Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Conference Report: Masters Forum IV, February 2002

The purpose of the APPL Masters Forum is to bring together some of the best project managers at NASA, as well as those in industry and other government agencies, for 2 1/2 days of knowledge sharing. The project managers come eager to reflect on their project experiences, to learn new things from one another--and to unlearn a few things, too. This was the fourth Masters Forum, and the first one held outside Washington, DC. Fifty participants from across the country came to Dallas at the American Airlines Conference Center, a wonderful facility that was conveniently located by the airport and yet still seemed isolated from the rest of the world. Masters Forum IV was also the first one held during the winter. Previous Masters Forums have been during the summer. Hot, sticky Washington, D.C. in the summer may sound unpleasant, but frankly the popularity of earlier Forums is what led to this annual event becoming a semiannual one.

Post, Todd↗

Airspace Systems Program: Virtual Airspace Modeling and Simulation Project

The Airspace Systems Program (ASP) has identified a set of goals based on projections of annual passenger demands. The topics of discussion include: 1) Virtual Airspace Modeling and Simulation Project (VAMS) Project Description; 2) VAMS Project Management; 3) VAMS Project Schedule; and 4) Technical Interchange Meeting (TIM). This paper is in viewgraph form.

Jacobsen, Robert↗

United States Domestic Research Reactor Infrastrucutre TRIGA Reactor Fuel Support

The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.

99 GENERAL AND MISCELLANEOUS↗

Corrective Action Unit Deliverable/Task Status Tracking Tool

The CDSTool is a project management tool designed specifically to manage environmental restoration projects. The tool allows users to capture all projects in their baseline, develop and assign approaches, assign documents and reviews to particular projects and approaches, track and measure progress and status of each document/phase/activity in the project, based on the approach. The CDSTtool provides the ability to assign responsible personnel to each activity, provide status to scheduling software, track WBS, capture issues, comments, and history of development or performance related to the activity, document or phase.

Nelson, Jerel↗

International Developments on Uncertainties in NPP Decommissioning costs and planned work on Benchmarking at the OECD-NEA - 17074

The ability to decommission NPPs shut down after normal operation has been proven technically. Issues of current concern include the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international developments concerning addressing uncertainties in NPP decommissioning cost estimation, and work currently being planned relating to decommissioning cost benchmarking at the OECD Nuclear Energy Agency. The process of decommissioning cost estimation is evolving, with a general trend towards showing greater levels of detail in the estimate. The International Structure for Decommissioning Costing was published in 2012 and presents a common reporting format for decommissioning costing undertaken on a deterministic basis. However, this does not address probabilistic methods or associated presentation formats for the inclusion of uncertainties in decommissioning estimates. A consistent and comparable treatment of uncertainties in decommissioning cost estimation would further facilitate comparison between different cost estimates and enhance understanding of and confidence in the estimates themselves. There is growing interest in benchmarking decommissioning costs, reflecting a need to better understand the relationships between estimates and actual costs, to give greater confidence that funding will be sufficient, and as a useful tool in project management and enhancing project delivery. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A system safety model for developmental aircraft programs

Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

Amberboy, E. J.↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ASK Magazine

What makes a successful team? In this issue our contributors look closely at the subject and come up with several answers. Working on team chemistry is the "Activation Energy" Dr. Owen Gadeken's story is about. Scott Cameron thinks it's getting to know people one to one. Tony Maturo says it's getting the most out of your support staff. Dr. Michael Hecht finds the best people he can and build the team around their talents. Teamwork is a theme we explore often in Academy Sharing Knowledge (ASK), but never so directly as in this issue. You'll not only find formulas for building successful teams, you'll see examples of ones in action, strategies for how project managers can motivate their teams, and expert advice on how to choose who to work with and who not to work with. It seems like all the stories make one common point: everyone on a team counts. Few project managers can pull off a project alone, and when the whole team is performing to everyone's potential, the chances of pulling off a successful project goes up exponentially. If that doesn't seem like enough by itself, listen to this... Discerning fans of ASK will note the last two issues our Special Feature was "There are no Mistakes, Only Lessons." We have not abandoned this feature, but for now we want to broaden our repertoire. In this issue we add a new Special Feature, "My Metaphor," starting with Paul Espinosa's article "My Big Wall" about his rock climbing adventures on El Capitan in Yosemite National Park. If you think getting to Mars is work, read what it's like to scale a 3,000-foot rock face. This issue we're also welcoming two new members to our Review Board, Hugh Woodward and Jody Kusek. Hugh and Jody are our first reviewers from outside NASA, and we are delighted to have them on our team. Read their bios on the ASK Review Board page and see why we feel privileged to have them on our team.

