Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Affordable Development and Demonstration of a Small NTR Engine and Stage: A Preliminary NASA, DOE, and Industry Assessment

In FY11, NASA formulated a plan for Nuclear Thermal Propulsion (NTP) development that included Foundational Technology Development followed by system-level Technology Demonstrations. The ongoing NTP project, funded by NASA's Advanced Exploration Systems (AES) program, is focused on Foundational Technology Development and includes 5 key task activities: (1) Fuel element fabrication and non-nuclear validation testing of heritage fuel options; (2) Engine conceptual design; (3) Mission analysis and engine requirements definition; (4) Identification of affordable options for ground testing; and (5) Formulation of an affordable and sustainable NTP development program. Performance parameters for Point of Departure designs for a small criticality-limited and full size 25 klb (sub f) (kip, or 1000 pound-force)-class engine were developed during FYs 13-14 using heritage fuel element designs for both Rover NERVA (Nuclear Engine for Rocket Vehicle Applications) Graphite Composite (GC) and Ceramic Metal (Cermet) fuel forms. To focus the fuel development effort and maximize use of its resources, the AES program decided, in FY14, that a leader-follower down-selection between GC and cermet fuel was required. An Independent Review Panel (IRP) was convened by NASA and tasked with reviewing the available fuel data and making a recommendation to NASA. In February 2015, the IRP recommended and the AES program endorsed GC as the leader fuel In FY14, a preliminary development schedule DDTE (Design Development Test and Evaluation) plan was produced by GRC (Glenn Research Center), DOE (Department of Energy) and industry for the AES program. Assumptions, considerations and key task activities are presented here. At the direction of NASA HQ (32515), NASA and DOE are to work together to formulate a detailed development plan and schedule allowing the affordable development of a small (7.5-16.5 klbf) GC engine for possible flight technology demonstration (FTD) mission within a 10-year timeframe.

Lunar Flyby Mission↗

Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

Giriunas, Julius A.↗

Tool for simulating space exploration initiative (SEI) operations as a means of obtaining intelligent systems requirements

The Lyndon B. Johnson Space Center Automation and Robotics Division has developed a simulation tool for use in evaluating the feasibility and effectiveness of proposed candidate mission concepts, such as the First Lunar Outpost design reference missions. The tool helps in defining requirements for such missions at the beginning of the definition activities and can be applied iteratively thereafter on a short cycle basis as changes are made to the mission definition. The simulation is applicable to the amount and capabilities of automation and robotics; number and skills of crew; amount of engineering work, science, and in-space materials utilization to be accomplished; impact of provision for maintenance and repair; and flight schedules and manifests. The simulation accounts for supply and demand of resources to accomplish tasks and accounts for elapsed time in carrying out mission processes and tasks.

Erickson, Jon D.↗

X-ray observations of rapidly rotating O stars

HEAO-2 results suggest that high vsini O stars appear to be significantly fainter x-ray sources. We proposed to observe additional high vsini O stars to test this hypothesis. Unfortunately, the PSPC was shot down during our scheduled observation time, and the observation was not re-scheduled. The contract work was modified to carry out other related x-ray tasks.

