Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Ground Vibration Measurements at LHC Point 4

Ground vibration was measured at Large Hadron Collider (LHC) Point 4 during the winter shutdown in February 2012. This report contains the results, including power and coherence spectra. We plan to collect and analyze vibration data from representative collider halls to inform specifications for future linear colliders, such as ILC and CLIC. We are especially interested in vibration correlations between final focus lens locations.

43 PARTICLE ACCELERATORS↗

Analysis of Loss-of-Offsite-Power Events 1997-2015

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2015. LOOP events during critical operation that do not result in a reactor trip, are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). There is an adverse trend in LOOP durations. The previously reported adverse trend in LOOP frequency was not statistically significant for 2006-2015. Grid-related LOOPs happen predominantly in the summer. Switchyard-centered LOOPs happen predominantly in winter and spring. Plant-centered and weather-related LOOPs do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986 -1996 time period.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

05 NUCLEAR FUELS↗

A Streamlined, Open Source Neutronics Toolkit for Fusion Reactor Design (Final Report)

Final report for the DOE Fusion Energy Sciences project titled "A Streamlined, Open Source Neutronics Toolkit for Fusion Reactor Design". This project developed unstructured mesh tracking capabilities in OpenMC as well as two shutdown dose rate methodologies, and performed extensive performance improvements and validation of the open source Monte Carlo code, OpenMC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Nuclear Safety [Vol. 37, No. 3, July-September 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS 181 Attitudes and Practices Regarding Disposal of Liquid Nuclear Waste at Clinton Laboratories in the Very Early Years: A Historical Analysis, S. H. Stow; 202 Off-Site Nuclear Emergency Management in Germany Under the Auspices of the Federal Structure, A. Bayer, S. Bittner, and H. Korn; DESIGN FEATURES: 211 Twenty-Fourth DOE/NRC Nuclear Air-Cleaning and Treatment Conference, R. R. Bellamy, J. J. Hayes, R. D. Porco, and M. W. First; OPERATING EXPERIENCES: 222 Explosion in the Tomsk-7 Reprocessing Plant on April 6, 1993, M. L. Hyder, W. G. Lussie, and F. E. Witmer; 234 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 237 Assessment of Spent Fuel Cooling, J. G. Ibarra, W. R. Jones, G. F. Lanik, H. L. Ornstein, and S. V. Pullani; RECENT DEVELOPMENTS: 256 Reports, Standards, and Safety Guides, D. S. Queener; 260 Proposed Rule Changes as of June 30, 1996; ANNOUNCEMENTS: 210 Tennessee Industries Week; 221 21st International Symposium on The Scientific Basis for Nuclear Waste Management; 259 IAEA Programme of Scientific Meetings for 1997; 270 PSAM 4 (International Conference on Probabilistic Safety Assessment and Management); 265 The Authors; 268 Errata.

05 NUCLEAR FUELS↗

Effects of Booster Scraping in Polarized Proton Runs 2006 and 2008

Effects of the Booster vertical scraping on the RHIC beam polarization, the RHIC beam emittance, and on the Booster to AGS transfer efficiency and AGS transmission as well, are further studied. In [1], the strong dependence of the RHIC beam polarization and emittance on bunch intensity in proton run 2008 (pp08) is compared with the proton run 2006 (pp06), where the dependence is much weaker. The setting in the AGS Booster, mainly the vertical scraping, is suspected to having played a role in the different patterns in the two runs. In this note, we further study the effects of the Booster vertical scraping on the RHIC beam polarization, and on the RHIC beam emittance as well. With the improvement of the RHIC bunch intensity in mind, the Booster scraping effects on the Booster to AGS transfer (BtA) efficiency and the AGS transmission are also studied. For simplicity and to be more useful, only the RHIC fills after the one-week shutdown in pp06 and the fills using the AGS User 2 in pp08 are shown. For these fills, the machine settings in AGS are similar in pp06 and pp08 runs. Furthermore, this setting might be used for next polarized proton run, at least at the beginning of the run.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Technical Letter Report, An Evaluation of Ultrasonic Phased Array Testing for Reactor Piping System Components Containing Dissimilar Metal Welds, JCN N6398, Task 2A

