Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE CONTAMINATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Development of a Conditioned System-Level Groundwater Model to Evaluate Long-Term Groundwater Impacts within a Performance Assessment - 20115

A preliminary performance assessment (PA) of single-shell tank Waste Management Area (WMA) A-AX located at the U.S. Department of Energy (DOE)'s Hanford Site in southeastern Washington is being conducted to satisfy the requirements of DOE Order 435.1 [1] as it relates to closure of the single-shell radioactive waste tanks in the WMA A-AX tank farms. A PA assesses the fate, transport, and impacts of radionuclides within a low-level radioactive waste disposal facility in its assumed closure configuration and the subsequent potential doses to humans over a 1,000-year compliance period and a 10,000-year performance evaluation period. The WMA A-AX preliminary PA evaluation is structured around the complementary use of process-level and system-level models to calculate the facility performance against established DOE Order 435.1 [1] performance objectives. Process-level models are those that represent a detailed phenomenological representation of processes of concern in the PA. Process models typically only represent one or a few of the components of the PA, such as groundwater flow and transport, and must be integrated with other modeling elements to perform PA calculations. System-level models are those that are abstracted from the process models, retaining the essential features of the process model, while allowing integration of all aspects of the PA in a single modeling framework. System-level models are often characterized by coarser numerical discretization, lower dimensionality, or other similar simplifications compared to the process-level model. Traditionally, a three-dimensional (3-D) process-level model is utilized primarily to evaluate the long-term impact on groundwater and the potential doses to individuals who consume contaminated groundwater. System-level models are also utilized to evaluate the groundwater pathway in PAs. These models typically have reduced dimensionality (1-D) and are conditioned utilizing flow fields (Darcy fluxes) and moisture content distributions that are abstracted from the process level models. The abstraction approach assures that the flow field in both models is consistent for a specific set of input parameters for flow, differing only in the discretization and dimensionality of the two models. The preliminary WMA A-AX PA incorporates a detailed representation of the geological system and hydraulic properties within the 3-D model STOMP{sup C} numerical code so that the effects of relevant features and processes on water flow and radionuclide transport in the subsurface can be evaluated. The complementary system-level model is developed utilizing the GoldSim{sup C} code to implement a simplified, 1-D equivalent model to represent the groundwater pathway. Contaminant transport through the vadose zone and unconfined aquifer for Tc-99 and I-129 were evaluated in each of the models. Adjustments to the saturated portion of the GoldSim{sup C} 1-D model were required to mimic the dispersion effect captured with the 3-D STOMP{sup C} model. Once this conditioning was conducted, highly similar results for the transport of Tc-99 and I-129 were achieved at the point of calculation, located 100 m downgradient from the WMA A-AX fenceline. These radionuclides represent elements that are regarded as primary dose drivers in the PA groundwater pathway analysis. The high degree of conformance between the two models suggests that the use of the equivalent 1-D system model is suitable for evaluating the full suite of radionuclides that will be released from the tank sources within WMA A-AX over the 1,000-year compliance period and over the 10,000-year evaluation period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Status Report FY 2021)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA) (CP-60089), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and that the determination must consider the results of data collection and analysis from research, field studies, and monitoring as well as the need to update any Radioactive Waste Management Basis (RWMB) documents. Beginning in 1996, the Environmental Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2021, extending from October 1, 2020, through September 30, 2021), approximately 9.14E+04 metric tons (1.01E+05 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2021, approximately 16.9 million metric tons (18.9 U.S. tons) of waste has been disposed of at ERDF, which equates to consumption of approximately 88.7% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. As a condition of the DAS, disposal operation within ERDF must be in accordance with the waste acceptance criteria (ERDF-00011) that provide specific radionuclide disposal limits, waste form restrictions, and descriptions of acceptable waste packages in compliance with the requirements of DOE M 435-1.1. The ERDF waste acceptance criteria stipulate that waste destined for disposal at ERDF be controlled based on source, physical form, and contaminant concentration and activity levels. There have been no changes to the physical configuration of ERDF or to the waste forms (source, physical form, etc.). No new unreviewed disposal question screenings or evaluations have been generated in this reporting period. Therefore, there are no noted impacts to the PA, CA, DAS, or RWMB resulting from the evaluations and screenings. Sum-of-fractions analysis shows that the disposed inventory meets both the concentration and inventory threshold requirements. A sum-of-fractions value is computed for ERDF sensitive radionuclides contributing to the all pathways and the air pathway inventory limits. Computed values were 7.63E-03 and 1.49E-03, respectively. The disposed waste inventory remained well under the PA imposed limits, as shown in Table 4 and Table 5 in the main text of this report. Required monitoring was satisfactorily completed during the fiscal year reporting period. Compliance with performance objectives were met as each of the reported values were well below the established limit. Overall, there are no substantive changes to primary PA assumptions or changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the DAS is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field-Scale Lysimeter Studies of Glass and Cementitious Waste Forms at the Hanford Site - 20392

