Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Risk-Informed Monitoring, Verification and Accounting (RI-MVA): An NRAP White Paper Documenting Methods and a Demonstration Model for Risk-Informed MVA System Design and Operations in Geologic Carbon Sequestration

This white paper accompanies a demonstration model that implements methods for the risk-informed design of monitoring, verification and accounting (RI-MVA) systems in geologic carbon sequestration projects. The intent is that this model will ultimately be integrated with, or interfaced with, the National Risk Assessment Partnership (NRAP) integrated assessment model (IAM). The RI-MVA methods described here apply optimization techniques in the analytical environment of NRAP risk profiles to allow systematic identification and comparison of the risk and cost attributes of MVA design options.

carbon sequestration↗

Apollo Medical Operations Project: Recommendations for EVA and Lunar Surface Operations

The potential risk of injury to crewmembers is inherent in aggressive surface activities, whether they be Moon-, Mars-, or asteroid-based. In December 2005, the Space Medicine Division at JSC requested a study to identify Apollo mission issues that had an impact to crew health or performance or both. This talk focused on the Apollo EVA suit and lunar surface operations concerning crew health and performance. There were roughly 20 recommendations from this study of Apollo for improving these two areas for future exploration missions, a few of which were incorporated into the Human Systems Integration Requirements (HSIR). Dr. Richard Scheuring covered these topics along with some of the analog work that has been done regarding surface operations and medical contingencies.

Scheuring, R. A.↗

Supporting Hazard Analysis for Wildfire Response Using fmdtools and MIKA

The System Wide Safety (SWS) Safety Demonstrator (SD) Series drives development of an increasingly capable In-Time Aviation Safety Management System (IASMS) focusing on humanitarian applications, starting with wildfire response (SD-1). The goals of this report are to (1) provide an early hazard analysis and mitigation evaluation of wildfire response to support these efforts and (2) provide a demonstration of capabilities of the Fault Model Design Tools (fmdtools) and Manager for Intelligent Knowledge Access (MIKA) tools. fmdtools provides a modeling, simulation, and resiliency analysis framework in which a wildfire response model, the System Modeling and Analysis of Resiliency in Scalable Traffic Management for Emergency Response Operations (SMARt-STEReO), is built. MIKA is an intelligent knowledge manager with several capabilities, including assisting in hazard analysis by extracting and analyzing hazards from historical incident reports. The following topics are covered in the report: Understanding Wildfire Hazard Dynamics. We provide a description and simulated examples of how hazards occur in the SMARt-STEReO model of wildfire response and their effect on its outcome. This provides a common mental model and focuses the analysis presented in the remainder of the report. Wildfire Hazard Identification. MIKA identifies wildfire hazards from three relevant datasets: the ICS-209-PLUS, SAFECOM, and SAFENET. Hazards are manually organized into a taxonomy and MIKA analyzes each hazard’s effects, likelihood, severity, and risk. Evaluating Mitigation Strategies. The SMARt-STEReO wildfire response model built in fmdtools evaluates a subset of identified hazards. Specifically, we simulate the effect of communications faults and equipment faults on operator safety, the effect of changing winds and flammability, and a scenario with multiple ignition points and heavy smoke. Tool Limitations and Usage Considerations. We provide a discussion of appropriate tool use cases as well as limitations and considerations for usage. The tool findings are used to synthesize recommendations for wildfire response operations, which can be captured as part of an IASMS. Key recommendations are as follows: Hazards are identified from a broad spectrum of sources including aircraft subsystems, operational sources, and ground crew operations. Highest risk operational environment hazards identified are Evacuations. The highest risk manned aerial operations hazard categorized is Jumper Operations Mishap. Ground crew hazards that are highest risk are Burns, Cargo Operations Overhead, Dehydration, Entrapment, Falling Objects, Heart Attacks, Heat Exhaustion, Inadequate Training or Certification, Vehicle Breakdown, and Vehicle Collision. Modelled containment failures arise from a mismatch between the difficulty of the firefighting scenario and the capacity (e.g., speed, effectiveness, awareness) of the response. In firefighting scenarios where containment is possible (e.g., because the fire does not spread too quickly), these mismatches can occur because of a change in environmental conditions (e.g., wind, flammability, etc) or because of planning, equipment, or communications faults. Improvements to communications increase the capacity of the firefighting response by reducing the time needed to respond to the fire. While surveillance does not increase this capacity by itself, it increases operator safety by increasing state awareness, enabling firefighters to evade approaching fires. Increasing both has a synergistic effect. In general, these performance and resilience increases generalize over fault scenarios as well as unforeseen changes to circumstances (i.e., wind, aridity, etc.). However, these improvements need to be designed so as not to make the system prone to persistent large-scale communications outages, which can reduce performance.

