Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Overview of a Preliminary Destination Mission Concept for a Human Orbital Mission to the Martial Moons

The National Aeronautics and Space Administration s Human Spaceflight Architecture Team (HAT) has been developing a preliminary Destination Mission Concept (DMC) to assess how a human orbital mission to one or both of the Martian moons, Phobos and Deimos, might be conducted as a follow-on to a human mission to a near-Earth asteroid (NEA) and as a possible preliminary step prior to a human landing on Mars. The HAT Mars-Phobos-Deimos (MPD) mission also permits the teleoperation of robotic systems by the crew while in the Mars system. The DMC development activity provides an initial effort to identify the science and exploration objectives and investigate the capabilities and operations concepts required for a human orbital mission to the Mars system. In addition, the MPD Team identified potential synergistic opportunities via prior exploration of other destinations currently under consideration.

Mazanek, D. D.↗

Modeling Uprighting of the Orion Crew Module using a Finite Element Method with Wave Coupling and Structural Deformability

The Crew Module Uprighting System (CMUS) for the Orion Crew Module (CM) includes five bags that inflate after splashdown to rotate and upright the CM as necessary. Wave conditions can be severe enough to damage the bags and tethers, which could make the recovery operation hazardous. The CMUS therefore has design limits that ultimately constrain where the CM can land based upon sea conditions. This manuscript describes a full fluid-structure interaction computational model being used for the CMUS. It is a finite element model that uses explicit time integration to directly simulate uprighting, a computational approach usually reserved for short duration, highly transient phenomena and novelly applied here. The goal of this current effort is to determine the feasibility of this approach for CMUS uprighting, and to estimate the loads the CMUS bags experience in different wave conditions. The results from this work will be used to supplement other experimental and computational data in support of NASA’s Artemis program.

John Puryear↗

Effects of Residual Water System Silver on Space Crop Microbiome and Nutrient Content

Ionic silver (Ag+) is being investigated as a residual biocide for use in spacecraft potable water systems on future crewed missions. In addition to providing clean water to the crew and other life support system functions, the potable water is used to irrigate space crop production units such as the Vegetable Production System (Veggie) and the Advanced Plant Habitat (APH). We have evaluated the impact of different concentrations of Ag+ biocide solutions in comparison to a control in both substrate (arcillite-based) and substrate-less (hydroponics-based) growth set ups. Here, we provide evidence that increasing the concentration of silver in the irrigation water impacts the root zone microbiome in both setups, with plant growth and elemental nutrient content also affected in the hydroponic set up. This suggests a need for a silver removal step to achieve acceptable silver levels in irrigation water before application to space crops in a substrate-less hydroponics system. This removal step is also recommended for a substrate-based system, although it is not as critical as in a hydroponics system.

Aubrie O’Rourke↗

Sirius Irradiation Experiments and Post-Irradiation Examinations for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) systems hold promise in reducing transit times for exploration of the solar system by both crewed and uncrewed missions. NTP systems currently under investigation include a once-through high temperature gas-cooled fission reactor to provide thermal energy to heat the coolant which also serves as the propellant. The fuel systems of angular UN fuel particles dispersed in a matrix of W/Re, creating a ceramic and metallic composite or cermet, has been irradiated in Idaho National Laboratory’s (INL) Transient Reactor Test Facility (TREAT) enabling evaluation of these materials under representative nuclear heating rates (~95 K/s) and peak temperatures (~2527 K). These tests named Sirius-1 (UN-W/Re), have been irradiated and this paper will present post-irradiation examination results. The Sirius-1 test produced cracks in the fuel specimen and spalling of surface material. Uranium soot was found on the inner wall of the irradiation capsule indicating loss of some fissile material from the fuel specimen. Spalling from the surfaces was also noted upon visual inspection. Uranium diffusion from the fuel particles resulted in the formation of U/Re phases and edge features producing a laminar microstructure.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Douglas flight deck design philosophy