The Hanford site Integrated Disposal Facility (IDF) will receive waste forms from vitrification activities at the Hanford Waste Treatment and Immobilization Plant (WTP). The waste form inventory to be disposed of at the IDF will consist of vitrified low-activity waste (LAW) in glass forms and solidified (or encapsulated) secondary wastes in cementitious forms. The IDF is a near-surface burial facility located near Hanford's Waste Treatment and Immobilization Plant in the 200 East Area of the site's Central Plateau. An extensive set of laboratory experimental data has been collected to support IDF performance assessment calculations of the eventual degradation of waste forms and mobility of contaminants. This paper describes the start of a field experiment to generate waste-form performance data on a larger scale (tens of centimeters), over a longer duration (five years or more), and under field conditions representative of the IDF. Results from this study are expected to improve model descriptions of contaminant mobility, reduce uncertainties about the representativeness of laboratory results in the IDF performance assessment, improve stakeholder confidence in the safe disposal of treated waste at the IDF, and facilitate the adoption of informed facility designs with the potential to reduce operational costs. A lysimeter test facility near Hanford's 200 West Area has been repurposed to carry out long-term assessments of waste forms buried in sediments excavated from the IDF. The waste forms are buried in large drainage lysimeters, open caissons that are two meters in diameter and three meters deep. Waste forms are buried in up to six locations in each lysimeter. Samplers collect pore water and drainage water beneath the waste forms and air from the pore space adjacent to waste forms. Sensors measure temperature, soil water content, soil water tension, and drainage flux. One lysimeter containing cementitious waste forms and one containing glass waste forms have been completed, along with a control lysimeter (without waste forms). The cementitious waste forms are Cast Stone grout formulations using a liquid secondary waste simulant and a generic Hanford high-salt simulant, as well as a hydrated lime-based grout formulation using a liquid secondary waste simulant. Technetium-99 and iodine-127 were added as tracers to monitor contaminant mobility. Glass waste forms were fabricated in two formulations (LAWA44 and ORLEC28), with rhenium and molybdenum tracers to monitor waste form degradation. The predicted performance of the waste forms in the lysimeters was modeled prior to installation to determine waste form size, tracer concentration/activity, and locations of sensors and samplers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intelligent Consequence Control by Aerial Reconnoiter Using Unmanned Systems

In a nuclear accident, or in the aftermath of an improvised nuclear device or radiological dispersal device detonation, radioactive materials may pose a severe health threat to individuals near the site of the incident. The Intelligent Consequence Control by Aerial Reconnoiter Using Unmanned Systems (ICARUS) does the dull, dirty, and dangerous (and, sometimes, deep) work of mapping and characterizing valuable information to enable a safe and appropriate response. ICARUS provides timely answers to the questions, “What is it?” “Where is it?”, and “How far does it extend?” Using commercial, off-the-shelf proven components, the integrated chemical, biological, radiological, nuclear, and explosives detection architecture for our drones provides a solution for collecting radiological, chemical, and optical information on developing complex situations, returning actionable data for determining if it is safe for further response efforts. ICARUS can determine and transmit the location, identity, and intensity of radionuclide contamination to a remote base station. It can deliver on the unexpected.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Electrochemical hydrogen isotope fractionation - fundamental insights leading to process scale up

