Search NASA⌕ Search

SEARCH · Search NASA

Results for “WELDING MACHINE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

414 records · Page 23

Integrated Computational Materials and Mechanical Modeling for Additive Manufacturing of Alloys with Graded Structure Used in Fossil Fuel Power Plants

Wire-arc additive manufacturing (WAAM) has demonstrated its unique capability of producing large-size alloy components with a significantly reduced fabrication time and enhanced geometry design freedom. In this project, the team has developed an ICME (Integrated Computational Materials Engineering) modeling framework, which supports the WAAM of the AUSC (Advanced Ultra-Supercritical) power plant components. The manufacturing design has been applied to Inconel 740H, steel P91, as well as the dissimilar alloy components between steel P91 and Inconel 740H. The ICME model framework is developed by considering two types of modeling. First, mechanistic modeling has been applied to control the printing quality and understand the sequence of the dissimilar printing of the wall structure. The following models have been included in the developed ICME framework: finite element thermal model, grain structure model, residual stress simulation, crystal plasticity model, CALPHAD-based precipitation kinetic model, phase stability prediction, thermal expansion predictive model, and heuristic creep model. Secondary, a physics-based machine learning model has also been developed based on the ICME model structure. The machine learning model development is based on the ICME model prediction with calibration of the experiments. In addition, the WAAM has been utilized as a high-throughput experimental tool rapidly generating a gradient of alloy composition to facilitate experimental database generation for process-structure-property relationships. Such a database directly supported the ICME-enhanced machine learning, which further assisted in intermediate composition block design between P91 and 740H. A high-throughput screening study of the oxidation resistance has been performed based on such high-throughput experimentation. Based on the computational design, several dissimilar alloy manufacturing with post-heat treatment have been performed with a comprehensive evaluation of mechanical performance, including hardness mapping, yield strength, creep resistance. In this project, the single component of P91 and 740H processed by WAAM after heat treatment designed by ICME has demonstrated higher performance in yield strength and creep resistance than the wrought materials. The P91 sample prepared by WAAM with ICME-designed heat treatment performs better than P92 in creep resistance. The designed graded alloy printing with intermediate block shows a promising performance that exceeds the traditional welding. Moreover, the current research indicates the high need for location-specific design analysis with uncertainty quantification, an important topic that deserves more dedicated research. The achievement of this project demonstrated the promising future of WAAM in structural alloy manufacturing for energy power plant development. Successful printing requires synergetic efforts made by manufacturing, mechanical, and materials sciences.

20 FOSSIL-FUELED POWER PLANTS↗

Additive Friction Stir Deposition of a Tantalum–Tungsten Refractory Alloy

Additive friction stir deposition (AFSD) is a solid-state metal additive manufacturing technique, which utilizes frictional heating and plastic deformation to create large deposits and parts. Much like its cousin processes, friction stir welding and friction stir processing, AFSD has seen the most compatibility and use with lower-temperature metals, such as aluminum; however, there is growing interest in higher-temperature materials, such as titanium and steel alloys. In this work, we explore the deposition of an ultrahigh-temperature refractory material, specifically, a tantalum–tungsten (TaW) alloy. The solid-state nature of AFSD means refractory process temperatures are significantly lower than those for melt-based additive manufacturing techniques; however, they still pose difficult challenges, especially in regards to AFSD tooling. In this study, we perform initial deposition trials of TaW using twin-rod-style AFSD with a high-temperature tungsten–rhenium-based tool. Many challenges arise because of the high temperatures of the process and high mechanical demand on AFSD machine hardware to process the strong refractory alloy. Despite these challenges, successful deposits of the material were produced and characterized. Mechanical testing of the deposited material shows improved yield strength over that of the annealed reference material, and this strengthening is mostly attributed to the refined recrystallized microstructure typical of AFSD. These findings highlight the opportunities and challenges associated with ultrahigh-temperature AFSD, as well as provide some of the first published insights into twin-rod-style AFSD process behaviors.

36 MATERIALS SCIENCE↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Attaching Thermocouples by Peening or Crimping

Two simple, effective techniques for attaching thermocouples to metal substrates have been devised for high-temperature applications in which attachment by such conventional means as welding, screws, epoxy, or tape would not be effective. The techniques have been used successfully to attach 0.005- in. (0.127-mm)-diameter type-S thermocouples to substrates of niobium alloy C-103 and stainless steel 416 for measuring temperatures up to 2,600 F (1,427 C). The techniques are equally applicable to other thermocouple and substrate materials. In the first technique, illustrated in the upper part of the figure, a hole slightly wider than twice the diameter of one thermocouple wire is drilled in the substrate. The thermocouple is placed in the hole, then the edge of the hole is peened in one or more places by use of a punch (see figure). The deformed material at the edge secures the thermocouple in the hole. In the second technique a hole is drilled as in the first technique, then an annular relief area is machined around the hole, resulting in structure reminiscent of a volcano in a crater. The thermocouple is placed in the hole as in the first technique, then the "volcano" material is either peened by use of a punch or crimped by use of sidecutters to secure the thermocouple in place. This second technique is preferable for very thin thermocouples [wire diameter .0.005 in. (.0.127 mm)] because standard peening poses a greater risk of clipping one or both of the thermocouple wires. These techniques offer the following advantages over prior thermocouple-attachment techniques: . Because these techniques involve drilling of very small holes, they are minimally invasive . an important advantage in that, to a first approximation, the thermal properties of surrounding areas are not appreciably affected. . These techniques do not involve introduction of any material, other than the substrate and thermocouple materials, that could cause contamination, could decompose, or oxidize at high measurement temperatures. . The simplicity of these techniques makes it possible to attach thermocouples quickly. . These techniques can be used to attach thermocouples at locations where access is somewhat restricted by the surrounding objects.

