Search NASA⌕ Search

SEARCH · Search NASA

Results for “Infrastructure deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

402 records · Page 23

Hydrogeological assessment of CO2 containment assurance and wellbore integrity at a Gulf Coast storage site

Abstract A large-scale carbon capture and storage (CCS) initiative on the Texas Gulf Coast serves as a premier demonstration of the U.S. Department of Energy’s CarbonSAFE program. Targeting deep saline formations, specifically Oligo-Miocene deltaic sequences, the project aims to establish technical and commercial viability for geologic CO2 storage within a major industrial corridor. This study provides a rigorous hydrogeological assessment to support Class VI permitting by quantifying the high degree of containment security. Utilizing a compositional reservoir simulator, we developed a suite of 27 distinct simulation cases to evaluate vertical plume dynamics near both planned injection wells and proximal legacy infrastructure. To ensure numerical accuracy near wellbores, we implemented a refined mesh strategy, determining that a 5.6 ft × 5.6 ft grid refinement offered the optimal balance between computational efficiency and descriptive precision. The modeling framework utilized a systematic sensitivity-based approach to evaluate the mechanical redundancy of the subsurface system by performing a bounding analysis of wellbore interfaces against hypothetical high-permeability microannuli. By systematically isolating competing physical drivers, including permeability, porosity, gas hysteresis, thermal gradients, salinity, and solubility trapping (quantified via Henry’s law with dynamically adjusted coefficients), this work moves beyond binary assessments to establish a nuanced hierarchy of containment factors. The results confirm that primary trapping mechanisms (e.g., gas hysteresis and solubility), combined with the site's unique geomechanical stratigraphy, significantly restrict vertical mobility and reinforce the robust containment security of the reservoir. Baseline results demonstrate substantial vertical separation between the CO2 plume and the upper confining system, ensuring robust containment. Sensitivity analysis reveals that even under highly conservative bounding scenarios—assuming theoretical 10-Darcy pathways at specific wellbore locations—the 2,900-ft thick multi-layered confining zone remains a reliable barrier. In these hypothetical upper-bound cases, peak upward fluxes of CO2 and saltwater after 15 years of injection remain localized and dissipate rapidly within the lower sections of the confining interval, leaving the integrity of the seal uncompromised. Furthermore, the study identifies that while localized wellbore pathways define theoretical upper bounds of vertical migration, the Area of Review (AoR) is primarily sensitive to regional thermal gradients and hysteresis, which can influence the AoR by over 3,000 acres in pessimistic configurations. Also, primary trapping mechanisms, specifically gas hysteresis and solubility, work in tandem with the Gulf Coast’s unique geomechanical stratigraphy to significantly restrict vertical mobility. Ductile, smectite-rich mudstones facilitate natural borehole convergence and the self-healing of potential conduits, creating a natural geomechanical bridge that effectively mitigates migration potential at both current injection points and legacy-well locations. This comprehensive modeling effort demonstrates that the integration of high-resolution wellbore simulations and regional geomechanical observations confirms the long-term storage security of the studied site, providing a physics-based foundation for industrial-scale CCS deployments. This modeling framework establishes a baseline for future research into coupled geomechanical effects, such as time-dependent borehole convergence, to further refine long-term containment projections. Acknowledgements We thank the Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology for foundational research support. We appreciate Alex Bump for technical guidance and David Hoffman for model mesh generation. This work used TACC’s Frontera cluster for simulations and CMG Ltd. software licenses provided to UT-Austin. This material is based upon work supported by the Department of Energy under Award Number DE-FE0032338. Disclaimer This material is based upon work supported by the U.S. Department of Energy’s Fossil Energy and Carbon Management Office under the CarbonSAFE program, award Number DE-FE0032338. The views expressed herein do not necessarily represent the views of the U.S. Department of Energy or the United States Government.

58 GEOSCIENCES↗

Hydrogeological assessment of CO2 containment assurance and wellbore integrity at a Gulf Coast storage site

