Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

High-Density Automated Vertiport Concept of Operations

The National Aeronautics and Space Administration (NASA) vision for Advanced Air Mobility (AAM) includes Urban Air Mobility (UAM) – a concept involving vertical takeoff and landing (VTOL) aircraft, decentralized (or federated) traffic management, and new infrastructure to support urban, suburban, and rural flight operations. High-density performance-based routes or corridors enable prompt transportation of people and goods from node to node, where each node represents a vertiport, defined as an identifiable ground or elevated area used for the takeoff and landing of VTOL aircraft. In the presence of uncertainty surrounding aircraft turnaround time on the ground, vertiports are the critical end points in scheduling, sequencing, and spacing (SSS) of aircraft in dense metropolitan environments. This Concept of Operations (ConOps) includes vertiports of varying sizes, configurations, service offerings, and locations. UAM air vehicles include conventional rotorcraft, unmanned VTOL aircraft, and novel piloted VTOL aircraft. This ConOps focuses on operations at a high-density vertiport, supported by a Vertiport Automation System (VAS) with high-throughput operation capabilities under conditions defined as NASA’s Urban Air Mobility Maturity Level Four (UML-4).

Urban Air Mobility↗

Commercial Low-Earth Orbit Destination (CLD) Concept of Operations

This concept of operations describes: - High-level Government goals, objectives, and needs for the CLD program, vehicle(s), and missions, - Strategies, policies, and processes for developing, certifying, maintaining, using, and retiring CLDs in the context of Government use, and - Government and CLD partner roles, responsibilities, and interactions during various phases of Government CLD operations. The intent of this document is to describe the overall high-level concept of how the end-to-end CLD service will be used to convey the nature and scope of services the Government intends to procure from the CLD partner. It will provide insight into NASA’s concepts for CLD operations rather than to provide mature, explicit, or complete requirements. It addresses how the concept of operations will be used to meet NASA expectations from an operational perspective to facilitate an understanding of the end-to-end CLD service needs, goals, and objectives (NGOs). Formal CLD requirements and standards are detailed in the NASA Commercial LEO Development Program’s (CLDP) various requirements, interface, process, and standards documents, as well as the contractual Statements of Work (SOW) and Data Requirement Deliverables (DRD). As such, the Concept of Operations can use terms such as “should” or “may” or “expects to” since it is not a contractual requirements document. It exists solely to convey the initial nature and type of services the Government intends to procure and is not, per se, a requirements document.

Operations↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

Cloud-Based Demodulation and Data Distribution of a Satellite Downlink

Ground station networks connected to the cloud allow space missions to have global communications coverage without operating their own infrastructure. In this work, we describe the communications architecture for the TechEdSat-13 mission, which performed the first in-space characterization of a neuromorphic processor. The mission utilizes a commercial provider for S-band downlinks. A suite of cloud services and open-source software such as GNU Radio are leveraged to demodulate signals received by an AWS ground station during passes with TechEdSat-13 and store recovered data. Once a pass is scheduled, the entire process takes place without human intervention. On-orbit results the past year of operations are presented, demonstrating the advantages of this approach over traditional operator-owned ground stations. Use of software-defined radio makes possible custom signal processing. The homogeneity of apertures and their interfaces to the cloud simplifies scaling across many sites. This abundance of candidate links lays the groundwork for intelligent scheduling agents to optimize pass selection across several factors, automatically recover from failed contacts, and gather metrics to learn from past performance.

cloud demodulation↗

Systems Engineering and Management Applications of ISO 9001:2015 for Government

The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle. Identification of stakeholder expectations, identifying solutions, creating specific product or service designs, production of the product or service, delivery to the public, and the associated management, planning, and control processes, are a familiar place to begin thinking of the overall system of identifying, designing, and competing a project or mission. Lining up this lifecycle with the ISO requirements (see Figure 1) illustrates how a quality management system is concerned with the same processes, and provides a governance and assurance function. If implemented properly, there are cost savings resulting from less rework, repair, reprocessing, failures, misplaced documents, and similar types of deficiencies1. Starting with an organization's systems engineering processes allows the organization to use their own terminology for a QMS plan, and tailor the plan to their own project or organization, so that it is more easily developed, understood, and implemented.