Murtland, Kevin↗

Specific Energy Analysis for the Manufacturing of Light-Weight Automobile Body

This manuscript analyses the specific energy requirements to produce two hybridised vehicle structures on current automotive assembly lines. It provides quantitative and specific electric (kWhr/vehicle) and fossil-fuel (MMBtu/vehicle) energy predictions of the body-in-white (BIW) manufacturing processes including body panel forming, welding, painting, and final assembly, in addition to the facility heating ventilation and air conditioning or HVAC consumption. Two hybridised BIW design criteria are analysed; the first is based on minimising the added cost per unit weight saved (+$/-kg), while the second is based on maximising the percentage of weight saved (% -kg). Also a new criterion; that is the added specific-energy per unit weight-saved or (+kWhr/vehicle/-kg) is proposed. The light-weight structures comprise body parts made of aluminium and steel. To compute energy consumptions, the study utilises the energy performance index (EPI) stochastic model in addition to complementing it with a panel-forming energy model. Cost analysis is also provided for all the major vehicle body-panels using an in-house Excel macro. The study reverse engineers a passenger vehicle BIW using a full-size coordinate measuring machine (CMM). The presented work further highlights the monetary value of the associated emissions when increasing the specific energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Production of Seamless Superconducting Radio Frequency Cavities from Ultra-fine Grained Niobium, Phase II Final Report

The positron and electron linacs of the International Linear Collider (ILC) will require over 14,000, nine-cell, one meter length, superconducting radio frequency (SRF) cavities [ILC Reference Design Report, 2007]. Manufacturing on this scale will benefit from more efficient fabrication methods. The current methods of fabricating SRF cavities involve deep drawing of the halves of each of the elliptical cells and joining them by high-vacuum, electron beam welding, with at least 19 circumferential welds per cavity. The welding is costly and has undesirable effects on the cavity surfaces, including grain-scale surface roughening at the weld seams. Hydroforming of seamless tubes avoids welding, but hydroforming of coarse-grained seamless tubes results in strain-induced surface roughening. Surface roughness limits accelerating fields, because asperities prematurely exceed the critical magnetic field and become normal conducting. This project explored the technical and economic feasibility of an improved processing method for seamless tubes for hydroforming. Severe deformation of bulk material was first used to produce a fine structure, followed by extrusion and flow-forming methods of tube making. Extrusion of the randomly oriented, fine-grained bulk material proceeded under largely steady-state conditions, and resulted in a uniform structure, which was found to be finer and more crystallographically random than standard (high purity) RRR niobium sheet metal. A 165 mm diameter billet of RRR grade niobium was processed into five, 150 mm I.D. tubes, each over 1.8 m in length, to meet the dimensions used by the DESY ILC hydroforming machine. Mechanical properties met specifications. Costs of prototype tube production were approximately twice the price of RRR niobium sheet, and are expected to be comparable with economies of scale. Hydroforming and superconducting testing will be pursued in subsequent collaborations with DESY and Fermilab. SRF Cavities are used to construct particle accelerators for high-energy physics research, as well as for lower energy particle accelerators, and Free Electron Lasers. These machines have applications in the fields of basic science, industrial processing, medical diagnostics, pharmaceutical research and weapons systems. The scientific community and the general public will benefit from the implementation of this technology since lower production costs will increase the availability of SRF particle accelerators.

36 MATERIALS SCIENCE↗

Structurally Integrated Coatings for Wear and Corrosion

Wear and corrosion of structures cuts across industries and continues to challenge materials scientists and engineers to develop cost effective solutions. Industries typically seek mature technologies that can be implemented for production with rapid or minimal development and have little appetite for the longer-term materials research and development required to solve complex problems. The collaborative work performed in this project addressed the complexity of this problem in a multi-year program that industries would be reluctant to undertake without government partnership. This effort built upon the prior development of Advanced Abrasion Resistant Materials conduct by Caterpillar Inc. under DOE Cooperative Agreement No. DE-FC26-01NT41054. In this referenced work, coatings were developed that exhibited significant wear life improvements over standard carburized heat treated steel in abrasive wear applications. The technology used in this referenced work, arc lamp fusing of thermal spray coatings, was one of the primary technical paths in this work effort. In addition to extending the capability of the coating technology to address corrosion issues, additional competitive coating technologies were evaluated to insure that the best technology was developed to meet the goals of the program. From this, plasma transferred arc (PTA) welding was selected as the second primary technology that was investigated. Specifically, this project developed improved, cost effective surfacing materials and processes for wear and corrosion resistance in both sliding and abrasive wear applications. Materials with wear and corrosion performance improvements that are 4 to 5 times greater than heat treated steels were developed. The materials developed were based on low cost material systems utilizing ferrous substrates and stainless steel type matrix with hard particulates formed from borides and carbides. Affordability was assessed against other competing hard surfacing or coating techniques, balanced with overall materials performance. State-of-the-art design and simulation capabilities were used to guide materials and process refinement. Caterpillar was the lead of the multi-partner collaborative project. Specific tasks were performed by the partners base on their unique capabilities. The project team was selected to include leaders in the field of material development, processing, modeling, and material characterization. Specifically, industrial members include the suppliers Deloro Stellite and Powder Alloy Corporation., who provided the experimental alloys and who aided in the development of the costs for the alloys, the Missouri University of Science and Technology and Iowa State University, who provided help in the alloy development and material characterization, QuesTek Innovations, a small company specializing the microstructural modeling of materials, and the DOE laboratories, Oak Ridge National Laboratory and National Energy Technology Laboratory (Albany), who provided unique coating process capability and wear characterization testing. The technologies developed in this program are expected to yield energy savings of about 50% over existing technologies, or 110 trillion BTUs per year by 2020 when fully implemented. Primary applications by Caterpillar are to replace the surface of machine components which are currently carburized and heat treated with new cladding materials with double the wear life. The new cladding technologies will consume less energy than carburizing. Thus, nearly 50% energy savings can be expected as a result from elimination of the heat treat process and the reduce wear of the materials. Additionally, when technologies from this project are applied on titanium or other non-ferrous substrates to make lighter weight, more wear resistant, and more efficient structures, significant fuel savings can be realized. With the anticipated drastic reduction in cost for refining titanium-containing ores, the usage of titanium alloys in earthmoving and related machinery is expected to increase multiple folds in the next decade. A major technical hurdle associated with the implementation of titanium alloys for heavy machinery is that of overcoming poor wear resistance. Proof of concept of the technologies developed in this project has been demonstrated by both laboratory testing of coupons and field testing of selected components. Further development will be required in order to have fully validated materials and process for production introduction and several technical hurdles remain to be addressed particular for use of the arc lamp fusing technology. The current project has reduced the risk of failure and provided sufficient data to encourage further investment by industry.