Hazard analysis↗

Natural Language Processing-Enhanced Nuclear Industry Operating Experience Data Analysis to Support Risk Model Parameter Estimations

This set of slides has been prepared for a talk at the INL AI/ML Symposium held on September 8, 2022. Presentation outline: Background - Nuclear power plant operating experience data sources • Research focus and motivation - Analyzing free-text operating experience data: present and future • Research method - Input - Methodological steps - Output • Conclusions and next steps

99 GENERAL AND MISCELLANEOUS↗

Integrating risk assessment methods for carbon storage: A case study for the quest carbon capture and storage facility

This paper documents how tools developed by the National Risk Assessment Partnership (NRAP) complement the Bowtie risk assessment approach through the demonstration of a risk-based Area of Review (AoR) determination for the Quest Carbon Capture and Storage (CCS) facility near Edmonton, Alberta with the NRAP Open-Source Integrated Assessment Model (NRAP Open-IAM). The Bowtie risk assessment for the Quest CCS site was developed by Shell Canada Ltd., who operates the asset on behalf of the Athabasca Oil Sand Project — a joint venture, owned by Canadian Natural Resources Ltd, Chevron Canada and Shell Canada Ltd. The Quest Bowtie treats site risk comprehensively – considering a large set of technical and project risks (e.g., operational risks, above ground infrastructure, public perception, etc.). NRAP tools, methods, and analyses are focused on quantitative assessment of subsurface technical risks. NRAP-Open-IAM was used to evaluate potential groundwater impacts at the Quest site, i.e., a sufficient change above background groundwater quality levels to be measurable, should CO 2 and/or brine leak from the reservoir via a faulty and/or compromised wellbore. Our results show there is a low potential for groundwater impact and support a further reduction (from ~460 to 100 km 2 ) to the established AoR for the Quest site. Integrating both approaches early in the site characterization period could significantly benefit commercial-scale projects by drastically reducing the region over which leakage risks (e.g., legacy wells) need to be evaluated, i.e., the AoR. This is especially true for brownfield sites, which could contain hundreds to thousands of legacy wells. Further, basing monitoring network design on those regions where impacts are most likely to occur has the potential to facilitate more efficient deployment of monitoring technologies and improve the likelihood of detecting a leak should one occur.

58 GEOSCIENCES↗

The hydrothermal reactions of monosodium titanate, crystalline silicotitanate and sludge in the modular salt process: a literature survey

The use of crystalline silicotitanate (CST) is proposed for an at-tank process to treat High Level Waste at the Savannah River Site. The proposed configuration includes deployment of ion exchange columns suspended in the risers of existing tanks to process salt waste without building a new facility. The CST is available in an engineered form, designated as IE-911-CW, from UOP. Prior data indicates CST has a proclivity to agglomerate from deposits of silica rich compounds present in the alkaline waste solutions. This report documents the prior literature and provides guidance for the design and operations that include CST to mitigate that risk. The proposed operation will also add monosodium titanate (MST) to the supernate of the tank prior to the ion exchange operation to remove strontium and select alpha-emitting actinides. The cesium loaded CST is ground and then passed forward to the sludge washing tank as feed to the Defense Waste Processing Facility (DWPF). Similarly, the MST will be transferred to the sludge washing tank. Sludge processing includes the potential to leach aluminum from the solids at elevated temperature (e.g., 65 C) using concentrated (3M) sodium hydroxide solutions. Prior literature indicates that both CST and MST will agglomerate and form higher yield stress slurries with exposure to elevated temperatures. This report assessed that data and provides guidance on minimizing the impact of CST and MST on sludge transfer and aluminum leaching sludge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BioSentinel: Leading the Way for Deep Space CubeSat Missions