The systems experience gained from 17 years of DC-10 operation was used during the design of the MD-11 to automate system operation and reduce crew workload. All functions, from preflight to shutdown at the termination of flight, require little input from the crew. The MD-11 aircraft systems are monitored for proper operation by the Aircraft Systems Controllers (ASC). In most cases, system reconfiguration as a result of a malfunction is automated. Manual input is required for irreversible actions such as engine shutdown, fuel dump, fire agent discharge, or Integrated Drive Generator (IDG) disconnect. During normal operations, when the cockpit is configured for flight, all annunciators on the overhead panel will be extinguished. This Dark Cockpit immediately confirms to the crew that the panels are correctly configured and that no abnormalities are present. Primary systems annunciations are shown in text on the Alert Area of the Engine and Alert Display (EAD). This eliminates the need to scan the overhead. The MD-11 aircraft systems can be manually controlled from the overhead area of the cockpit. The center portion of the overhead panel is composed of the primary aircraft systems panels, which include FUEL, AIR, Electrical (ELEC) and Hydraulic (HYD) systems, which are easily accessible from both flight crew positions. Each Aircraft Systems Controller (ASC) has two automatic channels and a manual mode. All rectangular lights are annunciators. All square lights are combined switches and annunciators called switch/lights. Red switch/lights on the overhead (Level 3 alerts) are for conditions requiring immediate crew action. Amber (Level 2 or Level 1 alerts) indicates a fault or switch out of position requiring awareness or crew interaction. Overhead switches used in normal operating conditions will illuminate blue when in use (Level 0 alerts) such as WING ANTI-ICE - ON. An overhead switch/light with BLACK LETTERING on an amber or red background indicates a system failure and that crew interaction is required. A switch/light with blue or amber lettering and a BLACK BACKGROUND indicates a switch out of normal position and that crew action is necessary only if the system is in manual operation.

Oldale, Paul↗

The rotor systems research aircraft - A flying wind tunnel

The Sikorsky Aircraft division of United Aircraft Corporation is constructing two uniquely designed Rotor Systems Research Aircraft (RSRA). These aircraft will be used through the 1980's to comparatively test many different types of rotors - articulated, hingeless, teetering, and gimballed, as well as advanced rotor concepts, such as reverse velocity and variable diameter rotors. The RSRA combines a new airframe with existing Sikorsky H-3 (S-61) dynamic components. A force measurement system is incorporated to permit accurate evaluation of significant rotor characteristics. Both rotor and fixed-wing control systems are provided, appropriately integrated for operation in the pure helicopter mode, compound helicopter mode, and fixed-wing mode. The RSRA is the first rotary wing aircraft designed with a crew escape system, including a pyrotechnic system to sever the main rotor blades.

Linden, A. W.↗

How To Train Your Dragon (and Vice Versa) – Human Spaceflight Research and The First Commercial Crews

The International Space Station has been an orbiting laboratory for human spaceflight research for over 20 years. NASA’s human research implementation teams have worked to develop, refine, and execute pre-, in-, and post-flight sessions to collect critical research data that will enable future spaceflight missions. The teams have worked closely with the spaceflight vehicle teams, including those for Soyuz and the now retired Space Shuttle vehicles, to successfully conduct this research. As NASA has transitioned to commercial vehicles for transport of crews to the ISS, the implementation teams have expanded their scope to include the SpaceX and upcoming Boeing vehicles. This session will focus on the unique implementation needs for the first available commercial platform, SpaceX. We will identify implementation adjustments made to accommodate the SpaceX Dragon system, including crew training and preflight baseline data collection, inflight operations tied to landing, and postflight planning and crew testing, as well as offer lessons learned from the past three SpaceX long-duration crew missions. Representatives from the Flight Operations Directorate, including the Astronaut Office and the vehicle recovery team, will also provide their perspectives on this new system, and how it affects their work with the human research community. A panel discussion with dedicated time for Q&A will follow.

