Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of the first LiDAR wind resource assessment buoy system offshore the Northeast United States

The US offshore wind industry is maturing with several projects in various stages of development. These projects require site wind and environmental data before and during operation. Conventional techniques such as fixed-bottom meteorological towers present economical and permitting challenges for the US. Floating Light Detection and Ranging (LiDAR) buoys offer significant advantages including reduced costs, less permitting, and reusability. This paper presents the validation of the first floating LiDAR buoy in Northeast US waters. The buoy, named DeepCLiDAR, includes a LiDAR, ecological monitoring sensors, and metocean sensors. A three-phase LiDAR validation plan was executed, and its results are presented. The objective of the validation plan was to verify the accuracy of measurements made by the LiDAR buoy in wave environments against an unmoving reference wind measurement. Due to a lack of reference met masts, the use of a LiDAR on land as a baseline reference was implemented for validation. Comparison to a reference LiDAR instead of a traditional meteorological tower was a unique approach required in the Northeast US waters due to the absence of a reference fixed-bottom meteorological tower in the region at the time of this study. The testing included a comparison of wind speed measurements made by the buoy deployed 15 km offshore from the mainland and a land-based reference LiDAR located on a nearby island. This paper presents the methodology and results of this program, which indicate favorable agreement. This was the first such validation program in the Northeast USA which is now seeing rapid development of offshore wind.

17 WIND ENERGY↗

Large Unmanned Aircraft System Operations in the National Airspace System - the NASA 2007 Western States Fire Missions

The National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC) Ikhana (ee-kah-nah) project executed the 2007 Western States Fire Missions over several of the western United States using an MQ-9 unmanned aircraft system (UAS) in partnership with the NASA Ames Research Center, the United States Forest Service, and the National Interagency Fire Center. The missions were intended to supply infrared imagery of wildfires to firefighters on the ground within 10 minutes of data acquisition. For each of the eight missions, the NASA DFRC notified the Federal Aviation Administration (FAA) of specific flight plans within three or fewer days of the flight. The FAA Certificate of Waiver or Authorization (commonly referred to as a COA ) process was used to obtain access to the United States National Airspace System. Significant time and resources were necessary to develop the COA application, perform mission planning, and define and approve emergency landing sites. Unique aspects of flying unmanned aircraft created challenges to mission operations. Close coordination with FAA headquarters and air traffic control resulted in safe and successful missions that assisted firefighters by providing near-real-time imagery of selected wildfires.

Buoni, Gregory P.↗

An Expert System for Autonomous Spacecraft Control

The Autonomous Sciencecraft Experiment (ASE), part of the New Millennium Space Technology 6 Project, is flying onboard the Earth Orbiter 1 (EO-1) mission. The ASE software enables EO-1 to autonomously detect and respond to science events such as: volcanic activity, flooding, and water freeze/thaw. ASE uses classification algorithms to analyze imagery onboard to detect chang-e and science events. Detection of these events is then used to trigger follow-up imagery. Onboard mission planning software then develops a response plan that accounts for target visibility and operations constraints. This plan is then executed using a task execution system that can deal with run-time anomalies. In this paper we describe the autonomy flight software and how it enables a new paradigm of autonomous science and mission operations. We will also describe the current experiment status and future plans.

utonomy flight software↗

Construction in space - Toward a fresh definition of the man/machine relation

The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.

Watters, H. H.↗

CaseMIDAS - A reactive planning architecture for the man-machine integration design and analysis system

MIDAS is a set of tools which allow a designer to specify the physical and functional characteristics of a complex system such as an aircraft cockpit, and analyze the system with regard to human performance. MIDAS allows for a number of static analyses such as military standard reach and fit analysis, display legibility analysis, and vision polars. It also supports dynamic simulation of mission segments with 3d visualization. MIDAS development has incorporated several models of human planning behavior. The CaseMIDAS effort has been to provide a simplified and unified approach to modeling task selection behavior. Except for highly practiced, routine procedures, a human operator exhibits a cognitive effort while determining what step to take next in the accomplishment of mission tasks. Current versions of MIDAS do not model this effort in a consistent and inclusive manner. CaseMIDAS also attempts to address this issue. The CaseMIDAS project has yielded an easy to use software module for case creation and execution which is integrated with existing MIDAS simulation components.

