Search NASA⌕ Search

SEARCH · Search NASA

Results for “buried”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Data for Monitoring Fracture Saturation with Internal Transportable Seismic Sources and Twin Neural Networks

Seismic coda-wave analysis is a well-developed method for detecting subtle physical changes in complex media by measuring arrival times in the late-arriving energy from multiply-scattered or reflected waves. However, a challenge arises when multiply-scattered waves are not sufficiently separated in time from the direct arrivals to provide a clear coda wave train. Additional complications for monitoring changes in fracture systems arise when the signals originate from unsynchronized internal sources, such as natural induced seismicity, from acoustic emission, or from transportable intra-fracture sources (chattering dust), that generate uncontrolled signals that vary in arrival time, amplitude and frequency content. Here, we use a twin neural network (also known as a Siamese neural network) for dimensionality reduction to analyze signals from chattering dust to classify the fluid saturation state of a synthetic fracture system. The twin neural network with shared weights generates a low-dimensional representation of the data input by minimizing contrastive loss, serving as the input to a multiclass classifier that accurately classifies whether multiple fractures in a fracture system are fully saturated or partially saturated, or whether a change in saturation has occurred in different fractures in the system. These results show that information buried in unresolved codas from uncontrolled sources can be extracted using machine learning to monitor the evolution of fracture systems caused by physical and chemical processes even when the scattered and direct wave fields overlap.

58 GEOSCIENCES↗

Wind redistribution of snow impacts the Ka- and Ku-band radar signatures of Arctic sea ice

Wind-driven redistribution of snow on sea ice alters its topography and microstructure, yet the impact of these processes on radar signatures is poorly understood. Here, we examine the effects of snow redistribution over Arctic sea ice on radar waveforms and backscatter signatures obtained from a surface-based, fully polarimetric Ka- and Ku-band radar at incidence angles between 0° (nadir) and 50°. Two wind events in November 2019 during the Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) expedition are evaluated. During both events, changes in Ka- and Ku-band radar waveforms and backscatter coefficients at nadir are observed, coincident with surface topography changes measured by a terrestrial laser scanner. At both frequencies, redistribution caused snow densification at the surface and the uppermost layers, increasing the scattering at the air–snow interface at nadir and its prevalence as the dominant radar scattering surface. The waveform data also detected the presence of previous air–snow interfaces, buried beneath newly deposited snow. The additional scattering from previous air–snow interfaces could therefore affect the range retrieved from Ka- and Ku-band satellite altimeters. With increasing incidence angles, the relative scattering contribution of the air–snow interface decreases, and the snow–sea ice interface scattering increases. Relative to pre-wind event conditions, azimuthally averaged backscatter at nadir during the wind events increases by up to 8 dB (Ka-band) and 5 dB (Ku-band). Results show substantial backscatter variability within the scan area at all incidence angles and polarizations, in response to increasing wind speed and changes in wind direction. Our results show that snow redistribution and wind compaction need to be accounted for to interpret airborne and satellite radar measurements of snow-covered sea ice.

54 ENVIRONMENTAL SCIENCES↗

IMPACT OF SOIL TEMPERATURE VARIATION ON PERFORMANCE MODELING OF A NOVEL SHALLOW BORE GROUND HEAT EXCHANGER

A novel shallow bore (< 6 m deep) ground heat exchanger is proposed to substitute the conventional vertical bore ground heat exchanger (> 60 m deep) for ground source heat pump systems. A series of simulations were carried out to evaluate the impacts of the vertical soil temperature profile on the performance of the shallow bore ground heat exchanger in response to thermal loads of a ground source heat pump system, with various lengths of the shallow bore ground heat exchanger and ground thermal properties. The results indicate that the vertical soil temperature profile has a noticeable influence on the thermal response of the shallow bore ground heat exchanger. Moreover, for shallow bore ground heat exchangers with the same volume and buried depth, the one with greater length and narrower diameter has lower tank water temperature fluctuations over the year due to relatively more stable soil temperature, and the larger surface to volume ratio.