Waldron, Wayne L.↗

Economic Metrics for Commercial Reusable Space Transportation Systems

The success of any effort depends upon the effective initial definition of its purpose, in terms of the needs to be satisfied and the goals to be fulfilled. If the desired product is "A System" that is well-characterized, these high-level need and goal statements can be transformed into system requirements by traditional systems engineering techniques. The satisfaction of well-designed requirements can be tracked by fairly straightforward cost, schedule, and technical performance metrics. Unfortunately, some types of efforts, including those that NASA terms "Programs," tend to resist application of traditional systems engineering practices. In the NASA hierarchy of efforts, a "Program" is often an ongoing effort with broad, high-level goals and objectives. A NASA "project" is a finite effort, in terms of budget and schedule, that usually produces or involves one System. Programs usually contain more than one project and thus more than one System. Special care must be taken in the formulation of NASA Programs and their projects, to ensure that lower-level project requirements are traceable to top-level Program goals, feasible with the given cost and schedule constraints, and measurable against top-level goals. NASA Programs and projects are tasked to identify the advancement of technology as an explicit goal, which introduces more complicating factors. The justification for funding of technology development may be based on the technology's applicability to more than one System, Systems outside that Program or even external to NASA. Application of systems engineering to broad-based technology development, leading to effective measurement of the benefits, can be valid, but it requires that potential beneficiary Systems be organized into a hierarchical structure, creating a "system of Systems." In addition, these Systems evolve with the successful application of the technology, which creates the necessity for evolution of the benefit metrics to reflect the changing baseline. Still, economic metrics for technology development in these Programs and projects remain fairly straightforward, being based on reductions in acquisition and operating costs of the Systems. One of the most challenging requirements that NASA levies on its Programs is to plan for the commercialization of the developed technology. Some NASA Programs are created for the express purpose of developing technology for a particular industrial sector, such as aviation or space transportation, in financial partnership with that sector. With industrial investment, another set of goals, constraints and expectations are levied on the technology program. Economic benefit metrics then expand beyond cost and cost savings to include the marketability, profit, and investment return requirements of the private sector. Commercial investment criteria include low risk, potential for high return, and strategic alignment with existing product lines. These corporate criteria derive from top-level strategic plans and investment goals, which rank high among the most proprietary types of information in any business. As a result, top-level economic goals and objectives that industry partners bring to cooperative programs cannot usually be brought into technical processes, such as systems engineering, that are worked collaboratively between Industry and Government. In spite of these handicaps, the top-level economic goals and objectives of a joint technology program can be crafted in such a way that they accurately reflect the fiscal benefits from both Industry and Government perspectives. Valid economic metrics can then be designed that can track progress toward these goals and objectives, while maintaining the confidentiality necessary for the competitive process.

Shaw, Eric J.↗

Towards Design Principles for Visual Analytics in Operations Contexts

Operations engineering teams interact with complex data systems to make technical decisions that ensure the operational efficacy of their missions. To support these decision-making tasks, which may require elastic prioritization of goals dependent on changing conditions, custom analytics tools are often developed. We were asked to develop such a tool by a team at the NASA Jet Propulsion Laboratory, where rover telecom operators make decisions based on models predicting how much data rovers can transfer from the surface of Mars. Through research, design, implementation, and informal evaluation of our new tool, we developed principles to inform the design of visual analytics systems in operations contexts. We offer these principles as a step towards understanding the complex task of designing these systems. The principles we present are applicable to designers and developers tasked with building analytics systems in domains that face complex operations challenges such as scheduling, routing, and logistics.

Lombeyda, Santiago↗

Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

crew autonomy↗

Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

planning and scheduling↗

STS-109 Mission Highlights Resource Tape: Flight Days 4 & 5 - Part 2 of 4

This video, Part 2 of 4, shows the activities of the STS-109 crew (Scott Altman, Commander; Duane Carey, Pilot; John Grunsfeld, Payload Commander; Nancy Currie, James Newman, Richard Linnehan, Michael Massimino, Mission Specialists) during flight days 4 and 5. The activities from other flights days can be seen on 'STS-109 Mission Highlights Resource Tape' Part 1 of 4 (internal ID 2002139471), 'STS-109 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139476), and 'STS-109 Mission Highlights Resource Tape' Part 4 of 4 (internal ID 2002137577). The primary activities during these days were EVAs (extravehicular activities) to replace two solar arrays on the HST (Hubble Space Telescope). Footage from flight day 4 records an EVA by Grunsfeld and Linnehan, including their exit from Columbia's payload bay airlock, their stowing of the old HST starboard rigid array on the rigid array carrier in Columbia's payload bay, their attachment of the new array on HST, the installation of a new starboard diode box, and the unfolding of the new array. The pistol grip space tool used to fasten the old array in its new location is shown in use. The video also includes several shots of the HST with Earth in the background. On flight day 5 Newman and Massimino conduct an EVA to change the port side array and diode box on HST. This EVA is very similar to the one on flight day 4, and is covered similarly in the video. A hand operated ratchet is shown in use. In addition to a repeat of the previous tasks, the astronauts change HST's reaction wheel assembly, and because they are ahead of schedule, install installation and lubricate an instrument door on the telescope. The Earth views include a view of Egypt and Israel, with the Nile River, Red Sea, and Mediterranean Sea.

