Search NASA⌕ Search

SEARCH · Search NASA

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Site Identification framework and environmental compliance for floating ocean turbines in US Waters (Abstract)

Like all potential marine energy deployment sites, characterizing the site, understanding the environmental interactions with floating tidal technology, and mapping a pathway towards regulatory acceptance will be needed to site and permit ocean current development within the Florida Current. The proposed work will be based on a modeling analysis, a desk-top review and analysis, focusing on the characteristics of the ocean current technology and environmental monitoring information on the marine animals and habitats that are specific to the appropriate latitude, particularly those that are endemic to the offshore Florida area. The analysis will also describe the state and federal authorizations required for deploying a floating tidal energy technology, with an emphasis on how they differ from those in Washington, Alaska, and Maine. Environmentally compliant sites within Florida Current will be selected based on environmental, logistical, and regulatory criteria. Recommendations on monitoring needs and adaptive management practices will be provided. The need to acquire social acceptance for the Orbital Marine Power technology will also be explored and general recommendations prepared to encourage the best acceptance in the communities of interest.

16 TIDAL AND WAVE POWER↗

Characterization of MC&A for the Molten Salt Fuel Cycle

Advanced reactor developers are exploring diverse reactor designs, including molten salt reactors (MSRs). These advanced reactors are considered for wider applications and a range of deployment locations, including supporting the integration of renewable energy sources in the grid. There are three main types of MSRs: (1) reactors in which the fuel salt freely circulates within the core; (2) reactors with the fuel salt contained within vented fuel tubes; and (3) reactors that use molten salt solely as a coolant, with the fuel in a separate, solid form. In this document, the term MSR refers specifically to the first two types, which use fuel salt—special nuclear material (enriched uranium, plutonium, and 233 U) in chloride or fluoride form mixed with chloride- or fluoride-based carrier salt in a peritectic mixture—as the primary medium for fission. The composition of fuel salt, both at startup and for makeup or refueling, varies depending on the MSR design and the chosen fuel cycle approach, which can be either once-through or closed. For MSRs, a variety of fuel cycle approaches (e.g., U, U–Pu, U–Pu–TRU, U–Th, U–Pu–Th) are being considered. Fuel in MSRs is much different than traditional solid fuel, including its preparation. The uniqueness warrants investigation into characterizing fuel preparation processes, known as fuel salt synthesis . This effort characterized major fuel preparation and synthesis processes, identifying temperature, equipment, and environmental requirements for uranium-, plutonium-, and thorium-based fuel preparation and synthesis. Because MSR fuel salt synthesis facilities handle special nuclear material in loose, bulk form, a material control and accounting plan will be required for licensing from the US Nuclear Regulatory Commission or under the US Department of Energy authorization. This effort serves as a foundation to investigate material control and accounting approaches for synthesis facilities, including determining measurement points and techniques. Because several MSR developers are planning demonstration facilities in the coming years, this effort will support stakeholders with preparing or reviewing material control and accounting plans for providing assurance that all special nuclear material is accounted for at fuel salt synthesis facilities. This report was produced for Materials Protection, Accounting, and Control Technologies (MPACT) program under the US Department of Energy (DOE), Office of Nuclear Energy, Nuclear Fuel Cycle and Supply Chain.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2022

The purpose of this analysis is to examine the cost-effectiveness of the 2022 edition of ANSI/ASHRAE/IES Standard 90.1, which is developed by the ASHRAE Standard Standing Project Committee (SSPC) 90.1 and is the model energy standard for all commercial buildings and multifamily residential buildings over three floors. PNNL analyzed the cost-effectiveness of changes in Standard 90.1-2022, compared to the previous 90.1-2019 edition, as applied in commercial buildings across the United States. In reviewing proposed changes to Standard 90.1, the SSPC considers the cost-effectiveness of individual changes (addenda). Due to the continuous nature of the development process, however, ASHRAE does not evaluate the entire package of addenda from one edition of the standard to the next, which is of particular interest to adopting state and local governments. Providing states with an analysis of cost-effectiveness facilitates a more comprehensive understanding of the impacts associated with updated model energy codes, informs the state decision-making process and its authorities, and ultimately encourages greater adoption of updated energy codes. This information also informs the development of future editions of Standard 90.1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Closeout Report of BNL LDRD 23-050 A Second EIC Detector: Physics Case and Conceptual Design