36 MATERIALS SCIENCE↗

Process Modeling for Additive Manufacturing

Additive Manufacturing (AM) provides a new avenue to design innovative materials and components that cannot be created using traditional machining operations. With current AM capabilities, complex designs (such as those required in weapon systems) can be readily manufactured with laser powder forming (or Laser-Engineered Net Shaping (LENSTM)) [1] that would be otherwise cost prohibitive or impossible to produce. However, before an AM product can be qualified for weapon applications, the characteristics of the metals produced by additive manufacturing processes need to be well understood. This work focuses on the development of computational simulation tools to model the metal additive manufacturing process. This work extends and integrates existing Sandia National Laboratories tools to accomplish the following: (i) be able to better predict residual stresses in AM product, (ii) extend high-fidelity material models to capture material evolution during the formation process, leading to prediction of end-state material properties, and (iii) provide a basis for engineering tools to propose improvements to additive manufacturing process variables, including those that minimize process variation. While this work in its current state is directly applicable to additive manufacturing processes, the tools developed may also help enable modeling welding processes such as gas tungsten arc (GTA), electron beam, and laser welding.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Pressure-Fed LOX/LCH4 Reaction Control System for Spacecraft: Transient Modeling and Thermal Vacuum Hotfire Test Results

An integrated cryogenic liquid oxygen, liquid methane (LOX/LCH4) reaction control system (RCS) was tested at NASA Glenn Research Center's Plum Brook Station in the Spacecraft Propulsion Research Facility (B-2) under vacuum and thermal vacuum conditions. The RCS is a subsystem of the Integrated Cryogenic Propulsion Test Article (ICPTA), a pressure-fed LOX/LCH4 propulsion system composed of a single 2,800 lbf main engine, two 28 lbf RCS engines, and two 7 lbf RCS engines. Propellants are stored in four 48 inch diameter 5083 aluminum tanks that feed both the main engine and RCS engines in parallel. Helium stored cryogenically in a composite overwrapped pressure vessel (COPV) flows through a heat exchanger on the main engine before being used to pressurize the propellant tanks to a design operating pressure of 325 psi. The ICPTA is capable of simultaneous main engine and RCS operation. The RCS engines utilize a coil-on-plug (COP) ignition system designed for operation in a vacuum environment, eliminating corona discharge issues associated with a high voltage lead. There are two RCS pods on the ICPTA, with two engines on each pod. One of these two engines is a heritage flight engine from Project Morpheus. Its sea level nozzle was removed and replaced by an 85:1 nozzle machined using Inconel 718, resulting in a maximum thrust of 28 lbf under altitude conditions. The other engine is a scaled down version of the 28 lbf engine, designed to match the core and overall mixture ratios as well as other injector characteristics. This engine can produce a maximum thrust of 7 lbf with an 85:1 nozzle that was additively manufactured using Inconel 718. Both engines are film-cooled and capable of limited duration gas-gas and gas-liquid operation, as well as steady-state liquid-liquid operation. Each pod contains one of each version, such that two engines of the same thrust level can be fired as a couple on opposite pods. The RCS feed system is composed of symmetrical 3/8 inch lines that tap off of the main propellant manifold to send LOX and LCH4 outboard to the RCS pods. A Thermodynamic Vent System (TVS) is used to condition propellants at each pod by venting through an orifice and then routing the cold expansion products back through tubing that is welded along a large portion of the main RCS feed lines. Prior to final installation on the ICPTA, the RCS engines were tested in a small vacuum chamber at the Johnson Space Center (JSC) Energy Systems Test Area (ESTA) to verify functionality of the new COP ignition system and check out operation of the vacuum nozzles. After engine-level testing, the RCS engines were installed on the vehicle and a series of integrated hot-fire tests were performed at JSC consisting of various pulsing and steady-state firings as well as integrated main engine/RCS operation. The ICPTA was then integrated into the Plum Brook B-2 facility for vacuum and thermal/vacuum testing. Testing in the B-2 facility was composed of multiple thermal and pressure environments. The first set of tests were performed under ambient temperature and altitude pressure conditions. These tests consisted of a range of minimum impulse bit (MIB) pulsing sequences with low duty cycle, analogous to a coast phase in which the RCS is primarily used for station keeping. The primary goal of this sequence is to understand how propellant conditions were effected without an active TVS. In this scenario, consistent gas-gas operation is desirable since it results in a smaller MIB and more efficient propellant consumption. Multiple skin thermocouples are mounted on the feedlines, in addition to a submerged thermocouple on each commodity, in order to gather thermal data on the system. Higher duty cycle pulsing tests were then performed, analogous to an ascent or landing mission phase. The primary goal of this sequence was to examine how well the engines self-conditioned without active TVS when starting from a quiescent state. The TVS was then activated during some tests to demonstrate the capability