Source record↗

New Integrated Modeling Capabilities: MIDAS' Recent Behavioral Enhancements

The Man-machine Integration Design and Analysis System (MIDAS) is an integrated human performance modeling software tool that is based on mechanisms that underlie and cause human behavior. A PC-Windows version of MIDAS has been created that integrates the anthropometric character "Jack (TM)" with MIDAS' validated perceptual and attention mechanisms. MIDAS now models multiple simulated humans engaging in goal-related behaviors. New capabilities include the ability to predict situations in which errors and/or performance decrements are likely due to a variety of factors including concurrent workload and performance influencing factors (PIFs). This paper describes a new model that predicts the effects of microgravity on a mission specialist's performance, and its first application to simulating the task of conducting a Life Sciences experiment in space according to a sequential or parallel schedule of performance.

Gore, Brian F.↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗

Langley Research Center resources and needs for manned space operations simulation

This paper describes current simulation research activities carried out at the Langley Research Center in the areas of remotely controlled operations, task performance, and analytical operations, along with early simulators developed at the center. Special attention is given to the center's current space simulation capabilities which are applicable to manned space operation studies, including the Advanced Concepts Simulator (ACS) and a computer-generated imagery (CGI). The ACS was designed to represent an aircraft cockpit for flight operations in the 1990s but will be also suitable for simulating a variety of astronaut work station applications. The CGI, scheduled for delivery in 1989, will be able to provide out-the-window scenes representative of many operational tasks from rendezvous and docking/berthing to control of telerobotic devices.

Nunamaker, Robert R.↗

Secure Autonomous Automated Scheduling (SAAS)

This report describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the UK-DMC, is used as the space-based sensor. The UK-DMC's availability is determined via machine-to-machine communications using SSTL's mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL's and Universal Space Network's (USN) ground assets. The availability and scheduling of USN's assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards

Walke, Jon G.↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

Virtual Mission Operations of Remote Sensors With Rapid Access To and From Space

This paper describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the United Kingdom Disaster Monitoring Constellation (UK-DMC), is used as the space-based sensor. The UK-DMC s availability is determined via machine-to-machine communications using SSTL s mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL s and Universal Space Network s (USN) ground assets. The availability and scheduling of USN s assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards.

Ivancic, William D.↗

Maintaining safety and high performance on shiftwork

This review of the shiftwork area focuses on aspects of safety and productivity. It discusses the situations in which shiftworker performance is critical, the types of problem that can develop and the reasons why shiftworker performance can be impaired. The review ends with a discnssion of the various advantages and disadvantages of several shift rotation systems, and of other possible solutions to the problem.

Review↗

Low-noise receivers: Microwave maser development

An S-Band traveling-wave maser with a 2260- to 2400-MHz tuning capability has been built and installed on the 26-m antenna. The traveling-wave maser closed cycle refrigerator package was assembled within a limited time schedule and at low cost to meet the requirements of the very long baseline interferometry validation task. The maser uses a superconducting magnet with a field staggering coil for gain/bandwidth adjustment. The maser pump source is a Gunn effect oscillator with the capability of continuous tuning throughout the entire maser tuning range. The package was assembled from surplus components that have been used previously in the Deep Space Network in a variety of applications.

Quinn, R.↗

AI in manufacturing

AI techniques are shown to have been useful in such aerospace industry tasks as vehicle configuration layouts, process planning, tool design, numerically-controlled programming of tools, production scheduling, and equipment testing and diagnosis. Accounts are given of illustrative experiences at the production facilities of three major aerospace defense contractors. Also discussed is NASA's autonomous Intelligent Computer-Aided Training System, for such ambitious manned programs as Space Station Freedom, which employs five different modules to constitute its job-independent training architecture.

Gross, John E.↗