Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lab Capabilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Options for an 11 GeV RF Beam Separator for the Jefferson Lab CEBAF Upgrade

The CEBAF accelerator at Jefferson Lab has had, since first demonstration in 1996, the ability to deliver a 5-pass electron beam to experimental halls (A, B, and C) simultaneously. This capability was provided by a set of three, room temperature 499 MHz rf separators in the 5th pass beamline. The separator was two-rod, TEM mode type resonator, which has a high shunt impedance. The maximum rf power to deflect the 6 GeV beams was about 3.4kW. The 12 GeV baseline design does not preserve the capability of separating the 5th pass, 11 GeV beam for the 3 existing halls. Several options for restoring this capability, including extension of the present room temperature system or a new superconducting design in combination with magnetic systems, are under investigation and are presented.

43 PARTICLE ACCELERATORS↗

Nuclear Physics Network Requirements Review Report

The Energy Sciences Network (ESnet) is the Office of Science’s high-performance network user facility, delivering highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the U.S. Department of Energy (DOE) science mission by connecting each and every DOE lab and its user facilities. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) Program, and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet connects DOE national laboratories, user facilities, and major experiments so scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large data sets, and access distributed data repositories. While ESnet provides network connectivity, it cannot be characterized as an internet service provider as it is specifically built to provide a range of network services that are tailored to meet the unique requirements of DOE’s data-intensive science. In short, ESnet’s mission is to enable and accelerate scientific discovery by delivering unparalleled network infrastructure, capabilities, and tools. ESnet’s vision is summarized by these three points. 1. Scientific progress will be completely unconstrained by the physical location of instruments, people, computational resources, or data. 2. Collaborations at every scale, in every domain, will have the information and tools they need to achieve maximum benefit from scientific facilities, global networks, and emerging network capabilities. 3. ESnet will foster the partnerships and pioneer the technologies necessary to ensure that these transformations occur. In May 2019, ESnet and the Office of Nuclear Physics (NP) of the DOE Office of Science organized an ESnet requirements review of NP-supported activities. Preparation for this event included identification of key stakeholders to the process: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the NP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task and facilitated a smooth transition to the in-person review.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Tests of innovative photon detectors and integrated electronics for the large-area CLAS12 ring-imaging Cherenkov detector

A large area ring-imaging Cherenkov detector has been designed to provide clean hadron identification capability in the momentum range from 3 GeV/c to 8 GeV/c for the CLAS12 experiments at the upgraded 12 GeV continuous electron beam accelerator facility of Jefferson Lab. Its aim is to study the 3D nucleon structure in the yet poorly explored valence region by deep-inelastic scattering, and to perform precision measurements in hadron spectroscopy. The adopted solution foresees a novel hybrid optics design based on an aerogel radiator, composite mirrors and a densely packed and highly segmented photon detector. Cherenkov light will either be imaged directly (forward tracks) or after two mirror reflections (large angle tracks). Extensive tests have been performed on Hamamatsu H8500 and novel flat multi-anode photomultipliers under development and on various types of silicon photomultipliers. A large scale prototype based on 28 H8500 MA-PMTs has been realized and tested with few GeV/c hadron beams at the T9 test-beam facility of CERN. In addition a small prototype was used to study the response of customized SiPM matrices within a temperature interval ranging from 25 down to –25 °C. The preliminary results of the individual photon detector tests and of the prototype performance at the test-beams are here reported.

Cherenkov radiation↗

The large-area hybrid-optics RICH detector for the CLAS12 spectrometer

A large area ring-imaging Cherenkov detector has been designed to provide clean hadron identification capability in the momentum range from 3 GeV/c to 8 GeV/c for the CLAS12 experiments at the upgraded 12 GeV continuous electron beam accelerator facility of Jefferson Lab to study the 3D nucleon structure in the yet poorly explored valence region by deep-inelastic scattering, and to perform precision measurements in hadronization and hadron spectroscopy. The adopted solution foresees a novel hybrid optics design based on an aerogel radiator, composite mirrors and densely packed and highly segmented photon detectors. Cherenkov light will either be imaged directly (forward tracks) or after two mirror reflections (large angle tracks). Finally, the preliminary results of individual detector component tests and of the prototype performance at test-beams are reported here.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Real-space simulations of the hyperbolic plasmon polaritons in 1T′ tungsten ditelluride