Pease, R. Adam↗

Solar Cruiser Technology Maturation Plans

The NASA Marshall Space Flight Center (MSFC) developed the Solar Cruiser mission concept to mature solar sail technology for use in future Heliophysics missions, as well as missions of interest across a broad user community (e.g., space weather and Earth polar observatories). Solar Cruiser will serve as a pathfinder for missions that observe the solar environment from unique vantage points such as a high inclination solar mission opening a fundamentally new range of observational capabilities for the Heliophysics Program and for space weather monitoring. Sustained observations away from the Sun-Earth line (SEL) present unique opportunities for answering the outstanding science questions of Heliophysics, improving space-weather monitoring and prediction, and revealing new information about our Sun and solar system. Propellantless solar sails can be used to create artificial equilibria and maintain indefinite station-keeping at locations sunward of L1 along the SEL, or at any desired offset from the SEL leading or trailing the Earth in its orbit. They can change the heliocentric inclination of a spacecraft from the ecliptic to as high as solar polar, stopping and remaining at any intermediate inclination orbit in between. Sails can be used to hover over the Earth’s poles, using solar photon pressure to offset the Earth’s gravitational attraction, creating functional equivalents of geostationary earth orbits. The Solar Cruiser mission would fly a small spacecraft with a large (>1,600 square meter) solar sail containing embedded reflectivity control devices (RCDs) and photovoltaic cells. The mission concept includes successful deployment of the solar sail, validation of all sail subsystems, controlled station-keeping inside of the Sun-Earth L1 point, attitude control of the sail with the RCDs (including spinning and de-spinning), demonstration of pointing performance for science imaging, and an increase in heliocentric inclination (out of the ecliptic). To demonstrate the requisite sail technology, the Solar Cruiser project will design, fabricate, deploy, and fly the Solar Sail Propulsion Element (SSPE). The SSPE incorporates the following three systems: • The Solar Sail System (SSS) provides the large propulsive surface required for acceleration and smaller reflectivity-changing surfaces for roll control. • The Active Mass Translator System (AMT) provides SSPE motion with respect to the sailcraft bus for pitch and yaw control. • The Solar Sail Attitude Determination and Control System (SSADCS) consists of embedded software to 1) provide autonomous sailcraft attitude estimation, attitude pointing control, and reaction wheel momentum management following sail deployment and 2) execute the uplinked inertial attitude pointing commands to maintain the desired sailcraft trajectory. The plans for maturing each of these technology systems to TRL 5 and beyond are described herein.

Solar Sail↗

The Life Cycle Application of Intelligent Software Modeling for the First Materials Science Research Rack

