Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Maintaining Aura's Orbit Requirements While Performing Orbit Maintenance Maneuvers Containing an Orbit Normal Delta-V Component

The Earth Observing System (EOS) Afternoon Constellation consists of five member missions (GCOM-W1, Aqua, CALIPSO, CloudSat, and Aura), each of which maintain a frozen, sun-synchronous orbit with a 16-day repeating ground track that follows the Worldwide Reference System-2 (WRS-2). Under nominal science operations for Aura, the propulsion system is oriented such that the resultant thrust vector is aligned 13.493 degrees away from the velocity vector along the yaw axis. When performing orbit maintenance maneuvers, the spacecraft performs a yaw slew to align the thrust vector in the appropriate direction. A new Drag Make Up (DMU) maneuver operations scheme has been implemented for Aura alleviating the need for the 13.493 degree yaw slew. The focus of this investigation is to assess the impact that no-slew DMU maneuver operations will have on Aura's Mean Local Time (MLT) which drives the required along track separation between Aura and the constellation members, as well as Aura's frozen orbit properties, eccentricity and argument of perigee. Seven maneuver strategies were analyzed to determine the best operational approach. A mirror pole strategy, with maneuvers alternating at the North and South poles, was implemented operationally to minimize impact to the MLT. Additional analysis determined that the mirror pole strategy could be further modified to include frozen orbit maneuvers and thus maintain both MLT and the frozen orbit properties under noslew operations.

Aqua↗

Circular-Orbit Maintenance Strategies for Primitive Body Orbiters

For missions to smaller primitive bodies, solar radiation pressure (SRP) is a significant perturbation to Keplerian dynamics. For most orbits, SRP drives large oscillations in orbit eccentricity, which leads to large perturbations from the irregular gravity field at periapsis. Ultimately, chaotic motion results that often escapes or impacts that body. This paper presents an orbit maintenance strategy to keep the orbit eccentricity small, thus avoiding the destabilizing secondary interaction with the gravity field. An estimate of the frequency and magnitude of the required maneuvers as a function of the orbit and body parameters is derived from the analytic perturbation equations.

comet↗

Advanced Ground Systems Maintenance Prognostics Project

The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.

Prognostics↗

Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

System health↗

Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

Remediation↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

CMI↗

Empirical and Face Validity of Software Maintenance Defect Models Used at the Jet Propulsion Laboratory

At the Mission Design and Navigation Software Group at the Jet Propulsion Laboratory we make use of finite exponential based defect models to aid in maintenance planning and management for our widely used critical systems. However a number of pragmatic issues arise when applying defect models for a post-release system in continuous use. These include: how to utilize information from problem reports rather than testing to drive defect discovery and removal effort, practical model calibration, and alignment of model assumptions with our environment.

software reliability↗

Orbit Maintenance and Navigation of Human Spacecraft at Cislunar Near Rectilinear Halo Orbits

Multiple studies have concluded that Earth-Moon libration point orbits are attractive candidates for staging operations. The Near Rectilinear Halo Orbit (NRHO), a member of the Earth-Moon halo orbit family, has been singularly demonstrated to meet multi-mission architectural constraints. In this paper, the challenges associated with operating human spacecraft in the NRHO are evaluated. Navigation accuracies and human vehicle process noise effects are applied to various station keeping strategies in order to obtain a reliable orbit maintenance algorithm. Additionally, the ability to absorb missed burns, construct phasing maneuvers to avoid eclipses and conduct rendezvous and proximity operations are examined.

Davis, Diane↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021. This paper will provide the original plan, requirements and restriction, and the plan changes that were made to adjust to this condition. The document will also discuss lessons learned.

flight dynamics↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021.

flight dynamics↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

Securing the Legacy of TESS through the Care and Maintenance of TESS Planet Ephemerides

Much of the science from the exoplanets detected by the Transiting Exoplanet Survey Satellite (TESS) mission relies on precisely predicted transit times that are needed for many follow-up characterization studies. We investigate ephemeris deterioration for simulated TESS planets and find that the ephemerides of 81% of those will have expired (i.e., 1σ mid-transit time uncertainties greater than 30 minutes) 1 yr after their TESS observations. We verify these results using a sample of TESS planet candidates as well. In particular, of the simulated planets that would be recommended as James Webb Space Telescope (JWST) targets by Kempton et al., ∼80% will have midtransit time uncertainties >30 minutes by the earliest time JWST would observe them. This rapid deterioration is driven primarily by the relatively short time baseline of TESS observations. We describe strategies for maintaining TESS ephemerides fresh through follow-up transit observations. We find that the longer the baseline between the TESS and the follow-up observations, the longer the ephemerides stay fresh, and that 51% of simulated primary mission TESS planets will require space-based observations. The recently approved extension to the TESS mission will rescue the ephemerides of most (though not all) primary mission planets, but the benefits of these new observations can only be reaped 2 yr after the primary mission observations. Moreover, the ephemerides of most primary mission TESS planets (as well as those newly discovered during the extended mission) will again have expired by the time future facilities such as the ELTs, Ariel, and the possible LUVOIR/Origins Space Telescope missions come online, unless maintenance follow-up observations are obtained.

Diana Dragomir↗

Orbit Maintenance For Low Altitude Near-Circular Lunar Orbits

The behavior of low altitude near-circular lunar orbits is a key design issue for some missions in the proposed Space Exploration Initiative. The Lunar gravity field strongly perturbs low altitude orits, so an effective orbit maintenance strategy is needed.

Near-Ciucular↗

Short Circuiting the Controller –Missteps in Maintenance and Inspection of Process and Wiring in STS-93

During the launch of the Chandra X-Ray Observatory in 1999, an in-flight anomaly occurred a few seconds after liftoff. A power fluctuation caused two Main Engine controllers to drop offline. Fortunately, due to redundancy, the Space Shuttle Columbia was able to successfully reach orbit and avoid an abort. After the successful deployment of Chandra and the safe return of the crew, in-vestigation revealed that the controller failure was due to a wire short in the pay-load bay. It was suspected that the Kapton insulation on the wire rubbed off against a burred screw head, the result of overtightening of the screw during a maintenance event 4 to 5 years prior to the STS-93 mission. Vibrations led the abraded wire to short during flight. The Space Shuttle Program was grounded for 4 months while a program-wide inspection and wire chafing mitigation effort of all orbiter wiring ensued.

Kristy S Yun↗