Shepherd, Christena C.↗

Battery capacity and recharging needs for electric buses in city transit service

Our paper evaluates the energy consumption and battery performance of city transit electric buses operating on real day-to-day routes and standardized bus drive cycles, based on a developed framework tool that links bus electrification feasibility with real-world vehicle performance, city transit bus service reliability, battery sizing and charging infrastructure. The impacts of battery capacity combined with regular and ultrafast charging over different routes have been analyzed in terms of the ability to maintain city transit bus service reliability like conventional buses. These results show that ultrafast charging via frequent short-time boost charging events, for example at a designated bus stop after completing each circuit of an assigned route, can play a significant role in reducing the battery size and can eliminate the need for longer duration charging events that would cause schedule delays. Furthermore, the analysis presented shows that significant benefits can be realized by employing multiple battery configurations and flexible battery swapping practices in electric buses. These flexible design and use options will allow electric buses to service routes of varying city driving patterns and can therefore enable meaningful reductions to the cost of the vehicle and battery while ensuring service that is as reliable as conventional buses.

33 ADVANCED PROPULSION SYSTEMS↗

Stabilizing the Grid and Reducing Utility Bills Through Price-Responsive Controls for Heat Pump Water Heaters

The electricity grid is facing increasing challenges in cost-effectively balancing supply and demand. These challenges are exacerbated by increased penetration of photovoltaics, which causes mid-day overproduction, and electrification of gas appliances, which increases peak-period electricity demand. Decarbonization requires shifting building loads from fossil-intensive high-cost times to renewable-intensive low-cost times while maintaining quality of service to occupants. Utilities and ISO’s are investigating new ways of incentivizing this load shifting. One promising method is the use of Highly Dynamic Prices (HDPs). HDPs feature continuously changing prices that reflect real-time grid generation and distribution costs and capacity constraints, and thus incentivize consumers to shift their loads. California’s CPUC CalFUSE proposal and Hawaii’s recent changes demonstrate that electricity tariffs are moving towards this model. For this to work however, loads must have the capability to respond to these prices. Heat pump water heaters (HPWHs) are an ideal device for this purpose because their storage tanks decouple delivery of domestic hot water from electricity consumption. The storage enables control strategies that consume midday solar power to increase the energy stored in the tank, then provide evening peak domestic hot water services using the stored energy. Berkeley Lab's CalFlexHub project is pioneering price-driven load flexibility by developing and deploying cost-minimizing controls for many flexible loads - including HPWHs - in response to HDP. Control development is based on simulations using the Flexible Heat Pump Water Heater Performance Predictor which captures the control decisions of the on-board controller in a residential, integrated HPWH . The price-responsive controls a) shift load in ways that consume additional midday solar power to help stabilize the grid and reduce overall emissions, b) ensure that occupants receive equal or better hot water delivery service, and c) minimize the operating cost for each home in the fleet. On the grid level, the resulting shift will reduce utility operating costs and emissions, and can avoid expensive system capacity expansions. The control approach is customized to each home based on typical hot water consumption patterns. HPWH controllers, whether on the device or remotely, will receive a schedule of CTA-2045-B signals or set temperature adjustments customized to the current HDP price schedule and home. Simulation results for a fleet of 148 HPWHs on a summer day in Berkeley, California show cost savings of 29% and high price electricity consumption reductions of 80%, while maintaining full quality of service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations

With increasing wind power penetration in the electricity grid, system operators are recognizing the need for additional flexibility, and some are implementing new ramping products as a type of ancillary service. However, wind is generally thought of as causing the need for ramping services, not as being a potential source for the service. In this paper, a multi-timescale unit commitment and economic dispatch model is developed to consider the wind power ramping product (WPRP). An optimized swinging door algorithm with dynamic programming is applied to identify and forecast wind power ramps (WPRs). Designed as positive characteristics of WPRs, the WPRP is then integrated into the multi-timescale dispatch model that considers new objective functions, ramping capacity limits, active power limits, and flexible ramping requirements. Numerical simulations on the modified IEEE 118-bus system show the potential effectiveness of WPRP in increasing the economic efficiency of power system operations with high levels of wind power penetration. It is found that WPRP not only reduces the production cost by using less ramping reserves scheduled by conventional generators, but also possibly enhances the reliability of power system operations. Moreover, wind power forecasts play an important role in providing high-quality WPRP service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methodology for Automated Detection of Degradation and Faults in Packaged Air Conditioners and Heat Pumps Using Only Two Sensors

The software was created in the process of developing a system known as the Smart Monitoring and Diagnostic System (SMDS) for packaged air conditioners and heat pumps used on commercial buildings (known as RTUs). The SMDS provides automated remote monitoring and detection of performance degradation and faults in these RTUs and could increase the awareness by building owners and maintenance providers of the condition of the equipment, the cost of operating it in degraded condition, and the quality of maintenance and repair service when it is performed. The SMDS provides these capabilities and would enable conditioned-based maintenance rather than the reactive and schedule-based preventive maintenance commonly used today, when maintenance of RTUs is done at all. Improved maintenance would help ensure persistent peak operating efficiencies, reducing energy consumption by an estimated 10% to 30%.