Marshall Space Flight Center (MSFC) has been funding development of intelligent software models to benefit payload ground operations for nearly a decade. Experience gained from simulator development and real-time monitoring and control is being applied to engineering design, testing, and operation of the First Material Science Research Rack (MSRR-1). MSRR-1 is the first rack in a suite of three racks comprising the Materials Science Research Facility (MSRF) which will operate on the International Space Station (ISS). The MSRF will accommodate advanced microgravity investigations in areas such as the fields of solidification of metals and alloys, thermo-physical properties of polymers, crystal growth studies of semiconductor materials, and research in ceramics and glasses. The MSRR-1 is a joint venture between NASA and the European Space Agency (ESA) to study the behavior of different materials during high temperature processing in a low gravity environment. The planned MSRR-1 mission duration is five (5) years on-orbit and the total design life is ten (IO) years. The MSRR-1 launch is scheduled on the third Utilization Flight (UF-3) to ISS, currently in February of 2003). The objective of MSRR-1 is to provide an early capability on the ISS to conduct material science, materials technology, and space product research investigations in microgravity. It will provide a modular, multi-user facility for microgravity research in materials crystal growth and solidification. An intelligent software model of MSRR-1 is under development and will serve multiple purposes to support the engineering analysis, testing, training, and operational phases of the MSRR-1 life cycle development. The G2 real-time expert system software environment developed by Gensym Corporation was selected as the intelligent system shell for this development work based on past experience gained and the effectiveness of the programming environment. Our approach of multi- uses of the simulation model and its intuitive graphics capabilities is providing a concurrent engineering environment for rapid prototyping and development. Operational schematics of the MSRR-1 electrical, thermal control, vacuum access, and gas supply systems, and furnace inserts are represented graphically in the environment. Logic to represent first order engineering calculations is coded into the knowledge base to simulate the operational behavior of the MSRR-1 systems. An example of engineering data provided includes electrical currents, voltages, operational power, temperatures, thermal fluid flow rates. pressures, and component status indications. These type of data are calculated and displayed at appropriate instrumentation points, and the schematics are animated to reflect the simulated operational status of the MSRR-1. The software control functions are also simulated to represent appropriate operational behavior based on automated control and response to commands received by the crew or ground controllers. The first benefit of this simulation environment is being realized in the high fidelity engineering analysis results from the electrical power system G2 model. Secondly, the MSRR-1 simulation model will be embedded with a hardware mock-up of the MSRR-1 to provide crew training on MSRR-1 integrated payload operations. G2 gateway code will output the simulated instrumentation values, termed as telemetry, in a flight-like data stream so that the crew has realistic and accurate simulated MSRR-1 data on the flight displays which will be designed for crew use. The simulation will also respond appropriately to crew or ground initiated commands, which will be part of normal facility operations. A third use of the G2 model is being planned; the MSRR-1 simulation will be integrated with additional software code as part of the test configuration of the primary onboard computer, or Master Controller, for MSRR-1. We will take advantage of the G2 capability to simulate the flight like data stream to test flight software responses and behavior. A fourth use of the G2 model will be to train the Ground Support Personnel that will monitor the MSRR-1 systems and payloads while they are operating aboard the ISS. The intuitive, schematic based environment will provide an excellent foundation for personnel to understand the integrated configuration and operation of the MSRR-1, and the anticipated telemetry feedback based on operational modes of the equipment. Expert monitoring features will be enhanced to provide a smart monitoring environment for the operators. These features include: (1) Animated, intuitive schematic-based displays which reflect telemetry values, (1) Real-time plotting of simulated or incoming sensor values, (3) High/Low exception monitoring for analog data, (4) Expected state monitoring for discrete data, (5) Data trending, (6) Automated malfunction procedure execution to diagnose problems, (7) Look ahead capability to planned MSRR-1 activities in the onboard timeline. And finally, the logic to calculate telemetry values will be deactivated, and the same environment will interface to the incoming data for the real-time telemetry stream to schematically represent the onboard hardware configuration. G2 will be the foundation for the real-time monitoring and control environment. In summary, our MSRR-1 simulation model spans many elements of the life cycle development of this project: Engineering Analysis, Test and Checkout, Training of Crew and Ground Personnel, and Real-time monitoring and control. By utilizing the unique features afforded by an expert system development environment, we have been able to synergize a powerful tool capable of addressing our project needs at every phase of project development.

Rice, Amanda↗

Lessons Learned in Extended-Extended Spitzer Space Telescope Operations

The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.