Abstract A large-scale carbon capture and storage (CCS) initiative on the Texas Gulf Coast serves as a premier demonstration of the U.S. Department of Energy’s CarbonSAFE program. Targeting deep saline formations, specifically Oligo-Miocene deltaic sequences, the project aims to establish technical and commercial viability for geologic CO2 storage within a major industrial corridor. This study provides a rigorous hydrogeological assessment to support Class VI permitting by quantifying the high degree of containment security. Utilizing a compositional reservoir simulator, we developed a suite of 27 distinct simulation cases to evaluate vertical plume dynamics near both planned injection wells and proximal legacy infrastructure. To ensure numerical accuracy near wellbores, we implemented a refined mesh strategy, determining that a 5.6 ft × 5.6 ft grid refinement offered the optimal balance between computational efficiency and descriptive precision. The modeling framework utilized a systematic sensitivity-based approach to evaluate the mechanical redundancy of the subsurface system by performing a bounding analysis of wellbore interfaces against hypothetical high-permeability microannuli. By systematically isolating competing physical drivers, including permeability, porosity, gas hysteresis, thermal gradients, salinity, and solubility trapping (quantified via Henry’s law with dynamically adjusted coefficients), this work moves beyond binary assessments to establish a nuanced hierarchy of containment factors. The results confirm that primary trapping mechanisms (e.g., gas hysteresis and solubility), combined with the site's unique geomechanical stratigraphy, significantly restrict vertical mobility and reinforce the robust containment security of the reservoir. Baseline results demonstrate substantial vertical separation between the CO2 plume and the upper confining system, ensuring robust containment. Sensitivity analysis reveals that even under highly conservative bounding scenarios—assuming theoretical 10-Darcy pathways at specific wellbore locations—the 2,900-ft thick multi-layered confining zone remains a reliable barrier. In these hypothetical upper-bound cases, peak upward fluxes of CO2 and saltwater after 15 years of injection remain localized and dissipate rapidly within the lower sections of the confining interval, leaving the integrity of the seal uncompromised. Furthermore, the study identifies that while localized wellbore pathways define theoretical upper bounds of vertical migration, the Area of Review (AoR) is primarily sensitive to regional thermal gradients and hysteresis, which can influence the AoR by over 3,000 acres in pessimistic configurations. Also, primary trapping mechanisms, specifically gas hysteresis and solubility, work in tandem with the Gulf Coast’s unique geomechanical stratigraphy to significantly restrict vertical mobility. Ductile, smectite-rich mudstones facilitate natural borehole convergence and the self-healing of potential conduits, creating a natural geomechanical bridge that effectively mitigates migration potential at both current injection points and legacy-well locations. This comprehensive modeling effort demonstrates that the integration of high-resolution wellbore simulations and regional geomechanical observations confirms the long-term storage security of the studied site, providing a physics-based foundation for industrial-scale CCS deployments. This modeling framework establishes a baseline for future research into coupled geomechanical effects, such as time-dependent borehole convergence, to further refine long-term containment projections. Acknowledgements We thank the Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology for foundational research support. We appreciate Alex Bump for technical guidance and David Hoffman for model mesh generation. This work used TACC’s Frontera cluster for simulations and CMG Ltd. software licenses provided to UT-Austin. This material is based upon work supported by the Department of Energy under Award Number DE-FE0032338. Disclaimer This material is based upon work supported by the U.S. Department of Energy’s Fossil Energy and Carbon Management Office under the CarbonSAFE program, award Number DE-FE0032338. The views expressed herein do not necessarily represent the views of the U.S. Department of Energy or the United States Government.

58 GEOSCIENCES↗

Optimization and Evaluation of Energy Savings for Connected and Autonomous Off-Road Vehicles

Off-road vehicles, such as wheel loaders, excavators, and harvesters, are extensively utilized across a wide range of industries, including construction, agriculture, and mining. These machines have become indispensable in supporting the day-to-day operational needs of a nation, playing a critical role in various sectors' infrastructure and productivity. However, despite their utility, off-road vehicles are significant consumers of fossil fuels, resulting in substantial emissions that contribute to environmental degradation. This highlights the pressing need for research and technological advancements aimed at improving their energy efficiency and reducing their carbon footprint. There are, however, two primary challenges that must be addressed to achieve these goals. First, off-road vehicles typically perform both driving and working tasks simultaneously, which introduces a high level of complexity into their overall dynamic systems. Analysis the interactions between these functions is challenging. Second, research into off-road vehicles is inherently interdisciplinary, demanding expertise across several domains such as fluid power systems, vehicle dynamics, control theory, optimization techniques, and real-world implementation. Recognizing these challenges, we proposed the project titled "Optimization and Evaluation of Energy Savings for Connected and Autonomous Off-Road Vehicles" as a comprehensive solution to enhance fuel efficiency while simultaneously improving productivity. This project specifically focuses on autonomous off-road vehicles, with particular attention to wheel loaders, and seeks to develop novel methods to optimize energy consumption without sacrificing operational performance. The project integrates real-time control algorithms, vehicle dynamics modeling, and co-optimization of powertrain system and vehicle system to achieve these goals. Our optimization strategy dynamically co-optimizes critical parameters at both the powertrain and vehicle levels, including vehicle speed, working tool movements, powertrain dynamics, and engine operations in real-time. To streamline this optimization process, we developed a vehicle model that captures the key dynamics while significantly enhancing computational efficiency. This allows the system to intelligently minimize fuel consumption, all while maintaining or even improving productivity through real-time calculations during various off-road operations. To validate the effectiveness of this energy optimization method, we introduced a state-of-the-art Hardware-in-the-Loop (HIL) testbed. This reconfigurable testbed seamlessly integrates the actual engine with virtual models of the wheel loader's subsystems, allowing for accurate emulation of real-world operational loads and environments. By simulating these conditions, the HIL testbed enables us to evaluate the wheel loader’s performance under diverse working scenarios, ensuring the developed solution is applicable in real-world operations. This testbed proved to be instrumental in validating the optimization algorithms and demonstrating the system's practical effectiveness. During the evaluation and testing phase, we employed the HIL testbed to rigorously assess the energy savings and productivity improvements generated by the optimized system. The results were highly encouraging, revealing that the automated wheel loader achieved over 30% fuel savings compared to traditional, human-operated cycles, with comparable or even enhanced levels of productivity. The insights gained from this HIL-based testing provided critical validation of our approach and highlighted the potential for deploying these optimized autonomous technologies in real-world off-road vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