Recent discoveries of hyperbolic surface plasmon polaritons (SPPs) in 1T′ WTe 2 have garnered significant attention in 2D materials and nanophotonics. In this study, we employ finite-element simulations to investigate the real-space characteristics of hyperbolic SPPs in thin WTe 2 flakes. Our results show that the SPPs exhibit a pronounced sensitivity to excitation energy and sample thickness. By analyzing the plasmonic field patterns, we extract key plasmonic parameters including plasmon wavelengths, hyperbolic angles, and plasmonic figures of merit. In addition, we examine SPP modes in stacked WTe 2 flakes with varying twist angles, demonstrating that the plasmonic field patterns can be effectively tuned by adjusting the twist angle. Notably, as the twist angle increases, the SPPs undergo a topological transition from open hyperbolic modes to closed elliptic modes. This twist-engineering capability offers promising potential for the development of tunable plasmonic devices based on WTe 2 .

2D materials↗

Insulation Coordination Design for Grid-Connected Solid-State Transformers

The deployment of solid-state transformers (SSTs) in medium-voltage (MV) distribution systems is facing various challenges, especially the challenge of insulation coordination design against grid-originated lightning impulses. In this article, two challenges in existing insulation coordination designs for grid-connected SSTs are identified. One challenge is the mismatch between metal-oxide varistor (MOV) protective levels and SST insulation strength, the other challenge is the incompatibility of standard impulse test on SST protective structures. To address the MOV selection challenge, a novel lightning protection scheme is designed to protect a single-stage SST where the semiconductor modules are directly exposed to external lightning impulses. Here, the in-lab lightning impulse tests are performed to verify the overvoltage attenuation performance of the prototyped lightning protection scheme. To address the impulse test challenge, the surge withstand capability of the protected SST is comprehensively evaluated with a complete set of insulation coordination design procedures beyond the basic insulation level (BIL) test. After these two challenges are addressed, a discussion is presented on substituting conventional transformers with the protected SSTs into insulation-coordinated distribution systems to facilitate the field deployment of SSTs.

solid-state transformer (SST)↗

Depth-Resolved Lithiated Gradients in Pristine and Laser-Ablated Anodes During Fast Charging

Laser ablating 3D electrode microstructures is a technique to improve Li-ion battery fast-charge performance. This technique has been theoretically proposed and electrochemically validated previously in the literature. The fundamental principle underlying laser ablation is that the ablated features reduce Li-ion transport pathways, improving access to the electrode active material near the current collector. This, in turn, promotes more homogeneous electrode utilization. The present study seeks to directly affirm the physics attributed to laser ablation using operando high-speed synchrotron X-ray diffraction. In this study, depth-resolved graphite lithiation gradients are measured operando during high-rate (15 min) charging. The depth-resolved lithiation dynamics of both ablated and non-ablated anodes are compared. The results highlight that the laser-ablated graphite electrode has notably more homogeneous utilization as compared to the non-ablated electrode. Additionally, the ablated electrode has a significant delay in reaching the maximum graphite lithiation at the separator, indicating less propensity for lithium plating. During low rate delithiation/discharge (2 hr), the two cells' lithiation gradients converge. Notably, a calibrated physics-based electrochemical model accurately reflects experimental findings, suggesting the potential to use pseudo-4D models not only to optimize laser ablation parameters in fast-charge capable electrodes but also to guide fast charging protocols that avoid lithium plating.

25 ENERGY STORAGE↗

Argonne National Laboratory annual report of Laboratory Directed Research and Development Program Activities FY 2009.