Lowrance, Patrick↗

TEX-HEU: Integral Experiments with Highly Enriched Uranium and Polyethylene [Slides]

This presentation discusses Thermal/Epithermal eXperiments (TEX) in relation to integral experiments spanning a wide range of fission energy spectra utilizing existing NCSP fissile material assets, TEX-Pu for plutonium, and TEX-HEU highly enriched uranium (HEU) for highly enriched uranium. It also discusses the TEX-HEU design, the use of HEU fuel, and polyethylene parts. The experiment, executed in the Nuclear Criticality Experiment Research Center of the Nevada National Security Site is discussed, specifically how it was assembled on the Comet Universal Critical Assembly Machine. Measured quantities and various critical configurations are listed. In conclusion, the presentation states that they successfully assembled and documented the baseline TEX-HEU experiments, that six critical configurations and one reproducibility measurement were produced, and that they are compiling results to submit to the International Criticality Safety Benchmark Evaluation Project. A future experiment campaign is planned in 2021 with Hafnium as a diluent.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

IUS/TUG Orbital Operations and Mission Support Study: Executive Summary - Volume 1

The space transportation system (STS) is discussed which will include a propulsive stage that is carried into low earth orbit by the space shuttle. Data were accumulated from the analyses of various stage concepts, operating modes, and projected missions (space tug systems studies, growth stage studies, engine studies, and critical area studies). The foundation formulated by these studies aided in establishing a tentative two-phase approach for the extension of the STS operating regime beyond the space shuttle including plane changes, higher orbits, geosynchronous orbits and beyond. The orbital operations study, was conducted to provide the generation and analysis of operational plans, requirement, and concepts for the utilization of these vehicles. Primary emphasis was placed on methods and techniques to provide a sound technical approach to operations at reduced cost for the STS mission period.

Source record↗

Implementing a Direct-Feed Low-Activity Waste Capability in the Hanford Waste Treatment Plant - 18332

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Under this plan, low-activity waste will be pretreated in the Hanford tank farms for cesium and solids separation to meet LAW Facility waste acceptance criteria and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed low-level waste disposal site located in the Hanford 200 East Area. The DFLAW operation will deliver about 1 million gallons of double-shell tank waste for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the double-shell tanks will support safe tank farm operations and staging of additional waste for treatment. In December 2016 DOE executed a contract modification and approved a change to the project's performance baseline to complete the LAW Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion and hot commissioning of WTP facilities needed for DFLAW operations is as early as January 2022. DOE has made significant progress on design, equipment procurements, and civil construction of modifications required to implement the DFLAW capability in the WTP, including progress on civil construction of a new effluent management facility, which will process secondary liquid waste resulting from LAW Facility vitrification operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AMO-EXPRESS-2.5: Crew Autonomy Onboard the International Space Station

NASA is committed to landing American astronauts, including the first woman and the next man, on the Moon by 2024. Currently, the crew cannot take on all functions performed by the ground today, so the future crews will need more automation to reduce the crew workload for future missions. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. The Advanced Exploration Systems (AES) Autonomous Systems and Operations (ASO) Project has been investigating the ability to evaluate crew self-scheduling and activity monitoring for future space missions. The ASO project designed the Autonomous Mission and Operations- EXpedite the PRocessing of Experiments to Space Station Rack-2.5 (AMO-EXPRESS-2.5) payload to evaluate crew self-scheduling and activity monitoring. The AMO-EXPRESS-2.5 builds on the previous AMO-EXPRESS and AMO-EXPRESS-2.0 demonstrations on ISS. The AMO-EXPRESS-2.5 demonstration goals are to prove crew self-scheduling by planning through diagnosing systems expertise, failure detection, procedure recommendation and situational awareness. This paper will describe the development, test and execution results of the AMO-EXPRESS-2.5 demonstration, and will also outline the future planned development and operational efforts to enable autonomy for future deep space manned missions.