Flagship science missions are not alone in Deep Space thanks to BioSentinel, a 6U spacecraft launched on Artemis-1. BioSentinel is one of the longest operating CubeSats beyond cislunar space. The subsystems and COTS components of the BioSentinel bus are a template for future deep space missions, and the lessons learned from over a year of operations will enable improved performance for the next missions. BioSentinel achieved its unprecedented performance for an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and primed operators to respond in flight, preparing the team to react quickly to successfully detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat, as well as the capability to detumble the spacecraft and manage momentum, while providing sufficient margin to execute potential delta-V maneuvers. The Iris radio has operated for over 18 months with no significant issues. Initial Iris performance estimates have been accurate throughout the mission. BioSentinel continues to collect data on thermal conditions and to validate our performance models with real-world knowledge. We have received exemplary support from our DSN partners. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer continued to collect solar and galactic radiation data from its location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. The lessons learned from BioSentinel suggest key areas to enhance performance. The ability to upload modified flight software can increase the stability of memory management. Additional heaters in the propulsion system design have already proven successful on the Starling mission. Streamlining mission operations can reduce costs, increase data return, and better utilize DSN time. Enhancements such as these will facilitate reliable, long-duration deep space exploration using the proven BioSentinel 6U CubeSat bus.

BioSentinel↗

BioSentinel: Forging the path for Deep Space CubeSat Missions

The BioSentinel mission was launched in 2022 aboard the SLS launch vehicle as part of the Artemis-I campaign and continues mission operations into 2024. The 6U CubeSat has been characterizing deep space radiation at large distances from Earth. This presentation gives a status of the mission performance to date, as well as some of the lessons learned from project. BioSentinel has achieved unprecedented performance as an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and trained operators to respond in flight, preparing the team to react quickly and successfully to detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat form factor as well as the capability to detumble the spacecraft and manage momentum for extended mission durations, while providing sufficient margin to execute potential delta-V maneuvers. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer has continued to collect solar and galactic radiation data from its unique location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for both model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. NASA Ames led development of the BioSentinel spacecraft to operate for long durations in deep space. The novel subsystems and COTS components that comprise the BioSentinel bus can serve as a template for future deep space missions, while the lessons the team has learned from well over a year of continuous operations will enable improved performance in the generation of deep space CubeSat missions.

BioSentinel↗

Cybersecurity Resiliency of Marine Renewable Energy Systems Part 2: Cybersecurity Best Practices and Risk Management

Marine renewable energy (MRE) is an emerging source of power for marine applications, marine devices, and coastal communities. This energy source relies on industrial control systems and IT to support operations and maintenance activities, which create a pathway for an adversary to gain unauthorized access to systems and data and disrupt operations. Incorporating cybersecurity risk prevention measures and mitigation capabilities from inception, development, operation, to decommissioning of the MRE system and components is paramount to the protection of energy generation and the security of network architecture and infrastructure. To improve the resilience of MRE systems as a predictable, affordable, and reliable source of energy, cybersecurity guidance was developed to enable operators to assess cybersecurity risks and implement security measures commensurate with the risk. This publication is the second of a two-part series, with Part 1 addressing a framework to determine cybersecurity risk by assessing the vulnerability of an MRE system to potential cyber threats and the consequences a cyberattack would have on the end user. This Part 2 publication describes an approach to select appropriate cybersecurity best practices commensurate with the MRE system's cybersecurity risk. The guidance includes 86 cybersecurity best practices, which are associated with 36 cybersecurity domains and grouped into nine categories. The best practices follow the core functions of the National Institute of Science and Technology Cybersecurity Framework (e.g., identify, detect, protect, respond, and and recover) and insights from both maritime and energy industry guidance documents to identify security measures effective in protecting information and operational technology assets prevalent in MRE systems.

