Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

A Geodetic and Positioning Thematic Layer - Identifying tools to connect the GGRF and IGIF

Effective and sustainable modernization of a nation’s geodetic framework relies on the ability of the relevant organizations and other stakeholders to communicate, integrate, and align both their strategic objectives and operational planning with the United Nations Committee of Experts on Global Geospatial Information Management (UN GGIM) Sub-Committee on Geodesy’s (SCoG) roadmap for a Global Geodetic Reference Frame (GGRF) for Sustainable Development. In addition, to implement geodetic modernization initiatives through multiple government agencies, a holistic country action plan (CAP) for geospatial information management must incorporate pertinent geodetic outcomes and outputs. Presently, the CAP framework and principles used by nations is the UN GGIM Integrated Geospatial Information Framework (IGIF). From engagement with geospatial and survey communities across emerging nations in the Asia Pacific region, it is evident more assistance and coordination is necessary to articulate, integrate and connect geodetic organizational strategies with the requirements of the GGRF roadmap; the strategic pathways of the IGIF; and resourcing for a meaningful and relevant multi-faceted CAP. One of the supporting mechanisms for such planning or preparation, which representatives of the International Federation of Surveyors (FIG) Asia Pacific Capacity Development Network (AP CDN) and the UN SCoG Education, Training and Capacity Building (ETCB) working group are considering, is a policy framework and guide for a “Geodetic and Positioning Thematic Layer” (GPTL). Essentially, this “thematic layer”, in terms of the GGRF and IGIF, aims to provide a comprehensive understanding of, and a toolbox for, the “why, what, how, and who” of geodesy and positioning. This discussion paper will provide background and insights for a GPTL dedicated to recognizing, and aligning the geodetic capacity development needs with broader geospatial information management issues and applications. The paper will also outline a rigorous, participatory, and inclusive consultation process for the design and development of a thematic layer. Furthermore, as the intention of the authors is to prepare a forthcoming “white paper” that will concisely describe the issues of a GPTL and initiatives for an appropriate guide and/or policy framework, this paper will seek feedback on: the potential scientific, social, environmental and political benefits of modernizing geodetic infrastructure and systems; the challenges associated with the GGRF roadmap; leveraging the geodesy-relevant elements of each IGIF strategic pathway; the importance of collaborative efforts; and the capacity development needs and resources in relation to governance, technology and people.

SARIB, Rob↗

CFM Analysis, Documentation, and Planning Support

The Multipurpose Hydrogen Test Bed (MHTB) Test Readiness Review (TRR), in preparation for upcoming thermodynamic vent system testing with LN2 (an LO2 simulant), was conducted on Aug 10 with no significant concerns or open action items. The 21 day test series, designed to evaluate the spray bar mixer/vent system concept suitability for zero-g operation began on August 19. The testing is progressing very well and results indicate that the Moog latching valve is more effective than the Castor solenoid valve in reducing pressure during the vent/mixing cycles. Testing with self-pressurization is expected to be completed on September 3 and testing with helium pressurization will be initiated on September 4 or 5. Additional activities during first half of August included coordination of Notification of Intent (NOI) to propose letters involving CFM in response to the HR&T BAA for Extramural Proposals.

Hastings, Leon J.↗

A two camera video imaging system with application to parafoil angle of attack measurements

This paper describes the development of a two-camera, video imaging system for the determination of three-dimensional spatial coordinates from stereo images. This system successfully measured angle of attack at several span-wise locations for large-scale parafoils tested in the NASA Ames 80- by 120-Foot Wind Tunnel. Measurement uncertainty for angle of attack was less than 0.6 deg. The stereo ranging system was the primary source for angle of attack measurements since inclinometers sewn into the fabric ribs of the parafoils had unknown angle offsets acquired during installation. This paper includes discussions of the basic theory and operation of the stereo ranging system, system measurement uncertainty, experimental set-up, calibration results, and test results. Planned improvements and enhancements to the system are also discussed.