Source record↗

Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems

For critical infrastructure restoration planning, the real-time scheduling and coordination of system restoration efforts, the key in decision-making is to prioritize those critical components that are out of service during the restoration. For this purpose, there is a need for component importance analysis. While it has been investigated extensively for individual systems, component importance considering interdependence among transmission, distribution and communication (T&D&C) systems has not been systematically analyzed and widely adopted. In this study, we propose a component importance assessment method in the context of interdependence between T&D&C networks. Analytic methods for multilayer networks and a set of metrics have been applied for assessing the component importance and interdependence between T&D&C networks based on their physical characteristics. The proposed methodology is further validated with integrated synthetic Illinois regional transmission, distribution, and communication (T&D&C) systems, the results reveal the unique characteristics of component/node importance, which are strongly affected by the network topologies and cross-domain node mapping.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Doppler measurements of the ionosphere on the occasion of the Apollo-Soyuz test project. Part 1: Computer simulation of ionospheric-induced Doppler shifts

A computer simulation of the ionospheric experiment of the Apollo-Soyuz Test Project (ASTP) was performed. ASTP is the first example of USA/USSR cooperation in space and is scheduled for summer 1975. The experiment consists of performing dual-frequency Doppler measurements (at 162 and 324 MHz) between the Apollo Command Service Module (CSM) and the ASTP Docking Module (DM), both orbiting at 221-km height and at a relative distance of 300 km. The computer simulation showed that, with the Doppler measurement resolution of approximately 3 mHz provided by the instrumentation (in 10-sec integration time), ionospheric-induced Doppler shifts will be measurable accurately at all times, with some rare exceptions occurring when the radio path crosses regions of minimum ionospheric density. The computer simulation evaluated the ability of the experiment to measure changes of columnar electron content between CSM and DM (from which horizontal gradients of electron density at 221-km height can be obtained) and to measure variations in DM-to-ground columnar content (from which an averaged columnar content and the electron density at the DM can be deduced, under some simplifying assumptions).

Grossi, M. D.↗

The space station assembly phase: System design trade-offs for the flight telerobotic servicer

The effects of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems often involves a substitution of automation capabilities for human EVA or IVA activities. A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effects of operational constaints. Changes in the region of cost-effectiveness are examined under a variety of system design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: as a research-oriented test bed to learn more about space usage of telerobotics; as a research based test bed having an experimental demonstration orientation with limited assembly and servicing applications; or as an operational system to augment EVA and to aid construction of the Space Station and to reduce the program (schedule) risk by increasing the flexibility of mission operations.

Smith, Jeffrey H.↗

Cross support overview and operations concept for future space missions

Ground networks must respond to the requirements of future missions, which include smaller sizes, tighter budgets, increased numbers, and shorter development schedules. The Consultative Committee for Space Data Systems (CCSDS) is meeting these challenges by developing a general cross support concept, reference model, and service specifications for Space Link Extension services for space missions involving cross support among Space Agencies. This paper identifies and bounds the problem, describes the need to extend Space Link services, gives an overview of the operations concept, and introduces complimentary CCSDS work on standardizing Space Link Extension services.

Stallings, William↗

Summary Describing Integration of ERM Methodology into Supervisory Control Framework with Software Package Documentation; Advanced Reactor Technology Milestone: M4AT-16PN2301052

This project involved the development of enhanced risk monitors (ERMs) for active components in Advanced Reactor (AdvRx) designs by integrating real-time information about equipment condition with risk monitors. Health monitoring techniques in combination with predictive estimates of component failure based on condition and risk monitors can serve to indicate the risk posed by continued operation in the presence of detected degradation. This combination of predictive health monitoring based on equipment condition assessment and risk monitors can also enable optimization of maintenance scheduling with respect to the economics of plant operation. This report summarizes PNNL’s multi-year project on the development and evaluation of an ERM concept for active components while highlighting FY2016 accomplishments. Specifically, this report provides a status summary of the integration and demonstration of the prototypic ERM framework with the plant supervisory control algorithms being developed at Oak Ridge National Laboratory (ORNL), and describes additional case studies conducted to assess sensitivity of the technology to different quantities. Supporting documentation on the software package to be provided to ONRL is incorporated in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