I am pleased to submit Argonne National Laboratory's Annual Report on its Laboratory Directed Research and Development (LDRD) activities for fiscal year 2009. Fiscal year 2009 saw a heightened focus by DOE and the nation on the need to develop new sources of energy. Argonne scientists are investigating many different sources of energy, including nuclear, solar, and biofuels, as well as ways to store, use, and transmit energy more safely, cleanly, and efficiently. DOE selected Argonne as the site for two new Energy Frontier Research Centers (EFRCs) - the Institute for Atom-Efficient Chemical Transformations and the Center for Electrical Energy Storage - and funded two other EFRCs to which Argonne is a major partner. The award of at least two of the EFRCs can be directly linked to early LDRD-funded efforts. LDRD has historically seeded important programs and facilities at the lab. Two of these facilities, the Advanced Photon Source and the Center for Nanoscale Materials, are now vital contributors to today's LDRD Program. New and enhanced capabilities, many of which relied on LDRD in their early stages, now help the laboratory pursue its evolving strategic goals. LDRD has, since its inception, been an invaluable resource for positioning the Laboratory to anticipate, and thus be prepared to contribute to, the future science and technology needs of DOE and the nation. During times of change, LDRD becomes all the more vital for facilitating the necessary adjustments while maintaining and enhancing the capabilities of our staff and facilities. Although I am new to the role of Laboratory Director, my immediate prior service as Deputy Laboratory Director for Programs afforded me continuous involvement in the LDRD program and its management. Therefore, I can attest that Argonne's program adhered closely to the requirements of DOE Order 413.2b and associated guidelines governing LDRD. Our LDRD program management continually strives to be more efficient. In addition to meeting all reporting requirements during fiscal year 2009, our LDRD Office continues to enhance its electronic systems to streamline the LDRD management process. You will see from the following individual project reports that Argonne's researchers have once again done a superb job pursuing projects at the forefront of their respective fields and have contributed significantly to the advancement of Argonne's strategic thrusts. This work has not only attracted follow-on sponsorship in many cases, but is also proving to be a valuable basis upon which to continue realignment of our strategic portfolio to better match the Laboratory's Strategic Plan.

43 PARTICLE ACCELERATORS↗

National Reactor Innovation Center Update

Authorized by the Nuclear Energy Innovation Capabilities Act (NEICA) DOE-Office of Nuclear Energy; INL Nuclear Science & Tech Partner with industry to bridge the gap between research and commercial deployment Leverage national lab expertise and infrastructure

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Perspectives on Potential Advanced Construction Technologies for Nuclear Energy

NRIC Enables Nuclear Reactor Tests & Demonstrations Authorized by the Nuclear Energy Innovation Capabilities Act (NEICA) DOE-Office of Nuclear Energy; INL Nuclear Science & Tech Partner with industry to bridge the gap between research and commercial deployment Leverage national lab expertise and infrastructure

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Nuclear Systems Through Demonstrations

DOE program launched in October 2019 Authorized by the Nuclear Energy Innovation Capabilities Act (NEICA) DOE-Office of Nuclear Energy; INL Nuclear Science & Tech Partner with industry to bridge the gap between research and commercial deployment Leverage national lab expertise and infrastructure

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

RidgeAlloy: A high pressure die casting alloy that captures the approaching wave of automotive body sheet scrap

Oak Ridge National Laboratory (ORNL) has recently launched an effort to economically expand the North American aluminum supply chain by designing and developing a new family of Al-Mg-Si-Fe-Mn structural die cast aluminum alloys that can be made from up to 100% mixed 5xxx and 6xxx series automotive post-consumer sheet scrap and do not require heat treatment. The goal is to develop an alloy capable of capturing the approaching scrap wave of aluminum sheet intensive vehicles (in the 2030’s) into integrated structural high pressure die castings, rather than down-cycling these high-grade sheet alloys into non-structural castings. ORNL discovered a significant gap in the commercial thermodynamic databases that were unable to predict the trends of a key primary intermetallic phase as a function of composition. Experiments were performed to correct this gap and to create a unique, corrected quaternary database for Al-Mg-Si-Fe. High throughput computational methods, including solidification simulations, were used to identify a composition volume capable of avoiding this embrittling primary intermetallic phase, even at higher Fe + Si contents. Laboratory scale castings validated the thermodynamic and solidification predictions and resulted in lab-cast alloys with little primary intermetallic, and which met or exceeded structural casting properties requirements for yield strength and ductility. An accelerated demonstration of an HPDC automotive part was conducted in collaboration with two U.S. small businesses. Ingots made from 100% recycled 5xxx and 6xxx series scrap (plus Fe) were used to die cast one variant of this new family of Al-Mg-Si-Fe-Mn alloys (with high Si + Fe content) into a mid-sized HPDC structural-type automotive component. The HPDC alloy demonstration part showed good properties (especially ductility) and good castability for a complex component.