This document is the closeout report for LDRD 23-050, a type-A LDRD project awarded in FY2022 under the title “ A Second EIC Detector: Physics Case and Conceptual Design ”. The project was motivated by the strong interest within the EIC community in a second general-purpose detector and interaction region, and by the recognition that such a detector is essential to fully exploit the scientific potential of the EIC over its multi-decade lifetime. The key goals of the LDRD were to (i) strengthen the case for a second EIC detector, building on the arguments already articulated in the community Yellow Report, (ii) provide a realistic detector concept that is complementary to the current project detector, ePIC, in terms of physics reach, precision, and control of systematics, and (iii) broaden the overall physics program of the EIC facility. Since a possible second detector is expected to be realized with a delay of several years relative to the first detector, the project explicitly aimed at identifying technologies that are not yet sufficiently mature for ePIC but could be deployed on the later timescale of a second detector, thereby providing genuine complementarity and room for innovation. LDRD 23-050 provided support for two postdoctoral researchers and partial support for several BNL staff members, and the effort ramped up in mid-2023. Work was carried out in close collaboration with colleagues from the EIC project, the Cold QCD and STAR groups at BNL, and with substantial input from members of the EIC User Group and the ePIC Collaboration as reflected in the author list. Over the period from October 2022 through September 2025, this team developed and refined a physics program tailored to a second detector, translated the resulting physics requirements into detector-level performance targets, and explored multiple conceptual detector layouts capable of meeting these targets within the constraints of the second interaction region. The expected outcome, as stated in the original proposal, was a document detailing the physics potential and requirements of a second EIC detector, accompanied by a comprehensive conceptual detector design and an outline of the remaining R&D needed to bring the relevant technologies to maturity. The present report summarizes the progress that has been achieved toward these goals. It consolidates the physics studies, detector concepts, and technology assessments developed under this LDRD and places them in the broader context of worldwide detector R&D. While the evolving priorities of the EIC project and the substantial community effort required to design and construct ePIC naturally limited the scope of EIC-wide activities toward a second detector during this period, the work documented here is intended to provide a foundation and a point of reference for future efforts. Whatever form a second EIC detector may ultimately take, we hope that this report will serve as a useful guide for colleagues who continue to advance this program in the near- and mid-term future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Solar@Scale: Improving the Local Rules of the Game for Large Scale Solar

This final report summarizes the Solar@Scale Project including project goals, milestones, tasks and deliverables. Solar@Scale, led by ICMA in partnership with the American Planning Association, took place from 2020-2025. The initiative addressed large-scale solar soft costs by developing tools and resources related to planning, siting, permitting and inspection in support of local governments, special districts, and other authorities that have jurisdiction over large-scale solar projects.

14 SOLAR ENERGY↗

Illinois Storage Corridor - CarbonSAFE Phase III: Policy, Regulatory, Legal and Permitting Characteristics; Subtask 5.5

