Search NASA⌕ Search

SEARCH · Search NASA

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Upgraded cavities for the CEBAF cryomodule rework program

The CEBAF cryomodule rework program has been a successful tool to recover and maintain the energy reach of the original baseline 6 GeV accelerator. The weakest original modules with eight five-cell cavities assembled in four ?pairs?, with a specification when new of 20 MV per cryomodule (5 MV/m), are disassembled, re-cleaned with modern techniques and re-qualified to at least 50 MV (12.5 MV/m), (leading to the acronym ?C50?). The cost per recovered MV is much less than building new modules. However over time the stock of weak modules is being used up and the voltage gain per rework cycle is diminishing. In an attempt to increase the gain per cycle it is proposed to rework the cavities by replacing the original accelerating cells with new ones of an improved shape and better material. The original CEBAF HOM and FPC end groups are retained. The goal is to achieve up to 75 MV (18.75 MV/m) for the reworked module (?C75?). We report on the fabrication experience and test results of the first trial pair, containing two such reworked cavities.

Rimmer, Robert↗

Gradients of 50 MV/m in TESLA Shaped Cavities via Modified Low Temperature Bake

This paper will discuss the 75/120 C modified low temperature bake capable of giving unprecedented accel-erating gradients of above 50 MV/m for 1.3 GHz TESLA-shaped niobium SRF cavities in CW operation. A bifurca-tion in the Q₀ vs E_{acc} curve is observed after retesting cavities without disassembly in between, yielding per-formance that ranges from exceptional to above state-of-the-art. Atomic Force Microscopy studies on cavity cut-outs gives a possible mechanism responsible for this branching in performance, namely, the dissociation and growth of room temperature niobium nano-hydrides that exist near the RF surface, which are made superconduct-ing only through the proximity effect. In-situ low temper-ature baking of cavity cutouts reveals a dissociation of these room temperature nano-hydrides, which could ex-plain the higher performance of cavities subject to similar in-situ heating in the dewar.

43 PARTICLE ACCELERATORS↗

Single-molecule 3D imaging of HIV cellular entry by liquid-phase electron tomography

Enveloped viruses, including human immunodeficiency virus (HIV) and SARS-CoV-2, target cells through membrane fusion process. The detailed understanding of the process is sought after for vaccine development but remains elusive due to current technique limitations for direct three-dimensional (3D) imaging of an individual virus during its viral entry. Recently, we developed a simple specimen preparation method for real-time imaging of metal dynamic liquid-vaper interface at nanometer resolution by transmission electron microscopy (TEM). Here, we extended this method to study biology sample through snapshot 3D structure of a single HIV (pseudo-typed with the envelope glycoprotein of vesicular stomatitis virus, VSV-G) at its intermediate stage of viral entry to HeLa cells in a liquid-phase environment. By individual-particle electron tomography (IPET), we found the viral surface release excess lipids with unbound viral spike proteins forming ~50-nm nanoparticles instead of merging cell membrane. Moreover, the spherical-shape shell formed by matrix proteins underneath the viral envelope does not disassemble into a cone shape right after fusion. Further, the snapshot 3D imaging of a single virus provides us a direct structure-based understanding of the viral entry mechanism, which can be used to examine other viruses to support the development of vaccines combatting the current ongoing pandemic.

Kong, Lingli↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{sup reg.} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200--350 F. Room temperature leak test failures have been experienced in 5 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30--48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200--300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51--95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350--400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests that CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures is needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

