Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Recommendations for Safe Separation Distances from the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB) Using a Heat-Flux-Based Analytical Approach (Abridged)

The NASA Engineering and Safety Center (NESC) was requested to provide computational modeling to support the establishment of a safe separation distance surrounding the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB). The two major objectives of the study were 1) establish a methodology based on thermal flux to determine safe separation distances from the Kennedy Space Center's (KSC's) Vehicle Assembly Building (VAB) with large numbers of solid propellant boosters containing hazard division 1.3 classification propellants, in case of inadvertent ignition; and 2) apply this methodology to the consideration of housing eight 5-segment solid propellant boosters in the VAB. The results of the study are contained in this report.

Cragg, Clinton H.↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

Johnstone, Paul M.↗

Portable Fan Assembly for the International Space Station

NASA/ Marshall Space Flight Center (NASA/MSFC) is responsible for the design and fabrication of a Portable Fan Assembly (PFA) for the International Space Station (ISS). The PFA will be used to enhance ventilation inside the ISS modules as needed for crew comfort and for rack rotation. The PFA consists of the fan on-orbit replaceable unit (ORU) and two noise suppression packages (silencers). The fan ORU will have a mechanical interface with the Seat Track Equipment Anchor Assembly, in addition to the power supply module which includes a DC-DC converter, on/standby switch, speed control, power cable and connector. This paper provides a brief development history, including the criteria used for the fan, and a detailed description of the PFA operational configurations. Space Station requirements as well as fan performance characteristics are also discussed.

Jenkins, Arthur A.↗

Autonomous Assembly of Modular Structures in Space and on Extraterrestrial Locations

The new U.S. National Vision for Space Exploration requires many new enabling technologies to accomplish the goals of space commercialization and returning humans to the moon and extraterrestrial environments. Traditionally, flight elements are complete subsystems requiring humans to complete the integration and assembly. These bulky structures also require the use of heavy launch vehicles to send the units to a desired location. This philosophy necessitates a high degree of safety, numerous space walks at a significant cost. Future space mission costs must be reduced and safety increased to reasonably achieve exploration goals. One proposed concept is the autonomous assembly of space structures. This concept is an affordable, reliable solution to in-space and extraterrestrial assembly. Assembly is autonomously performed when two components join after determining that specifications are correct. Local sensors continue monitor joint integrity post assembly, which is critical for safety and structural reliability. Achieving this concept requires a change in space structure design philosophy and the development of innovative technologies to perform autonomous assembly. Assembly of large space structures will require significant numbers of integrity sensors. Thus simple, low-cost sensors are integral to the success of this concept. This paper addresses these issues and proposes a novel concept for assembling space structures autonomously. Core technologies required to achieve in space assembly are presented. These core technologies are critical to the goal of utilizing space in a cost efficient and safe manner. Additionally, these novel technologies can be applied to other systems both on earth and extraterrestrial environments.

Alhorn, Dean C.↗

Seed-to-seed growth of Arabidopsis thaliana on the International Space Station

The assembly of the International Space Station (ISS) as a permanent experimental outpost has provided the opportunity for quality plant research in space. To take advantage of this orbital laboratory, engineers and scientists at the Wisconsin Center for Space Automation and Robotics (WCSAR), University of Wisconsin-Madison, developed a plant growth facility capable of supporting plant growth in the microgravity environment. Utilizing this Advanced Astroculture (ADVASC) plant growth facility, an experiment was conducted with the objective to grow Arabidopsis thaliana plants from seed-to-seed on the ISS. Dry Arabidopsis seeds were anchored in the root tray of the ADVASC growth chamber. These seeds were successfully germinated from May 10 until the end of June 2001. Arabidopsis plants grew and completed a full life cycle in microgravity. This experiment demonstrated that ADVASC is capable of providing environment conditions suitable for plant growth and development in microgravity. The normal progression through the life cycle, as well as the postflight morphometric analyses, demonstrate that Arabidopsis thaliana does not require the presence of gravity for growth and development. c2003 COSPAR. Published by Elsevier Ltd. All rights reserved.

