Search NASA⌕ Search

SEARCH · Search NASA

Results for “analysis methodologies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Calibration Designs for Non-Monolithic Wind Tunnel Force Balances

This research paper investigates current experimental designs and regression models for calibrating internal wind tunnel force balances of non-monolithic design. Such calibration methods are necessary for this class of balance because it has an electrical response that is dependent upon the sign of the applied forces and moments. This dependency gives rise to discontinuities in the response surfaces that are not easily modeled using traditional response surface methodologies. An analysis of current recommended calibration models is shown to lead to correlated response model terms. Alternative modeling methods are explored which feature orthogonal or near-orthogonal terms.

Wind tunnel models↗

Predicting Failure Progression and Failure Loads in Composite Open-Hole Tension Coupons

Failure types and failure loads in carbon-epoxy [45n/90n/-45n/0n]ms laminate coupons with central circular holes subjected to tensile load are simulated using progressive failure analysis (PFA) methodology. The progressive failure methodology is implemented using VUMAT subroutine within the ABAQUS(TradeMark)/Explicit nonlinear finite element code. The degradation model adopted in the present PFA methodology uses an instantaneous complete stress reduction (COSTR) approach to simulate damage at a material point when failure occurs. In-plane modeling parameters such as element size and shape are held constant in the finite element models, irrespective of laminate thickness and hole size, to predict failure loads and failure progression. Comparison to published test data indicates that this methodology accurately simulates brittle, pull-out and delamination failure types. The sensitivity of the failure progression and the failure load to analytical loading rates and solvers precision is demonstrated.

Arunkumar, Satyanarayana↗

Model-Based Fault Diagnosis: Performing Root Cause and Impact Analyses in Real Time

Generic, object-oriented fault models, built according to causal-directed graph theory, have been integrated into an overall software architecture dedicated to monitoring and predicting the health of mission- critical systems. Processing over the generic fault models is triggered by event detection logic that is defined according to the specific functional requirements of the system and its components. Once triggered, the fault models provide an automated way for performing both upstream root cause analysis (RCA), and for predicting downstream effects or impact analysis. The methodology has been applied to integrated system health management (ISHM) implementations at NASA SSC's Rocket Engine Test Stands (RETS).

Figueroa, Jorge F.↗

Accelerated Creep Testing of High Strength Aramid Webbing

A series of preliminary accelerated creep tests were performed on four variants of 12K and 24K lbf rated Vectran webbing to help develop an accelerated creep test methodology and analysis capability for high strength aramid webbings. The variants included pristine, aged, folded and stitched samples. This class of webbings is used in the restraint layer of habitable, inflatable space structures, for which the lifetime properties are currently not well characterized. The Stepped Isothermal Method was used to accelerate the creep life of the webbings and a novel stereo photogrammetry system was used to measure the full-field strains. A custom MATLAB code is described, and used to reduce the strain data to produce master creep curves for the test samples. Initial results show good correlation between replicates; however, it is clear that a larger number of samples are needed to build confidence in the consistency of the results. It is noted that local fiber breaks affect the creep response in a similar manner to increasing the load, thus raising the creep rate and reducing the time to creep failure. The stitched webbings produced the highest variance between replicates, due to the combination of higher local stresses and thread-on-fiber damage. Large variability in the strength of the webbings is also shown to have an impact on the range of predicted creep life.

Jones, Thomas C.↗

Structural Design and Sizing of a Metallic Cryotank Concept

This paper presents the structural design and sizing details of a 33-foot (10 m) metallic cryotank concept used as the reference design to compare with the composite cryotank concepts developed by industry as part of NASA s Composite Cryotank Technology Development (CCTD) Project. The structural design methodology and analysis results for the metallic cryotank concept are reported in the paper. The paper describes the details of the metallic cryotank sizing assumptions for the baseline and reference tank designs. In particular, the paper discusses the details of the cryotank weld land design and analyses performed to obtain a reduced weight metallic cryotank design using current materials and manufacturing techniques. The paper also discusses advanced manufacturing techniques to spin-form the cryotank domes and compares the potential mass savings to current friction stir-welded technology.

Sleight, David W.↗

Proposed Objective Odor Control Test Methodology for Waste Containment

The Orion Cockpit Working Group has requested that an odor control testing methodology be proposed to evaluate the odor containment effectiveness of waste disposal bags to be flown on the Orion Crew Exploration Vehicle. As a standardized "odor containment" test does not appear to be a matter of record for the project, a new test method is being proposed. This method is based on existing test methods used in industrial hygiene for the evaluation of respirator fit in occupational settings, and takes into consideration peer reviewed documentation of human odor thresholds for standardized contaminates, industry stardnard atmostpheric testing methodologies, and established criteria for laboratory analysis. The proposed methodology is quantitative, though it can readily be complimented with a qualitative subjective assessment. Isoamyl acetate (IAA - also known at isopentyl acetate) is commonly used in respirator fit testing, and there are documented methodologies for both measuring its quantitative airborne concentrations. IAA is a clear, colorless liquid with a banana-like odor, documented detectable smell threshold for humans of 0.025 PPM, and a 15 PPB level of quantation limit.