to quickly condition the engines for higher pulsing demand scenarios. A thermocouple at the TVS outlet allows for the calculation of energy absorbed by the vented propellant. Lastly, tests with longer pulses and multiple engines firing either in sequence or simultaneously were run in order to gather transient system response data on waterhammer. Six total high-speed pressure transducers are installed on the RCS system, one sensor at the end of each propellant manifold line on the pods, and one at the tap-off location for each commodity. This will allow for the accurate characterization of waterhammer in the system under various propellant conditions and firing sequences. Other instrumentation for this test series includes nozzle throat thermocouples, chamber pressure measurement, heat soakback measurement, and tank wall plume impingement temperature measurement. The next set of tests were performed to demonstrate simultaneous main engine and RCS operation. Data from this test will be used to examine if there is any change to nominal operation of the RCS as a result of feed system interaction or other phenomenon. Some of these tests began under high vacuum conditions (target ambient pressure less than 1x10(exp -3) torr) and others began at altitude conditions. The last set of tests were performed with the B-2 cold wall active. Under these tests, many of the same low duty cycle MIB tests were repeated in order to characterize how propellant conditions changed with the lower heat leak. In this scenario the RCS manifold experiences much less heat leak, resulting in a change to how well the engines self-condition. As a result, an increase in maximum waterhammer pressures and a change in natural frequency of the system was expected due to higher density propellants. The lower heat leak should also result in a change to the MIB pulse profile, and data will be examined to understand how MIB repeatability is affected in the different operating environments. Parallel to the test efforts, a set of transient model development efforts were made to predict RCS performance. The primary effort was aimed at producing a SINDA/FLUINT model to predict propellant conditioning up to the engine inlet as a function of different environmental and operating parameters, with the goal of predicting chamber pressure, TVS performance, and propellant consumption over time. Preliminary results for this effort will be presented in comparison with test data. Additional modeling efforts were made using SINDA/FLUINT to predict waterhammer in the system since the software is capable of handling multiphase transient fluid dynamics. These results will be compared with the high-speed pressure transducer test data for validation purposes.

Atwell, Matthew J.↗

Creep Testing of High-Temperature Cu-8 Cr-4 Nb Alloy Completed

A Cu-8 at.% Cr-4 at.% Nb (Cu-8 Cr-4 Nb) alloy is under development for high-temperature, high heatflux applications, such as actively cooled, hypersonic vehicle heat exchangers and rocket engine combustion chambers. Cu-8 Cr-4 Nb offers a superior combination of strength and conductivity. It has also shown exceptional low-cycle fatigue properties. Following preliminary testing to determine the best processing route, a more detailed testing program was initiated to determine the creep lives and creep rates of Cu-8 Cr-4 Nb alloy specimens produced by extrusion. Testing was conducted at the NASA Lewis Research Center with constant-load vacuum creep units. Considering expected operating temperatures and mission lives, we developed a test matrix to accurately determine the creep properties of Cu-8 Cr-4 Nb between 500 and 800 C. Six bars of Cu-8 Cr-4 Nb were extruded. From these bars, 54 creep samples were machined and tested. The figure on the left shows the steady-state, or second-stage, creep rates for the samples. Comparison data for NARloy-Z (Cu-3 wt % Ag-0.5 wt % Zr), the alloy currently used in combustion chamber liners, were not unavailable. Therefore the steady-state creep rates for Cu at similar temperatures are presented. As expected, in comparison to pure Cu, the creep rates for Cu-8 Cr-4 Nb are much lower. The lives of the samples are presented in the figure on the right. As shown, Cu-8 Cr-4 Nb at 800 C is comparable to NARloy-Z at 648 C. At equivalent temperatures, Cu-8 Cr-4 Nb enjoys a 20 to 50 percent advantage in stress for a given life and 1 to 3 orders of magnitude greater life at a given stress. The improved properties allow for design tradeoffs and improvements in new and existing heat exchangers such as the next generation of combustion chamber liners. Average creep rates for Cu-8 Cr-4 Nb and pure Cu are shown. Average creep lives for Cu-8 Cr- 4 Nb and NARloy-Z are also shown. Currently, two companies are interested in the commercial usage of the Cu-8 Cr-4 Nb alloy. The Rocketdyne Division of Rockwell International is conducting independent testing to analyze the properties for their projected needs in advanced rocket engine applications. Metallamics, a company based in Traverse City, Michigan, is entering into a Space Act Agreement to evaluate and test Cu-Cr-Nb alloys as materials for welding electrodes that are used in robotic welding operations. Creep rate is one of the alloy properties that determines the degree to which a welding electrode will mushroom or expand at the tip. A material with a low creep rate will resist mushrooming and give the electrode a longer life, minimizing downtime. This application holds the potential for large-scale usage of the alloy in the automotive and other industries. Success here would dramatically decrease the cost of the alloy and increase availability for aerospace applications.

