Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Driven Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Roadmap to Cooperative Operating Practices for Strategic Conflict Detection and Resolution in the Upper Class-E Traffic Management Concept

As the governing body of flight operations in the highly anticipated emergent area of Upper Class E airspace (60,000 ft and above), the Federal Aviation Administration (FAA) has recognized the potential for a possible extensible traffic management system for new entrants into this domain. Following the successes with Unmanned Aircraft Systems (UAS) Traffic Management (UTM) and Advanced / Urban Air Mobility (AAM / UAM) Traffic Management programs, FAA put forth an initial concept of operations for supporting the start of the Upper Class E Traffic Management (ETM) concept. Like UTM and AAM / UAM, ETM is envisioned to also be a community-based, industry driven cooperative management concept. However, tailoring it to be adaptable to the atmospheric communication, navigation, and surveillance deficits, as well as the diverse vehicle and mission profiles operating in the ETM environment will be the challenge. As such, the National Aeronautics and Space Administration (NASA) Ames Research Center has been investigating several technologies that will help enable industry in the development of this new type of cooperative operating environment. These technologies are being prototyped and will be tested in a collaborative evaluation of an initial ETM system in late 2023. The evaluation will concentrate on building out ETM system technologies that will inform the participants regarding operational intent sharing, strategic conflict detection, and the resultant deconfliction process. In addition to the technical aspects, key roles and responsibilities will need to be defined. This will be done through exploring community-agreed upon Cooperative Operating Practices (COPs) that include procedures and capabilities to aid in timely, strategic conflict identification and resolution to be developed during the evaluation. As an initial step to the evaluation, the ETM research team at NASA Ames solicited industry feedback on various aspects of ETM operations from subject matter experts. A virtual tabletop walkthrough session was held over a two-day period to follow a roadmap through the functional steps needed to build COPs, focusing on strategic conflict detection and resolution. Overall, the ETM tabletop provided insights into how the community wanted to instantiate the generation and sharing of operational intent, detect strategic conflicts and resolve those conflicts using a preliminary set of procedural community-agreed upon COPs.

Upper Class-E Traffic Management (ETM)↗

Roadmap to Cooperative Operating Practices for Strategic Conflict Detection and Resolution in the Upper Class E Traffic Management Concept

As the governing body of flight operations in the highly anticipated emergent area of Upper Class E airspace (60,000 ft and above), the Federal Aviation Administration (FAA) has recognized the potential for a possible extensible traffic management system for new entrants into this domain. Following the successes with Unmanned Aircraft Systems (UAS) Traffic Management (UTM) and Advanced / Urban Air Mobility (AAM / UAM) Traffic Management programs, FAA put forth an initial concept of operations for supporting the start of the Upper Class E Traffic Management (ETM) concept. Like UTM and AAM / UAM, ETM is envisioned to also be a community-based, industry driven cooperative management concept. However, tailoring it to be adaptable to the atmospheric communication, navigation, and surveillance deficits, as well as the diverse vehicle and mission profiles operating in the ETM environment will be the challenge. As such, the National Aeronautics and Space Administration (NASA) Ames Research Center has been investigating several technologies that will help enable industry in the development of this new type of cooperative operating environment. These technologies are being prototyped and will be tested in a collaborative evaluation of an initial ETM system in late 2023. The evaluation will concentrate on building out ETM system technologies that will inform the participants regarding operational intent sharing, strategic conflict detection, and the resultant deconfliction process. In addition to the technical aspects, key roles and responsibilities will need to be defined. This will be done through exploring community-agreed upon Cooperative Operating Practices (COPs) that include procedures and capabilities to aid in timely, strategic conflict identification and resolution to be developed during the evaluation. As an initial step to the evaluation, the ETM research team at NASA Ames solicited industry feedback on various aspects of ETM operations from subject matter experts. A virtual tabletop walkthrough session was held over a two-day period to follow a roadmap through the functional steps needed to build COPs, focusing on strategic conflict detection and resolution.