Meyn, Larry A.↗

Earth Science Project Office (ESPO) Field Experiences During ORACLES, ATom, KORUS and POSIDON

Very often, scientific field campaigns entail years of planning and incur substantial cost, especially if they involve the operation of large research aircraft in remote locations. Deploying and operating these aircrafts even for short periods of time poses challenges that, if not addressed properly, can have significant negative consequences and potentially jeopardize the success of a scientific campaign. Challenges vary from country to country and range from safety, health, and security risks to differences in cultural and social norms. Our presentation will focus on sharing experiences on the ESPO 2016 conducted field campaigns ORACLES, ATom, KORUS and POSIDON. We will focus on the best practices, lessons learned, international relations and coordination aspects of the country-specific experiences. This presentation will be part of the ICARE Conference (2nd International Conference on Airborne Research for the Environment (ICARE 2017) that will focus on "Developing the infrastructure to meet future scientific challenges". This unique conference and gathering of facility support experts will not only allow for dissemination and sharing of knowledge but also promote collaboration and networking among groups that support scientific research using airborne platforms around the globe.

Salazar, Vidal↗

Working Toward A National Coordinated Soil Moisture Monitoring Network: Vision, Progress, and Future Directions

Soil moisture is a critical land surface variable, impacting the water, energy, and carbon cycles. While in situ soil moisture monitoring networks are still developing, there is no cohesive strategy or framework to coordinate, integrate, or disseminate these diverse data sources in a synergistic way that can improve our ability to understand climate variability at the national, state, and local levels. Thus, a national strategy is needed to guide network deployment, sustainable network operation, data integration and dissemination, and user-focused product development. The National Coordinated Soil Moisture Monitoring Network (NCSMMN) is a federally led, multi-institution effort that aims to address these needs by capitalizing on existing wide-ranging soil moisture monitoring activities, increasing the utility of observational data, and supporting their strategic application to the full range of decision-making needs. The goals of the NCSMMN are to 1) establish a national “network of networks” that effectively demonstrates data integration and operational coordination of diverse in situ networks; 2) build a community of practice around soil moisture measurement, interpretation, and application—a “network of people” that links data providers, researchers, and the public; and 3) support research and development (R&D) on techniques to merge in situ soil moisture data with remotely sensed and modeled hydrologic data to create user-friendly soil moisture maps and associated tools. The overarching mission of the NCSMMN is to provide coordinated high-quality, nationwide soil moisture information for the public good by supporting applications like drought and flood monitoring, water resource management, agricultural and forestry planning, and fire danger ratings.

C. Bruce Baker↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Mars 94 Mission: Current plans and science

The Soviet Space Program proposes large-scale investigations of Mars as one of the most important trends for the next 10 to 15 years. The objectives include global studies of the surface of Mars, its atmosphere, and the return of soil samples to Earth. The first stage of the program is to be implemented in the mid-90s. It includes measurements from an orbiter and a balloon in the atmosphere and on the surface from a rover as well. This can be done using the high energy upper stage of the launch vehicle. The payload mass could amount to about 1500 to 1700 kg. The capabilities of the Mars Mission in 1994 are discussed. As presently planned, Mars will be studied concurrently with the following facilities: an orbiter with instruments for remote sensing from a polar orbit; a balloon deployed in the Martian atmosphere; a rover on the surface; a network of smaller stations on the surface; a subsatellite; and a device to return a container with photo films of the Martian surface taken with a super high resolution. If the exploration of Mars with the MARS-94 spacecraft begins late in 1994 the American Mars-Observer will still be functioning in the near-Mars orbit. Thus, joint operation of the two satellites becomes possible providing coordinated exploration, the creation of joint data banks, joint data interpretation, and the development of a joint engineering model of Mars for its further exploration. There is an opportunity for experiments and instrumentation on the Soviet missions that address questions of interest to exobiology. American scientists are invited to participate in the upcoming Soviet missions, and lend expertise to further understanding of the relationship between the physical and chemical evolution of the solar system and the appearance of life.