Pasha Morshedi↗

Demonstrating Capabilities for Mars Exploration on the Moon

The U.S. Space Policy Directive of 2017 calls for the United States to lead the return of humans to the Moon for long-term exploration and utilization, followed by human missions to Mars. To achieve these goals, NASA is working with commercial and international partners to develop systems and operational approaches that could be tested on the Moon to prepare for Mars missions. NASA’s human exploration strategy progresses in phases from the ISS in low-Earth orbit, to a sustained presence in cislunar space and on the Moon, to humans in Mars orbit, and finally humans on Mars. There is a huge jump in the capabilities required between the last two phases: humans in Mars orbit and humans on the surface. These include landing large payloads, surface habitation, extra-vehicular activity and crew mobility systems, in-situ resource utilization, and ascent from Mars to return the crew to Earth. Many of these needed capabilities can be tested first on the Moon to reduce the risk for Mars missions. There are a few challenges, however, in extrapolating from capability demonstrations on the Moon to enabling Mars missions such as greater remoteness, the Mars atmosphere, different gravity levels, and planetary protection. Key technologies, concepts for early demonstration of the required capabilities on the Moon, and potential areas for commercial and international partnerships will be discussed.

Moore, Christopher↗

Aerodynamic Loading on Crew Access Arm

An aerodynamic database for the crew access arm during deployment is generated. While initial attempts used data derived from wind tunnel testing, limitations lead to the use of computational fluid dynamics to improve analysis. This computational data compared favorably to the experimental data increasing confidence in both. Further analysis lead to simplification showing the ability to build the database with a single relative wind variable which takes into account both arm deployment angle and wind direction. Eventually geometric simplifications and conservative results lead to the use of simulations of the CAA alone to build the database.Finally these static conditions are then compared to a dynamic simulation where the CAA rotates into position to test the quasi-steady state assumptions used to generate the database. The dynamic case showed an increase in the moment of interest but within acceptable bounds for now.

SLS↗

Design of a fast crew transfer vehicle to Mars

A final report is made on the trajectory and vehicle requirements for a fast crew transfer vehicle to Mars which will complete an Earth to Mars (and Mars to Earth) transfer in 150 days and will have a stay time at Mars of 40 days. This vehicle will maximize the crew's effectiveness on Mars by minimizing detrimental physiological effects such as bone demineralization and loss of muscle tone caused by long period exposure to zero gravity and radiation from cosmic rays and solar flares. The crew transfer vehicle discussed will complete the second half of a Split Mission to Mars. In the Split Mission, a slow, unmanned cargo vehicle, nicknamed the Barge, is sent to Mars ahead of the crew vehicle. Once the Barge is in orbit around Mars, the fast crew vehicle will be launched to rendezvous with the Barge in Mars orbit. The vehicle presented is designed to carry six astronauts for a mission duration of one year. The vehicle uses a chemical propulsion system and a nuclear power system. Four crew modules, similar to the proposed Space Station Common Modules, are used to house the crew and support equipment during the mission. The final design also includes a command module that is shielded to protect the crew during radiation events.

Source record↗

Internal Layout of a Lunar Surface Habitat

NASA is currently developing concepts for sustained crewed missions to the lunar surface. Sustained missions will occur on annual basis for durations of 30 days or more. To house and support the crew, NASA is exploring the use of a lunar Surface Habitat. NASA relies on conceptual spacecraft design to assist in planning and mission analysis. A crucial component of this habitation design is the internal layout: the interior location of systems, workstations, crew quarters, etc. The purpose of this paper is to describe the process and resulting layout of a specific Surface Habitat design. This paper describes the SH’s hybrid inflatable structure then details the habitat’s interior layout. The proposed SH’s internal layout is depicted inside a hybrid inflatable structure using a low-fidelity CAD model. Multiple NASA references were consulted to determine the SH’s required functionality, minimal Net Habitable Volume, and minimal functional dimensions. These functions and volumes contribute to the placement and location of systems and spaces inside the habitat. In addition to functional volume, the layout includes systems and logistics placement. The resulting design will aid NASA in mission planning and further systems analysis.

