates (64%, 86%, 127%, and 143%, respectively, where recovery rate is defined as the mass ratio of the recovered plastic to the added standard polymer). Fourier transform infrared spectroscopy (FTIR) was used to verify the recovered plastics’ purity using a similarity analysis. The similarities ranged from 0.98 to 0.99. Another similar process, which was denoted as an alternative method for plastic recovery, was examined as well. Nonetheless, the FTIR results showed degradation may occur over time. Additionally, the recovery cost estimation model of our method was established. The recovery cost estimation indicated that a certain range of proportion of plastics in e-waste, especially with a higher proportion of PC and PS, can achieve a lower cost than virgin polymer product. It also reduced 99.6%, 30.7% and 75.8% of energy consumptions and CO{sub 2} emissions during the recovery of PC, PS and ABS, and reduced the amount of plastic waste disposal via landfill or incineration and associated environmental impacts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2024 Buildings Technology Baseline: Dataset Documentation

The Buildings Technology Baseline is a curated and regularly updated dataset of current and projected performance, retail, and installed price data for all major building energy technologies needed to enable cost/benefit analyses. Building technology analyses require an up-to-date understanding of installation costs and cost-effectiveness of key building energy efficiency technologies. The dataset was assembled by Guidehouse during fiscal year 2024. Data was gathered from the 2024 National Residential Efficiency Measures Database (NREMDB), the 2023 Energy Information Administration Updated Buildings Sector Appliance and Equipment Costs and Efficiencies ("EIA Building Data Report"), DOE Lighting Market Model, the 2023 RSMeans database, and the 2020 Grid-Interactive Efficient Building Technology Cost, Performance, and Lifetime Characteristics ("GEB Data Report"), Lawrence Berkeley National Laboratory, various literature, as well as new data from online retailers, stakeholder interviews, and contractor databases in 2023 and 2024. The dataset has been reviewed by subject matter experts at NREL and DOE. The 2024 dataset release is intended to be a starting point for interested users to provide feedback. This database is not intended to provide specific cost estimates for a specific project. The cost estimates do not include any rebates or tax incentives that may be available for the measures. Rather, it is meant to help determine which measures may be more cost-effective. The National Renewable Energy Laboratory (NREL) makes every effort to ensure accuracy of the data; however, NREL does not assume any legal liability or responsibility for the accuracy or completeness of the information.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Historical Cost and Schedule Data to Predict Cost Risk for Future NASA X-Planes

Accurate cost estimates help managers understand critical cost-risk information, which improves their perception of the impact project changes have on the budget and schedule. This research project examined buffer reserves, a key aspect of cost estimation. The main focus of this project was to utilize historical data to calculate the extent to which NASA programs typically exceed their original buffers.

cost analysis↗

Utilizing Expert Knowledge in Estimating Future STS Costs

A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.

Fortner, David B.↗

Developing a New Model to Estimate the Costs to Decommission DOE's Active Facilities - 16368

The Active Facilities Data Collection System (AFDCS) is a major means the U.S. Department of Energy (DOE or Department) uses to estimate its out-year environmental liability for the active and surplus facilities across the Department. The previous AFDCS cost model was based on cost assumptions that date back to the mid-1990s. The model is being replaced with a model that reflects more recent facility disposition experience and costs. DOE's Office of Environmental Management's (DOE-EM) historical cost collection database provides the basis for the new AFDCS cost model. This paper describes the process that was used to update the AFDCS facility data inputs, analyze this data, and formulate historical costs and parameters. This process created a robust and reliable cost model that will provide DOE with a valid estimate of the facilities' disposition costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Efficient of Ernie Turner Center. Final Progress Report

The objective of this project was to complete the specifications and drawings for a variable speed kitchen exhaust system and the boiler heating system which when implemented will improve the heating efficiency of the building. The design work was focused in two key areas: kitchen ventilation and heating for the Ernie Turner Center building (ETC). RSA completed design work and issued a set of 100% drawings. RSA also worked with a cost estimator to put together a detailed cost estimate for the project. The design components are summarized.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Pressure Electrolyzer System Evaluation

This report documents the continuing efforts to evaluate the operational state of a high pressure PEM based electrolyzer located at the NASA Glenn Research Center. This electrolyzer is a prototype system built by General Electric and refurbished by Hamilton Standard (now named Hamilton Sunstrand). It is capable of producing hydrogen and oxygen at an output pressure of 3000 psi. The electrolyzer has been in storage for a number of years. Evaluation and testing was performed to determine the state of the electrolyzer and provide an estimate of the cost for refurbishment. Pressure testing was performed using nitrogen gas through the oxygen ports to ascertain the status of the internal membranes and seals. It was determined that the integrity of the electrolyzer stack was good as there were no appreciable leaks in the membranes or seals within the stack. In addition to the integrity testing, an itemized list and part cost estimate was produced for the components of the electrolyzer system. An evaluation of the system s present state and an estimate of the cost to bring it back to operational status was also produced.

Prokopius, Kevin↗

Development of Risk Uncertainty Factors from Historical NASA Projects

NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

Amer, Tahani R.↗