42 ENGINEERING↗

Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 35, No. 1, January-June 1994]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: THE CHERNOBYL ACCIDENT: 1 Chernobyl Accident Management Actions, A. R Sich 25 The IAEA-ASSET Approach to Avoiding Accidents is to Recognize the Precursors to Prevent Incidents, F. Reisch; ACCIDENT ANALYSIS: 36 A Review of the Available Information on the Triggering Stage of a Steam Explosion, D. F. Fletcher; 58 Analysis and Modeling of Flow-Blockage-Induced Steam Explosion Events in the High-Flux Isotope Reactor, R. P. Taleyarkhan, V. Georgevich, C. W. Nestor, U. Gat, B. L. Lepard, D. H. Cook, J. Freels, S. J. Chang, C. Luttrell, R. C. Gwaltney, and J. Kirkpatrick; 74 An Analysis of Disassembling the Radial Reflector of a Thermionic Space Nuclear Reactor Power System, M. S. El-Genk and D. V. Paramonov; CONTROL AND INSTRUMENTATION: 86 Standards for High-Integrity Software, D. R. Wallace, D. R. Kuhn, L M. Ippolito, and L. Beltracchi; DESIGN FEATURES: 98 Adoption of New Design Features for the Next Generation Nuclear Power Reactors, L. S. Tong; 114 Review of Nuclear Piping Seismic Design Requirements, G. C. Slagis and S. E. Moore; ENVIRONMENTAL EFFECTS: 128 PC-Based Probabilistic Safety Assessment Study for a Geological Waste Repository Placed in a Bedded Salt Formation, S. A. Khan; OPERATING EXPERIENCES: 142 Managing Aging in Nuclear Power Plants: Insights from NRC’s Maintenance Team Inspection Reports, A. Fresco and M. Subudhi; 150 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 153 Selected Safety-Related Events, Compiled by G. A. Murphy; RECENT DEVELOPMENTS: 158 Reports, Standards, and Safety Guides, D. S. Queener; 168 Proposed Rule Changes as of Dec. 31, 1993; ANNOUNCEMENTS: 177 Symposium on Radioactive and Mixed Waste—Risk as a Basis for Waste Classification; 177 1995 Incineration Conference 178 Ninth Power Plant Dynamics Control and Testing Symposium; 174 The Authors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SIXTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for seven years at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 33 GLT O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 7 fixtures aging at 300 F. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 41-60 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging within the past year at an intermediate temperature of 270 F, with hopes that they may leak before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300 F for up to 26 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-96%. This is greater than seen to date for packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350-400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

D0 Decommissioning: Storage of depleted uranium modules inside D0 calorimeters after the termination of D0 experiment

Dzero liquid Argon calorimeters contain hadronic modules made of depleted uranium plates. After the termination of D0 detector's operation, liquid Argon will be transferred back to Argon storage Dewar, and all three calorimeters will be warmed up. At this point, there is no intention to disassemble the calorimeters. The depleted uranium modules will stay inside the cryostats. Depleted uranium is a by-product of the uranium enrichment process. It is slightly radioactive, emits alpha, beta and gamma radiation. External radiation hazards are minimal. Alpha radiation has no external exposure hazards, as dead layers of skin stop it; beta radiation might have effects only when there is a direct contact with skin; and gamma rays are negligible - levels are extremely low. Depleted uranium is a pyrophoric material. Small particles (such as shavings, powder etc.) may ignite with presence of Oxygen (air). Also, in presence of air and moisture it can oxidize. Depleted uranium can absorb moisture and keep oxidizing later, even after air and moisture are excluded. Uranium oxide can powder and flake off. This powder is also pyrographic. Uranium oxide may create health problems if inhaled. Since uranium oxide is water soluble, it may enter the bloodstream and cause toxic effects.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Los Alamos National Laboratory W76 Pit Tube Lifetime Study

A metallurgical study was requested as part of the Los Alamos National Laboratory (LANL) W76-1 life-extension program (LEP) involving a lifetime analysis of type 304 stainless steel pit tubes subject to repeat bending loads during assembly and disassembly operations at BWXT/Pantex. This initial test phase was completed during the calendar years of 2004-2006 and the report not issued until additional recommended tests could be performed. These tests have not been funded to this date and therefore this report is considered final. Tubes were reportedly fabricated according to Rocky Flats specification P14548 - Seamless Type 304 VIM/VAR Stainless Steel Tubing. Tube diameter was specified as 0.125 inches and wall thickness as 0.028 inches. A heat treat condition is not specified and the hardness range specification can be characteristic of both 1/8 and 1/4 hard conditions. Properties of all tubes tested were within specification. Metallographic analysis could not conclusively determine a specified limit to number of bends allowable. A statistical analysis suggests a range of 5-7 bends with a 99.95% confidence limit. See the 'Statistical Analysis' section of this report. The initial phase of this study involved two separate sets of test specimens. The first group was part of an investigation originating in the ESA-GTS [now Gas Transfer Systems (W-7) Group]. After the bend cycle test parameters were chosen (all three required bends subjected to the same amount of bend cycles) and the tubes bent, the investigation was transferred to Terri Abeln (Metallurgical Science and Engineering) for analysis. Subsequently, another limited quantity of tubes became available for testing and were cycled with the same bending fixture, but with different test parameters determined by T. Abeln.