Callie Burke↗

Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission

The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

Takada, Kevin C.↗

Multigenerational Independent Colony for Extraterrestrial Habitation, Autonomy, and Behavior Health (MICEHAB): An Investigation of a Long Duration, Partial Gravity, Autonomous Rodent Colony

The path from Earth to Mars requires exploration missions to be increasingly Earth-independent as the foundation is laid for a sustained human presence in the following decades. NASA pioneering of Mars will expand the boundaries of human exploration, as a sustainable presence on the surface requires humans to successfully reproduce in a partial gravity environment independent from Earth intervention. Before significant investment is made in capabilities leading to such pioneering efforts, the challenges of multigenerational mammalian reproduction in a partial gravity environment need be investigated. The Multi-generational Independent Colony for Extraterrestrial Habitation, Autonomy, and Behavior health is designed to study these challenges. The proposed concept is a conceptual, long duration, autonomous habitat designed to house rodents in a partial gravity environment with the goal of understanding the effects of partial gravity on mammalian reproduction over multiple generations and how to effectively design such a facility to operate autonomously while keeping the rodents healthy in order to achieve multiple generations. All systems are designed to feed forward directly to full-scale human missions to Mars. This paper presents the baseline design concept formulated after considering challenges in the mission and vehicle architectures such as: vehicle automation, automated crew health management/medical care, unique automated waste disposal and hygiene, handling of deceased crew members, reliable long-duration crew support systems, and radiation protection. This concept was selected from an architectural trade space considering the balance between mission science return and robotic and autonomy capabilities. The baseline design is described in detail including: transportation and facility operation constraints, artificial gravity system design, habitat design, and a full-scale mock-up demonstration of autonomous rodent care facilities. The proposed concept has the potential to integrate into existing mission architectures in order to achieve exploration objectives, and to demonstrate and mature common capabilities that enable a range of destinations and missions.

Rodgers, Erica M.↗

Orion Launch Abort System Performance on Exploration Flight Test 1

This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, R.↗

A Mission Concept to Study Multigenerational Mammalian Reproduction in Partial Gravity

A team at NASA Langley Research Center conducted a study during which a conceptual space mission was designed. In this study, rodents are used as human analogs to gather biological and systems data in a relevant environment applicable to future settlements on Mars. The mission concept uniquely addresses the combined effects of long-durations (one-year or greater), autonomous and robotic operations, and biological responses to partial gravity with an emphasis on reproduction. The objectives of this study were to 1) understand challenges associated with designing an artificial gravity habitat that supports the reproduction and maturation of a large animal colony, 2) identify mission architectures and operational concepts to transport and maintain such a facility, and 3) identify fundamental science considerations for mammalian reproduction studies to inform vehicle design. A model demonstration unit was developed to visualize and test certain design concepts that resulted from these considerations. Three versions of this demonstration unit were built over the course of the study, each taking into account lessons learned from the previous version. This paper presents the updated baseline mission and spacecraft design concepts to achieve these objectives, with a specific emphasis on updates since publication in previous works. Analyses of the integrated system trades among the elements which make up the conceptual vehicle are described to address overall feasibility and identify potential integrated design opportunities. The latest iteration of the habitat robotics design and a conceptual design example for autonomous care of crew and systems are also presented. Finally, the conclusion of this conceptual design study, necessary future analyses to enable such a facility, and comments upon other applications of a similar exploration-focused research facilities are addressed.

Rodgers, Erica M.↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.↗

A hybrid regenerative water recovery system for lunar/Mars life support applications

Long-duration manned space missions will require integrated biological and physicochemical processes for recovery of resources from wastes. This paper discusses a hybrid regenerative biological and physicochemical water recovery system designed and built at NASA's Crew and Thermal Systems Division at Johnson Space Center. The system is sized for a four-person crew and consists of a two-stage, aerobic, trickling filter bioreactor; a reverse osmosis system; and a photocatalytic oxidation system. The system was designed to accommodate high organic and inorganic loadings and a low hydraulic loading. The bioreactor was designed to oxidize organics to carbon dioxide and water; the reverse osmosis system reduces inorganic content to potable quality; and the photocatalytic oxidation unit removes residual organic impurities (part per million range) and provides in situ disinfection. The design and performance of the hybrid system for producing potable/hygiene water is described. Aspects of the system such as closure, automation and integration are discussed and preliminary results presented.

Verostko, Charles E.↗