Search NASA⌕ Search

SEARCH · Search NASA

Results for “Software Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Orbit determination and orbit control for the Earth Observing System (EOS) AM spacecraft

Future NASA Earth Observing System (EOS) Spacecraft will make measurements of the earth's clouds, oceans, atmosphere, land and radiation balance. These EOS Spacecraft will be part of the NASA Mission to Planet Earth. This paper specifically addresses the EOS AM Spacecraft, referred to as 'AM' because it has a sun-synchronous orbit with a 10:30 AM descending node. This paper describes the EOS AM Spacecraft mission orbit requirements, orbit determination, orbit control, and navigation system impact on earth based pointing. The EOS AM Spacecraft will be the first spacecraft to use the TDRSS Onboard Navigation System (TONS) as the primary means of navigation. TONS flight software will process one-way forward Doppler measurements taken during scheduled TDRSS contacts. An extended Kalman filter will estimate spacecraft position, velocity, drag coefficient correction, and ultrastable master oscillator frequency bias and drift. The TONS baseline algorithms, software, and hardware implementation are described in this paper. TONS integration into the EOS AM Spacecraft Guidance, Navigation, and Control (GN&C) System; TONS assisted onboard time maintenance; and the TONS Ground Support System (TGSS) are also addressed.

Herberg, Joseph R.↗

SpaceHab 1 maintenance experiment

The SpaceHab 1 flight on STS-57 served as a test platform for evaluation of two space station payloads. The first payload evaluated a space station maintenance concept using a sweep signal generator and a 48-channel logic analyzer to perform fault detection and isolation. Crew procedures files, test setup diagram files, and software to configure the test equipment were created on the ground and uplinked on the astronauts' voice communication circuit to perform tests in flight. In order to use these files, the portable computer was operated in a multi-window configuration. The test data transmitted to the ground allowing the ground staff to identify the cause of the fault and provide the crew with the repair procedures and diagrams. The crew successfully repaired the system under test. The second payload investigated hand soldering and de-soldering of standard components on printed circuit (PC) boards in zero gravity. It also used a new type of intra-vehicular foot restraints which uses the neutral body posture in zero-g to provide retention of the crew without their conscious attention.

Bohannon, Jackie W.↗

Deictic primitives for general purpose navigation

A visually-based deictic primative used as an elementary command set for general purpose navigation was investigated. It was shown that a simple 'follow your eyes' scenario is sufficient for tracking a moving target. Limitations of velocity, acceleration, and modeling of the response of the mechanical systems were enforced. Realistic paths of the robots were produced during the simulation. Scientists could remotely command a planetary rover to go to a particular rock formation that may be interesting. Similarly an expert at plant maintenance could obtain diagnostic information remotely by using deictic primitives on a mobile are used in the deictic primitives, we could imagine that the exact same control software could be used for all of these applications.

Crismann, Jill D.↗

Volatile Organic Analyzer (VOA) in 2006: Repair, Revalidation, and Restart of Elektron Even

The Volatile Organic Analyzer (VOA) had been providing valuable data on trace contaminants in the atmosphere of the International Space Station (ISS) from January 2002 through May 2003. Component temperature errors, detected by the VOA s software, shut down the unit in May 2003, but in early 2005 on orbit diagnostics verified fuse failures had disabled both VOA channels. An in-flight maintenance (IFM) session in December 2005 returned the VOA to an operational mode by January 2006. This paper will present the on-orbit data from 2006 that were used to revalidate the VOA, and provide an overview of the VOA s contributions during the Elecktron contingency event that occurred on ISS in September 2006.

Limero, Thomas↗

Tools for Administration of a UNIX-Based Network

Several computer programs have been developed to enable efficient administration of a large, heterogeneous, UNIX-based computing and communication network that includes a variety of computers connected to a variety of subnetworks. One program provides secure software tools for administrators to create, modify, lock, and delete accounts of specific users. This program also provides tools for users to change their UNIX passwords and log-in shells. These tools check for errors. Another program comprises a client and a server component that, together, provide a secure mechanism to create, modify, and query quota levels on a network file system (NFS) mounted by use of the VERITAS File SystemJ software. The client software resides on an internal secure computer with a secure Web interface; one can gain access to the client software from any authorized computer capable of running web-browser software. The server software resides on a UNIX computer configured with the VERITAS software system. Directories where VERITAS quotas are applied are NFS-mounted. Another program is a Web-based, client/server Internet Protocol (IP) address tool that facilitates maintenance lookup of information about IP addresses for a network of computers.