Vos, Gordon↗

Determination of Parachute Joint Factors using Seam and Joint Testing

This paper details the methodology for determining the joint factor for all parachute components. This method has been successfully implemented on the Capsule Parachute Assembly System (CPAS) for the NASA Orion crew module for use in determining the margin of safety for each component under peak loads. Also discussed are concepts behind the joint factor and what drives the loss of material strength at joints. The joint factor is defined as a "loss in joint strength...relative to the basic material strength" that occurs when "textiles are connected to each other or to metals." During the CPAS engineering development phase, a conservative joint factor of 0.80 was assumed for each parachute component. In order to refine this factor and eliminate excess conservatism, a seam and joint testing program was implemented as part of the structural validation. This method split each of the parachute structural joints into discrete tensile tests designed to duplicate the loading of each joint. Breaking strength data collected from destructive pull testing was then used to calculate the joint factor in the form of an efficiency. Joint efficiency is the percentage of the base material strength that remains after degradation due to sewing or interaction with other components; it is used interchangeably with joint factor in this paper. Parachute materials vary in type-mainly cord, tape, webbing, and cloth -which require different test fixtures and joint sample construction methods. This paper defines guidelines for designing and testing samples based on materials and test goals. Using the test methodology and analysis approach detailed in this paper, the minimum joint factor for each parachute component can be formulated. The joint factors can then be used to calculate the design factor and margin of safety for that component, a critical part of the design verification process.

Mollmann, Catherine↗

The Safe Removal of Frozen Air from the Annulus of an LH2 Storage Tank

Large Liquid Hydrogen (LH2) storage tanks are vital infrastructure for NASA. Eventually, air may leak into the evacuated and perlite filled annular region of these tanks. Although the vacuum level is monitored in this region, the extremely cold temperature causes all but the helium and neon constituents of air to freeze. A small, often unnoticeable pressure rise is the result. As the leak persists, the quantity of frozen air increases, as does the thermal conductivity of the insulation system. Consequently, a notable increase in commodity boil-off is often the first indicator of an air leak. Severe damage can result from normal draining of the tank. The warming air will sublimate which will cause a pressure rise in the annulus. When the pressure increases above the triple point, the frozen air will begin to melt and migrate downward. Collection of liquid air on the carbon steel outer shell may chill it below its ductility range, resulting in fracture. In order to avoid a structural failure, as described above, a method for the safe removal of frozen air is needed. A thermal model of the storage tank has been created using SINDA/FLUINT modeling software. Experimental work is progressing in an attempt to characterize the thermal conductivity of a perlite/frozen nitrogen mixture. A statistical mechanics model is being developed in parallel for comparison to experimental work. The thermal model will be updated using the experimental/statistical mechanical data, and used to simulate potential removal scenarios. This paper will address methodologies and analysis techniques for evaluation of two proposed air removal methods.

cryogenic insulation↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.

DeMott, Diana↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. To determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators, and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules, and operational requirements are developed and then finalized.

DeMott, Diana L.↗

Sizing and Margins Assessment of the Mars2020 Acusil-II Thermal Protection System

The Mars2020 entry vehicle is currently being developed by NASA to safely land its next rover on the Martian surface in 2021. The vehicle will be protected from entry aeroheating using three different TPS materials: PICA tiles on the forebody, SLA-561V on the backshell and Acusil-II on the parachute close-out cone (PCC) and its backshell interface plate (BIP). Mars2020's entry vehicle and TPS design is identical to the Mars Science Laboratory, NASA's last Mars lander; therefore, the purpose of this study is to assess the adequacy of the existing TPS design and thickness for Mars2020 predicted environments. This study focuses on sizing and margin assessment of Acusil-II TPS on the PCC and BIP. The methodology and analysis techniques that were used for assessing thermal margins are reviewed. Analysis assumptions and limitations are discussed in detail. Thermal sizing is performed at different locations and results are presented.