Plotkowski, Alex [ORNL] (ORCID:0000000154718681)↗

NREL Quickens its Tech Transfer Efforts

Innovations and 'aha' movements in renewable energy and energy efficiency, while exciting in the lab, only truly live up to their promise once they find a place in homes or business. Late last year President Obama issued a directive to all federal agencies to increase their efforts to transfer technologies to the private sector in order to achieve greater societal and economic impacts of federal research investments. The president's call to action includes efforts to establish technology transfer goals and to measure progress, to engage in efforts to increase the speed of technology transfer and to enhance local and regional innovation partnerships. But, even before the White House began its initiative to restructure the commercialization process, the National Renewable Energy Laboratory had a major effort underway designed to increase the speed and impact of technology transfer activities and had already made sure its innovations had a streamlined path to the private sector. For the last three years, NREL has been actively setting commercialization goals and tracking progress against those goals. For example, NREL sought to triple the number of innovations over a five-year period that began in 2009. Through best practices associated with inventor engagement, education and collaboration, NREL quadrupled the number of innovations in just three years. Similar progress has been made in patenting, licensing transactions, income generation and rewards to inventors. 'NREL is known nationally for our cutting-edge research and companies know to call us when they are ready to collaborate,' William Farris, vice president for commercialization and technology transfer, said. 'Once a team is ready to dive in, they don't want be mired in paperwork. We've worked to make our process for licensing NREL technology faster; it now takes less than 60 days for us to come to an agreement and start work with a company interested in our research.' While NREL maintains a robust patent portfolio, often companies are looking to do more than just license a technology. These relationships are invaluable in successfully moving technologies from NREL to the marketplace. 'We may generate new and potentially valuable innovations, but our commercialization partners do the heavy work of building a successful business around our technology,' Farris said. Tools such as CRADAs (Cooperative Research and Development Agreements) allow NREL to continue working with companies to refine and develop technologies. And, working with businesses is an area where NREL excels. NREL is responsible for one quarter of the CRADAs in the DOE system. 'When you look at the results of our CRADA program, you can demonstrate that we are actively engaged with companies in collaborating on research and moving technologies to market,' Farris said. NREL is first among DOE labs with 186 active CRADAs. And last year, NREL also was first with the number of new CRADAs signed. 'Part of the success in our working with industry goes back to NREL's mission to grow and support new industries,' Farris added. 'NREL has basic research capabilities, but we are never going to be the ultimate producer of a commercial product. That is the role of the private sector.' Farris also credits the advocacy and support that the Office of Energy Efficiency and Renewable Energy at DOE provides for these technology transfer activities. 'EERE's support is critical to our success,' Farris said. To assist the private sector in moving a technology from the lab to the manufacturing line, NREL has a number of programs in place to give that first, or even final, nudge toward commercialization. For instance, the Commercialization Assistance Program helps startups overcome technical barriers by granting free access to 40 hours of work at the lab. Through the Innovation and Entrepreneurship Center, NREL also helps clean energy businesses develop strong links with the financial community, as well as other key stakeholders in the commercialization process. In March, NREL formally opened the Colorado Center for Renewable Energy and Economic Development a cooperative program with the state of Colorado designed to bring together stakeholders and service providers that support the growth of cleantech companies. CREED currently is working with more than 25 stakeholders - governmental partners, universities, industry associations, venture capital organizations and small businesses - to improve the access these groups have to technologies developed at NREL and to provide services such as classes and workshops for entrepreneurs. When it comes to bringing together cleantech stakeholders, NREL's Industry Growth Forum is the marquee event. At the forum, clean energy entrepreneurs have the opportunity to present their business cases to an expert panel of investors and energy executives. Companies that have presented have raised $3.4 billion in funding to date.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Aerogel Cerenkov detector for the SHMS magnetic spectrometer in Hall C at Jefferson Lab