36 MATERIALS SCIENCE↗

Wind Turbine Gearbox Condition Monitoring Round Robin Study – Vibration Analysis

The Gearbox Reliability Collaborative (GRC) at the National Wind Technology Center (NWTC) tested two identical gearboxes. One was tested on the NWTCs 2.5 MW dynamometer and the other was field tested in a turbine in a nearby wind plant. In the field, the test gearbox experienced two oil loss events that resulted in damage to its internal bearings and gears. Since the damage was not severe, thetest gearbox was removed from the field and retested in the NWTCs dynamometer before it was disassembled. During the dynamometer retest, some vibration data along with testing condition information were collected. These data enabled NREL to launch a Wind Turbine Gearbox Condition Monitoring Round Robin project, as described in this report. The main objective of this project was to evaluatedifferent vibration analysis algorithms used in wind turbine condition monitoring (CM) and find out whether the typical practices are effective. With involvement of both academic researchers and industrial partners, the project sets an example on providing cutting edge research results back to industry.

17 WIND ENERGY↗

Model 9975 PCV O-Ring Fixture Long-Term Leak Performance (Seventh Interim Status Report)

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450ºF. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200–270ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350ºF and higher temperatures, and in 8 fixtures aging at 300ºF. The remaining GLT O-ring fixtures aging at 300ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200ºF for 54-72 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200ºF will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270ºF, with hopes that they may reach a failure condition before the 200ºF fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200–300ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300ºF for 30-36 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51–96%. This is greater than seen to date for any packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350–400ºF). However, at 300ºF, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300ºF will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining PCV O-ring fixtures.

36 MATERIALS SCIENCE↗

An Analysis of Electrostatic Discharge Considerations in the Use of Sodium Bicarbonate Media for De-Potting Sensitive Electronic Assemblies

Sodium bicarbonate blast media offers superior performance in removing low-to-medium density polyurethane foam potting materials from electronic assemblies compared to conventional abrasive or other low-hardness blast media. This work identifies a class of processing equipment suitable for potting removal in electronic assemblies and provides a technical evaluation of appropriate process controls that significantly reduce the potential for Electrostatic Discharge (ESD) degradation or damage. Once appropriate process controls are added, the class of blast equipment demonstrated here, previously used only for non-ESD sensitive assemblies, can be safely used to provide new capabilities for component-level support. In many cases, assemblies that have been de-potted using sodium bicarbonate can be disassembled and rebuilt using normal production processes, enabling repair, reacceptance, and surveillance of assemblies that was previously impractical. This paper presents the results of a study that identifies significant process variables and their contribution to ESD generation. Data are presented to quantify process-related peak ESD voltages and mitigation methods. A discussion of how to implement practical ESD controls and de-potting process test methodologies is provided. The intent of this work is to document foundational experimental work that provides a technical basis for sodium bicarbonate as an ESD-safe material for use in de-potting processes when appropriate controls are implemented.

Kinzel, Robert L.↗

Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (Final Report)

Based on conclusions of a recent pit disassembly and conversion (PDC) Alternatives Study, the plutonium facility at Los Alamos (TA-55-4, “PF-4”) may be a viable location for converting pits into a feed material for making mixed oxide fuel rods at Savannah River Site (SRS). The alternatives study was separate from the on-going effort to develop a Supplemental Environmental Impact Statement (SEIS) for Surplus Plutonium Disposition (SPD). The National Nuclear Security Administration (NNSA) has decided to include the Los Alamos option in the National Environmental Policy Act (NEPA) analysis. An NNSA memorandum “Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental Impact Statement” received on October 26, 2011 directed Los Alamos to gather data in support of this effort.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Canless HIP Development for Aluminum Cladding of LEU Fuel Foils using Electron Beam Welding