Shi, Liang↗

Assessing the Potential for Inadvertent Human Intrusion at the Area 3 and Area 5 Radioactive Waste Management Sites on the Nevada National Security Site, Nye County, Nevada

This paper recommends an approach to inadvertent human intrusion (IHI) at the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) on the Nevada National Security Site (NNSS). IHI analysis uses the consequences of an individual inadvertently contacting buried waste to set waste concentration limits for near-surface disposal of low-level radioactive waste (LLW). Regulatory agencies are increasingly applying risk-informed decision-making to LLW waste management (NRC 2006). Risk-informed decision-making combines scientific risk assessment with stakeholder values and perceptions to determine a level of acceptable risk. Risk considers not only the consequences of an event, but also its probability of occurring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hard x-ray standing-wave photoemission study of the interfaces in a BiFeO$_3$/La$_{0.7}$Sr$_{0.3}$MnO$_3$ superlattice

Hybrid multiferroics such as BiFeO$_3$ (BFO) and La$_{0.7}$Sr$_{0.3}$MnO$_3$ (LSMO) heterostructures are highly interesting functional systems due to their complex electronic and magnetic properties. One of the key parameters influencing the emergent properties is the quality of interfaces, where varying interdiffusion lengths can give rise to different chemistry and distinctive electronic states. Here we report high-resolution depth resolved chemical and electronic investigation of BFO/LSMO superlattice using standing-wave hard X-ray photoemission spectroscopy in the first-order Bragg as well as near-total-reflection geometry. Our results show that the interfaces of BFO on top of LSMO are atomically abrupt, while the LSMO on top of BFO interfaces show an interdiffusion length of around 1.2 unit cells. The two interfaces also exhibit different chemical gradients, with the BFO/LSMO interface being Sr-terminated by a spectroscopically distinctive high binding energy component in Sr 2p core-level spectra, which is spatially contained within 1 unit cell from the interface. From the electronic point of view, unique valence band features were observed for bulk-BFO, bulk-LSMO and their interfaces. Our X-ray optical analysis revealed a unique electronic signature at the BFO/LSMO interface, which we attribute to the coupling between those respective layers. Valence band decomposition based on the Bragg-reflection standing-wave measurement also revealed the band alignment between BFO and LSMO layers. Our work demonstrates that standing-wave hard x-ray photoemission is a reliable non-destructive technique for probing depth-resolved electronic structure of buried layers and interfaces with sub-unit-cell resolution. Equivalent investigations can be successfully applied to a broad class of material such as perovskite complex oxides with emergent interfacial phenomena.

Martins, HP↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined Techno-Economic Analysis and Life Cycle Assessment of an Integrated Direct Air Capture System with Advanced Algal Biofuel Production

The continuous increase in carbon dioxide (CO2) concentration in the atmosphere since the First Industrial Revolution correlates convincingly with the ongoing rise of the Earth's global average temperature contributing to climate change. As a response, carbon capture and sequestration (CCS) technologies are being implemented to mitigate anthropogenic CO2 emissions by capturing CO2 from high emitting point sources, such as power plants, refineries, and cement factories, and subsequently buried in geological formations underground for long term storage. Recently direct air capture (DAC) has emerged as a promising alternative technology that captures CO2 directly from the atmosphere for use or sequestration. This study investigates the potential synergistic benefits of integrating a solid amine-based DAC system with advanced algal biofuel production in photobioreactors (PBRs). DAC utilization allows the removal of atmospheric CO2 while also decoupling algae production facilities from anthropogenic point CO2 sources and avoiding the cost and logistics challenges of transporting CO2 long distances to remote facilities. Techno-economic analysis and life cycle assessment are performed to assess the economic and environmental benefits of heat and mass integration between the DAC and the PBR for biofuel production. The DAC-PBR system integration also considers on-site flue gas handling options, DAC capital utilization, the tradeoff between centralization or decentralization of key unit operations, and the PBR array. This presentation will discuss how optimizing DAC-PBR process integration can enhance the algal biofuel's economic and environmental sustainability and the prospect of DAC enabling the circular carbon economy.

algal biofuel production↗

Experimental Study on Charging and Discharging Performance of a Dual-Purpose Underground Thermal Battery

A dual-purpose underground thermal battery (DPUTB) was proposed for Grid-interactive Efficient Buildings. It integrates underground thermal energy storage with a shallow-buried ground heat exchanger (less than 6 m deep). The charging and discharging performance of a lab-scale DPUTB were experimentally investigated. The test results show that the lab-scale (1:125 in volume) DPUTB can provide 34 W cooling continuously for 3.7 h with a supply water temperature below 14°C. The water temperature rise of the inner tank was slowed down during the discharging process due to the phase change of the phase change material (PCM). Thermal storage capacity was increased by 156% using the PCM that only occupied 19% volume of the inner tank. The heat lost from the inner tank was recovered in the outer tank and led to the efficiency improvement of a ground source heat pump.