LeClaire, Stephen↗

Robonaut 2 on the International Space Station: Status Update and Preparations for IVA Mobility

Robotics engineers, ground controllers and International Space Station (ISS) crew have been running successful experiments using Robonaut 2 (R2) on-board the ISS for more than a year. This humanoid upper body robot continues to expand its list of achievements and its capabilities to safely demonstrate maintenance and servicing tasks while working alongside human crewmembers. The next phase of the ISS R2 project will transition from a stationary Intra Vehicular Activity (IVA) upper body using a power/data umbilical, to an IVA mobile system with legs for repositioning, a battery backpack power supply, and wireless communications. These upgrades will enable the R2 team to evaluate hardware performance and to develop additional control algorithms and control verification techniques with R2 inside the ISS in preparation for the Extra Vehicular Activity (EVA) phase of R2 operations. As R2 becomes more capable in assisting with maintenance tasks, with minimal supervision, including repositioning itself to different work sites, the ISS crew will be burdened with fewer maintenance chores, leaving them more time to conduct other activities. R2's developers at the Johnson Space Center (JSC) are preparing the R2 IVA mobility hardware and software upgrades for delivery to the ISS in late 2013. This paper summarizes R2 ISS achievements to date, briefly describes the R2 IVA mobility upgrades, and discusses the R2 IVA mobility objectives and plans.

Ahlstrom, Thomas D.↗

The design and use of an error correction information system for NASTRAN

Error Correction Information System (ECIS) is a system for a two-way transmittal of NASTRAN maintenance information via a data base stored on a nationwide accessible computer. ECIS consists of two data bases. The first data base is used for comments, reporting NASTRAN Software Problem Reports (SPR's) and bookkeeping information which can be updated by the user or the NASTRAN Office. The second data base is used by the NSMO to store all SPR information and updates. The hardware needed by an accessing user is any desktop computer terminal and a telephone to communicate with the central computer. The instruction format is an engineering oriented language and requires less than an hour to obtain a working knowledge of its functions.

Rosser, D. C., Jr.↗

Case for Deploying Complex Systems Utilizing Commodity Components

When the International Space Station (ISS) finally reached an operational state, many of the Payload Operations and Integration Facility (POIF) hardware components were reaching end of life, COTS product costs were soaring, and the ISS budget was becoming severely constrained. However, most requirement development was complete. In addition, the ISS program is a fully functioning program with at least fifteen years of operational life remaining. Therefore it is critical that any upgrades, refurbishments, or enhancements be accomplished in realtime with minimal disruptions to service. For these and other reasons, it was necessary to ensure the viability of the POIF. Due to the to the breadth of capability of the POIF (a NASA ground station), it is believed that the lessons to be learned by other complex systems are applicable and any solutions garnered by the POIF are applicable to other complex systems as well. With that in mind, a number of new approaches have been investigated to increase the portability of the POIF and reduce the cost of refurbishment, operations, and maintenance. These new approaches were directed at the Total Cost of Ownership (TCO); not only the refurbishment but also current operational difficulties, licensing, and anticipation of the next refurbishment. Our basic premise is that technology had evolved dramatically since the concept of the POIF ground system and we should leverage our experience on this new technological landscape. Fortunately, Moore's law and market forces have changed the landscape considerably. These changes are manifest in five (5) ways that are particularly relevant to POIF: 1. Complex Instruction Set Computing (CISC) processors have advanced to unprecedented levels of compute capacity with a dramatic cost break, 2. Linux has become a major operating system supported by most vendors on a broad range of platforms, 3. Windows(TradeMark) based desktops are pervasive in the office environment, 4. Stable and affordable WindowsTM development environments and tools are available and offer a rich set of capabilities, 5. The WindowsTM 2000 provides a stable client platform, Therefore, five studies were proposed, developed, and are in the current process of deployment which dramatically reduces the cost of operations, maintenance, refurbishment, and deployment of a ground system. Restating and refining the basic premise stated earlier, it is possible to enhance operations through the replacement of hardware and software components with commodity based items wherever applicable. This will dramatically reduce the overall lifecycle cost of the project. The first study leveraged the POIF S secure, three-tier, web architecture to replace the client workstations with lower cost PC platforms. A second study initiated a review of COTS products to examine the level of added value of each product. This study included replacement of some COTS products with custom code, deletions, substitutions, and consolidation of COTS products. Studies three and four reviewed the server architectures of the data distribution systems and Enhanced HOSC System (EHS) command and telemetry system to propose migration to new platforms, both software and hardware. The final study reviewed current IP communication technologies, developed an operational model for flight operations, and demonstrated that voice over IP was practical and could be integrated into operations.

