Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Ex Situ Investigation of Anisotropic Interconnection in Silicon-Titanium-Nickel Alloy Anode Material

Herein we investigate the nanostructural evolution of Silicon-Titanium-Nickel (Si-Ti-Ni) ternary alloy material synthesized by melt spinning process for advanced lithium-ion battery anode. The synthesized material was found to have nano-Silicon particles dispersed in the Ti 4 Ni 4 Si 7 (STN) alloy buffering matrix and was characterized by X-ray diffraction (XRD), High resolution- transmission electron microscope (HR-TEM), Scanning transmission electron microscopes - energy dispersive X-ray spectrometer (STEM-EDS), and electrochemical performance test. The role of STN matrix is to accommodate the volume expansion stresses of the dispersed Si nanoparticles. However, an interesting behavior was observed during cycling. The Si nanoparticles were observed to form interconnection channels growing through the weak STN matrix cracks and evolving to a network isolating the STN matrix into small puddles. In conclusion, this unique nanostructural evolution of Si particles and isolation of the STN matrix failing to offer significant buffering effect to the grown Si network eventually accelerates more volume expansions during cycling due to less mechanical confinement and leads to performance degradation and poor cycle stability.

36 MATERIALS SCIENCE↗

Western Interconnect Transmission Line Wildfire Risk

The datasets contain wildfire risk probabilities for transmission lines in the Western Interconnect, identified only by the HIFLD dataset identifier. The dataset is generated using PNNL's WREST Tool (https://www.pnnl.gov/projects/wildfire-risk-resilience/tools/wrest). The input dataset includes HIFLD datasets on transmission lines and wildfire burn potentials and flame lengths from the PNNL RADR-FIRE Tool for 2025.

psps↗

R3IT: Rapid, Rural, Resilient Interconnection Toolkit

R3IT is a free and open-source web application that allows utilities to automate the processing of solar interconnection requests. It handles request submission, request review workflows, payment collection, signature collection, email notifications for any status changes, and optionally an automated engineering screening and approval process.

Pinney, David↗

Virtual interconnection platform initiative scoping study

Due to security and liability concerns, the research community has limited access to realistic large-scale power grid models to test and validate new operation and control methodologies. It is also difficult for industry to evaluate the relative value of competing new tools without a common platform for comparison. This report proposes to develop a large-scale virtual power grid model that retains basic features and represents future trends of major U.S. electric interconnections. This model will include realistic power flow and dynamics information as well as a relevant geospatial distribution of assets. This model will be made widely available to the research community for various power system stability and control studies and can be used as a common platform for comparing the efficacies of various new technologies.

97 MATHEMATICS AND COMPUTING↗

Addendum to the 2015 Eastern Interconnect Baselining and Analysis Report

This report serves as an addendum to the report 2015 Eastern Interconnect Baselining and Analysis Report (Amidan, Follum, and Freeman, 2015). This addendum report investigates the following: the impact of shorter record lengths and of adding a daily regularization term to the date/time models for angle pair measurements, additional development of a method to monitor the trend in phase angle pairs, the effect of changing the length of time to determine a baseline, when calculating atypical events, and a comparison between quantitatively discovered atypical events and actual events.

97 MATHEMATICS AND COMPUTING↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of PJM Interconnection's April 13, 2018, Response to National Energy Technology Laboratory's Report on Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units

In a March 2018 report entitled Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units , the National Energy Technology Laboratory (NETL) analyzed the fleet performance of market areas impacted by a 13-day storm known colloquially as the “Bomb Cyclone.” Special attention was paid to northeastern areas, as these were most impacted. With respect to PJM Interconnection LLC (PJM), the report found that 1) without coal units, the system would have experienced shortfalls; 2) approximately 25 gigawatts (GW) of heretofore underutilized coal-fired plants provided crucial capacity, lending the system resilience; 3) nearly 28 GW of natural gas-fired capacity did not deploy, due to severe spikes in natural gas prices caused in turn by constrained gas deliverability, in the face of tremendous space heating demand and transmission deliverability constraints on the bulk electric system. In April 2018, PJM issued a response that argued the NETL analysis was misplaced, asserting that gas-fired capacity was available and that it could have been called into service but was not, due to “economics.” This brief represents NETL’s reaction to PJM’s assertions in its April 2018 response.

20 FOSSIL-FUELED POWER PLANTS↗

R&D in Interconnect Technologies and Radiation Damage Studies

The R&D carried out under this proposal will help with the development and construction of radiation-hard tracking detectors aimed at the high-luminosity phase of the LHC (HL-LHC, 2025-35, 3000 fb -1 /experiment). Interconnect issues are an integral part of new assemblies being developed for these next generation trackers because they require conduits for data-flow between different intelligent modules. We also evaluated various thin films and studied their mechanical and thermal properties.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Secondary Networks and Protection: Implications for DER and Microgrid Interconnection