The Illinois Storage Corridor (ISC) project aims to advance the commercial development and implementation of carbon capture and storage (CCS) technologies within a region in Illinois of suitable geology for carbon dioxide (CO 2 ) storage in deep saline aquifers. The project partners have annual emissions greater than 6.5 million tonnes per year; storage hubs are being explored at two sites—one near the One Earth Energy facility in east-central Illinois, and one near the Prairie State Generating Company campus in southwest Illinois. To implement the technology, legal, policy, and economic considerations must be explored. The United States Environmental Protection Agency (US EPA) administers the Underground Injection Control (UIC) program and is responsible for issuing Class VI permits to construct and operate CO 2 injection wells, i.e., a UIC Class VI well permit is required to inject CO 2 into the subsurface for geologic sequestration. The largest consideration of the Class VI well requirements is to protect underground sources of drinking water (USDWs). Additionally discussed are considerations for Class VI permits relating to public engagement. Besides permitting, property rights to storage sites, subsurface pore spaces, and areas for pipeline transportation must be secured. Pore space rights is still a novel concept being explored and not yet addressed by the Illinois legislature. It is believed that surface property rights are required for the subsurface pore space below, so long as there is not a separated mineral estate in the subsurface. Illinois legislature has addressed securing rights-of-way for CO 2 transportation, allowing for easements and the exercise of eminent domain to secure such rights. Economically, the incentives for CCS are ever-expanding. Recently, the federal government broadened the availability and increased the dollar-amounts for the § 45Q tax credits for geological storage of carbon oxides. Congress has also authorized the Advanced Industrial Facilities Development Program which allocates billions of dollars in funds to installing technology at industrial facilities to reduce greenhouse gas emissions. On the state level, Illinois has had its own incentives for CCS projects since 2009 and expanded its emission-related goals again in 2021. The law enacted in 2021 specifically creates a commission to explore implementing CCS at Prairie State Generating Company, a partner on the Illinois Storage Corridor project.

54 ENVIRONMENTAL SCIENCES↗

Stakeholder Questionnaire on Fish Passage Facilities at U.S. Hydropower Developments

To mitigate the environmental impacts of hydropower dams on fish populations in rivers, fish passage infrastructure may be required by regulatory authorities or recommended by state or federal agencies to allow migratory fish to pass hydropower barriers and complete their life histories. However, information on the location, types, and characteristics of fish passage infrastructure is incomplete at the national scale. This lack of information limits understanding of current fish passage capabilities and hinders efforts to anticipate future passage requirements during project licensing or relicensing. To address this knowledge gap, researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. As part of this effort, a stakeholder questionnaire was created and deployed to solicit information on fish passage infrastructure, including engineering characteristics, operational schedules, targeted species, and costs. This online questionnaire was designed to allow respondents to provide highly detailed information regarding fish passage capabilities at U.S. hydropower developments as efficiently as possible. The questionnaire improved database coverage and accuracy by providing valuable development- or passage-specific stakeholder knowledge that is not otherwise publicly available. However, questionnaire response rates were low, and stakeholders showed a preference for providing data via the spreadsheet template. This is likely because most stakeholders had high-level knowledge about fish passage existence and type at many features, and few stakeholders had highly detailed, feature-specific knowledge of fish passage infrastructure, cost, operational scheduling, and capabilities. Nonetheless, the development and deployment of the stakeholder questionnaire advanced the project in several fundamental ways, and a similar questionnaire may be valuable for future database expansion via targeted dissemination to stakeholders with confirmed knowledge of detailed fish passage information at specific hydropower projects.

13 HYDRO ENERGY↗

A case study in contrastive learning information combination: Application to technical forensics of additive manufacturing filament source identification