Upper Class E Traffic Management (ETM)↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Analysis of Darkened Fragments Resulting from Laboratory Hypervelocity Experiments

NASA’s Orbital Debris Program Office (ODPO) relies on measurements from optical, radar, and in situ measurements to facilitate the development of data-driven orbital debris environmental engineering models such as the NASA Orbital Debris Engineering Model (ORDEM). For optical measurements, the ODPO relies on ground-based optical telescopes to statistically assess objects in geosynchronous orbit and, in the future, low Earth orbit (LEO). The data collected include the detected object’s orbital parameters, time of observation, and optical magnitude. The latter parameter can be converted to a size using NASA’s optical Size Estimation Model (oSEM). It is well known that the observed magnitude of orbital debris can vary based on an object's material constituents, observational geometry, and the effects of space weathering. To assess these magnitude variations, the ODPO uses the Optical Measurement Center (OMC) at NASA Johnson Space Center to characterize a variety of materials and fragments from laboratory impact tests representative of fragments that constitute the orbital debris population. One experiment was DebriSat: a 56 kg spacecraft was built to incorporate structural elements of a modern LEO spacecraft and was subjected to a hypervelocity impact test at the U.S. Air Force’s Arnold Engineering Development Complex using test parameters that may be encountered in LEO. The DebriSat project has provided an abundance of information for assessing fragmentation debris in terms of material, color, shape, size, density, mass, and other derived parameters. Prior to the impact test, the ODPO collected spectral measurements on a subset of the materials used to construct DebriSat for a “ground-truth” of their optical properties. After the successful hypervelocity impact test, the DebriSat team observed a fine, dark dust coating all the fragments. Prior research has suggested that this came from ablated material deposited on the fragments during the impact test, causing a change in the reflective properties [1]. Given that this lower reflectivity on the DebriSat fragments will influence the laboratory-acquired magnitudes used to calculate size and inform potential updates to the oSEM, it is critical to assess if this darkening effect on the DebriSat fragments is a laboratory bias or something that could occur in on-orbit breakup events. This paper will provide a brief overview of the OMC and DebriSat experiment, focused on the optical characterization of a subset of materials using broadband photometric measurements and spectroscopic measurements. In addition, elemental analysis of various DebriSat fragments and the soft-catch foam used in the hypervelocity experiment compared with pristine foam will be examined to further evaluate the source of the dark material coating all fragments. Finally, the authors will present a twofold plan 1) for assessing potential biases in laboratory impact experiments that could affect laboratory optical characterization and 2) for mitigating biases when compared with ground-based optical telescopic measurements of the orbital debris environment.

Heather Cowardin↗

Analysis of Darkened Fragments Resulting from Laboratory Hypervelocity Experiments

NASA’s Orbital Debris Program Office (ODPO) relies on measurements from optical, radar, and in situ measurements to facilitate the development of data-driven orbital debris environmental engineering models such as the NASA Orbital Debris Engineering Model (ORDEM). For optical measurements, the ODPO relies on ground-based optical telescopes to statistically assess objects in geosynchronous orbit and, in the future, low Earth orbit (LEO). The data collected include the detected object’s orbital parameters, time of observation, and optical magnitude. The latter parameter can be converted to a size using NASA’s optical Size Estimation Model (oSEM). It is well known that the observed magnitude of orbital debris can vary based on an object's material constituents, observational geometry, and the effects of space weathering. To assess these magnitude variations, the ODPO uses the Optical Measurement Center (OMC) at NASA Johnson Space Center to characterize a variety of materials and fragments from laboratory impact tests representative of fragments that constitute the orbital debris population. One experiment was DebriSat: a 56 kg spacecraft was built to incorporate structural elements of a modern LEO spacecraft and was subjected to a hypervelocity impact test at the U.S. Air Force’s Arnold Engineering Development Complex using test parameters that may be encountered in LEO. The DebriSat project has provided an abundance of information for assessing fragmentation debris in terms of material, color, shape, size, density, mass, and other derived parameters. Prior to the impact test, the ODPO collected spectral measurements on a subset of the materials used to construct DebriSat for a “ground-truth” of their optical properties. After the successful hypervelocity impact test, the DebriSat team observed a fine, dark dust coating all the fragments. Prior research has suggested that this came from ablated material deposited on the fragments during the impact test, causing a change in the reflective properties [1]. Given that this lower reflectivity on the DebriSat fragments will influence the laboratory-acquired magnitudes used to calculate size and inform potential updates to the oSEM, it is critical to assess if this darkening effect on the DebriSat fragments is a laboratory bias or something that could occur in on-orbit breakup events. This presentation will provide a brief overview of the OMC and DebriSat experiment, focused on the optical characterization of a subset of materials using broadband photometric measurements and spectroscopic measurements. In addition, elemental analysis of various DebriSat fragments and the soft-catch foam used in the hypervelocity experiment compared with pristine foam will be examined to further evaluate the source of the dark material coating all fragments. Finally, the authors will present a twofold plan 1) for assessing potential biases in laboratory impact experiments that could affect laboratory optical characterization and 2) for mitigating biases when compared with ground-based optical telescopic measurements of the orbital debris environment.