97 MATHEMATICS AND COMPUTING↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Dexterity test data contribute to reduction in leaded glovebox gloves use

Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (T A-55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through the use of a variety of gloveboxes. Using an integrated approach, controls have been developed and implemented through an efficient Glovebox Glove Integrity Program. A key element of this program is to consider measures that lower the overall risk of glovebox operations. Line management who own glovebox processes through this program make decisions on which type of glovebox gloves (hereafter referred to as gloves), the weakest component of this safety-significant system, would perform best in these aggressive environments. As Low as Reasonably Achievable considerations must be balanced with glove durability and worker dexterity, both of which affect the final overall risk of the operation. In the past, lead-loaded (leaded) gloves made from Hypalon(reg.) were the primary glove for programmatic operations at TA55. Replacing leaded gloves with unleaded gloves for certain operations would lower the overall risk as well as reduce the amount of mixed transuranic waste. This effort contributes to the Los Alamos National Laboratory Continuous Improvement Program by improving the efficiency, cost-effectiveness, and formality of glovebox operations. In this report, the pros and cons of wearing leaded gloves, the effect of leaded gloves versus unleaded gloves on task performance using standard dexterity tests, the justification for switching from leaded to unleaded gloves, and the pollution prevention benefits of this dramatic change in the glovebox system are presented.

42 ENGINEERING↗

Stochastic Optimization with Risk Aversion for Virtual Power Plant Operations: A Rolling Horizon Control

While the concept of aggregating and controlling renewable distributed energy resources (DERs) to provide grid services is not new, increasing policy support of DER market participation has driven research and development in algorithms to pool DERs for economically viable market participation. Sandia National Laboratories recently undertook a three-year research program to create the components of a real-world virtual power plant (VPP) that can simultaneously participate in multiple markets. Our research extends current state-of-the-art rolling horizon control through the application of stochastic programming with risk aversion at various time resolutions. Our rolling horizon control consists of (1) day-ahead optimization to produce an hourly aggregate schedule for the VPP operator and (2) sub-hourly optimization for real-time dispatch of each VPP subresource. Both optimization routines leverage a two-stage stochastic program (SP) with risk aversion, and integrate the most up-to-date forecasts to generate probabilistic scenarios in real operating time. Our results demonstrate the benefits to the VPP operator of constructing a stochastic solution regardless of the weather. In more extreme weather, applying risk optimization strategies can dramatically increase the financial viability of the VPP. As a result, the methodologies presented here can be further tailored for optimal control of any VPP asset fleet and its operational requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Work Smarter, Not Harder: Improving Energy Efficiency and Safety through Smarter Ventilation: Preprint

Ventilation is a key component to maintaining healthy, safe indoor air quality. Especially important in laboratories, ventilation is the first line of defense against airborne hazards produced during research activities. Though a vital component, laboratory ventilation systems are often victim to ineffective operation, posing a risk to the most important asset - the researchers. Furthermore, system inefficiencies can lead to up to 50% wasted energy. To improve both energy efficiency and safety in laboratories, we present the Smart Labs Toolkit - a resource developed by the U.S. Department of Energy Federal Energy Management Program and the International Institute for Sustainable Laboratories that guides laboratory stakeholders through a straight-forward, holistic approach to achieve dynamic, high-performance laboratories. Smart Labs enable safe and efficient world class science to occur in laboratories through high-performance methods. A Smart Labs program employs a combination of physical, administrative, and management techniques to assess, optimize, and manage high performance laboratories. We will focus on a central component of the Smart Labs approach - the Laboratory Ventilation Risk Assessment, a systematic process for identifying risk due to airborne hazards to inform the operation of dynamic ventilation that optimizes safety and efficiency. Case studies of organizations who have successfully implemented Smart Labs ventilation management programs will also be shared. In learning ventilation strategies successful in critical laboratory environments, learn the tools and resources needed to successfully manage energy in any building through smarter, safer ventilation.