Source record↗

ETP-0474: Evaluation of Electroless Nickel Coatings to Achieve Interference Fit in the RSRM Without Fretting

Part of the redesign of the SRMs for the Space Shuttle involved the substitution of three new capture cylinders for three of the previously used cylinders. These new cylinders mate with the old standard case segments in each of the three field joints. The new capture cylinders contain an integral capture latch on the tang end which mates with a case clevis during stackup at KSC. The capture cylinders also contain a groove in the capture latch to provide for a third 0-ring in the joint and are designed to achieve a metal-to- metal interference fit between the capture latch and the mating clevis. An unexpected fretting problem has occurred on the tang capture feature and the inner clevis leg interference fit surfaces on flight hardware since STS-26. Varying degrees of fretting damage have been found on the case segments from different flight motors. Fretting is a wear phenomena that occurs when two tightly fitting metal surfaces are subject to cyclic relative motion of extremely small amplitudes (generally less than 0.010-inch) in the absence of adequate lubrication. It is adhesive ("cold" - welding) in nature and vibration is its essential causative factor. This problem has manifested itself on the flight motors as a series of pits and axial gouges on the inside diameter (ID) surfaces of the inner clevis legs and the outside diameter (OD) surfaces of the tang capture features. The problem occurs in varying degrees of severity in all of the field joints. It is not believed that fretting is a flight safety issue. However, it could become a reusability issue if left unattended. Fretting has been encountered in other industries for many years and measures that will prevent or reduce it have been devised. These include: elimination or reduction of vibration (amplitudes and/or frequencies), elimination of slip, improved lubrication between parts, increased surface separation, increased interference, inducing residual compressive stresses in the surfaces of the mating parts, and employing non-fretting interference shims. Looking at each of these separately; vibration and slip occur in varying degrees and magnitudes in the field joints (as part of the roll-out, launch, flight, splashdown, flotation, and/or tow back) and are difficult to define or eliminate. Improved lubrication is something that was evaluated since it would be the simplest change to incorporate, but little or no improvement was found. Increasing surface separation would defeat the purpose of the interference fit. The effect of increasing the interference fit is unknown. Additional shot peening and/or surface rolling to impart residual compressive stresses in the joints undoubtedly would alter the characteristics and finish of the sealing surfaces of the motor cases. Also, experimental data' indicate that the tangs and clevises already have residual compressive stress fields on their surfaces yet fretting occurs. These stresses probably result from the case machining and the glass beading used to clean these surfaces.

Schaffnit, William O.↗

Welded Titanium Case for Space-Probe Rocket Motor

Early in 1958, the Jet Propulsion Laboratory of the California Institute of Technology was requested to participate in a lunar-probe mission code-named Juno II which would place a 15-lb Instrumented payload (Pioneer IV) in the vicinity of the moon. The vehicle was to use the same high-speed upper-stage assembly as flown on the successful Jupiter-C configuration; however, the first-stage booster was to be a Jupiter rather than a Redstone. An analysis of the intended flight and payload configuration Indicated that the feasibility of accomplishing the mission was questionable and that additional performance would have to be obtained if the mission was to be feasible. Since the most efficient way of Increasing the performance of a staged vehicle is to increase the performance of the last stage, a study of possible ways of doing this was made.. Because of the time schedule placed on this effort It was decided to reduce the weight of the fourth-stage rocket-motor case by substituting the annealed 6Al--4V titanium alloy for the Type 410 stainless steel. Although this introduced an unfamiliar material, It reduced the changes in design and fabrication techniques. This particular titanium alloy was chosen on the basis of previous tests which proved the suitability of the alloy as a pressure-vessel material when used at an annealed yield strength of about 120, 000 psi. The titanium-case fourth stage of Juno U is shown with the payload and on the missile in Fig. 1; the stainless-steel motor cases used in the Jupiter-C vehicle are shown in Fig. 2. The fourth-stage motor case has a diameter of 6 in., a length of approximately 38 in. center dot and a nominal cylindrical wall thickness of 0.025 in. As shown in Fig. 1, the case serves as the structural support of the payload and is aligned to the upper stage assembly through an alignment ring. The nozzle is threaded into the end of the motor case, and is of the ceramic-coated steel design. Figure 3 shows a comparison of the components used to make the stainless steel and the 6A1--4V titanium alloy cases. The forward dome and aft fitting for the stainless steel assembly were fabricated from a combination of forged, spun and machined parts.. In order to facilitate the fabrication of the titanium alloy motor ) these components were machined from a large-diameter billet.