Research is being conducted for the U.S. Nuclear Regulatory Commission at the Pacific Northwest National Laboratory to assess the effectiveness and reliability of advanced nondestructive examination (NDE) methods for the inspection of light-water reactor components. The scope of this research encom¬passes primary system pressure boundary materials including dissimilar metal welds (DMWs), cast austenitic stainless steels (CASS), piping with corrosion-resistant cladding, weld overlays, inlays and onlays, and far-side examinations of austenitic piping welds. A primary objective of this work is to evaluate various NDE methods to assess their ability to detect, localize, and size cracks in steel components that challenge standard and/or conventional inspection methodologies. This interim technical letter report provides a summary of a technical evaluation aimed at assessing the capabilities of phased-array (PA) ultrasonic testing (UT) methods as applied to the inspection of small-bore DMW components that exist in the reactor coolant systems (RCS) of pressurized water reactors (PWRs). Operating experience and events such as the circumferential cracking in the reactor vessel nozzle-to-RCS hot leg pipe at V.C. Summer nuclear power station, identified in 2000, show that in PWRs where primary coolant water (or steam) are present under normal operation, Alloy 82/182 materials are susceptible to pressurized water stress corrosion cracking. The extent and number of occurrences of DMW cracking in nuclear power plants (domestically and internationally) indicate the necessity for reliable and effective inspection techniques. The work described herein was performed to provide insights for evaluating the utility of advanced NDE approaches for the inspection of DMW components such as a pressurizer surge nozzle DMW, a shutdown cooling pipe DMW, and a ferritic (low-alloy carbon steel)-to-CASS pipe DMW configuration.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Creep and Creep-Fatigue Crack Growth at Structural Discontinuities and Welds

The subsection ASME NH high temperature design procedure does not admit crack-like defects into the structural components. The US NRC identified the lack of treatment of crack growth within NH as a limitation of the code and thus this effort was undertaken. This effort is broken into two parts. Part 1, summarized here, involved examining all high temperature creep-fatigue crack growth codes being used today and from these, the task objective was to choose a methodology that is appropriate for possible implementation within NH. The second part of this task, which has just started, is to develop design rules for possible implementation within NH. This second part is a challenge since all codes require step-by-step analysis procedures to be undertaken in order to assess the crack growth and life of the component. Simple rules for design do not exist in any code at present. The codes examined in this effort included R5, RCC-MR (A16), BS 7910, API 579, and ATK (and some lesser known codes). There are several reasons that the capability for assessing cracks in high temperature nuclear components is desirable. These include: (1) Some components that are part of GEN IV reactors may have geometries that have sharp corners - which are essentially cracks. Design of these components within the traditional ASME NH procedure is quite challenging. It is natural to ensure adequate life design by modeling these features as cracks within a creep-fatigue crack growth procedure. (2) Workmanship flaws in welds sometimes occur and are accepted in some ASME code sections. It can be convenient to consider these as flaws when making a design life assessment. (3) Non-destructive Evaluation (NDE) and inspection methods after fabrication are limited in the size of the crack or flaw that can be detected. It is often convenient to perform a life assessment using a flaw of a size that represents the maximum size that can elude detection. (4) Flaws that are observed using in-service detection methods often need to be addressed as plants age. Shutdown inspection intervals can only be designed using creep and creep-fatigue crack growth techniques. (5) The use of crack growth procedures can aid in examining the seriousness of creep damage in structural components. How cracks grow can be used to assess margins on components and lead to further safe operation. After examining the pros and cons of all these methods, the R5 code was chosen as the most up-to-date and validated high temperature creep and creep fatigue code currently used in the world at present. R5 is considered the leader because the code: (1) has well established and validated rules, (2) has a team of experts continually improving and updating it, (3) has software that can be used by designers, (4) extensive validation in many parts with available data from BE resources as well as input from Imperial college's database, and (5) was specifically developed for use in nuclear plants. R5 was specifically developed for use in gas cooled nuclear reactors which operate in the UK and much of the experience is based on materials and temperatures which are experienced in these reactors. If the next generation advanced reactors to be built in the US used these same materials within the same temperature ranges as these reactors, then R5 may be appropriate for consideration of direct implementation within ASME code NH or Section XI. However, until more verification and validation of these creep/fatigue crack growth rules for the specific materials and temperatures to be used in the GEN IV reactors is complete, ASME should consider delaying this implementation. With this in mind, it is this authors opinion that R5 methods are the best available for code use today. The focus of this work was to examine the literature for creep and creep-fatigue crack growth procedures that are well established in codes in other countries and choose a procedure to consider implementation into ASME NH. It is very important to recognize that all creep and creep fatigue crack growth procedures that are part of high temperature design codes are related and very similar. This effort made no attempt to develop a new creep-fatigue crack growth predictive methodology. Rather examination of current procedures was the only goal. The uncertainties in the R5 crack growth methods and recommendations for more work are summarized here also.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HEP Science Network Requirements--Final Report