Acusil↗

New York City Panel on Climate Change 2019 Report Chapter 2: New Methods for Assessing Extreme Temperatures, Heavy Downpours, and Drought

This New York City Panel on Climate Change (NPCC3) chapter builds on the projections developed by the second New York City Panel on Climate Change (NPCC2) (Horton et al., 2015). It confirms NPCC2 projections as those of record for the City of New York, presents new methodology related to climate extremes, and describes new methods for developing the next generation of climate projections for the New York metropolitan region. These may be used by the City of New York as it continues to develop flexible adaptation pathways to cope with climate change. The main topics of the climate science chapter are: (1) Comparison of observed temperature and precipitation trends to NPCC2 2015 projections. (2) New methodology for analysis of historical and future projections of heatwaves, humidity, and cold snaps. (3) Improved characterization of observed heavy downpours. (4) Characterization of observed drought using paleoclimate data. (5) Suggested methods for next generation climate risk information.

Gonzalez, Jorge E.↗

Preliminary Approach to Assess the Seismic Hazard on a Lunar Site

The passive seismic network deployed on the Moon during the Apollo missions operated for eight years and allowed the observation of seismic activity. More than 12500 seismic events were registered, where 28 were classified as shallow moonquakes with moment magnitudes up to 4.1. Seismic events of this nature pose a significant risk to future long-term lunar habitats; thus, these events must be carefully studied and considered in the seismic design of these structures. This paper proposes a preliminary seismic hazard assessment imposed by shallow moonquakes. The hazard assessment is performed using the Probabilistic Seismic Hazard Analysis (PSHA) methodology, considering previous studies and theories regarding the seismic environment of the Moon. The study zone covers ~860 km2 of the Taurus-Littrow Valley, containing the Apollo 17 landing site and the Lee-Lincoln lobate scarp as the considered seismic source. The seismic hazard is quantified in terms of peak ground acceleration (PGA) and spectral acceleration (5% damped pseudo-acceleration, PSA). Seismic hazard deaggregation scenarios, Uniform Hazard Spectra (UHS) for different hazard levels, and a Conditional Mean Spectrum (CMS) for a target period of 0.2 s are obtained to quantify the seismic hazard on a specific site on the Moon. The developed seismic hazard assessment provides a preliminary approach for realistic scenarios to conduct structural designs that ensure the seismic performance of fully operational long-term lunar structures.

Moonquake↗

Reusable Rocket Engine Operability Modeling and Analysis

This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

Christenson, R. L.↗

A comparison of analytical results for 20 K LOX/hydrogen instabilities

Test data from NASA Lewis' Effect of Thrust Per Element on Combustion Stability Characteristics of Hydrogen-Oxygen Rocket Engines test program are used to validate two recently released stability analysis tools. The first tool is a design methodology called ROCCID (ROCket Combustor Interactive Design). ROCCID is an interactive design and analysis methodology that uses existing performance and combustion stability analysis codes. The second tool is HICCIP (High frequency Injection Coupled Combustion Instability Program). HICCIP is a recently developed combustion stability analysis model. Using a matrix of models, results from analytic comparisons with 20 K LOX/H2 experimental data are presented.

Klem, Mark D.↗

A comparison of analytical results for 20 K LOX/hydrogen instabilities

Test data from NASA Lewis' Effect of Thrust Per Element on Combustion Stability Characteristics of Hydrogen-Oxygen Rocket Engines test program are used to validate two recently released stability analysis tools. The first tool is a design methodology called ROCCID (ROCket Combustor Interactive Design). ROCCID is an interactive design and analysis methodology that uses existing performance and combustion stability analysis codes. The second tool is HICCIP (High frequency Injection Coupled Combustion Instability Program). HICCIP is a recently developed combustion stability analysis model. Using a matrix of models, results from analytic comparisons with 20 K LOX/H2 experimental data are presented.

Klem, Mark D.↗

The Aeronautical Data Link: Decision Framework for Architecture Analysis

A decision analytic approach that develops optimal data link architecture configuration and behavior to meet multiple conflicting objectives of concurrent and different airspace operations functions has previously been developed. The approach, premised on a formal taxonomic classification that correlates data link performance with operations requirements, information requirements, and implementing technologies, provides a coherent methodology for data link architectural analysis from top-down and bottom-up perspectives. This paper follows the previous research by providing more specific approaches for mapping and transitioning between the lower levels of the decision framework. The goal of the architectural analysis methodology is to assess the impact of specific architecture configurations and behaviors on the efficiency, capacity, and safety of operations. This necessarily involves understanding the various capabilities, system level performance issues and performance and interface concepts related to the conceptual purpose of the architecture and to the underlying data link technologies. Efficient and goal-directed data link architectural network configuration is conditioned on quantifying the risks and uncertainties associated with complex structural interface decisions. Deterministic and stochastic optimal design approaches will be discussed that maximize the effectiveness of architectural designs.

Morris, A. Terry↗

Space Tug Docking Study. Volume 5: Cost Analysis

The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

Source record↗