Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Time scheduling of a mix of 4D equipped and unequipped aircraft

In planning for a future automated air traffic system, it is necessary to confront the transition situation in which some percentage of the traffic must be handled by conventional means. A safe, efficient transition system is needed since initially not all aircraft will be able to respond to a more automated system. The specific problem addressed was that of time scheduling a mix of 4D-equipped aircraft (aircraft that can accurately meet a controller specified time schedule at selected way points in the terminal area) when operating in conjunction with unequipped aircraft (aircraft that require air traffic handling by means of standard vectoring techniques). First, a relationship between time separation and system capacity was developed. The time separations were incorporated into a set of scheduling algorithms which contain the required elements of flexibility needed for terminal-area operation, such as delaying aircraft and changing time separations. The problem of reducing the size of time separations allotted for vectored aircraft by means of computer assists to the controller was also addressed.

Tobias, L.↗

On scheduling tasks with a quick recovery from failure

Multiprocessors used in life-critical real-time systems must recover quickly from failure. Part of this recovery consists of switching to a new task schedule which ensures that hard deadlines for critical tasks continue to be met. A dynamic programming algorithm is presented that ensures that backup, or contingency, schedules can be efficiently embedded within the original, 'primary' schedule to ensure that hard deadlines continue to be met in the face of up to a given maximum number of processor failures. Several illustrative examples are included.

Krishna, C. M.↗

The resource envelope as a basis for space station management system scheduling

The Platform Management System (PMS) Resource Envelope Scheduling System (PRESS) expert system prototype developed for space station scheduling is described. The purpose of developing the prototype was too investigate the resource envelope concept in a practical scheduling application, using a commercially available expert system shell. PRESS is being developed on an IBM PC/AT using Teknowledge, Inc.'s M.1 expert system shell.

Bush, Joy↗

Range and mission scheduling automation using combined AI and operations research techniques

Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.

Arbabi, Mansur↗

Expert systems tools for Hubble Space Telescope observation scheduling

This paper discusses the utility of expert systems techniques for Hubble Space Telescope (HST) planning and scheduling and describes a plan for development of expert system tools which will augment the existing ground system. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

Expert systems tools for Hubble Space Telescope observation scheduling

The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

Dypas: A dynamic payload scheduler for shuttle missions

Decision and analysis systems have had broad and very practical application areas in the human decision making process. These software systems range from the help sections in simple accounting packages, to the more complex computer configuration programs. Dypas is a decision and analysis system that aids prelaunch shutlle scheduling, and has added functionality to aid the rescheduling done in flight. Dypas is written in Common Lisp on a Symbolics Lisp machine. Dypas differs from other scheduling programs in that it can draw its knowledge from different rule bases and apply them to different rule interpretation schemes. The system has been coded with Flavors, an object oriented extension to Common Lisp on the Symbolics hardware. This allows implementation of objects (experiments) to better match the problem definition, and allows a more coherent solution space to be developed. Dypas was originally developed to test a programmer's aptitude toward Common Lisp and the Symbolics software environment. Since then the system has grown into a large software effort with several programmers and researchers thrown into the effort. Dypas is currently using two expert systems and three inferencing procedures to generate a many object schedule. The paper will review the abilities of Dypas and comment on its functionality.

Davis, Stephen↗

Ada and cyclic runtime scheduling

An important issue that must be faced while introducing Ada into the real time world is efficient and prodictable runtime behavior. One of the most effective methods employed during the traditional design of a real time system is the cyclic executive. The role cyclic scheduling might play in an Ada application in terms of currently available implementations and in terms of implementations that might be developed especially to support real time system development is examined. The cyclic executive solves many of the problems faced by real time designers, resulting in a system for which it is relatively easy to achieve approporiate timing behavior. Unfortunately a cyclic executive carries with it a very high maintenance penalty over the lifetime of the software that is schedules. Additionally, these cyclic systems tend to be quite fragil when any aspect of the system changes. The findings are presented of an ongoing SofTech investigation into Ada methods for real time system development. The topics covered include a description of the costs involved in using cyclic schedulers, the sources of these costs, and measures for future systems to avoid these costs without giving up the runtime performance of a cyclic system.