Brothers, A. J.↗

Analysis of the Cause of High External Q Modes in the JLab High Gradient Prototype Cryomodule Renascence

The Renascence cryomodule [1] installed in CEBAF in 2007 consists of 8 cavities as shown in Figure 1. The first three cavities (No.1-No.3) in the upstream end are of the Low Loss (LL) shape design, and the remaining 5 cavities (No.4-No.8) on the beam downstream end are the High Gradient (HG) shape design. The fundamental power couplers (FPCs) are the rectangular waveguides, and the little cylindrical structures are the HOM couplers. The locations of the FPC in the last four cavities are mirrored about the beam z axis. Cavities No.4 and No.5 form a back-to-back cavity pair. Among the HG cavities installed in the Renascence cryomodule, the only identifiable difference from their fabrication documentation is that cavity No.5 received an extra EBW pass on one equator weld, specifically cell 5. The non-uniform mechanical tuning required to compensate the fundamental mode tune and flatness for the extra shrinkage of this cell is believed to contribute the most significant differences from the other HG cavities. Beam based instability studies on this cryomodule in CEBAF have shown a significant beam breakup (BBU) threshold current reduction, well below design value. Frequency spectrum peaked by the off-sided beam power indicated the cause is due to abnormal high Q modes in the cavity No.5. Measured beam off-axis position at the cavity No.5 does not correspond to the shunt impedances calculated for an ideal cavity. Low power RF measurements have identified that the problematic modes are in the second dipole band (TM110 like). Three of the modes have external Qs two orders magnitude higher than the others, while the rest of modes in the first two dipole bands are normal in terms of the design values. The cause of this abnormality and the future impact on the BBU was not able to be resolved due to the limitations of information that can be obtained from the measurements. It is important to understand the cause of this abnormality so that effective QA/QC measures can be implemented to avoid such problem in the final upgrade design and manufacture. The goal of this work is to utilize advanced simulation tools to understand the high external Q (Q{sub ext}) problem observed in the Renascence cryomodule. In the past years, SLAC has built a set of state-of-the-art advanced simulation tools based on finite-element unstructured meshes and parallel computation implementations on supercomputers [2, 3]. The codes are capable of simulating large complex RF systems with unprecedented resolution and turnaround time. They have been successfully applied to many existing and future accelerator R&D projects to improve the machine performance and to optimize the designs. These tools are essential to perform accurate full system analyses such as the JLab's SRF cavities. We will use the simulation results and the data from the RF measurements to gain a better understanding of the cavity performance and tolerance issues and provide a solid foundation to do the BBU simulation and prediction for the 12GeV Upgrade project by using JLab's BBU codes. In this report, we will focus on the following two main tasks: (1) Ideal cavity simulation--to evaluate the effectiveness of the damping by the higher-order-mode (HOM) couplers, and search for possible trapped modes in a back-to-back cavity pair (e.g. cavity No.4 & No.5). (2) Abnormal cavity study--to understand the cause of the high Q{sub ext} modes in cavity No.5 using an advanced Shape Determination Tool.

43 PARTICLE ACCELERATORS↗

Results of stainless steel canister corrosion studies and environmental sample investigations

This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of used nuclear fuel. The work involves both characterization of the potential physical and chemical environment on the surface of the storage canisters and how it might evolve through time, and testing to evaluate performance of the canister materials under anticipated storage conditions. To evaluate the potential environment on the surface of the canisters, SNL is working with the Electric Power Research Institute (EPRI) to collect and analyze dust samples from the surface of in-service SNF storage canisters. In FY 13, SNL analyzed samples from the Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI); here, results are presented for samples collected from two additional near-marine ISFSI sites, Hope Creek NJ, and Diablo Canyon CA. The Hope Creek site is located on the shores of the Delaware River within the tidal zone; the water is brackish and wave action is normally minor. The Diablo Canyon site is located on a rocky Pacific Ocean shoreline with breaking waves. Two types of samples were collected: SaltSmart™ samples, which leach the soluble salts from a known surface area of the canister, and dry pad samples, which collected a surface salt and dust using a swipe method with a mildly abrasive ScotchBrite™ pad. The dry samples were used to characterize the mineralogy and texture of the soluble and insoluble components in the dust via microanalytical techniques, including mapping X-ray Fluorescence spectroscopy and Scanning Electron Microscopy. For both Hope Creek and Diablo Canyon canisters, dust loadings were much higher on the flat upper surfaces of the canisters than on the vertical sides. Maximum dust sizes collected at both sites were slightly larger than 20 μm, but Phragmites grass seeds ~1 mm in size, were observed on the tops of the Hope Creek canisters. At both sites, the surface dust could be divided into fractions generated by manufacturing processes and by natural processes. The fraction from manufacturing processes consisted of variably-oxidized angular and spherical particles of stainless steel and iron, generated by machining and welding/cutting processes, respectively. Dust from natural sources consisted largely of detrital quartz and aluminosilicates (feldspars and clays) at both sites. At Hope Creek, soluble salts were dominated by sulfates and nitrates, mostly of calcium. Chloride was a trace component and the only chloride mineral observed by SEM was NaCl. Chloride surface loads measured by the Saltsmart™ sensors were very low, less than 60 mg m –2 on the canister top, and less than 10 mg m –2 on the canister sides. At Diablo Canyon, sea-salt aggregates of NaCl and Mg-SO 4 , with minor K and Ca, were abundant in the dust, in some cases dominating the observed dust assemblage. Measured Saltsmart™ chloride surface loads were very low (<5 mg m –2 ); however, high canister surface temperatures damaged the Saltsmart™ sensors, and, in view of the SEM observations of abundant sea-salts on the package surfaces, the measured surface loads may not be valid. Moreover, the more heavily-loaded canister tops at Diablo Canyon were not sampled with the Saltsmart™ sensors. The observed low surface loads do not preclude chloride-induced stress corrosion cracking (CISCC) at either site, because (1) the measured data may not be valid for the Diablo Canyon canisters; (2) the surface coverage was not complete (for instance, the 45º offset between the outlet and inlet vents means that near-inlet areas, likely to have heavier dust and salt loads, were not sampled); and (3) CISCC has been experimentally been observed at salt loads as low as 5-8 mg/m 2 . Experimental efforts at SNL to assess corrosion of interim storage canister materials include three tasks in FY14. First, a full-diameter canister mockup, made using materials and techniques identical to those used to make interim storage canisters, was designed and ordered from Ranor Inc., a cask vendor for Areva/TN. The mockup will be delivered prior to the end of FY14, and will be used for evaluating weld residual stresses and degrees of sensitization for typical interim storage canister welds. Following weld characterization, the mockup will be sectioned and provided to participating organizations for corrosion testing purposes. A test plan is being developed for these efforts. In a second task, experimental work was carried out to evaluate crevice corrosion of 304SS in the presence of limited reactants, as would be present on a dustcovered storage canister. This work tests the theory that limited salt loads will limit corrosion penetration over time, and is a continuation of work carried out in FY13. Laser confocal microscopy was utilized to assess the volume and depth of corrosion pits formed during the crevice corrosion tests. Results indicate that for the duration of the current experiments (100 days), no stifling of corrosion occurred due to limitations in the amount of reactants present at three different salt loadings. Finally, work has been carried out this year perfecting an instrument for depositing sea-salts onto metal surfaces for atmospheric corrosion testing purposes. The system uses an X-Y plotter system with a commercial airbrush, and deposition is monitored with a quartz crystal microbalance. The system is capable of depositing very even salt loadings, even at very low total deposition rates.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2016 Accomplishments. Tritium aging studies on stainless steel. Forging process effects on the fracture toughness properties of tritium-precharged stainless steel