Heather Cowardin↗

Baseline automotive gas turbine engine development program

Tests results on a baseline engine are presented to document the automotive gas turbine state-of-the-art at the start of the program. The performance characteristics of the engine and of a vehicle powered by this engine are defined. Component improvement concepts in the baseline engine were evaluated on engine dynamometer tests in the complete vehicle on a chassis dynamometer and on road tests. The concepts included advanced combustors, ceramic regenerators, an integrated control system, low cost turbine material, a continuously variable transmission, power-turbine-driven accessories, power augmentation, and linerless insulation in the engine housing.

Wagner, C. E.↗

What is the Final Verification of Engineering Requirements?

This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

Poole, Eric↗

Capabilities Development: From International Space Station and the Moon to Mars

The President of the United States, in signing Space Policy Directive-1, directed the NASA Administrator “to lead an innovative and sustainable program of exploration with commercial and international partners to enable human expansion across the solar system and to bring back to Earth new knowledge and opportunities. Beginning with missions beyond low-Earth orbit (LEO), the United States will lead the return of humans to the Moon for long-term exploration and utilization, followed by human missions to Mars and other destinations.” NASA is charged to land American astronauts on the lunar South Pole in 2024 and to continue a campaign of sustainable lunar surface exploration in order to develop necessary technologies and capabilities to enable initial human missions to Mars. NASA’s lunar surface exploration plans are part of a continuum of activities utilizing platforms in low Earth orbit (LEO), cislunar space, and the lunar surface to demonstrate advanced technologies, advance operations concepts, and develop countermeasures to lessen the impacts of the space environment and long duration exposure on the crew working in space. NASA is using a capability-driven approach to identify critical gaps to be addressed as part of a focused program to reduce risk for future deep space exploration missions building to eventual human missions to the surface of Mars. Teams of discipline experts from across NASA identify capability gaps between the current state of the art and the needs of proposed exploration missions and develop integrated strategies and roadmaps for filling those gaps. These inputs include assessment of platform needs for demonstration and testing of new capabilities. Generally, the International Space Station (ISS) and Gateway are needed for demonstration of capabilities for Mars transit, while Lunar surface activities focus on development of capabilities and operational protocols for Mars surface. This paper discusses the activities required to advance critical exploration capabilities, focusing on selection of demonstration and test location based upon the unique environments and characteristics of the ISS, Gateway, and potential lunar surface assets. The optimal strategy will be a combination of ISS/LEO, Gateway, and lunar surface testing; however, not all capabilities require a deep space exploration missions.

Boggs, Kathleen Gallagher↗

Effect of velocity ratio on plane mixing layer development - Influence of the splitter plate wake

The effect of the velocity ratio on the approach of a plane mixing layer to self-similarity was investigated experimentally. In the experiment, plane mixing layers with velocity ratios 0.5, 0.6, 0.7, 0.8, and 0.9 were generated in a mixing-layer wind tunnel consisting of two individually driven legs, in which the two streams were allowed to merge at the sharp edge of a tappered splitter plate. The leg driven by the bigger blower was operated at a free-stream velocity in the test section of 21 m/s, while the flow speed in the other leg was varied to change the velocity ratio. For each velocity ratio, the mean flow- and turbulence measurements were carried out at eight streamwise locations. Results showed that, for velocity ratios between 0.5 and 0.7, self-similarity of the mixing layer was achieved, with the asymptotic states comparable; mixing layers with higher velocity ratios failed to achieve a self-similar state within the measurement domain.

Mehta, R. D.↗

Development and Implementation of a Model-Driven Envelope Protection System for In-Flight Ice Contamination

Fatal loss-of-control (LOC) accidents have been directly related to in-flight airframe icing. The prototype system presented in this paper directly addresses the need for real-time onboard envelope protection in icing conditions. The combinations of a-priori information and realtime aerodynamic estimations are shown to provide sufficient input for determining safe limits of the flight envelope during in-flight icing encounters. The Icing Contamination Envelope Protection (ICEPro) system has been designed and implemented to identify degradations in airplane performance and flying qualities resulting from ice contamination and provide safe flight-envelope cues to the pilot. Components of ICEPro are described and results from preliminary tests are presented.