Combination of information from disparate data sources into a single decision is a core challenge in many fields, including the field of technical forensics. Technical forensics (TF) utilizes technical characterization of questioned samples to determine properties of that sample; these properties are then used to infer information of forensic interest, such as provenance, age, or attribution. TF is utilized in traditional forensic applications, such as the attribution of material fragments from an explosive, and in nuclear forensic applications, such as the attribution of actinides which have been interdicted out of regulatory control. The challenge of combining information from disparate sources, described alternately by many terms including “Data Fusion” and “Data Integration”, is exacerbated in the technical forensics domain due to at least two factors: the challenge of interpreting each information source singularly, and the relatively small data set sizes available. Extensive literature exists attempting to combine technical forensics information sources, both in manual and automated processes. These attempts are often bespoke to the specific information sources (such as the bi-, tri-, or quad-isotope chart (Moody, Grant, and Hutcheon 2005)), with some emerging examples of simple early- and late- fusion (, respectively). Simultaneous to the information combination efforts described in the previous paragraph, the field of natural language processing attempted (and largely succeeded) in combining information from multiple non-technical information sources. The ecosystem of “multi-modal” language models, which can take text and images as input, and generate text and images as output, became large and diverse by 2025 (Khan et al. 2025). In a generalized sense, many of these methods are trained by learning neural networks which can convert raw text or images into a vector of numbers describing the text or image, hereafter called “embeddings” and the neural networks performing the conversion are called “embedders”. By using a separate embedder for text and images, finding coincident text and images (such as images with their captions), and optimizing the parameters of the embedders such that the embeddings for the text and the image are similar, the field has found a bridge between text and images (Girdhar et al. 2023). It is the contention of the authors of this report that this insight is not limited to text and images but instead can be extended to any modality which can be found coincidently. The subject of the rest of this report is the application of this method to example multi-modal technical forensic data. Some details about the data used in this report are not appropriate for this report, and are included in a companion report (PNNL-38669).

36 MATERIALS SCIENCE↗

DASSH-F: Subchannel Based Thermal Analysis

The DASSH thermal analysis code is designed to rapidly allow a reactor design engineer to obtain flow rates requirements that satisfy peak temperature constraints in the domain. The advantage of using DASSH over a hand calculation is that it has a more rigorous treatment of the pin power distribution and coolant heat transfer within an assembly and between assemblies. The advantage of using DASSH over a conventional 3D subchannel code or a computational fluid dynamics code (CFD) is that it can obtain the desired solution in a matter of minutes in serial with minor computer memory needs. The DASSH methodology for pin lattice models is virtually identical to SUPERENERGY-2 with additional functionalities taken from follow on work to SUPERENERGY-2 done at ANL in the 1980s. DASSH today is an integral component of the Argonne Fast Reactor analysis suite for reactor design work. DASSH obtains the power distribution from a coupled neutron-gamma heating calculation in GAMSOR (including DIF3D) at each time point of a companion fuel cycle analysis calculation with REBUS. The domain in DASSH assumes a hexagonal grid typical for fast reactors with much of the geometry information taken from the DIF3D model. DASSH assumes the assemblies that are loaded into each grid position are ducted to control the coolant flow. The user can alternatively provide their own geometry and power profile instead of inheriting it from DIF3D. Considerable detail is given on the subchannel formulation of DASSH in this document. Much of the formulation and design of the code builds upon research done by previous authors with little new investigation. Thus the decisions made in developing the subchannel model used in DASSH have their origins over 50 years ago. Much of the heat transfer methodology in DASSH is built upon correlations for both the coolant mixing and heat transfer coefficients for pins and ducts. DASSH is thus not a rigorous treatment of a given problem, but a rapid assessment of the temperature field that has known limitations with respect to an experimental measurement or CFD calculation. The DASSH input and output are detailed along with usage of the software. The DASSH output provides tables of evaluated material properties and key coolant and pin temperature results. DASSH can create Python scripts that generate domain summary pictures. DASSH can also generate assembly temperature maps and VTK output files which allow the DASSH solution to be visualized. As the primary purpose of the DASSH software is to compute the coolant and fuel pin temperature distribution for a given model of a reactor, much of the output focus is giving the user quick summary tables needed to assess the performance of a given orifice flow specification. The present version of DASSH has a crude orifice search capability and a sufficient orifice flow search capability. The flow search tries to meet user specified constraints for 1) peak 2-sigma clad temperature, 2) peak coolant temperature, and 3) desired bulk outlet temperature. This document serves as the manual for the Fortran based DASSH software that was developed to replace the Python version of DASSH developed as part of the VTR program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2024

This Fiscal Year (FY) 2024 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA), and associated operating disposal- authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory (INL). Annual review of the adequacy of the PA and CA for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2024, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Nineteen waste canister shipments were received at the RHLLW Disposal Facility, and all nineteen waste canisters were emplaced in disposal vaults.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

DC Fast Charging Test Procedures

This report has been drafted as an initial effort to develop a standardized test procedure for DCFC for LD EVs. The proposed test procedures are designed to be time-efficient, aligned with EV discharge tests, and practical to implement, thereby minimizing the testing and computational efforts required by OEMs and testing authorities.

