Search NASA⌕ Search

SEARCH · Search NASA

Results for “Orbiter Loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Thermal Modeling of Mars Ground for Surface Missions

Thermal analysis packages are capable of including ground temperature effects for orbital and surface thermal analyses. In particular, Thermal Desktop® offers the option of specifying ground temperatures as a function of time for planetary surface modeling. While suitable for many cases, this approach is not sufficient if an object has local interactions with the ground that could significantly affect the ground temperature. Ground modeling is necessary for the Mars 2020 rover thermal design and analysis since shadowing and heat dissipation from the rover’s Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) can result in significant temperature deviations of the local ground. The Mars 2020 thermal team is explicitly modeling the Martian ground so that these local temperature effects can be captured. The upper portion of the ground is modeled, and material and optical properties of the ground are varied in order to match data collected from orbiting science instruments. Atmospheric surface temperature, sky temperatures, and solar loads from a Mars General Circulation Model (GCM) are used as boundary conditions, resulting in a ground surface temperature profile consistent with the GCM predictions. The rover model is then placed on this modeled ground so that the effects of shadowing and MMRTG dissipation on the ground temperature can be captured.

Farias, Edgardo↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Final design of a space debris removal system

The objective is the removal of medium sized orbital debris in low Earth orbits. The design incorporates a transfer vehicle and a netting vehicle to capture the medium size debris. The system is based near an operational space station located at 28.5 degrees inclination and 400 km altitude. The system uses ground based tracking to determine the location of a satellite breakup or debris cloud. This data is unloaded to the transfer vehicle, and the transfer vehicle proceeds to rendezvous with the debris at a lower altitude parking orbit. Next, the netting vehicle is deployed, tracks the targeted debris, and captures it. After expending the available nets, the netting vehicle returns to the transfer vehicle for a new netting module and continues to capture more debris in the target area. Once all the netting modules are expended, the transfer vehicle returns to the space station's orbit, where it is resupplied with new netting modules from a space shuttle load. The new modules are launched by the shuttle from the ground, and the expended modules are taken back to Earth for removal of the captured debris, refueling, and repacking of the nets. Once the netting modules are refurbished, they are taken back into orbit for reuse. In a typical mission, the system has the ability to capture 50 pieces of orbital debris. One mission will take about six months. The system is designed to allow for a 30 degree inclination change on the outgoing and incoming trips of the transfer vehicle.

Carlson, Erika↗

SPECS: Orbital debris removal

The debris problem has reached a stage at which the risk to satellites and spacecraft has become substantial in low Earth orbit (LEO). This research discovered that small particles posed little threat to spacecraft because shielding can effectively prevent these particles from damaging the spacecraft. The research also showed that, even though collision with a large piece of debris could destroy the spacecraft, the large pieces of debris pose little danger because they can be tracked and the spacecraft can be maneuvered away from these pieces. Additionally, there are many current designs to capture and remove large debris particles from the space environment. From this analysis, it was decided to concentrate on the removal of medium-sized orbital debris, that is, those pieces ranging from 1 cm to 50 cm in size. The current design incorporates a transfer vehicle and a netting vehicle to capture the medium-sized debris. The system is based near an operational space station located at 28.5 deg inclination and 400 km altitude. The system uses ground-based tracking to determine the location of a satellite breakup or debris cloud. These data are uploaded to the transfer vehicle, which proceeds to rendezvous with the debris at a lower altitude parking orbit. Next, the netting vehicle is deployed, tracks the targeted debris, and captures it. After expending the available nets, the netting vehicle returns to the transfer vehicle for a new netting module and continues to capture more debris in the target area. Once all the netting modules are expended, the transfer vehicle returns to the space station's orbit where it is resupplied with new netting modules from a space shuttle load. The new modules are launched by the shuttle from the ground and the expended modules are taken back to Earth for removal of the captured debris, refueling, and repacking of the nets. Once the netting modules are refurbished, they are taken back into orbit for reuse. In a typical mission, the system has the ability to capture 50 pieces of orbital debris. One mission will take approximately six months and the system is designed to allow for a 30 deg inclination change on the outgoing and incoming trips of the transfer vehicle.