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity is more complex than network engineering for intra-US connectivity. This is because transoceanic circuits have lower reliability and longer repair times when compared with land-based circuits. Therefore, trans-Atlantic connectivity requires greater deployed bandwidth and diversity to ensure reliability and service continuity of the user-level required data transfer rates. (4) Trans-Atlantic traffic load and patterns must be monitored, and projections adjusted if necessary. There is currently a shutdown planned for the LHC in 2012 that may affect projections of trans-Atlantic bandwidth requirements. (5) There is a significant need for network tuning and troubleshooting during the establishment of new LHC Tier-2 and Tier-3 facilities. ESnet will work with the HEP community to help new sites effectively use the network. (6) SLAC is building the CCD camera for the LSST. This project will require significant bandwidth (up to 30Gbps) to NCSA over the next few years. (7) The accelerator modeling program at SLAC could require the movement of 1PB simulation data sets from the Leadership Computing Facilities at Argonne and Oak Ridge to SLAC. The data sets would need to be moved overnight, and moving 1PB in eight hours requires more than 300Gbps of throughput. This requirement is dependent on the deployment of analysis capabilities at SLAC, and is about five years away. (8) It is difficult to achieve high data transfer throughput to sites in China. Projects that need to transfer data in or out of China are encouraged to deploy test and measurement infrastructure (e.g. perfSONAR) and allow time for performance tuning.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

54 ENVIRONMENTAL SCIENCES↗

Feasibility analyses for HEU to LEU fuel conversion of the LAUE Langivin Institute (ILL) High Flux Reactor (RHF).

The High Flux Reactor (RHF) of the Laue Langevin Institute (ILL) based in Grenoble, France is a research reactor designed primarily for neutron beam experiments for fundamental science. It delivers one of the most intense neutron fluxes worldwide, with an unperturbed thermal neutron flux of 1.5 x 10{sup 15} n/cm{sup 2}/s in its reflector. The reactor has been conceived to operate at a nuclear power of 57 MW but currently operates at 52 MW. The reactor currently uses a Highly Enriched Uranium (HEU) fuel. In the framework of its non-proliferation policies, the international community presently aims to minimize the amount of nuclear material available that could be used for nuclear weapons. In this geopolitical context, most worldwide research and test reactors have already started a program of conversion to the use of Low Enriched Uranium (LEU) fuel. A new type of LEU fuel based on a mixture of uranium and molybdenum (UMo) is expected to allow the conversion of compact high performance reactors like the RHF. This report presents the results of reactor design, performance and steady state safety analyses for conversion of the RHF from the use of HEU fuel to the use of UMo LEU fuel. The objective of this work was to show that is feasible, under a set of manufacturing assumptions, to design a new RHF fuel element that could safely replace the HEU element currently used. The new proposed design has been developed to maximize performance, minimize changes and preserve strong safety margins. Neutronics and thermal-hydraulics models of the RHF have been developed and qualified by benchmark against experiments and/or against other codes and models. The models developed were then used to evaluate the RHF performance if LEU UMo were to replace the current HEU fuel 'meat' without any geometric change to the fuel plates. Results of these direct replacement analyses have shown a significant degradation of the RHF performance, in terms of both neutron flux and cycle length. Consequently, ANL and ILL have collaborated to investigate alternative designs. A promising candidate design has been selected and studied, increasing the total amount of fuel without changing the external plate dimensions by relocating the burnable poison. In this way, changes required in the fuel element are reasonably small. With this new design, neutronics analyses have shown that performance could be maintained at a high level: 2 day decrease of cycle length (to 47.5 days at 58.3 MW) and 1-2% decrease of brightness in the cold and hot sources in comparison to the current typical operation. In addition, studies have shown that the thermal-hydraulic and shutdown margins for the proposed LEU design would satisfy technical specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AGR-2 Data Qualification Interim Report

Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Booster and AGS transverse emittance during the 2006 and 2009 polarized proton runs

This note is an overview of issues relating to transverse polarized proton emittance in the Booster and AGS. It also compares the transverse emittance during the FY09 polarized proton run with it during the FY06 run as several changes were made for the FY09 run in an attempt to reduce the transverse emittance coming out of the AGS. The FY06 run is used for comparison because it was relatively long, and it's believed that the performance of the injectors for polarized protons, up until FY09, was best during that run. Over the shutdown just before the FY09 run work was done in LEBT and MEBT to reduce the emittance coming out of the Linac. Measurements of the beam coming out of Linac1 indicate that the horizontal normalized emittance was reduced from 11.0 {pi} to 4.5 {pi}mm mrad, and that the vertical normalized emittance was reduced from 12.1 {pi} to 5.5 {pi} mm mrad going from FY06 to FY09. There were 2 new types of stripping foil installed in the Booster, called descriptively the 'strip' (No.6) and 'stamp' (No.2) foil, both nominally 100 {micro}g/cm{sup 2}. Both foils are composed of a diamond like material, and designed to reduce the number of times the beam goes through the foil. Other than those, there are two standard 100 {micro}g/cm carbon foils (No.3 and 5), and one 200 {micro}g/cm{sup 2} carbon foil (No.4). Of the two 100 {micro}g/cm{sup 2} foils, one has shown some deterioration (No.3) in stripping efficiency. During the FY06 run a standard 100 {micro}g/cm{sup 2} foil was generally used, and during the FY09 run the strip foil was generally used, though the stamp foil was also used for the last 3-4 weeks of the run. Both the FY06 and FY09 runs were about 5 months long, starting in late January, FY06 ending in late June, and FY09 ending in early July. A new injection setup was used for about the last 3 months of FY09, from the beginning of April to the end of the run. This setup uses 1/2 integer stopband correctors with the tunes near, but slightly greater than, 4.5 to distort the {beta} functions at the foil in order to reduce the emittance blowup caused by scattering on the foil. New BtA quad settings, largely based on a MAD model of the BtA line and AGS were used for virtually the entire FY09 run (Feb 5 to the end) in an attempt to improve the matching into the AGS. Since, it has been thought for some time that there is emittance blowup in the vertical due to an injection mismatch. The nominal Linac pulse width was decreased from 400 {micro}s to 300 {micro}s in the latter part of february 09, so the vast majority of the FY09 run used a 300 {micro}s pulse width. The standard pulse width for FY06 was 400 {micro}s. This has some implications for comparing the data from FY06 with that from FY09, but they don't seem insurmountable.