33 ADVANCED PROPULSION SYSTEMS↗

Knowledge-Based Hazardous Waste Determinations for Solar Photovoltaic (PV) Modules: A Foundational Study

This report explores using "generator knowledge" to determine whether a solar photovoltaic (PV) module must be managed as hazardous waste prior to recycling or landfilling. Generator knowledge is a legal term and existing regulatory pathway for making a hazardous waste determination that has been used by other industries but is a relatively unknown option to the PV industry. In the United States, a hazardous waste determination often acts as a pre-requisite to recycle or landfill a PV module. The results of the hazardous waste determination dictate whether the PV module must be managed as hazardous waste or nonhazardous solid waste. Managing a PV module as hazardous waste requires compliance with stringent U.S. federal and state hazardous waste law. In addition to increased management costs, which can be ten times higher, legal liability for PV modules regulated as hazardous waste is also heightened with both civil and criminal penalties for noncompliance which includes making an inaccurate or faulty hazardous waste determination. The most common reason a PV module would be regulated as hazardous is if it contains a regulated metal in an amount that equals or exceeds the toxicity characteristic limits. To determine whether a PV module exhibits a hazardous characteristic, the regulated person/entity must "apply knowledge...in light of the materials and processes used." In the absence of adequate knowledge to determine whether the PV module is hazardous, it must be tested using Test Method 1311 Toxicity Characteristic Leaching Procedure (TCLP) or an equivalent EPA-approved method. Although TCLP is the predominant method used to today to make a hazardous waste determination for PV modules, evidence from this study concludes it is not practical to TCLP test every PV module even in a single utility-scale installation, and a scalable solution is needed. This study finds that knowledge-based hazardous waste determinations may allow a regulated person/entity to make a hazardous waste determination for more than one PV module at one time - making this regulatory pathway a potential scalable solution. Through legal analysis and interviews with 44 experts, the authors explore what it means to make an accurate knowledge-based hazardous determination for PV modules considering sources and forms of information as well as potential limitations. The work aims to provide a foundation for building consensus on whether knowledge-based hazardous determinations are a viable, scalable industry approach for solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Massachusetts and New England Sustainable Aviation Fuel Study

The Massachusetts Port Authority established a project to assess feedstock availability to produce SAF near 10 New England airports. A techno-economic analysis was conducted to determine renewable fuels and SAF that could be produced from these feedstocks. The resource assessment found municipal solid waste, woody biomass, and food waste were most abundant. The techno-economic analysis found that potential fuel production varied widely based on location, feedstock, and technology production pathway ranging from 1 to 369 million gallons of gasoline equivalent per year. An assessment of infrastructure readiness to handle SAF was conducted. It was determined that SAF produced outside of New England should be blended in other regions with more capacity and flexibility and delivered to New England as Jet A is today. For SAF produced in New England, there are terminals that have existing infrastructure to receive, blend, and distribute SAF/Jet A blends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Interesting Solar Energy System Simulations in 1990 and 2025

This presentation uses a simulation by the author in 1991 and newer developements in 2025 to illustrate strategies to address problems that arise when steady state assumption is applied in time series simulation: 1) high resolution time series data; 2) distirbution functiion; 3) machine learning. The presentation does not report new findings (previously published material is cited).