Source record↗

Interpolation schemes for orbit determination with the global positioning system

This paper demonstrates that the Global Positioning System (GPS) and simple interpolation schemes can be utilized to satisfy typical orbit determination demands of applications satellites. The complete GPS consists of 24 satellites and permits a position fix of a user satellite at any arbitrary instant. The interpolation formulae used in this report fit generalized Keplerian orbits through a number of position fixes. For a given accuracy level the telemetry requirements as measured by the time intervals between position fixes and the computational load of an interpolation as measured by the number of points through which a generalized Keplerian orbit is fitted vary inversely. A set of possible compromises between these two factors is presented. The Phase I GPS consists of 6 satellites and permits a position fix of a user satellite just 36% of the time. It is shown that with this system more sophisticated interpolation schemes which model atmospheric drag and higher degree terms of the earth's gravity field must be employed to obtain accurate orbits.

Argentiero, P.↗

Arcjet propulsion system for an SP-100 flight experiment

The design and performance of a arcjet nuclear electric propulsion spacecraft, suitable for use in a space reactor power system (SRPS) flight experiment, are outlined. The vehicle design is based on a 92-kW ammonia arcjet system operating at a specific impulse of 1050 s and an efficiency of 45 percent. The arcjet/gimbal system, power processing unit, and propellant feed system are described. A 100-kW SRPS is assumed and the spacecraft mass is baselined at 5250 kg, excluding the propellant and propellant feed system. A radiation/arcjet efflux diagnostics package is included in the performance analysis. This spacecraft, assuming a Shuttle launch from Kennedy Space Center, can perform a 35-deg inclination change and reach a final orbit of 35,860 km with a 120-day trip time, thus providing a four-month active load for the SRPS. Alternatively, a Titan IV launch could provide a mass margin of 120 kg to a 1000km, 58-deg final orbit in 74 days.

Deininger, William D.↗

Three Orbital Burns to Molniya Orbit Via Shuttle_Centaur G Upper Stage

An unclassified analytical trajectory design, performance, and mission study was done for the 1982 to 1986 joint National Aeronautics and Space Administration (NASA)-United States Air Force (USAF) Shuttle/Centaur G upper stage development program to send performance-demanding payloads to high orbits such as Molniya using an unconventional orbit transfer. This optimized three orbital burn transfer to Molniya orbit was compared to the then-baselined two burn transfer. The results of the three dimensional trajectory optimization performed include powered phase steering data and coast phase orbital element data. Time derivatives of the orbital elements as functions of thrust components were evaluated and used to explain the optimization's solution. Vehicle performance as a function of parking orbit inclination was given. Performance and orbital element data was provided for launch windows as functions of launch time. Ground track data was given for all burns and coasts including variation within the launch window. It was found that a Centaur with fully loaded propellant tanks could be flown from a 37 deg inclination low Earth parking orbit and achieve Molniya orbit with comparable performance to the baselined transfer which started from a 57 deg inclined orbit: 9,545 versus 9,552 lb of separated spacecraft weight, respectively. There was a significant reduction in the need for propellant launch time reserve for a 1 hr window: only 78 lb for the three burn transfer versus 320 lb for the two burn transfer. Conversely, this also meant that longer launch windows over more orbital revolutions could be done for the same amount of propellant reserve. There was no practical difference in ground tracking station or airborne assets needed to secure telemetric data, even though the geometric locations of the burns varied considerably. There was a significant adverse increase in total mission elapsed time for the three versus two burn transfer (12 vs. 1-1/4 hr), but could be accommodated by modest modifications to Centaur systems. Future applications were discussed. The three burn transfer was found to be a viable, arguably preferable, alternative to the two burn transfer.