The conventional canning method for HIP processing of fuel foils requires that foil assemblies be stacked within a stainless steel can, which is then welded shut and the internal air evacuated. A few of the detracting aspects associated with this method include i) the time required to hand construct and disassemble each can, ii) the possibility for bonding between adjacent foil assemblies and backing plates, and iii) the generation of large volumes of contaminated waste (can material and backing plates) that must be disposed. The new “canless” HIP approach discussed in this report involves the hermetic sealing of individual foil assemblies by electron beam welding their outer perimeter. A foil assembly consists of a zirconium-clad LEU (U-10Mo) foil sandwiched between two aluminum 6061 plates. Hermetic sealing is accomplished by making 4 intersecting aluminum-to-aluminum, full-penetration lap welds as shown in Figure 1. Since welds are made in a hard vacuum (10-5 torr), there is no need for a separate air evacuation step. The fuel itself sits within a pocket machined into one of the aluminum plates. Multiple foil assemblies welded in this manner can then be placed in a HIP fixture and batch processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

Formation of imploding plasma liners for fundamental HEDP studies and MIF Standoff Driver Concept

The disciplines of High Energy Density Physics (HEDP) and Inertial Confinement Fusion (ICF) are characterized by hypervelocity implosions and strong shocks. The Plasma Liner Experiment (PLX) is focused on reaching HEDP and/or ICF relevant regimes in excess of 1 Mbar peak pressure by the merging and implosion of discrete plasma jets, as a potentially efficient path towards these extreme conditions in a laboratory. In this work we have presented the first 3D simulations of plasma liner, formation, and implosion by the merging of discrete plasma jets in which ionization, thermal conduction, and radiation are all included in the physics model. The study was conducted by utilizing a smoothed particle hydrodynamics code (SPHC) and was a part of the plasma liner experiment (PLX). The salient physics processes of liner formation and implosion are studied, namely vacuum propagation of plasma jets, merging of the jets (liner forming), implosion (liner collapsing), stagnation (peak pressure), and expansion (rarefaction wave disassembling the target). Radiative transport was found to significantly reduce the temperature of the liner during implosion, thus reducing the thermal leaving more pronounced gradients in the plasma liner during the implosion compared with ideal hydrodynamic simulations. These pronounced gradients lead to a greater sensitivity of initial jet geometry and symmetry on peak pressures obtained. Accounting for ionization and transport, many cases gave higher peak pressures than the ideal hydrodynamic simulations. Scaling laws were developed accordingly, creating a non-dimensional parameter space in which performance of an imploding plasma jet liner can be estimated. It is shown that HEDP regimes could be reached with ~ 5 MJ of liner energy, which would translate to roughly 10 to 20 MJ of stored (capacitor) energy. This is a potentially significant improvement over the currently available means via ICF of achieving HEDP and nuclear fusion relevant parameters.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hot Isostatic Press Can Optimization for Aluminum Cladding of U-10Mo Reactor Fuel Plates: FY12 Final Report and FY13 Update

Currently, the proposed processing path for low enriched uranium – 10 wt. pct. molybdenum alloy (LEU-10Mo) monolithic fuel plates for high power research and test reactors includes hot isostatic pressing (HIP) to bond the aluminum cladding that encapsulates the fuel foil. Initial HIP experiments were performed at Idaho National Laboratory (INL) on approximately ¼ scale “mini” fuel plate samples using a HIP can design intended for these smaller experimental trials. These experiments showed that, with the addition of a co-rolled zirconium diffusion barrier on the LEU-10Mo alloy fuel foil, the HIP bonding process is a viable method for producing monolithic fuel plates. Further experimental trials at Los Alamos National Laboratory (LANL) effectively scaled-up the “mini” can design to produce full-size fuel prototypic plates. This report summarizes current efforts at LANL to produce a HIP can design that is further optimized for higher volume production runs. The production-optimized HIP can design goals were determined by LANL and Babcock & Wilcox (B&W) to include maintaining or improving the quality of the fuel plates produced with the baseline scaled-up mini can design, while minimizing material usage, improving dimensional stability, easing assembly and disassembly, eliminating machining, and significantly reducing welding. The initial small-scale experiments described in this report show that a formed-can approach can achieve the goals described above. Future work includes scaling the formed-can approach to full-size fuel plates, and current progress toward this goal is also summarized here.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