ISS Project↗

Prospects for Interdisciplinary Science Aboard the International Space Station

The assembly of the International Space Station was completed in early 2011, and is now embarking on its first year of the coming decade of use as a laboratory. Two key types of physical science research are enabled by ISS: studies of processes that are normally masked by gravity, and instruments that take advantage of its position as a powerful platform in orbit. The absence of buoyancy-driven convection enables experiments in diverse areas such as fluids near the critical point, Marangoni convection, combustion, and coarsening of metal alloys. The positioning of such a powerful platform in orbit with robotic transfer and instrument support also provides a unique alternative platform for astronomy and physics instruments. Some of the operating or planned instruments related to fundamental physics on the International Space Station include MAXI (Monitoring all-sky X-ray Instrument for ISS), the Alpha Magnetic Spectrometer, CALET (Calorimetric Electron Telescope), and ACES (Atomic Clock Experiment in Space). The presentation will conclude with an overview of pathways for funding different types of experiments from NASA funding to the ISS National Laboratory, and highlights of the streamlining of services to help scientists implement their experiments on ISS.

Robinson, Julie A.↗

Frameworks for the future

NASA is exploring the techniques and technologies which will permit the construction of large structures in space. EASE (Experimental Assembly of Structures in Extravehicular Activity) and ACCESS (Assembly Concept for Construction of Erectable Space Structures) are structures which are carried in the Atlantis bay and are assembled in space by astronauts. The experimental structures were designed to be durable and strong, easily assembled, have removable parts, and be amenable to alterations using specially-designed tools. All space activities are first rehearsed in detail on earth, mainly in the NASA Neutral Buoyancy Facility. Thorough studies are also being done to examine the human factors of space assembly and to gather biomedical data to characterize the capabilities of humans doing construction work in space.

Mcmahan, T.↗

Thermal Model Development for an X-Ray Mirror Assembly

Space-based x-ray optics require stringent thermal environmental control to achieve the desired image quality. Future x-ray telescopes will employ hundreds of nearly cylindrical, thin mirror shells to maximize effective area, with each shell built from small azimuthal segment pairs for manufacturability. Thermal issues with these thin optics are inevitable because the mirrors must have a near unobstructed view of space while maintaining near uniform 20 C temperature to avoid thermal deformations. NASA Goddard has been investigating the thermal characteristics of a future x-ray telescope with an image requirement of 5 arc-seconds and only 1 arc-second focusing error allocated for thermal distortion. The telescope employs 135 effective mirror shells formed from 7320 individual mirror segments mounted in three rings of 18, 30, and 36 modules each. Thermal requirements demand a complex thermal control system and detailed thermal modeling to verify performance. This presentation introduces innovative modeling efforts used for the conceptual design of the mirror assembly and presents results demonstrating potential feasibility of the thermal requirements.

x ray optics↗

SpRoUTS (Space Robot Universal Truss System): Reversible Robotic Assembly of Deployable Truss Structures of Reconfigurable Length

Automatic deployment of structures has been a focus of much academic and industrial work on infrastructure applications and robotics in general. This paper presents a robotic truss assembler designed for space applications - the Space Robot Universal Truss System (SpRoUTS) - that reversibly assembles a truss from a feedstock of hinged andflat-packed components, by folding the sides of each component up and locking onto the assembled structure. We describe the design and implementation of the robot and show that the assembled truss compares favorably with prior truss deployment systems.

Deployable↗

Microbiological Characterization of the International Space Station Water Processor Assembly External Filter Assembly S/N 01

The External Filter Assembly (EFA) S/N 01 is a mesh screen filter with a pore size of approximately 300 micron that was installed in the International Space Station (ISS) Water Processor Assembly (WPA) between the Waste Tank and the Mostly Liquid Separator (MLS) on February 11, 2010 to protect clearances in the MLS solenoid valve SV_1121_3. A removal & replacement of the EFA Filter was performed on March 22, 2011 in response to increasing pressure across the Waste Tank solenoid valve SV_1121_1 and the EFA Filter. The EFA Filter was returned on ULF6 and received in the Boeing Huntsville Laboratory on June 13, 2011. The filter was aseptically removed from the housing, and the residual water was collected for enumeration and identification of bacteria and fungi. Swab samples of the filter surface were also collected for microbiological enumeration and identification. Sample analyses were performed by Boeing Huntsville Laboratory and NASA Johnson Space Center Microbiology for comparison. Photographic documentation of the EFA filter was performed using a stereo microscope and environmental scanning electron microscope. This paper characterizes the amount and types of microorganisms on the filter surface and in the residual water from the filter housing following 1 year of utilization in the ISS WPA.