Orbital trajectory design↗

Synergetic plane-change capability of a conceptual aeromaneuvering-orbital-transfer vehicle

The flight strategy for a general low-earth orbit plane-change is analyzed for a conceptual, high-lift, aeromaneuvering-orbital-transfer vehicle, and applied to the important case of the 45 deg plane-inclination change. The study focuses on two principal methods: (1) the procedure to obtain a change in the inclination of the vehicle's orbital plane, and (2) the full rendezvous procedure. Optimal trajectories for minimal propellant use during the synergetic aerotransit are developed, which incorporate best estimates of constraints imposed by reusable thermal-protection requirements and human tolerance to g-load levels. The performance capability for one-way payload delivery to the target orbit is analyzed in detail and the capability for return to the base orbit demonstrated.

Menees, Gene P.↗

Autonomous Spacecraft Communication Interface for Load Planning

Ground-based controllers can remain in continuous communication with spacecraft in low Earth orbit (LEO) with near-instantaneous communication speeds. This permits near real-time control of all of the core spacecraft systems by ground personnel. However, as NASA missions move beyond LEO, light-time communication delay issues, such as time lag and low bandwidth, will prohibit this type of operation. As missions become more distant, autonomous control of manned spacecraft will be required. The focus of this paper is the power subsystem. For present missions, controllers on the ground develop a complete schedule of power usage for all spacecraft components. This paper presents work currently underway at NASA to develop an architecture for an autonomous spacecraft, and focuses on the development of communication between the Mission Manager and the Autonomous Power Controller. These two systems must work together in order to plan future load use and respond to unanticipated plan deviations. Using a nominal spacecraft architecture and prototype versions of these two key components, a number of simulations are run under a variety of operational conditions, enabling development of content and format of the messages necessary to achieve the desired goals. The goals include negotiation of a load schedule that meets the global requirements (contained in the Mission Manager) and local power system requirements (contained in the Autonomous Power Controller), and communication of off-plan disturbances that arise while executing a negotiated plan. The message content is developed in two steps: first, a set of rapid-prototyping "paper" simulations are preformed; then the resultant optimized messages are codified for computer communication for use in automated testing.

Controls↗

System performance predictions for Space Station Freedom's electric power system

Space Station Freedom Electric Power System (EPS) capability to effectively deliver power to housekeeping and user loads continues to strongly influence Freedom's design and planned approaches for assembly and operations. The EPS design consists of silicon photovoltaic (PV) arrays, nickel-hydrogen batteries, and direct current power management and distribution hardware and cabling. To properly characterize the inherent EPS design capability, detailed system performance analyses must be performed for early stages as well as for the fully assembled station up to 15 years after beginning of life. Such analyses were repeatedly performed using the FORTRAN code SPACE (Station Power Analysis for Capability Evaluation) developed at the NASA Lewis Research Center over a 10-year period. SPACE combines orbital mechanics routines, station orientation/pointing routines, PV array and battery performance models, and a distribution system load-flow analysis to predict EPS performance. Time-dependent, performance degradation, low earth orbit environmental interactions, and EPS architecture build-up are incorporated in SPACE. Results from two typical SPACE analytical cases are presented: (1) an electric load driven case and (2) a maximum EPS capability case.

Kerslake, Thomas W.↗

Orbiter lessons learned: A guide to future vehicle development

Topics addressed are: (1) wind persistence loads methodology; (2) emphasize supportability in design of reusable vehicles; (3) design for robustness; (4) improved aerodynamic environment prediction methods for complex vehicles; (5) automated integration of aerothermal, manufacturing, and structures analysis; (6) continued electronic documentation of structural design and analysis; and (7) landing gear rollout load simulations.