Introduction Deuterium and tritium, the two isotopes of hydrogen besides protium, are utilized in many industries. Deuterium is routinely used as a nuclear reactor moderator and molecular labeling agent, while tritium is used as an autoradiography label in medical imaging, and in an emerging market for self-powered lighting for watches, exit signs, firearm night-sights and future fusion fuel. Tritium is produced naturally at very low steady-state levels due to cosmic rays, natural nuclear decay reactions, as well as commercial nuclear fission reactors, and terrestrial nuclear testing conducted primarily in the mid-twentieth century. Tritium often accumulates in the heavy water used in nuclear fission reactors and sometimes appears in groundwater near nuclear reactors due to slight leakage from water sources in the reactor. Because of the health and environmental impacts from tritium leaking into the water sources, as well as the value of this precious material, it is desirable to remove and recover as much tritium as reasonably possible from contaminated water.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of C-Reactor (105-C) Moderator Tanks 204 and 205

Area Completion Project (ACP)/Savannah River Nuclear Solutions (SRNS) has requested Savannah River National Laboratory (SRNL) to perform chemical and radiological analyses on moderator heavy water samples from C-Reactor (105-C) in Moderator Tanks 204 and 205. The heavy water samples have been characterized using SRNL analytical methods. Information generated from the characterization of these heavy water samples provide a basis for determining the residual contamination remaining in the tanks. These analyses are needed in order to update the C-Reactor Contaminant migration groundwater model and report, to help determine a disposition pathway for the moderator water, and to ship samples off-site to the Southwest Research Institute (SWRI). This report presents characterization results for the March 2024 C-Reactor Moderator Tank 204 and 205 heavy water samples. SRNL results are critical to allow ACP to complete this Performance Based Incentive project on time. Based on the characterization data provided in this report, results of these samples meet customer expectations and satisfy the Technical Assistance Request (TAR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PFAS Removal by Ion Exchange Resins: Background and Knowledge Gaps with Respect to the Hanford Site

Per- and polyfluoroalkyl substances (PFAS) have been a rising concern for the past two decades, with the United States Department of Defense and Environmental Protection Agency investing millions of dollars in research into remediation and clean-up technologies. Due to the environmental persistence, toxicity, biological uptake, and ongoing changes in both federal and state regulatory space, understanding the fate and transport of PFAS compounds has been of growing concern to the US Department of Energy (DOE). The DOE’s Hanford Site is investigating historical use of PFAS and will be doing site characterization for PFAS. Thus, PFAS have not yet been identified as a contaminant concern in regulatory documents. Based on historical records that mention the discharge of aqueous film-forming foam containing PFAS and having on-site fire stations (a risk factor for PFAS contamination), it seems likely that environmental releases of PFAS may have occurred. Pump and treat (P&T) remediation is the selected remedy for multiple groundwater contaminant plumes at Hanford. These P&T systems use ion exchange (IX) as a component of aboveground treatment, with the specific resins depending on the target contaminants. There is potential that these IX resins may be able to remove PFAS from groundwater, but investigation is needed to understand affinity/selectivity and removal capacity given the groundwater composition and the operating conditions. This report provides background on PFAS uses and chemistry, then provides a review of IX resin applications for PFAS, identifying knowledge gaps. Recommendations are provided regarding research needed to address knowledge gaps and acquire information needed to propose IX as a future PFAS remediation technology at the Hanford Site, as well as other U.S. Department of Energy sites. Generally, PFAS compounds are fluorinated substances that contain at least one fully fluorinated methyl or methylene carbon – with a few noted exceptions, any chemical with at least a perfluorinated methyl group (–CF3) or a perfluorinated methylene group (–CF2–) is a PFAS. These chemical compounds are characterized as non-biodegradable, non-reactive, non-photolytic, and hydrolysis resistant. This makes them highly recalcitrant within the environment, however polyfluoroalkyl materials are less recalcitrant as the carbon chains contain C–H bonds which are more easily broken than carbon – fluorine (C–F) bonds. The backbone carbon structures are commonly punctuated with a head group, the most well-known of them are perfluorooctanesulfonic acid and perfluorooctanoic acid, which possess a sulfonate and a carboxylate group, respectively. IX resins are marketed for the removal of PFAS from water systems and industrial water, however, the mechanism of removal is not as well understood as for anion or cation removal. A better understanding of the mechanism of removal would enable the development of IX resins that have improved specificity for PFAS removal. Four knowledge gaps were identified: 1) the effect of dissolved ions on the IX resin PFAS removal effectiveness, 2) the effect of additional primary contaminants of concern (PCOCs) or secondary contaminants of concern (SCOCs) on the effectiveness of PFAS via IX resin, 3) the mechanisms of PFAS removal from water, and 4) practical solutions to IX resin regeneration and waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluate Synergies of Using Hydrothermal Liquefaction and Anerobic Digestion Treatment Technologies for Wastewater Resource Recovery Facilities (CRADA 516 Final Report)