Gingras, David R.↗

An Integrated Analysis-Test Approach

This viewgraph presentation provides an overview of a project to develop a computer program which integrates data analysis and test procedures. The software application aims to propose a new perspective to traditional mechanical analysis and test procedures and to integrate pre-test and test analysis calculation methods. The program also should also be able to be used in portable devices and allows for the 'quasi-real time' analysis of data sent by electronic means. Test methods reviewed during this presentation include: shaker swept sine and random tests, shaker shock mode tests, shaker base driven model survey tests and acoustic tests.

Kaufman, Daniel↗

VIPER Lunar Rover Agile Mission Systems

Agile development methods, which have gone from outlier to mainstream in software development, are poised to expand into all aspects of space mission development. Modern software development operates on a principle of continuous deployment, where progress is verified not with conventional metrics, but with a continuous build, available to key stakeholders, enabling direct examination of the state of the code base, and assessment of progress through demonstration of capability. Delivery times are measured in weeks, not months. Stakeholders are part of the process on an ongoing basis. The cost of change is comparatively low and requirements, which often are not precisely defined at the start of a project, may be iteratively refined in a series of agile development cycles. Agile methods are compatible with traditional system engineering methods and may be tailored to the space operations environment. The low cost of change and iterative development cycles of agile enable requirements to be defined as outcomes and constraints, with design details to be refined during the development cycle. We are now at a point where agile methods may be extended beyond software, to Mission Systems, including the Mission Operations System and the Ground Data System. For NASA’s VIPER Lunar Rover Mission, scheduled to land at a lunar pole in late 2023, we are developing the Mission System using agile methods. As in agile software, where the measure of progress is working code, in agile mission system development, the measure of capability is what we can demonstrate. Demonstrations over presentations. We demonstrate mission system capability using simulations. The concept of operations, from commanding, to driving the rover, to how we downlink images for evaluation for a near-real time command cycle, will be tested and proven in simulation, years before we begin the traditional simulation cycle for training. “Say it then simulate it.” We develop and refine our designs using simulations, with an emphasis on new components of the system that are not well known early. For example, the required duration of a mission planning cycle for a lunar surface asset such as VIPER, that operates twenty-four hours a day, seven days a week, with continuous communications and a unique set of constraints based on the physics of the lunar poles and the line of site to Earth, is a unique problem in mission planning that is unlikely to be solved in a series of meetings. A small number of requirements specifying the outcomes may serve as the jumping off point to an agile development cycle, with demonstration in simulations. We have already demonstrated this process with simulations of rover driver decision time. VIPER is driven using near-real time command and control to waypoints. The driver decision time between waypoints is a fundamental enabling unit of productivity to accomplish the mission timeline. We have validated driver decision time in simulations of rover driving at the lunar South Pole, using the prototype mission tools for driving, command and control. The capability to develop and refine designs using simulations as part of agile Mission System development cycle changes the nature of team interactions, creating a focus on doing, rather than analyzing and documenting. Waterfall development cycles were, in part, a product of the significant cost of change in the early days of spaceflight. When the cost of change is high, it is vital to get your requirements right at the outset, because the system will be built to those specifications, and, when change is expensive, you better get it right early. However, modern technology has greatly lowered the cost of change, enabling iterative, rapid development cycles, in which key operations concepts may be tested and refined during development. Extending agile development to the Mission System for VIPER is a significant step in moving agile development methods for space operations beyond software, to the Mission System.

Agile↗

The prediction of sea-surface temperature variations by means of an advective mixed-layer ocean model

An advective mixed layer ocean model was developed by eliminating the assumption of horizontal homogeneity in an already existing mixed layer model, and then superimposing a mean and anomalous wind driven current field. This model is based on the principle of conservation of heat and mechanical energy and utilizes a box grid for the advective part of the calculation. Three phases of experiments were conducted: evaluation of the model's ability to account for climatological sea surface temperature (SST) variations in the cooling and heating seasons, sensitivity tests in which the effect of hypothetical anomalous winds was evaluated, and a thirty-day synoptic calculation using the model. For the case studied, the accuracy of the predictions was improved by the inclusion of advection, although nonadvective effects appear to have dominated.

