Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Statistical Analysis Of Tank 5 Floor Sample Results (U)

Sampling has been completed for the characterization of the residual material on the floor of Tank 5 in the F-Area Tank Farm at the Savannah River Site (SRS), near Aiken, SC. The sampling was performed by Savannah River Remediation (SRR) LLC using a stratified random sampling plan with volume-proportional compositing. The plan consisted of partitioning the residual material on the floor of Tank 5 into three non-overlapping strata: two strata enclosed accumulations, and a third stratum consisted of a thin layer of material outside the regions of the two accumulations. Each of three composite samples was constructed from five primary sample locations of residual material on the floor of Tank 5. Three of the primary samples were obtained from the stratum containing the thin layer of material, and one primary sample was obtained from each of the two strata containing an accumulation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada

This report presents results of data collected during the annual post-closure site inspection conducted at the Central Nevada Test Area, surface Corrective Action Unit (CAU) 417 in June 2009. The annual post-closure site inspection included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspection conducted at the UC-1 Central Mud Pit (CMP) indicated that the site and soil cover were in good condition. Three new fractures were identified in the soil cover and were filled with bentonite chips during the inspection. The vegetation on the soil cover was adequate but showed signs of the area's ongoing drought. No issues were identified with the CMP fence, gate, or subsidence monuments. No issues were identified with the warning signs and monuments at the other two UC-1 locations

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0 with ROTC 1

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

Airborne Radar Observations of Hurricane Georges during Landfall over the Dominican Republic

On 22 September 1998 hurricane Georges made landfall on the Dominican Republic (DR). Georges cost the DR at least 500 lives, made more than 155,000 people homeless and caused extensive damage to the country's main industries, tourism and agriculture. There was considerable wind damage, with wind gusts up to 58 m/s in Santa Domingo on the south coast, but most of the damage and deaths resulted from mudslides and the flooding of rivers. While this may have been the worst natural disaster to strike the DR, the sustained rapid storm movement saved the island from worse damage. Georges had previously affected several islands in the Lesser Antilles and Puerto Rico, but it had retained much of its circulation strength. Forty raingauge stations across the DR measured rainfall totals from Georges between 0.7 and 41 cm, the latter at the capital Santo Domingo, located on the south coast. At Herrera the maximum 1 h rainfall rate was 72 mm/h. It is suspected that much higher rain rates occurred in DR's mountainous interior. Before landfall the eye was clearly evident in satellite imagery. When the eye moved over southeastern DR, it filled rapidly, and the cloud top height decreased in all storm sectors except in the southern inflow sector, where a long-lived MCS, with a diameter larger than that of the eyewall, slowly became enwrapped in the hurricane circulation. The eye closure was most rapid between 16-18 UTC, when the eyewall circulation felt the mountainous terrain of the Cordillera Central, which rises up to 3,093 m. The estimated central pressure increased from 962 hPa at 15 UTC to 986 hPa at 03Z on 23 Sept, and the maximum sustained surface wind speed decreased from 54 to 36 in s-1 during the same period. The island of Hispaniola has a cross-track width of about 250 km, much wider than the diameter of the eyewall anvil (about 100 km before landfall). So the event can truly be considered to be a landfalling case, even though Georges recovered after crossing Hispaniola, albeit never to the same strength. This talk will summarize satellite and ground observations of Georges, as it passed the DR, and it will focus on EDOP data. In particular, we will try to estimate the rainfall rate over the mountainous terrain of the DR. And we will use detailed sounding data to explain the presence and characteristics of the massive MCS to the south, as well as the upper-level updrafts apparent over this MCS and over the mountains of the DR.