43 PARTICLE ACCELERATORS↗

Target Strength of Southern Resident Killer Whales (Orcinus orca): Measurement and Modeling

A major criterion for tidal power licensing in Washington’s Puget Sound is the management of the risk of injury to killer whales due to collision with moving turbine blades. An active monitoring system is being proposed for killer whale detection, tracking, and alerting that links to and triggers temporary turbine shutdown when there is risk of collision. Target strength (TS) modeling of the killer whale is critical to the design and application of any active monitoring system. A 1996 study performed a high-resolution measurement of acoustic reflectivity as a function of frequency of a female bottlenose dolphin (2.2 m length) at broadside aspect and TS as a function of incident angle at 67 kHz frequency. Assuming that killer whales share similar morphology structure with the bottlenose dolphin, we extrapolated the TS of an adult killer whale 7.5 m in length at 67 kHz frequency with -8 dB at broadside aspect and -28 dB at tail side. The backscattering data from three Southern Resident killer whales were analyzed to obtain the TS measurement. These data were collected at Lime Kiln State Park using a split-beam system deployed from a boat. The TS of the killer whale at higher frequency (200 kHz) was estimated based on a three-layer model for plane wave reflection from the lung of the whale. The TS data of killer whales were in good agreement with our model. In this paper, we also discuss and explain possible causes for measurement estimation error.

16 TIDAL AND WAVE POWER↗

Initiating the D&D Project for the EBR-II

A novel decommissioning project is underway to close the Experimental Breeder Reactor-II (EBR-II) “fast” reactor at the Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) facility near Idaho Falls, ID. The facility was placed in cold shutdown in 1994 and work began on the removal of the metallic sodium coolant. The bulk of the sodium was drained and treated beginning in 2001. The residual sodium heel was chemically passivated to render it less reactive in 2005 using a novel carbon dioxide treatment. Approximately 700 kg of metallic sodium and 3500 kg of sodium bicarbonate remain in the facility. A RCRA Waste Treatment Permit, issued in 2002 by the State of Idaho Department of Environmental Quality, requires annual progress toward closure of the facility, and that all regulated materials be removed or deactivated, and the waste products removed by 2022. The baseline sodium removal technology would result in about 100,000 gallons of low-level waste solution requiring treatment along with separate handling of the large components (intermediate heat exchanger, rotating plug, etc) outside of the primary tank.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Degradation Mechanisms and Accelerated Testing in PEM Fuel Cells

The durability of PEM fuel cells is a major barrier to the commercialization of these systems for stationary and transportation power applications. Although there has been recent progress in improving durability, further improvements are needed to meet the commercialization targets. Past improvements have largely been made possible because of the fundamental understanding of the underlying degradation mechanisms. By investigating component and cell degradation modes; defining the fundamental degradation mechanisms of components and component interactions new materials can be designed to improve durability. Various factors have been shown to affect the useful life of PEM fuel cells. Other issues arise from component optimization. Operational conditions (such as impurities in either the fuel or oxidant stream), cell environment, temperature (including subfreezing exposure), pressure, current, voltage, etc.; or transient versus continuous operation, including start-up and shutdown procedures, represent other factors that can affect cell performance and durability.

COMMERCIALIZATION↗

Electron cooling for low-energy RHIC program

Electron cooling was proposed to increase luminosity of the RHIC collider for heavy ion beam energies below 10 GeV/nucleon. Providing collisions at such energies, termed RHIC 'low-energy' operation, will help to answer one of the key questions in the field of QCD about existence and location of critical point on the QCD phase diagram. The electron cooling system should deliver electron beam of required good quality over energies of 0.9-5 MeV. Several approaches to provide such cooling were considered. The baseline approach was chosen and design work started. Here we describe the main features of the cooling system and its expected performance. We have started design work on a low-energy RHIC electron cooler which will operate with kinetic electron energy range 0.86-2.8 (4.9) MeV. Several approaches to an electron cooling system in this energy range are being investigated. At present, our preferred scheme is to transfer the Fermilab Pelletron to BNL after Tevatron shutdown, and to use it for DC non-magnetized cooling in RHIC. Such electron cooling system can significantly increase RHIC luminosities at low-energy operation.

43 PARTICLE ACCELERATORS↗