Post, Todd↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

Kea, Howard↗

STS-114: Discovery Propulsion System Modification Briefing

A briefing on the propulsion system modification of the STS-114 Discovery is presented. June Malone, NASA Public Affairs, introduces the panel who consists of: Sandy Coleman, External Tank Project Manager, Neil Otte, External Tank Chief Engineer, and Tom Williams, Solid Rocket Booster, Deputy Project Manager. Neil Otte presents charts on new requirements for foam debris reduction on the external tank. He also presents charts describing the Forward Bipod Redesign, LO2 Feedline Bellows Location, LH2 Intertank Flange Location, and In-Flight Imagery. Tom Williams presents charts describing Solid Rocket Booster Activities and Return to Flight efforts.

Source record↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

Georgetown University – SYSM 5630 Systems Integration Verification and Validation : Todd Noste

At Lawrence Livermore National Laboratory in the National Ignition Facility Optics Group, we use the systems engineering approach for project management and as a design tool. Systems engineering is used in a graded approach to design and project management that is based on risk, informing how much rigor to apply. The tools and techniques from systems engineering offer a framework to organize projects with everyone speaking the same language to provide consistent and repeatable project success that satisfies the stakeholders’ needs and meets the mission. The classes have provided a framework with tools for communicating system design, requirements, verification and validation, and an operational context.

42 ENGINEERING↗

Masters Study in Advanced Energy and Fuels Management

There are currently three key drivers for the US energy sector a) increasing energy demand and b) environmental stewardship in energy production for sustainability and c) general public and governmental desire for domestic resources. These drivers are also true for energy nation globally. As a result, this sector is rapidly diversifying to alternate sources that would supplement or replace fossil fuels. These changes have created a need for a highly trained workforce with a the understanding of both conventional and emerging energy resources and technology to lead and facilitate the reinvention of the US energy production, rational deployment of alternate energy technologies based on scientific and business criteria while invigorating the overall economy. In addition, the current trends focus on the the need of Science, Technology, Engineering and Math (STEM) graduate education to move beyond academia and be more responsive to the workforce needs of businesses and the industry. The SIUC PSM in Advanced Energy and Fuels Management (AEFM) program was developed in response to the industries stated need for employees who combine technical competencies and workforce skills similar to all PSM degree programs. The SIUC AEFM program was designed to provide the STEM graduates with advanced technical training in energy resources and technology while simultaneously equipping them with the business management skills required by professional employers in the energy sector. Technical training include core skills in energy resources, technology and management for both conventional and emerging energy technologies. Business skills training include financial, personnel and project management. A capstone internship is also built into the program to train students such that they are acclimatized to the real world scenarios in research laboratories, in energy companies and in government agencies. The current curriculum in the SIUC AEFM will help fill the need for training both recent graduates seeking specialized training prior to entering the energy industry workforce as well as working professionals in the energy industry who require additional training and qualifications for further career advancement. It is expected that the students graduating from the program will be stewards of effective, sustainable and environmentally sound use of these resources to ensure energy independence and meet the growing demands.The application of this Professional Science Masters’ (PSM) program is in the fast evolving Fuels Arena. The PSM AEFM is intended to be a terminal degree which will prepare the graduates for interdisciplinary careers in team-oriented environment. The curriculum for this program was developed in concert with industry to dovetail with current and future demands based on analysis and needs. The primary objective of the project was to exploit the in house resources such as existing curriculum and faculty strengths and develop a curriculum with consultations with industry to meet current and future demands. Additional objectives was to develop courses specific to the degree and to provide the students with a set of business skills in finance accounting and sustainable project management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology into Aeronautics Research Mission Directorate Projects for 2016

This report is intended to help NASA program and project managers incorporate Small Business Innovation Research (SBIR) technologies into NASA Aeronautics Research Mission Directorate (ARMD) projects. Other Government and commercial project managers interested in ARMD funding opportunities through NASA's SBIR program will find this report useful as well.

Structural Efficiency; Aeroelasticity; Low Emissio↗

An Investigation of Risk Management Approaches for NASA Piloted X-Plane Projects

NASA is resuming X-plane research. It plans to build a low-boom supersonic flight demonstrator (LBFD), an all-electric general aviation aircraft (X-57), and possibly an ultra-efficient subsonic transport (UEST) demonstrator. In an attempt to define what levels of risk are appropriate in piloted X-plane research, the NASA Office of the Chief Engineer (OCE) evaluated numerous NASA, Department of Defense (DoD), and industry project management and risk assessment tools. Provided are the results of the evaluations of NASA Procedural Requirements (NPR) 7120.5, 7120.8, and 8705.4; Langley Research Center (LaRC) Procedural Requirement (LPR) 7120.5; Dryden (Armstrong) Center Procedures S-002 and X-009; and Military Handbook 516C. Some of these were applied to the LBFD and X-57 aircraft. The impacts on risk of budgeting decisions and specialized flight conditions were also considered. None of the evaluated processes were found to be fully appropriate for governing experimental aircraft projects, but many useful elements were found in some of them.

X-59↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