Hood, Philip E.↗

Scheduling Nonconsumable Resources

Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

Porta, Harry J.↗

Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems

A two-stage heuristic solution approach for a class of multiobjective, n-job, 1-machine scheduling problems is described. Minimization of job-to-job interference for n jobs is sought. The first stage generates alternative schedule sequences by interchanging pairs of schedule elements. The set of alternative sequences can represent nodes of a decision tree; each node is reached via decision to interchange job elements. The second stage selects the parent node for the next generation of alternative sequences through automated paired comparison of objective performance for all current nodes. An application of the heuristic approach to communications satellite systems planning is presented.

Heyward, Ann O.↗

The role of artificial intelligence techniques in scheduling systems

Artificial Intelligence (AI) techniques provide good solutions for many of the problems which are characteristic of scheduling applications. However, scheduling is a large, complex heterogeneous problem. Different applications will require different solutions. Any individual application will require the use of a variety of techniques, including both AI and conventional software methods. The operational context of the scheduling system will also play a large role in design considerations. The key is to identify those places where a specific AI technique is in fact the preferable solution, and to integrate that technique into the overall architecture.

Geoffroy, Amy L.↗

PLAN-IT-2: The next generation planning and scheduling tool

PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

Eggemeyer, William C.↗

Parallel processing of real-time dynamic systems simulation on OSCAR (Optimally SCheduled Advanced multiprocessoR)

Parallel processing of real-time dynamic systems simulation on a multiprocessor system named OSCAR is presented. In the simulation of dynamic systems, generally, the same calculation are repeated every time step. However, we cannot apply to Do-all or the Do-across techniques for parallel processing of the simulation since there exist data dependencies from the end of an iteration to the beginning of the next iteration and furthermore data-input and data-output are required every sampling time period. Therefore, parallelism inside the calculation required for a single time step, or a large basic block which consists of arithmetic assignment statements, must be used. In the proposed method, near fine grain tasks, each of which consists of one or more floating point operations, are generated to extract the parallelism from the calculation and assigned to processors by using optimal static scheduling at compile time in order to reduce large run time overhead caused by the use of near fine grain tasks. The practicality of the scheme is demonstrated on OSCAR (Optimally SCheduled Advanced multiprocessoR) which has been developed to extract advantageous features of static scheduling algorithms to the maximum extent.

Kasahara, Hironori↗

Focus of attention in an activity-based scheduler

Earlier research in job shop scheduling has demonstrated the advantages of opportunistically combining order-based and resource-based scheduling techniques. An even more flexible approach is investigated where each activity is considered a decision point by itself. Heuristics to opportunistically select the next decision point on which to focus attention (i.e., variable ordering heuristics) and the next decision to be tried at this point (i.e., value ordering heuristics) are described that probabilistically account for both activity precedence and resource requirement interactions. Preliminary experimental results indicate that the variable ordering heuristic greatly increases search efficiency. While least constraining value ordering heuristics have been advocated in the literature, the experimental results suggest that other value ordering heuristics combined with our variable-ordering heuristic can produce much better schedules without significantly increasing search.

Sadeh, Norman↗

Scheduling periodic jobs that allow imprecise results

The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

Chung, Jen-Yao↗

A human factors approach to range scheduling for satellite control

Range scheduling for satellite control presents a classical problem: supervisory control of a large-scale dynamic system, with unwieldy amounts of interrelated data used as inputs to the decision process. Increased automation of the task, with the appropriate human-computer interface, is highly desirable. The development and user evaluation of a semi-automated network range scheduling system is described. The system incorporates a synergistic human-computer interface consisting of a large screen color display, voice input/output, a 'sonic pen' pointing device, a touchscreen color CRT, and a standard keyboard. From a human factors standpoint, this development represents the first major improvement in almost 30 years to the satellite control network scheduling task.

Wright, Cameron H. G.↗

A distributed scheduling algorithm for heterogeneous real-time systems

Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

Zeineldine, Osman↗