Geerts, B.↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenge Problem 1: Preliminary Results of the Direct Numerical Simulation of Transient Flows

This report presents the first direct numerical simulations (DNS) of transient mixed convection in an idealized downcomer-like channel (Challenge Problem 1, Phase II). Using the GPU-accelerated NekRS solver, we modeled a sudden decay in driving pressure, mimicking loss-of-flow events, and tracked the resulting evolution of Reynolds number, boundary-layer structure, turbulence statistics, and heat-transfer metrics. Key findings include the systematic thickening and eventual asymmetry of velocity and thermal boundary layers under buoyant deceleration; minimal “memory” lag in Reynolds shear stress and TKE profiles when sampled at matching Re, yet clear shifts of peak locations toward the cooled wall; overshoots in transient eddy-viscosity and eddy-diffusivity (and corresponding sub-unity turbulent Prandtl numbers) on the cooled side; and a pronounced transient Nusselt-number enhancement driven by wall-temperature inertia and residual eddy mixing. These effects combined to offer a temporary cooling margin above steady-state predictions during reactor LOF transients. Future work will extend this work to a more complex “Case II” geometry (90° turn + lower plenum) and generate multi-Re/Pr datasets for data-driven turbulence closures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance Assessment for Closure of the Calcined Solids Storage Facility at the INL Site - 19289

The Calcined Solids Storage Facility is composed of six discrete stainless steel 'bin sets' at the Idaho Nuclear Technology and Engineering Center at the INL Site. Approximately 4,440 m{sup 3} of the dry, granular calcine waste is stored in the facility. Closure of the facility will entail removal of the calcine waste followed by grouting. A 5-cm thick residual amount of calcine was assumed to remain at the bottom of the bins. Important radionuclides in the residual layer for the groundwater pathway were identified as the fission and activation products Tc-99, Se-79, I-129, Cs-135, H-3, and actinides Pu-239, and Pu-240. The stainless-steel bins prevent near-term release of grouted residual calcine waste to the environment. Future releases were conservatively based on the corrosion rate of the weld seams on the stainless-steel bins, which site-specific studies measured mean tunnel corrosion rates of 0.0132 mm/yr with a coefficient of variation of 0.333. Based on tunnel corrosion rates, mean bin hydrologic containment times were estimated to be between 238 years and 1,191 years, depending on the thickness of the bin. Any breach in the weld seam was assumed to result in water flow and radionuclide leaching through the bin. The structural integrity of the bin was assumed to be controlled by the general stainless-steel corrosion rate, which was much slower (3.5 x 10{sup -5} mm/yr), resulting in structural integrity times between 24,000 years to over 100,000 years. A mixing-cell model was used to compute water flow and transport through the hydrologically failed bins and the vadose zone. Credit was taken for the geochemical properties of the grout used to fill the bins at closure, which significantly slows the releases from the bins for key radionuclides like Tc-99. A semi-analytical model for three-dimensional dissolved-phase transport in an aquifer of constant unidirectional flow, infinite length and width, and finite thickness was used to compute concentrations in the aquifer across the model domain for a time varying source. Cumulative impacts from all bin sets were calculated by summation across the bin set sources that were superimposed on a uniform Cartesian grid. Effective doses were calculated for direct groundwater ingestion from wells located 100-m downgradient from each of the bin sets and ingestion of meat, milk, and vegetables irrigated with water derived from the well. Intruder doses were based on a well drilled through the grouted waste and cuttings spread around a home site after a 500-year institutional control period. Peak doses during the 1,000-year compliance period were less than 5% of the 250 μSv/yr (25 mrem/yr) performance objective and intruder doses were generally less 5% of the of the 5000 μSv/yr (500 mrem) and 1000 μSv/yr (100 mrem) performance objective for acute and chronic intruder exposure, respectively. Groundwater concentrations were all less than the maximum contaminant limits. In all cases, doses were highest for the oldest bin set because, compared to the other bin sets, it had the highest radionuclide concentrations in the calcine waste. The performance assessment results indicate that performance objectives can be met leaving considerably more than 5-cm of residual calcine waste in the bin sets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Design for a Short-Lived Low- and Intermediate-Level Waste Repository at the Al Tuwaitha Nuclear Center, Baghdad, Iraq - 17189