Wang, Lingshi↗

Reversible pump-turbine installation

The present invention is a reversible pump-turbine installation positioned in a vertical borehole instead of in a conventional underground powerhouse or deep concrete powerhouse. The required plant cavitation coefficient may be achieved by simply boring a vertical borehole to the required depth rather than routing the water flow to and from a deeply buried powerhouse. A pneumatically controlled pressure relief valve may be incorporated into this invention.

Obermeyer, Henry K.↗

Quantum Sensors for High Energy Physics

Strong motivation for investing in quantum sensing arises from the need to investigate phenomena that are very weakly coupled to the matter and fields well described by the Standard Model. These can be related to the problems of dark matter, dark sectors not necessarily related to dark matter (for example sterile neutrinos), dark energy and gravity, fundamental constants, and problems with the Standard Model itself including the Strong CP problem in QCD. Resulting experimental needs typically involve the measurement of very low energy impulses or low power periodic signals that are normally buried under large backgrounds. This report documents the findings of the 2023 Quantum Sensors for High Energy Physics workshop which identified enabling quantum information science technologies that could be utilized in future particle physics experiments, targeting high energy physics science goals.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquid Interfacial Electron Microscopy Identifies Nanogalvanic Corrosion in Pearlitic Steel

The nanoscale mechanisms of localized corrosion in low carbon steels have remained elusive due to the complexity of studying the degradative material behavior at nanoscale solid-liquid interfaces. We identified various steps in the nanogalvanic corrosion processes using in-situ liquid-cell scanning transmission electron microscopy (STEM) using a microfluidic holder by Hummingbird Scientific. Initial work, performed at low magnification, identified the initiation point on a 1018 low-carbon steel surface. This initiation point was determined to be a triple junction of two ferrite grains bridging a cementite grain in contact with a baseline electrolyte of 6 uM CO2 dissolved in a buffered (2.78 uM Na2SO4) aqueous solution, pH 6.1. The pre-etched low-carbon steel surface was prepared using focused ion beam lift-out procedures to extract a cross-section of the low-carbon steel surface, which then was thinned to about 150 nm and transferred to a SiN membrane microfluidic window. The transfer was made using a lift-out needle to attach the low-carbon steel lamella to the corner of the SiN window, and then Pt/C deposition held the lamella in contact with the window while it was released from the lift out needle. To identify the triple point on the low carbon steel lamella, prior to attachment on the SiN window, the sample was characterized for compositional variations with energy dispersive x-ray spectroscopy mapping, grain orientation and phase mapping with precession electron diffraction, and thickness mapping with energy filtered transmission electron microscopy. This pre-characterization prior to the in-situ experiment provided a map of the multiphase and multigrain structure, where the in-situ liquid cell imaging provided a clear understanding of the initiation point on the sample. These data were cross-correlated to paint a holistic picture of the triple junction site, enabling low electron-fluence in-situ snapshot imaging to avoid dominating the native corrosion reactions with effects from the incident electron beam. This initial result identified that localized, nanogalvanic corrosion at the phase interface was the dominant corrosion process in the low-carbon steel, so we next targeted the observation of an array of these nanogalvanic features phase boundaries in a pearlite grain. Near-surface ferrite/cementite phase interfaces that typify pearlitic low-carbon steel were extracted, pre-characterized, and imaged for the in-situ corrosion processes. The sample was a cross-section from a pearlite grain, with alternating ferrite and cementite grains that extended microns down from the pre-etched low-carbon steel pipe surface. After contact with a buffered aqueous solution, the phase boundaries between the ferrite and cementite began to dissolve, with observable material loss and thickness changes in the dark-field and bright-field STEM images. Within minutes, the corrosion front proceeded deeper into the material, claiming a thin layer of ferrite around all exposed phase boundaries before progressing laterally into the ferrite matrix, converting the ferrite to corrosion product normal to each buried cementite grain. Formation of the corrosion product causes a volumetric expansion, creating a lateral wedging force that mechanically ejects the cementite grains from their grooves and leaves behind percolation channels into the steel substructure. Rapid and deleterious, this nanogalvanic corrosion pathway represents an important target for understanding and preventing run-away degradation in this common building material. Observation of this corrosion mechanism was enabled by the combination of pre-characterization using standard structural, grain, and compositional analysis in the TEM, which provides maps for understanding the reaction propagation captured in low-dose, in-situ, liquid-cell STEM.