Forged austenitic stainless steels are used as the materials of construction for pressure vessels designed to contain tritium at high pressure. These steels are highly resistant to tritium-assisted fracture but their resistance can depend on the details of the forging microstructure. During FY16, the effects of forging strain rate and deformation temperature on the fracture toughness properties of tritium-exposed-and-aged Type 304L stainless steel were studied. Forgings were produced from a single heat of steel using four types of production forging equipment – hydraulic press, mechanical press, screw press, and high-energy-rate forging (HERF). Each machine imparted a different nominal strain rate during the deformation. The objective of the study was to characterize the J-Integral fracture toughness properties as a function of the industrial strain rate and temperature. The second objective was to measure the effects of tritium and decay helium on toughness. Tritium and decay helium effects were measured by thermally precharging the as-forged specimens with tritium gas at 34.5 MPa and 350°C and aging for up to five years at -80°C to build-in decay helium prior to testing. The results of this study show that the fracture toughness properties of the as-forged steels vary with forging strain rate and forging temperature. The effect is largely due to yield strength as the higher-strength forgings had the lower toughness values. For non-charged specimens, fracture toughness properties were improved by forging at 871°C versus 816°C and Screw-Press forgings tended to have lower fracture toughness values than the other forgings. Tritium exposures reduced the fracture toughness values remarkably to fracture toughness values averaging 10-20% of as-forged values. However, forging strain rate and temperature had little or no effect on the fracture toughness after tritium precharging and aging. The result was confirmed by fractography which indicated that fracture modes in the tritium-exposed specimens were similar for all forgings. Another FY16 objective was to prepare fracture toughness specimens from Types 304L and 21-6-9 stainless steel weldments and heat-affected zones (HAZ) for tritium charging.