The European Commission under their Instrument for Nuclear Safety Cooperation (INSC) has initiated a project supporting Iraq's efforts for the safe disposal of short lived low- and intermediate-level radioactive waste (SL-LILW) arising from the decommissioning of Iraqi nuclear installations. The INSC project includes both the development of an initial conceptual level basic design and preliminary safety assessment (PSAR) report and the subsequent detailed engineering design and supporting intermediate safety assessment report (ISAR). The project is being executed by a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany; JAVYS a.s. of Slovakia and MCM Environmental Services Ltd of the United Kingdom. The current paper focuses on the development of the conceptual level basic design. In previous decades Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were located. The facilities suffered significant damage from bombing and subsequent looting during the first Gulf War in 1991. Currently, the Ministry of Science and Technology (MoST) is the radioactive waste management operator in Iraq and also the license holder for the ten Iraqi nuclear sites, all of them heavily damaged. Because of the ongoing security concerns in Iraq MoST has selected the Al Tuwaitha Nuclear Center as the preferred and best suited location for development of an SL-LILW repository. As an initial step in development of the conceptual design various repository design options for the site were examined and assessed. The assessment considered similar facilities that have been implemented internationally. At the conclusion of the assessment and in conjunction with the Iraqi Beneficiaries from MoST, a near-surface vault design was selected for the facility. The design of the facility relies on experience gained from existing low-level waste repositories at Centre de l'Aube in France and the El Cabril solid radioactive waste disposal facility in Spain as well as on more recent experience gained in the design of the Bulgaria National Disposal Facility (NDF) under construction near the Kozloduy Nuclear Power Plant. Similar to these reference designs, the concept for the Al Tuwaitha Disposal Facility (ATDF) will rely on a series of reinforced concrete vaults into which containerised waste will be placed. Each vault will consist of two chambers designed specifically to hold the waste. Central drainage points in each waste chamber will lead to an infiltration water collection system designed to detect any failures in the waste containment. Each disposal vault will be sealed after filling by installation of a reinforced concrete closure slab. Once all of the waste has been disposed of the site will be decommissioned and a multilayer protective cover will be installed over the sealed disposal vaults. The multilayer cover will act to further isolate the waste from the environment by limiting the access of water to the waste. Due in part to the presence of shallow groundwater at the site and to avoid potential damage to the facility by flooding from the nearby Tigris River the concept for the Al Tuwaitha Disposal Facility requires construction of the disposal vaults on a raised platform several meters above ground level. Construction of this platform will be integrated into the conceptual safety design and materials will be selected which further enhance the isolation function of the disposal system by hindering or delaying the release of radionuclides to the environment. The infiltration water collection system, which will be constructed in a specifically designed accessible gallery embedded and fully integrated into the platform, will provide access to inspection points located beneath each disposal chamber. The ATDF when completed will be a further demonstration of the adaptability of the disposal vault concept for use in isolating SL-LILW from the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO2 response screen in grass Brachypodium reveals the key role of a MAP kinase in CO2-triggered stomatal closure

Abstract Plants respond to increased CO2 concentrations through stomatal closure, which can contribute to increased water use efficiency. Grasses display faster stomatal responses than eudicots due to dumbbell-shaped guard cells flanked by subsidiary cells working in opposition. However, forward genetic screening for stomatal CO2 signal transduction mutants in grasses has yet to be reported. The grass model Brachypodium distachyon is closely related to agronomically important cereal crops, sharing largely collinear genomes. To gain insights into CO2 control mechanisms of stomatal movements in grasses, we developed an unbiased forward genetic screen with an EMS-mutagenized B. distachyon M5 generation population using infrared imaging to identify plants with altered leaf temperatures at elevated CO2. Among isolated mutants, a “chill1” mutant exhibited cooler leaf temperatures than wild-type Bd21-3 parent control plants after exposure to increased CO2. chill1 plants showed strongly impaired high CO2-induced stomatal closure despite retaining a robust abscisic acid-induced stomatal closing response. Through bulked segregant whole-genome sequencing analyses followed by analyses of further backcrossed F4 generation plants and generation and characterization of sodium azide and CRISPR-cas9 mutants, chill1 was mapped to a protein kinase, Mitogen-Activated Protein Kinase 5 (BdMPK5). The chill1 mutation impaired BdMPK5 protein-mediated CO2/HCO3− sensing together with the High Temperature 1 (HT1) Raf-like kinase in vitro. Furthermore, AlphaFold2-directed structural modeling predicted that the identified BdMPK5-D90N chill1 mutant residue is located at the interface of BdMPK5 with the BdHT1 Raf-like kinase. BdMPK5 is a key signaling component that mediates CO2-induced stomatal movements and is proposed to function as a component of the primary CO2 sensor in grasses.