Brooke C. Allen↗

Evaluation of Open-Source Hard Real Time Software Packages

Reliable software is, at times, hard to find. No piece of software can be guaranteed to work in every situation that may arise during its use here at Glenn Research Center or in space. The job of the Software Assurance (SA) group in the Risk Management Office is to rigorously test the software in an effort to ensure it matches the contract specifications. In some cases the SA team also researches new alternatives for selected software packages. This testing and research is an integral part of the department of Safety and Mission Assurance. Real Time operation in reference to a computer system is a particular style of handing the timing and manner with which inputs and outputs are handled. A real time system executes these commands and appropriate processing within a defined timing constraint. Within this definition there are two other classifications of real time systems: hard and soft. A soft real time system is one in which if the particular timing constraints are not rigidly met there will be no critical results. On the other hand, a hard real time system is one in which if the timing constraints are not met the results could be catastrophic. An example of a soft real time system is a DVD decoder. If the particular piece of data from the input is not decoded and displayed to the screen at exactly the correct moment nothing critical will become of it, the user may not even notice it. However, a hard real time system is needed to control the timing of fuel injections or steering on the Space Shuttle; a delay of even a fraction of a second could be catastrophic in such a complex system. The current real time system employed by most NASA projects is Wind River's VxWorks operating system. This is a proprietary operating system that can be configured to work with many of NASA s needs and it provides very accurate and reliable hard real time performance. The down side is that since it is a proprietary operating system it is also costly to implement. The prospect of replacing this somewhat costly implementation is the focus of one of the SA group s current research projects. The explosion of open source software in the last ten years has led to the development of a multitude of software solutions which were once only produced by major corporations. The benefits of these open projects include faster release and bug patching cycles as well as inexpensive if not free software solutions. The main packages for hard real time solutions under Linux are Real Time Application Interface (RTAI) and two varieties of Real Time Linux (RTL), RTLFree and RTLPro. During my time here at NASA I have been testing various hard real time solutions operating as layers on the Linux Operating System. All testing is being run on an Intel SBC 2590 which is a common embedded hardware platform. The test plan was provided to me by the Software Assurance group at the start of my internship and my job has been to test the systems by developing and executing the test cases on the hardware. These tests are constructed so that the Software Assurance group can get hard test data for a comparison between the open source and proprietary implementations of hard real time solutions.

Mattei, Nicholas S.↗

A Space Station robot walker and its shared control software

In this paper, we first briefly overview the update of the self-mobile space manipulator (SMSM) configuration and testbed. The new robot is capable of projecting cameras anywhere interior or exterior of the Space Station Freedom (SSF), and will be an ideal tool for inspecting connectors, structures, and other facilities on SSF. Experiments have been performed under two gravity compensation systems and a full-scale model of a segment of SSF. This paper presents a real-time shared control architecture that enables the robot to coordinate autonomous locomotion and teleoperation input for reliable walking on SSF. Autonomous locomotion can be executed based on a CAD model and off-line trajectory planning, or can be guided by a vision system with neural network identification. Teleoperation control can be specified by a real-time graphical interface and a free-flying hand controller. SMSM will be a valuable assistant for astronauts in inspection and other EVA missions.

Xu, Yangsheng↗

Development of a Work Control System for Propulsion Testing at NASA Stennis

In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.

Messer, Elizabeth A.↗

Design Guidelines for Deployable Wind Turbines for Defense and Disaster Response Missions

Access to on-site electrical energy is critical to ensuring a successful military or humanitarian response to conflicts and disasters. These missions typically rely on access to liquid fuel that could be vulnerable to disruption or attack during transport. Generating power on location with wind technology can reduce this risk and enhance mission reach by diversifying energy sources. Common characteristics of these missions are short planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. These design drivers depart from features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This poster serves as a summary of project publications which presents the best currently available design guidance for deployable wind turbines to facilitate the effective development and acquisition of technology solutions to support mission success. This Defense and Disaster Deployable Turbine Project (D3T) is a multi-laboratory effort led by Sandia National Laboratories and funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Wind Energy Technologies Office.

deployable wind↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