Mukhin, Lev↗

RouteE API

This is the API endpoint for RouteE energy prediction, which can be used to get both single vehicle link or route energy estimates and transportation network-wide energy consumption estimates for a variety of vehicles. This enables external researchers and transportation engineers to access and utilize NLR's growing library of pre-trained vehicle models for prediction of transportation energy consumption. This API provides three endpoints: - /route: Energy estimation of a vehicle over a planning link or sequence of links (route). - /network: Network-wide estimation of energy consumption for all vehicle traffic in the desired area. - /compass: Energy-optimal “eco-routing” between input origin and destination coordinates (Currently in beta for Denver metro area only).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA Enterprise Digital Transformation Initiative Strategic Framework & Implementation Approach

Since 1958, NASA has delivered its enduring bold purpose, characterized in the 2022 NASA Strategic Plan as a mission to discover, explore, innovate, and advance solutions to the problems of flight, within and outside the Earth’s atmosphere, for the benefit of humankind. The NASA Strategic Plan also recognizes that this mission will be delivered differently as it looks to a future marked by radical global change, which is in part being driven by digital advances. For this reason, in late 2020 NASA established an Enterprise Digital Transformation (DT) agency-level strategic initiative to accelerate and coordinate leveraging digital advances to transform the way the Agency works, the experience of its workforce and the agility of its workplace. This paper documents NASA’s DT strategic framework and associated implementation approach, with the DT strategic initiative serving to ignite, connect, integrate, and facilitate DT progress across a federated organizational operating model.

digital transformation↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Architecting Communication Network of Networks for Space System of Systems

The National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD) are planning Space System of Systems (SoS) to address the new challenges of space exploration, defense, communications, navigation, Earth observation, and science. In addition, these complex systems must provide interoperability, enhanced reliability, common interfaces, dynamic operations, and autonomy in system management. Both NASA and the DoD have chosen to meet the new demands with high data rate communication systems and space Internet technologies that bring Internet Protocols (IP), routers, servers, software, and interfaces to space networks to enable as much autonomous operation of those networks as possible. These technologies reduce the cost of operations and, with higher bandwidths, support the expected voice, video, and data needed to coordinate activities at each stage of an exploration mission. In this paper, we discuss, in a generic fashion, how the architectural approaches and processes are being developed and used for defining a hypothetical communication and navigation networks infrastructure to support lunar exploration. Examples are given of the products generated by the architecture development process.

Bhasin, Kul B.↗

Project Management Using Modern Guidance, Navigation and Control Theory

The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

Hill, Terry↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Optical Testing of Retroreflectors for Cryogenic Applications

A laser tracker (LT) is an important coordinate metrology tool that uses laser interferometry to determine precise distances to objects, points, or surfaces defined by an optical reference, such as a retroreflector. A retroreflector is a precision optic consisting of three orthogonal faces that returns an incident laser beam nearly exactly parallel to the incident beam. Commercial retroreflectors are designed for operation at room temperature and are specified by the divergence, or beam deviation, of the returning laser beam, usually a few arcseconds or less. When a retroreflector goes to extreme cold (.35 K), however, it could be anticipated that the precision alignment between the three faces and the surface figure of each face would be compromised, resulting in wavefront errors and beam divergence, degrading the accuracy of the LT position determination. Controlled tests must be done beforehand to determine survivability and these LT coordinate errors. Since conventional interferometer systems and laser trackers do not operate in vacuum or at cold temperatures, measurements must be done through a vacuum window, and care must be taken to ensure window-induced errors are negligible, or can be subtracted out. Retroreflector holders must be carefully designed to minimize thermally induced stresses. Changes in the path length and refractive index of the retroreflector have to be considered. Cryogenic vacuum testing was done on commercial solid glass retroreflectors for use on cryogenic metrology tasks. The capabilities to measure wavefront errors, measure beam deviations, and acquire laser tracker coordinate data were demonstrated. Measurable but relatively small increases in beam deviation were shown, and further tests are planned to make an accurate determination of coordinate errors.