Lopez, Bryn N. K. (ORCID:0009000937288216)↗

Atmospheric Drivers of Wind Turbine Blade Leading Edge Erosion: Review and Recommendations for Future Research

Leading edge erosion (LEE) of wind turbine blades causes decreased aerodynamic performance leading to lower power production and revenue and increased operations and maintenance costs. LEE is caused primarily by materials stresses when hydrometeors (rain and hail) impact on rotating blades. The kinetic energy transferred by these impacts is a function of the precipitation intensity, droplet size distributions (DSD), hydrometeor phase and the wind turbine rotational speed which in turn depends on the wind speed at hub-height. Hence, there is a need to better understand the hydrometeor properties and the joint probability distributions of precipitation and wind speeds at prospective and operating wind farms in order to quantify the potential for LEE and the financial efficacy of LEE mitigation measures. However, there are relatively few observational datasets of hydrometeor DSD available for such locations. Here, we analyze six observational datasets from spatially dispersed locations and compare them with existing literature and assumed DSD used in laboratory experiments of material fatigue. We show that the so-called Best DSD being recommended for use in whirling arm experiments does not represent the observational data. Neither does the Marshall Palmer approximation. We also use these data to derive and compare joint probability distributions of drivers of LEE; precipitation intensity (and phase) and wind speed. We further review and summarize observational metrologies for hydrometeor DSD, provide information regarding measurement uncertainty in the parameters of critical importance to kinetic energy transfer and closure of data sets from different instruments. A series of recommendations are made about research needed to evolve towards the required fidelity for a priori estimates of LEE potential.

17 WIND ENERGY↗

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

The Chesapeake Lighthouse and Aircraft Measurements for Satellites (CLAMS) Experiment

NASA has developed an Earth Observing System (EOS) consisting of a series of satellites designed to study global change from space. The EOS flagship is the EOS TERRA satellite, launched in December 1999, equipped with five unique sensors to monitor and study the Earth s heat budget and many of the key controlling variables governing the Earth's climate system. CLAMS, the Chesapeake Lighthouse and Aircraft Measurements for Satellites field campaign was conducted from NASA Wallops Flight Facility and successfully executed over the middle Atlantic eastern seaboard from July 10 August 2, 2001. CLAMS is primarily a shortwave closure experiment designed to validate and improve EOS TERRA satellite data products being derived from three sensors: CERES (Clouds and Earth's Radiant Energy System), MISR (Multi-angle Imaging Spectro-Radiometer) and MODIS (MODerate Resolution Imaging Spectroradiometer). CLAMS is jointly sponsored by the CERES, MISR and MODIS instrument teams and the NASA GEWEX Global Aerosol Climatology Project (GACP). CLAMS primary objectives are to validate satellite-based retrievals of aerosol properties and vertical profiles of radiative flux, temperature and water vapor. Central to CLAMS measurement strategy is the Chesapeake Lighthouse, a stable sea platform located in the Atlantic Ocean, 13 miles east of Virginia Beach near the mouth of the Chesapeake Bay and the site of an ongoing CERES Ocean Validation Experiment (COVE). Six research aircraft were deployed to make detailed measurements of the atmosphere and ocean surface in the vicinity of COVE, over the surrounding ocean, over nearby NOAA buoys and over a few land sites. The measurements are used to validate and provide ground truth for simultaneous products being derived from TERRA data, a key step toward an improved understanding and ability to predict changes in the Earth's climate. One of the two CERES instruments on-board TERRA was programmed for Rotating Azimuth Plane Scans (RAPS) during CLAMS, increasing the CERES coverage over COVE by a factor of 10. Nine coordinated aircraft missions and numerous additional sorties were flown under a variety of atmospheric conditions and aerosol loadings. On one golden day, July 17, all six aircraft flew coordinated patterns, vertically stacked between 100 ft and 65,000 ft over the COVE site as the TERRA satellite orbited overhead. A summary of CLAMS measurement campaign and a description of the platforms and measurements is given.