Hadronic reactions producing strange quarks such as exclusive or semi-inclusive kaon production, play an important role in studies of hadron structure and the dynamics that bind the most basic elements of nuclear physics. The small-angle capability of the new Super High Momentum Spectrometer (SHMS) in Hall C, coupled with its high momentum reach - up to the anticipated 11-GeV beam energy in Hall C - and coincidence capability with the well-understood High Momentum Spectrometer, will allow for probes of such hadron structure involving strangeness down to the smallest distance scales to date. To cleanly select the kaons, a threshold aerogel Cerenkov detector has been constructed for the SHMS. The detector consists of an aerogel tray followed by a diffusion box. Four trays for aerogel of nominal refractive indices of n =1.030, 1.020, 1.015 and 1.011 were constructed. The tray combination will allow for identification of kaons from 1 GeV/c up to 7.2 GeV/c, reaching 10 -2 proton and 10 -3 pion rejection, with kaon detection efficiency better than 95%. The diffusion box of the detector is equipped with 14 five-inch diameter photomultiplier tubes. Its interior walls are covered with Gore diffusive reflector, which is superior to the commonly used Millipore paper and improved the detector performance by 35%. The inner surface of the two aerogel trays with higher refractive index is covered with Millipore paper, however, those two trays with lower aerogel refractive index are again covered with Gore diffusive reflector for higher performance. The measured mean number of photoelectrons in saturation is ~12 for n =1.030, ~8 for n =1.020, ~10 for n =1.015, and ~5.5 for n =1.011. Here the design details, the results of component characterization, and initial performance tests and optimization of the detector are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Air-Source Integrated Heat Pump System Development – Final Report

Between October 2007 and September 2017, Oak Ridge National Laboratory (ORNL) and Lennox Industries, Inc. (Lennox) engaged in a Cooperative Research and Development Agreement (CRADA) to develop an air-source integrated heat pump (AS-IHP) system for the US residential market. The Lennox AS-IHP concept consisted of a high-efficiency air-source heat pump (ASHP) for space heating and cooling services and a separate heat pump water heater/dehumidifier (WH/DH) module for domestic water heating and dehumidification (DH) services. A key feature of this system approach with the separate WH/DH is capability to pretreat (i.e., dehumidify) ventilation air and dedicated whole-house DH independent of the ASHP. Two generations of laboratory prototype WH/DH units were designed, fabricated, and lab tested. Performance maps for the system were developed using the latest research version of the US Department of Energy/ORNL heat pump design model (Rice 1992; Rice and Jackson 2005; Shen et al. 2012) as calibrated against the lab test data. These maps served as the input to TRNSYS (Solar Energy Laboratory et al. 2010) to predict annual performance relative to a baseline suite of equipment meeting minimum efficiency standards in effect in 2006 (i.e., a combination of an ASHP with a seasonal energy efficiency ratio (SEER) of 13 and resistance water heater with an energy factor (EF) of 0.9). Predicted total annual energy savings (based on use of a two-speed ASHP and the second-generation WH/DH prototype for the AS-IHP), while providing space conditioning, water heating, and dehumidification for a tight, well-insulated 2600 ft2 (242 m2) house at three US locations, ranged from 33 to 36%, averaging 35%, relative to the baseline system. The lowest savings were seen at the cold-climate Chicago location. Predicted energy use for water heating was reduced by about 50 to 60% relative to a resistance WH.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