Atlas, R. M.↗

An intelligent ground operator support system

This paper presents first results of the project 'Technologien fuer die intelligente Kontrolle von Raumfahrzeugen' (TIKON). The TIKON objective was the demonstration of feasibility and profit of the application of artificial intelligence in the space business. For that purpose a prototype system has been developed and implemented for the operation support of the Roentgen Satellite (ROSAT), a scientific spacecraft designed to perform the first all-sky survey with a high-resolution X-ray telescope and to investigate the emission of specific celestial sources. The prototype integrates a scheduler and a diagnosis tool both based on artificial intelligence techniques. The user interface is menu driven and provides synoptic displays for the visualization of the system status. The prototype has been used and tested in parallel to an already existing operational system.

Goerlach, Thomas↗

Electrospray Thruster Performance with Microfabricated Emitter Arrays and Indium Propellant

The feasibility of a microfabricated indium-fueled electrospray thruster with excellent performance was demonstrated. High efficiency electrospray thrusters with microfabricated components are under development for very compact, distributable propulsion systems that can be employed on both very small and large spacecraft with 10X improvement over SOA in mass, volume and specific impulse The critical components of this technology are the microfabricated emitter arrays and the capillary force driven indium feed system. Grey scale electron-beam lithography patterning and reactive ion dry etching provided the required micron-scale etch precision and uniformity across an array of 400 emitters in 1 cm2. Initial tests of single microfabricated silicon emitters demonstrated better performance than industry standard single emitters and the performance required to achieve 200 micronewtons when scaled up to a thruster with 400 emitters in 1 cm2. Arrays of emitters tested in a preliminary prototype Microfluidic Electrospray Propulsion (MEP) thruster assembly demonstrated stable performance at estimated thrust levels of 5, 50, and 120 µN at extraction voltages less than 4 kV. Current stability was within 0.15 % at 120 µN with only 1.5% of the emitter current collected by the extractor electrode. Post-test inspections revealed that more than 99% of the 400 emitters were electrospraying during the test. Specific impulse was estimated to be >3100 s from measurements of total charge and consumed indium mass at an emitter voltage of 1470 V. The results of this investigation suggest that microfabricated indium electrospray thruster technology is both feasible and capable of excellent performance as a highly compact microthruster.

Marrese-Reading, Colleen M.↗

"Long life" DC brush motor for use on the Mars surveyor program

DC brush motors have several qualities which make them very attractive for space flight applications. Their mechanical commutation is simple and lightweight, requiring no external sensing and control in order to function properly. They are extremely efficient in converting electrical energy into mechanical energy. Efficiencies over 80% are not uncommon, resulting in high power throughput to weight ratios. However, the inherent unreliability and short life of sliding electrical contacts, especially in vacuum, have driven previous programs to utilize complex brushless DC or the less efficient stepper motors. The Mars Surveyor Program (MSP'98) and the Shuttle Radar Topography Mission (SRTM) have developed a reliable "long life" brush type DC motor for operation in low temperature, low pressure CO2 and N2, utilizing silver-graphite brushes. The original intent was to utilize this same motor for SRTM's space operation, but the results thus far have been unsatisfactory in vacuum. This paper describes the design, test, and results of this development.

Braun, David↗

Development and Characterization Testing of an Air Pulsation Valve for a Pulse Detonation Engine Supersonic Parametric Inlet Test Section

In pulse detonation engines, the potential exists for gas pulses from the combustor to travel upstream and adversely affect the inlet performance of the engine. In order to determine the effect of these high frequency pulses on the inlet performance, an air pulsation valve was developed to provide air pulses downstream of a supersonic parametric inlet test section. The purpose of this report is to document the design and characterization tests that were performed on a pulsation valve that was tested at the NASA Glenn Research Center 1x1 Supersonic Wind Tunnel (SWT) test facility. The high air flow pulsation valve design philosophy and analyses performed are discussed and characterization test results are presented. The pulsation valve model was devised based on the concept of using a free spinning ball valve driven from a variable speed electric motor to generate air flow pulses at preset frequencies. In order to deliver the proper flow rate, the flow port was contoured to maximize flow rate and minimize pressure drop. To obtain sharp pressure spikes the valve flow port was designed to be as narrow as possible to minimize port dwell time.

Tornabene, Robert↗