Bryant, Barry S.↗

EOS MLS Level 2 Data Processing Software Version 3

This software accepts the EOS MLS calibrated measurements of microwave radiances products and operational meteorological data, and produces a set of estimates of atmospheric temperature and composition. This version has been designed to be as flexible as possible. The software is controlled by a Level 2 Configuration File that controls all aspects of the software: defining the contents of state and measurement vectors, defining the configurations of the various forward models available, reading appropriate a priori spectroscopic and calibration data, performing retrievals, post-processing results, computing diagnostics, and outputting results in appropriate files. In production mode, the software operates in a parallel form, with one instance of the program acting as a master, coordinating the work of multiple slave instances on a cluster of computers, each computing the results for individual chunks of data. In addition, to do conventional retrieval calculations and producing geophysical products, the Level 2 Configuration File can instruct the software to produce files of simulated radiances based on a state vector formed from a set of geophysical product files taken as input. Combining both the retrieval and simulation tasks in a single piece of software makes it far easier to ensure that identical forward model algorithms and parameters are used in both tasks. This also dramatically reduces the complexity of the code maintenance effort.

Livesey, Nathaniel J.↗

TDRSS Onboard Navigation System (TONS) flight qualification experiment

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

Gramling, C. J.↗

National Solar Thermal Test Facility: Operations & Maintenance Report

The NSTTF O&M Project continues the operation and maintenance activities of the existing critical capabilities and infrastructure at the NSTTF. This project is to support and assure the success of Solar Heat for Industrial Process in the United States and the larger global community by ensuring the NSTTF is a safe and operational facility. The primary goal of this project will be to maintain the solar tower and heliostat field while also allowing NSTTF staff to improve processes for operations and maintenance. This includes expanding our preventative maintenance program, inventory systems, and our data sharing capabilities. Additionally, this will support an outreach program with regular seminars, sharing of data, and the release of open-source software to support heliostat metrology

14 SOLAR ENERGY↗

System integration report

Several areas that arise from the system integration issue were examined. Intersystem analysis is discussed as it relates to software development, shared data bases and interfaces between TEMPUS and PLAID, shaded graphics rendering systems, object design (BUILD), the TEMPUS animation system, anthropometric lab integration, ongoing TEMPUS support and maintenance, and the impact of UNIX and local workstations on the OSDS environment.

Badler, N. I.↗

Conceptual Design of a 150-Passenger Civil Tiltrotor

The conceptual design of a short-haul civil tiltrotor aircraft is presented. The concept vehicle is designed for runway-independent operations to increase the capacity of the National Airspace System without the need for increased infrastructure. This necessitates a vehicle that is capable of integrating with conventional air traffic without interfering with established flightpaths. The NASA Design and Analysis of Rotorcraft software was used to size the concept vehicle based on the mission requirements of this market. The final configuration was selected based upon performance metrics such as acquisition and maintenance costs, fuel fraction, empty weight, and required engine power. The concept presented herein has a proposed initial operating capability date of 2035, and is intended to integrate with conventional air traffic as well as proposed future air transportation concepts.

150-Passenger↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Concepts and Tools for the Software Life Cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large softwaare base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software activity are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

Concepts and tools for the software life cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large software base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software actively are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

System Engineering Strategy for Distributed Multi-Purpose Simulation Architectures

This paper describes the system engineering approach used to develop distributed multi-purpose simulations. The multi-purpose simulation architecture focuses on user needs, operations, flexibility, cost and maintenance. This approach was used to develop an International Space Station (ISS) simulator, which is called the International Space Station Integrated Simulation (ISIS)1. The ISIS runs unmodified ISS flight software, system models, and the astronaut command and control interface in an open system design that allows for rapid integration of multiple ISS models. The initial intent of ISIS was to provide a distributed system that allows access to ISS flight software and models for the creation, test, and validation of crew and ground controller procedures. This capability reduces the cost and scheduling issues associated with utilizing standalone simulators in fixed locations, and facilitates discovering unknowns and errors earlier in the development lifecycle. Since its inception, the flexible architecture of the ISIS has allowed its purpose to evolve to include ground operator system and display training, flight software modification testing, and as a realistic test bed for Exploration automation technology research and development.

Bhula, Dlilpkumar↗