14 SOLAR ENERGY↗

Challenges and Opportunities for Electric Utility Modeling and Asset Valuation Frameworks: Case Study on Valuing New Pumped Storage Hydropower

Asset valuation by electric utilities is becoming increasingly difficult in the rapidly changing electric sector. Rapid deployment of variable generation and inverter-based storage systems along with uncertain demand growth, climate, policies, and other factors create a challenging environment for understanding the value proposition of a new potential asset. This report describes an effort between the Tennessee Valley Authority (TVA) and three U.S. Department of Energy laboratories to perform a detailed review of utility modeling and analysis practices for asset valuation and identify challenges and opportunities for advancing its methods into the future. It focuses on a case study of new potential pumped storage hydropower (PSH) because of growing interest in new PSH capacity to provide energy balancing, firm capacity, and a range of ancillary services. Staff from the DOE labs conducted systematic interviews about current practices in capacity expansion modeling, production-cost modeling, hydrological modeling, and transmission stability modeling while also discussing how scenario analysis is conducted and how models and data are integrated. The effort resulted in a set of model, integration, and scenario recommendations that could be valuable to TVA, other utilities, system operators, and other stakeholders conducting integrated grid analysis. Individual model recommendations suggest exploring computational tradeoffs with detail and resolution across spatiotemporal structure, supply- and demand-side details, transmission overlays, market interactions, and ancillary services. Automated processes to pass data between models and conduct larger scenario suites could also enhance valuation practices by enabling a more consistent study of asset value across a broader range of uncertain future grid conditions where PSH could be particularly valuable. TVA and other industry stakeholders can learn from and adapt applied research-grade methods developed by DOE laboratories and other research institutions to improve decision making and accelerate progress towards a reliable, economic, sustainable energy system.

13 HYDRO ENERGY↗

Strategic Energy Plan: Playa de Ponce, Ponce, Puerto Rico

Un Nuevo Amanecer Inc. (UNA), a community-based NGO (501C(3)), sought technical assistance through the U.S. Department of Energy's (DOE's) Energy Technology Innovation Partnership Project (ETIPP) to develop a strategic energy plan (SEP) for the community of Playa de Ponce on the south coast of Puerto Rico. A SEP helps communities identify energy goals and priority projects, and outline strategies and actions to build a shared path toward their energy vision. The primary goal of this SEP is to collaboratively explore pathways for the community's energy future. Researchers from the National Laboratory of the Rockies (NLR) engaged with the community for a period of seven months and facilitated a series of in-person community engagement workshops along with ETIPP regional partner Puerto Rico Hispanic Federation, UNA, and community leaders. The SEP workshops were held twice, March 18-20 and June 24-26, 2025. Through facilitated discussions, the community worked together to define and articulate a clear vision for its short-, medium-, and long-term energy goals. The workshops played a key role in identifying the specific strategies and priority projects that would best suit the needs of the community. The discussions outlined the community's energy aspirations, establishing a shared vision, setting goals, and outlining the priority actions needed to bring them to fruition. During the workshops, the community shared some of the most pressing energy challenges that they face on a regular basis, such as high energy costs that disproportionately impact an aging population and unreliable electricity during extreme weather events that result in frequent power outages. These issues have also exacerbated risks to public health and safety of the community. In response, UNA requested technical assistance through ETIPP to inform the development of a SEP tailored to Playa de Ponce to support its energy vision. This document explores four community-driven energy strategies aligned with that vision. Figure 1 shows the strategies outlined in this plan, which are categorized into three focus areas as identified by the community: energy reliability; safety and security; and stakeholder participation, education, and capacity building. This document serves as a shared roadmap for developing and implementing energy solutions that meet the needs of Playa de Ponce. It is intended to serve as a public resource for the community, UNA, and local authorities - providing tools, information and a shared foundation to inform future implementation efforts. This plan is intended to complement ongoing planning frameworks at the municipal, regional, and island-wide levels. As a living document, this SEP can evolve alongside Playa de Ponce's changing energy goals, while offering a framework to help them realize their energy vision.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