The research focuses on utilizing a new anaerobic digestion (AD) configuration to treat the aqueous by-product generated by hydrothermal liquefaction (HTL) of sewage sludge. This report found that for Anaerobic Digestion for HTL By-product, Anaerobic biofilms can degrade some HTL wastewater contaminants, but co-digestion is essential to address nutrient deficiencies and optimize performance. Without AD, toxicity of HTL aqueous streams may limit broader adoption in wastewater treatment plants (WWTPs). Great Lakes Water Authority (GLWA) used an innovative reactor design, involving a dynamic membrane anaerobic bioreactor to promote biofilm growth, improving contaminant degradation. The tree-like structure inside the reactor supports biofilm development with recirculation enhancing microbial activity. Overall, a 70% chemical oxygen demand (COD) removal was achieved, although nutrient supplementation is required for stability. The reactor achieved a diverse microbial community, including methanogens and bacteria capable of degrading phenols and aromatics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Approach to Sampling and Survey for Radiological Contaminants to Release Overburden Soil for Reuse - 20120

Various methods may be utilized to determine if overburden soil meets approved release criteria to allow for reuse of overburden soil as backfill material: soil scanning and sorting equipment, survey and sampling of excavated soil, in-situ sampling, and utilization of box or truck counters are common approaches. This paper focuses on a modified approach using elements of in-situ sampling and after excavation survey for a large volume of overburden soil that was expected to meet soil release criteria. This approach was utilized for the U.S. Army Corps of Engineers (USACE) St. Louis District at a North St. Louis County property. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2018 Long-Term Hydrologic Monitoring Program Report for Rio Blanco, Colorado, Site

This report presents the monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Rio Blanco, Colorado, Site (Figure 1). The Rio Blanco site was the location of an underground nuclear test during which three nuclear devices were detonated nearly simultaneously in a single borehole in 1973. The test resulted in residual radionuclide contamination at the detonation depths of 5840, 6230, and 6690 feet (ft) (DOE 2015). Monitoring includes the collection of samples from groundwater wells and surface water locations near the site to assess for any potential impacts that may be attributed to the Rio Blanco nuclear test. This report summarizes the laboratory analytical results obtained from the sampling event conducted in 2018. This annual report and previous reports are available on the LM public website at https://www.lm.doe.gov/rio_blanco/Sites.aspx. Data collected during this and previous monitoring events are available on the Geospatial Environmental Mapping System (GEMS) website at https://gems.lm.doe.gov/#site=RBL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 50 Salt Solution Sample (2QCY21)

In this Technical Report, the chemical and radionuclide contaminant results from the Second Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Second Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Third Quarter Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Second Quarter Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Second Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Second Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the January 2022 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the January 2022 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the January 2022 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the RMC request, will be obtained semiannually for the January 2022 and July 2022 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the July 2022 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the July 2022 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the July 2022 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRMC request, will be obtained semiannually for the January 2022 and July 2022 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