Secondary networks are used to supply power to loads that require very high reliability and are in use around the world, particularly in dense urban downtown areas. The protection of secondary network systems poses unique challenges. The addition of distributed energy resources (DERs) to secondary networks can compound these challenges, and deployment of microgrids on secondary networks will create a new set of challenges and opportunities. This report discusses secondary networks and their protection, the challenges associated with interconnecting DERs to a secondary network, issues expected to be associated with creating microgrids on secondary networks, standards that deal with these challenges and issues, and suggestions for research and development foci that would yield new means for addressing these challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Distributed Solar Photovoltaic Deployment via Barrier Mitigation or Removal in the Western Interconnection (Final Technical Report)

In 2017, the Western Electricity Coordinating Council (WECC) 2026 Common Case projected that distributed solar PV deployment in the Western U.S. would meet or exceed 16,106 MW of installed capacity by 2026. Of this total, 12,218 MW was projected to be deployed in California and another 3,888 MW was projected to be deployed across Arizona, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. However, WIEB recognized that barriers to distributed solar PV deployment could cause the region to fall short of these projections. WIEB identified three types of perceived barriers that might interfere with the deployment of distributed solar PV generation in the West, including: (1) interconnection barriers; (2) utility rate-design barriers; and (3) reliability barriers.

14 SOLAR ENERGY↗

Event Screening Methods for the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS)

The Eastern Interconnection Situational Awareness and Monitoring System (ESAMS) is a tool developed to explore the applications and advantages of sharing phasor measurement unit (PMU) data among operating entities. An initial conclusion from testing was that detected events required further screening before being reported to ensure that events would be of interest to system operators. The methods described in this report were integrated into ESAMS to meet this need. First, an event is screened for whether the change in voltage angle measurements indicates that the detected disturbance is sufficiently large. Next, an event is classified to determine if it was related to a loss of generation. Finally, a neural network is used to determine if the system’s response to the disturbance is normal or abnormal. These methods were tested with one month of field-measured PMU data. Results indicate that the additional information provided by these additional screening tools will improve selection of events for inclusion in the daily event reports automatically generated by ESAMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Quantum Computing Interconnect Based on Aerosol Jet Printing and Electrochemical Deposition of Rhenium

The electrodeposition of rhenium on to a metal seed layer on flexible substrates is presented as a means to creating superconducting flexible cable connectors in an enabling plug-and-play approach for quantum computing. Cryogenic quantum electronics are currently connected using masses of stainless-steel coaxial cables that are bulky, rigid - both in form and design - and lead to significant joule heating, thermal noise, and cross talk. Here, we present an unprecedented approach to integrate an aerosol jet printed (AJP) metal seed layer with rhenium electrodeposition on a flexible substrate in the advancement of superconducting interconnect technologies. Silver and gold were printed using the ‘Nanojet’ aerosol jet printer on Kapton films. Adhesion of gold was found to be far superior to that of silver and adhesion on roughened Kapton surpassed that of its smooth counterpart. Electrodeposition of rhenium was successful on both silver and gold and an amorphous Re film was confirmed by XRD. Results for both materials are presented however due to the poor adhesion of silver to Kapton it was ruled out as a viable candidate. Composite materials were characterized by profilometry, EDS, XRD and FIBSEM. Electrical measurements of the composite at ambient temperature showed a critical temperature (T c ), where the resistance drops to 0, of 5.8 K, well above 4.2 K, the temperature of liquid helium. Stress-strain tests of the Ag-Re and Au-Re composites on roughened and smooth Kapton were completed. Cyclic flexure testing (200 cycles) to 1.25% strain showed smooth Kapton samples reach a stress of ~16 MPa, while Kapton roughened with sandpaper, reaches ~20MPa of stress for the same 1.25% strain.

36 MATERIALS SCIENCE↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Regulatory Road Map for Distributed Energy Resource (DER) Interconnection and Interoperability

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, participants from Colombia's Energy and Gas Regulatory Commission (CREG) leveraged their training and professional experience to develop a regulatory roadmap for the interconnection and interoperability of increasing integration of distributed energy resources (DERs). CREG was one of four teams selected by the training program development team to receive continued technical assistance and strategic advisory support from the USAID-NREL Partnership for action plan development and implementation. This case study provides an overview of the key activities and outcomes of the technical assistance provided by NREL on the CREG Action Plan, and key next steps for implementation of Colombia's DER Integration Regulatory Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

Assessment of Regional Interconnections to Meet Southeast Asia's Renewable Energy Targets: Phase I of the Singapore – U.S. Collaboration

This report summarizes the results of a study of long-distance subsea electrical interconnections in Southeast Asia, conducted under the first phase of the Singapore-U.S. collaboration under the Net Zero World Initiative. In Phase 1, the Net Zero World team evaluated the current state of the renewable energy landscape in Southeast Asia; developed an open-source capacity expansion model using GridPath and evaluated several future scenarios including changes in interregional transmission; explored the technical feasibility of regional subsea interconnectors; and estimated socio-economic benefits of expanded regional transmission.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Characterization of Fine-Pitch Interconnects for Long-Lifetime HI Applications

This conference talk discusses optimizing gold-gold and gold-ENIG fine-pitch interconnections for Heterogeneous Integration applications, with a focus on longevity. We first look at electrical data from gold-gold bumps subjected to highly accelerated lifetime testing. Then, we discuss using chemical and physical data as a predictor for ENIG bump flip-chip success.

Humphrey, Nicholas James [Sandia National Laborato↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