Weir, Natalee↗

User assembly and servicing system for Space Station, an evolving architecture approach

On-orbit assembly and servicing of a variety of scientific and applications hardware systems is expected to be one of the Space Station's primary functions. The hardware to be serviced will include the attached payloads resident on the Space Station, the free-flying satellites and co-orbiting platforms brought to the Space Station, and the polar orbiting platforms. The requirements for assembly and servicing such a broad spectrum of missions have led to the development of an Assembly and Servicing System Architecture that is composed of a complex array of support elements. This array is comprised of US elements, both Space Station and non-Space Station, and elements provided by Canada to the Space Station Program. For any given servicing or assembly mission, the necessary support elements will be employed in an integrated manner to satisfy the mission-specific needs. The structure of the User Assembly and Servicing System Architecture and the manner in which it will evolved throughout the duration of the phased Space Station Program are discussed. Particular emphasis will be placed upon the requirements to be accommodated in each phase, and the development of a logical progression of capabilities to meet these requirements.

Lavigna, Thomas A.↗

Alternate assembly sequence databook for the Tier 2 Bus-1 option of the International Space Station

The JSC International Space Station program office requested that SSB prepare a databook to document the alternate space station assembly sequence known as Tier 2, which assumes that the Russian participation has been eliminated and that the functions that were supplied by the Russians (propulsion, resupply, initial attitude control, communications, etc.) are now supplied by the U.S. Tier 2 utilizes the Lockheed Bus-l to replace much of the missing Russian functionality. The space station at each stage of its buildup during the Tier 2 assembly sequence is characterized in terms of of properties, functionality, resource balances, operations, logistics, attitude control, microgravity environment and propellant usage. The assembly sequence as analyzed was defined by JSC as a first iteration, with subsequent iterations required to address some of the issues that the analysis in this databook identified. Several significant issues were identified, including: less than desirable orbit lifetimes, shortage of EVA, large flight attitudes, poor microgravity environments, and reboost propellant shortages. Many of these issues can be resolved but at the cost of possible baseline modifications and revisions in the proposed Tier 2 assembly sequence.

Brewer, L. M.↗

Evaluation of the carbon dioxide removal assembly requirements for the Space Station Freedom in the Manned Tended Capability through Permanently Manned Capability configurations

Analyses have been conducted to assess the capability of the Atmosphere Revitalization Subsystem to control ambient CO2 levels of the Space Station Freedom (SSF). The adequacy of the Carbon Dioxide Removal Assembly (CDRA) performance to meet design requirements has been evaluated. Analyses considered transient effects of crew location and metabolic loading on SSF Restructure configurations. The analyses consisted of computer simulations of on-orbit conditions using both supplier-provided and adjusted CO2 removal performance approximations along with derived crew metabolic activities and locations. Results show that while the current performance of the CDRA will maintain CO2 levels within specifications for Man-Tended Operations, it cannot maintain the SSF atmosphere below specifications during Permanently Manned Operations. Potential design options are discussed and other relevant analyses are summarized.

Knox, J. C.↗

Low-gravity experiments on Liquid Phase Miscibility Gap (LPMG) alloys: Materials Experiments Assembly (MEA)

Space shuttle experiments which study the massive separation which occurred during sounding rocket Al-In alloy tests are described. The gradient cool experiment studies surface tension driven droplet migration and particle pushing in an LPMG alloy. Isothermal experiments on the Te-Tl alloys test the hypothesis that LPMG systems with low surface energies produce relatively fine, and uniform emulsions and dispersions. It also examines the effect of droplet concentration on phase separation kinetics. Isothermal plunger experiments on Al-In alloys determine whether surface tension driven convection currents originating at a free surface contribute to massive separation. They ascertain whether In-rich droplets migrate under the action of a temperature gradient when they are not influenced by the crucible walls.

Gelles, S. H.↗

Chronology: MSFC Space Shuttle program development, assembly, and testing major events (1969 - April, 1981)

Listings of major events directly related to the Space Shuttle Program at Marshall Space Flight Center (MSFC) are presented. This information will provide the researcher with a means of following the chronological progression of the program. The products that the historians have prepared are intended to provide supportive research essential to the writing of formal narrative histories of Marshall's contributions to the Space Shuttle and Space Station.

Whalen, Jessie E.↗