buildings↗

NASA's Agency-Wide Strategy for Environmental Regulatory Risk Analysis and Communication

NASA's mission is to pioneer the future in space exploration, scientific discovery, and aeronautics research. To help enable existing and future programs to pursue this mission, NASA has established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) to proactively identify, analyze, and communicate environmental regulatory risks to the NASA community. The RRAC PC is chartered to evaluate the risks posed to NASA Programs and facilities by environmentally related drivers. The RRAC PC focuses on emerging environmental regulations, as well as risks related to operational changes that can trigger existing environmental requirements. Changing regulations have the potential to directly affect program activities. For example, regulatory changes can restrict certain activities or operations by mandating changes in how operations may be done or limiting where or how certain operations can take place. Regulatory changes also can directly affect the ability to use certain materials by mandating a production phase-out or restricting usage applications of certain materials. Such changes can result in NASA undertaking material replacement efforts. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented several strategies for proactively managing regulatory change to minimize potential adverse impacts to NASA Programs and facilities. This presentation highlights the lessons learned through establishing the RRAC PC, the process by which the RRAC PC monitors and distributes information about emerging regulatory requirements, and the cross-Agency cooperation that is vital to supporting NASA's mission.

Duda, Kristen↗

NASA's Agency-wide Strategy for Environmental Regulatory Risk Analysis and Communication

NASA's mission is to pioneer the future in space exploration, scientific discovery, and aeronautics research. To help enable existing and future programs to pursue this mission, NASA has established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) to proactively identify, analyze, and communicate environmental regulatory risks to the NASA community. The RRAC PC is chartered to evaluate the risks posed to NASA Programs and facilities by environmentally related drivers. The RRAC PC focuses on emerging environmental regulations, as well as risks related to operational changes that can trigger existing environmental requirements. Changing regulations have the potential to directly affect program activities. For example, regulatory changes can restrict certain activities or operations by mandating changes in how operations may be done or limiting where or how certain operations can take place. Regulatory changes also can directly affect the ability to use certain materials by mandating a production phase-out or restricting usage aPi'iications of certain materials. Such changes can result in NASA undertaking material replacement efforts. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented several strategies for proactively managing regulatory change to minimize potential adverse impacts to NASA Programs and facilities. This presentation highlights the lessons learned through establishing the RRAC PC, the process by which the RRAC PC monitors and distributes information about emerging regulatory requirements, and the cross-Agency cooperation that is vital to supporting NASA's mission.

Duda, Kristen↗

Quantifying the Impact of Systems Interdependencies in Space Systems Architectures

Due to the high number of systems in a space mission architecture and to their complex interactions, identifying risk and critical operational dependencies is not obvious. Traditional systems engineering methodology and risk assessment does not capture the impact of interactions between systems nor the cascading effects of disruptions. Based on these considerations, the Systems Operational Dependency Analysis methodology was developed for use by systems analysts and decision makers. This methodology utilizes a parametric model of interdependencies between systems to quantify the direct and indirect impact of system disruptions on other systems, as well as identify root causes. The results are effective at providing decision support for prioritizing technology investment based on risk reduction associated with potential system disruptions. Expanding on research presented at IAC 2018 and based on a collaboration with NASA Marshall Space Flight Center, this paper applies the Systems Operational Dependency Analysis methodology to NASA Lunar Gateway in collaboration with NASA’s lunar exploration plans. The paper presents a hierarchical representation of the interdependencies between a Gateway habitat’s systems and subsystems, demonstrates quantification of the impact of disruption, and assesses the criticality of the constituent systems and subsystems.

Guariniello, Cesare↗

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1↗