Smith, William L., Jr.↗

Status of the Characterization of DEs from the Full Circumference Examination of the Inner Container Closure Weld Region (FY2020)

One of the main focus areas of the 3013 Surveillance Program is a thorough evaluation of the inner container closure weld region (ICCWR) opened for destructive examination (DE). As part of the protocol to investigate the corrosion in the ICCWR a laser confocal microscope (LCM) is used to perform close visual examination of the surface and measurements of corrosion features on the surface. DE containers from FY13 through FY16 were screened with three candidates selected for full circumference evaluation (FCE) according to the ICCWR examination protocol, During the FCE, FY16 DE05 and FY15 DE07 showed suspect major corrosion events, FY16 DE05 Section C2 shows two crack-like features, identified as Denebola and Draco. Both features are located at the boundary of Zone 2 and Zone 3. Consequently, Section C2 of FY16 DE05 was selected for examination by serial metallography at Savannah River National Laboratory (SRNL). For FY15 DE07 the suspect corrosion events were observed on Sections Cl and C2. Section Cl shows one crack-like feature, identified as Acrux. Section C2 shows three crack-like features, identified as Bellatrix, Cursa Minor and Cursa Major. Unlike Acrux and Bellatrix, which are located at the boundary of Zone 2 and Zone 3, Cursa Minor and Cursa Major are located in Zone 2. Sections Cl and C2 of FY15 DE07 were sent to Los Alamos National Laboratory (LANE) for characterization by X-Ray Tomography (XRT).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement (Rev. 6)

This Compliance Monitoring Implementation Plan outlines monitoring activities conducted by the U.S. Department of Energy (DOE) at the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with the U.S. Environmental Protection Agency (EPA) disposal regulations at Title 40 Code of Federal Regulations (CFR) Part 191, "Environmental Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes," Subparts B and C; and the EPA criteria for certifying compliance at 40 CFR Part 194, "Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the Disposal Regulations," Certification Decision, Final Rule. This plan does not address | monitoring activities intended to demonstrate compliance with 40 CFR Part 191 Subpart A. WIPP is a mined repository designed for the permanent disposal of defense-related transuranic (TRU)waste located in the Chihuahuan Desert, 26 miles east of Carlsbad, New Mexico. The suitability of the WIPP site for TRU waste disposal is supported by more than three decades of environmental studies. Monitoring the WIPP facility is one of the DOE's top priorities. Monitoring activities are implemented in compliance with various federal and state of New Mexico regulatory and operational safety requirements. These activities are conducted to ensure environmental protection, public and worker health and safety, and proper characterization of the disposal system. Monitoring activities will continue at WIPP through the operational period and until well after closure of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulating the Clamped Tapered Beam Specimen Under Quasi-Static and Fatigue Loading Using Floating Node Method

As part of the NASA Advanced Composites Project (ACP), a sub-element has been designed to provide validation data for progressive damage analysis models. The clamped tapered beam is a cross-ply laminated composite specimen designed to validate the simulation of the onset of matrix cracks and their interaction with delaminations, including delamination migration. A tapered geometry was used to localize the first damage occurrence in the tapered region, without prescribing an initial crack. The boundary and loading conditions were chosen to favor delamination growth and subsequent migration after the first damage occurrence. The typical sequence of events consists of a matrix crack located at the tapered region, leading to delamination onset, followed by delamination growth and subsequent delamination migration to a different interface via a dominant matrix crack. The Clamped Tapered Beam (CTB) was tested in both quasi-static and fatigue regimes. The results obtained are used in this study to assess and validate a methodology based on the Floating Node Method (FNM) implemented as an Extended Interface Element. In this methodology, quasi-static and fatigue damage formation and development are modeled by combining FNM to represent crack networks, with Directional Cohesive Zone Elements (DCZE) and Virtual Crack Closure Technique (VCCT), respectively. Qualitatively, the methodology is capable of predicting the sequence of events and overall failure morphology. Quantitatively, the simulation results generally bound the experimental data, based on the range of the characterization data used. In this paper, the results from quasi static and fatigue simulations are compared and correlated with experimental data.

Seshadri, B. R.↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0 with ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