36 MATERIALS SCIENCE↗

Identifying Challenges in Safeguards for Metallic Fuel Fabrication Facilities

As new advanced reactors gain popularity, there is an increasing interest in metallic fuel fabrication for fast reactors. While metallic fuels themselves are not a new idea, as many of the first reactors employed metallic fuels, new designs, compositions, and fabrication methods are appearing throughout the nuclear community. As the interest grows and facilities are constructed, both domestic and international safeguards will need to be heavily involved to support safeguards-by-design (SBD) measures from the start. This work compiles a review of historical and modern fuel types and fabrication methods, fabrication processes, safeguards gaps, and potential safeguards solutions. Metallic nuclear fuel types have been around for many decades and were included in some of the first reactors including the Experimental Breeder Reactor (EBR)-I and -II, the Fermi 1 reactor, the Integral Fast Reactor (IFR), and the Dounreay Fast Reactor (DFR). These reactors used various compositions including pure uranium (U) metal, U-zirconium (Zr) alloys, plutonium (Pu)-aluminum (Al) alloys, U-fissium (Fs) alloys, U-Pu-Zr alloys, and U-molybdenum (Mo) alloys [1, 2, 3, 4, 5]. These small alloying additions are included to improve the material properties of the pure U metal. The alpha-phase U (stable below 661C) suffers elongation in one direction causing grain boundary cracking and increasing creep rate due to irradiation growth, thermal cycling, and preferential crystal orientation. It is ideal to utilize the gamma-phase U (typically stable above 769C) by adding small amounts of alloying elements such as Zr or Mo to stabilize this phase down to room temperature [3]. Additionally, some research has been focused on U with transuranic (TRU) elements present, typically coming from the used fuel recycling process. Including these elements in fast reactor fuel can aid in the reduction of nuclear waste by burning minor long-lived actinides. However, the additions of TRU elements can cause concerns to arise when trying to fabrication or safeguard metallic fuels. A typical metallic fuel element is shown in Figure 1. Sodium is added into the cladding to create a thermal bond between the fuel slug and cladding wall. The fuel slug is then inserted and the end plug is welded on to the top of the fuel element. A gas plenum is left to create a headspace for gaseous fission products to escape rather than continue to build in the fuel itself [1, 5]. Other fuel element geometries exist as well, such as the Lightbridge twisted cruciform geometry shown in Figure 2 [6]. This design allows for better cooling performance and provides room for fuel rod swelling without impacting the fuel rod diameter. There are many different fabrication methods for metallic fuels, which is one of the many benefits of these fuel types. Many of these fabrication methods are relatively easy and cost-efficient. The most popular fabrication method is injection casting, sometimes called vacuum induction melting (VIM), shown in Figure 3 [4, 8, 9, 7, 10]. This method was largely used for EBR-II fuel fabrication. The injection casting system is contained inside of a vessel consisting of a Y2O3-coated graphite crucible surrounded by an induction coil with ZrO2-coated quartz molds suspended above the crucible. The fuel feedstock is placed inside of the graphite crucible and melted using the induction furnace. The induction furnace utilizes a dual frequency with the high frequency melting the feedstock and the low frequency causing stirring of the melted feedstock to form a homogeneous mixture. The mixture is heated to approximately 1600C in an argon environment. The vessel is evacuated and then the quartz molds are lowered into the graphite crucible containing the molten metal and the vessel is repressurized to inject the metal fuel upwards into the molds. The molds are removed and then shattered to release the fuel slugs. This fabrication method was used to fabricate 39,000 metallic fuel pins for EBR-II. While injection casting has been the most common metallic fuel fabrication method throughout the decades, many other methods have been explored including low-pressure gravity casting, microwave casting, continuous casting, centrifugal casting, coextrusion, and many others [11, 12, 8, 13, 14, 15]. Some of these methods aim to mitigate challenges that arise with americium (Am) volatilization during the casting process for TRU-containing fuel feedstocks, an issue with injection casting. Coextrusion is one of the methods explored at the Idaho National Laboratory (INL) and has been utilized for the initial fabrication tests of Lightbridge's unique fuels, as well as other metallic fuels with cladding coextruded. In this process, large billets are formed and machined and then inserted into a molten salt bath for approximately 30 minutes. The billets are then loaded into the extrusion press and extruded. This process can be seen in Figure 4 [15].

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Multi-Scale Computational Platform for Predictive Modeling of Corrosion in Al-Steel Joints (Final Report)

The research team proposed to develop innovative multi-scale models to predict corrosion and the resulting mechanical performances in aluminum-steel joints. The methods of joining considered are resistance spot welding, self-piercing riveting, and rivet-welding, all suitable for mass production applications. The multi-scale models integrate high throughput first-principle calculations based on density functional theory (DFT), high throughput calculation of phase diagrams (CALPHAD) modeling, and finite element method (FEM) simulations. These models are to be validated through laboratory experiments. Furthermore, the models are available as open source so as to enable scientists and engineers in the community to adapt and contribute to the development and application. The approaches rely on the research team’s extensive experience on the prediction of properties of individual phases at finite temperatures and variable compositions through DFT calculations, and our broad expertise on dissimilar material joining and their corrosion. The proposed computational framework enables high throughput computations for improved predictions of corrosion and the associated mechanical performance in dissimilar material joints, resulting in significant reduction in computational time needed by the current state-of-the-art methods. With the participation of researchers from three universities, an auto manufacturer, two manufacturing technology/equipment suppliers, and a software developer/vendor, the interdisciplinary research team applies the technical development on both phase-based modeling and laboratory experiments into the automobile body joining processes for validation and technology demonstration. The global cost of corrosion was estimated at about 3.4% of the global GDP in 2013. By using available corrosion control practices, it is estimated a saving between 15-35% of the cost of corrosion. In the U.S., more than $276 billion is spent repairing corrosion damage. Prediction of the corrosion and its impact on performance of the dissimilar material joints is critical for reducing the massive number of the current corrosion-based recalls for automobiles. Thus, the project goal is to develop models to enable predictive maintenance and end-of-life planning of multi-metal joints with risk of corrosion under different conditions such as exposure to high temperatures in summer and salt solutions in winter, quantified through its pH. An academia-industry consortium led by the University of Michigan and including Pennsylvania State University, University of Illinois Urbana-Champaign, University of Georgia, General Motors Company, Livermore Software Technology Corporation, and Optimal Process Technologies, LLC. created multi-scale models for prediction of corrosion in aluminum-steel joint structures such of them used in vehicle subassemblies – chassis and transmission systems. Starting from the first principle calculations, the team developed mathematical and data-driven models to predict the metallic components, which are formed during joining of two metals, for example aluminum and steel - a lightweight multilateral system which is currently used in more than 60% car bodies. These models were used for simulating chemical reactions that are happening when the joining metallic components are exposed to high temperatures and different pH values. The team was able to predict how the corrosion installs on the metallic components and how they lead to a sudden failure of components in cars. Newly developed machine learning algorithms combining Science, Technology, Engineering and Math disciplines, advanced finite element simulation and experimental validations have been integrated in a platform for prediction of the corrosion evolution and prediction the failure of joints under mechanical loadings and fatigue. Moreover, based on machine learning and inverse analysis, the team proposed solutions for designing new metallic alloys less susceptible to corrosion when joining multi-material assembles. An average of 4% error compared with experiments was achieved for the most common joints that are used in vehicle subassemblies.

36 MATERIALS SCIENCE↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