Greenberg, Harry Stan↗

Item Description: ISS TransHab Restraint Sample and Photo Documentation

The yellow strap seen in the display is a piece of the main restraint layer of a test article for the ISS TransHab spacecraft, First conceived as a technology which is capable of supporting a [human] crew of six on an extended space journey such as the six-month trip to Mars, TransHab (short for "Transit habitat") is the first space inflatable module ever designed. As this text is written it is being considered as a replacement for the Habitation module on the International Space Station (ISS). It constitutes a major breakthrough both in technology and in tectonics: capable of tight packaging at light weight for efficient launch, the vehicle can then be inflated to its full size on orbit via its own inflation tanks. This is made possible by the separation of its main structural elements from its pressure-shell. In other words, all spacecraft flown to date have been of an exoskeletal type---i.e., its hard outer shell acts both as a pressure container and as its main channel for structural loading This includes the ISS, which is currently under construction in Low Earth Orbit [275 miles above the Earth]. By contrast TransHab is the first endoskeletal space Habitat, consisting of a dual system: a light, reconfigurable central structure of graphite composite and a multilayered, deployable pressure shell.

Adams, Constance↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

JPL analytical performance prediction capability

The development of a computer code to simulate and predict the performance of large deployable antenna structures is discussed. The computer code is expected to account for all phases of hardware use, i.e., ground handling, boost, deployment, on orbit station keeping, and transfer from LEO to GEO, if applicable. In addition to accounting for static and dynamic loading of the basic structure, the variation in the precision of the reflector surface and the alignment of the feed support structure as a function orbit are scrutinized in order to accommodate electromagnetic analysis. Specific tasks directed towards the development of the computer code are reported and a number of thermal and structural models are discussed.

Chen, R.↗

Control Of Flexible Structures-2 (COFS-2) flight control, structure and gimbal system interaction study

The second Control Of Flexible Structures Flight Experiment (COFS-2) includes a long mast as in the first flight experiment, but with the Langley 15-m hoop column antenna attached via a gimbal system to the top of the mast. The mast is to be mounted in the Space Shuttle cargo bay. The servo-driven gimbal system could be used to point the antenna relative to the mast. The dynamic interaction of the Shuttle Orbiter/COFS-2 system with the Orbiter on-orbit Flight Control System (FCS) and the gimbal pointing control system has been studied using analysis and simulation. The Orbiter pointing requirements have been assessed for their impact on allowable free drift time for COFS experiments. Three fixed antenna configurations were investigated. Also simulated was Orbiter attitude control behavior with active vernier jets during antenna slewing. The effect of experiment mast dampers was included. Control system stability and performance and loads on various portions of the COFS-2 structure were investigated. The study indicates possible undesirable interaction between the Orbiter FCS and the flexible, articulated COFS-2 mast/antenna system, even when restricted to vernier reaction jets.

Fay, Stanley↗

Launch flexibility using NLP guidance and remote wind sensing

This paper examines the use of lidar wind measurements in the implementation of a guidance strategy for a nonlinear programming (NLP) launch guidance algorithm. The NLP algorithm uses B-spline command function representation for flexibility in the design of the guidance steering commands. Using this algorithm, the guidance system solves a two-point boundary value problem at each guidance update. The specification of different boundary value problems at each guidance update provides flexibility that can be used in the design of the guidance strategy. The algorithm can use lidar wind measurements for on pad guidance retargeting and for load limiting guidance steering commands. Examples presented in the paper use simulated wind updates to correct wind induced final orbit errors and to adjust the guidance steering commands to limit the product of the dynamic pressure and angle-of-attack for launch vehicle load alleviation.

Cramer, Evin J.↗

The evolution of power management architecture for missions to the outer planets

Outer planet spacecraft have unique requirements that differentiate them from inner planet and Earth orbiter spacecraft. To meet these requirements, the Voyager and Galileo Power Management And Distribution (PMAD) architectures employed shunt regulation and carried on the Mariner tradition of AC power distribution to many of the user loads. Also, autonomous fault recovery was achieved by automatic responses in hardware and software recovery routines. Finally, power distribution switching was expanded to allow for removal of the most trivial load element as the nuclear source depleted itself. The design cycle has begun for a third generation spacecraft set named Comet Rendezvous Asteroid Flyby (CRAF) and Cassini (a saturn orbiter). In their power systems, AC power distribution, relay/fuse load switching, and fault protection will give way to the advantages of DC power and solid state load switches.

Detwiler, R. C.↗