Ohl, Raymond G.↗

Airspace Technology Demonstration 3 (ATD-3): Multi-Flight Common Route (MFCR) Technology Transfer Document Summary Version 1.0

This summary document and accompanying technology artifacts satisfy the second of three Research Transition Products (RTPs) defined in the ATD-3 Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan. This transfer consists of NASA's Multi-Flight Common Route (MFCR) research for efficient route corrections for en-route weather avoidance. The MFCR concept builds on the experience of the legacy Dynamic Weather Routes (DWR) and focuses on a better balance of potential savings with ATC acceptability, common route corrections options for multiple flights on similar routings, and better use of existing and/or modern automation for communication and coordination of route change options. All of these capabilities are expected to improve system performance significantly in terms of actual delay-reducing clearances issued to flights compared to that of the DWR tool and operating concept.

tech transfer↗

The Solar-B Mission: First Light, Future Plans and Community Participation

The Solar-B spacecraft was launched from the Uchinoura Space Center into a circular, sun-synchronous, polar orbit by the Japanese Aerospace Exploration Agency in late September 2006. The spacecraft carries thee scientific instruments designed to follow the flow of magnetic energy from the photosphere to the corona to improve our understanding of both steady state and transient energy release. This goal will be achieved through coordinated observations of three highly advanced solar telescopes developed cooperatively by teams from Japan, the United States and the United Kingdom. The three telescopes are a 0.5m aperture, diffraction limited, solar optical telescope (SOT), an X-ray telescope (XRT) designed for full sun imaging with 1.0 arcsec pixels and an EUV imaging spectrometer (EIS) with an order of magnitude improvement in sensitivity over past instruments. The SOT focal plane contains three instruments, a spectropolarimeter for measuring vector magnetic fields, a broadband filter imager for recording images of the photosphere and chromosphere at the highest resolution the telescope is capable of, and a narrow band filter imager that will record Doppler grams and vector magnetograms. The XRT has broad temperature coverage and a spatial a resolution three times as high as Yohkoh. EIS covers a broad range of transition region and coronal temperatures in two spectral bands. Both XRT and EIS have 2 arcsec spatial resolution (1 arcsec pixels). Instrument first light occurred after five weeks on orbit to allow for out gassing and the opening of the telescopes doors. The initial observation sequences are designed to test the functionality of the different operating modes and for calibration. After this commissioning phase is complete a series of observations are planned to demonstrate the ability of the instruments to meet NASA's mission minimum success criteria. Data is downloaded every orbit to the Norwegian high latitude ground station at Svalbard. The data are transmitted to ISAS where they are reformatted into FITS files and archived as Level 0 data on the ISAS DARTS system. Once the initial observation period is complete, approximately six months after launch, the mission data will be open and freely available to researchers shortly after receipt at the DARTS data archive hosted in Japan and at NASA s Solar Data Analysis Center at the Goddard Space Flight Center. Scientific operations will be conducted from the ISAS facility in Sagamihara, Japan and the observatory will become available for performing joint operations with both ground and space based instruments and for conducting observing programs proposed by non-team members. This process will be described together with a status report from the initial operation of the observatory, showing examples of the first observations.

Davis, John M.↗

Grid Forming and Following Background, Future, and Strategies

The landscape of the U.S. power structure with respect to microgrid configuration strategies that utilize grid forming and grid following converters is becoming relevant. Inverter based control and coordination strategies are every changing due to critical failures and limitations. Understanding current state of grid forming and following converter technology and their normal operational guidelines will lead into the next stage of future research. Grid forming and following converter control strategies and ratio of assets review two case studies to develop an understanding of the current landscape.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff↗