corrosion↗

Quasi-Extended Range Optical Frequency Domain Reflectometry for Product Pipelines

Throughout the United States, large natural gas and product transmission pipelines exist. These pipelines are susceptible to failure through corrosion and cracking due to internal and external factors. As these transmission pipeline age, the likelihood of a catastrophic failure increases. The ability to the monitor corrosion and wall thickness of these pipelines is paramount to reduce risk of disastrous failure and increase reliability as well as safety. Optical frequency domain reflectometry can monitor distributed temperature and strain measurements along the natural gas and product pipelines. This measurement technique can provide valuable information of pipe structural health through hoop strain changes due to pipe wall thinning, temperature changes due to gas leaks based on Joule-Thomson effect. Since these pipelines are typically buried, the depth of the pipeline results in a potential loss in the sensing range where the fiber is not physically monitoring the hoop strain of the pipeline. A different configuration of the interferometer will allow for the distributed fiber measurement to start atop the pipeline itself. This configuration results in no loss of sensing range and maintains the sensing resolution of a typically interferometer for an optical frequency domain reflectometry measurement. The quasi-extended range distributed hoop strain measurements were demonstrated on an active transmission pipeline.

Brister, Matthew↗

Nuclear Safety [Vol. 16, No. 2, March-April 1975]

Nuclear Safety covers significant developments in the field of nuclear safety. The scope is limited to topics relevant to the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, safety considerations in regard to the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 127 Quality Assurance in the Construction of Nuclear Power Plants by Sidney A. Bernsen, 141 1974 ANS Topical Meeting on Fast Reactor Safety by M. H. Fontana; CONTROL AND INSTRUMENTATION: 150 GBR-4 Protection Systems: Failures and Their Consequences by Peter Burgsmüller, J. J. Dekais, Albert Krähe, Raffaello Pignatelli, and Gottfried Vieider, 162 Standby Emergency Power Systems. Part 2—The Later Plants by E. W. Hagen; PLANT SAFETY FEATURES: 180 Radiotoxic Hazard Measure for Buried Solid Radioactive Waste by J. Hamstra, 190 The Thirteenth AEC Air-Cleaning Conference by D. W. Moeller, D. W. Underhill, and M. W. First, 203 Book Review: Nuclear Criticality Safety; CONSEQUENCES OF EFFLUENT RELEASE: 204 Environmental Radiation Effects of Nuclear Facilities in New York State by M. S. Terpilak and B. L. Jorgensen, 222 Book Review: Thermal Ecology; OPERATING EXPERIENCES: 223 Set-Point Drift in Nuclear Power-Plant Safety-Related Instrumentation Adapted by the Nuclear Safety Staff, 224 Diesel-Generator Operating Experience at Nuclear Power Plants, 227 Summary of Operating U. S. Power Reactors as of Jan. 1, 1975, 232 Selected Safety-Related Occurrences Reported in November and December 1974 Compiled by William R. Casto, 235 Recent Occurrences at Nuclear Reactors and Their Causes Compiled by William R. Casto; CURRENT EVENTS: 243 General Administrative Activities Compiled by Wm. B. Cottrell, 251 Action on Power-Reactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B. Cottrell, 266 Action on Nonreactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B Cottrell, 268 Proposed Rule Changes as of Jan. 1, 1975; MISCELLANY: 149 Course in Italy on High-Energy Radiation Dosimetry and Protection (Announcement), 250 Course at Northwestern on Safety of Light-Water-Cooled Nuclear Power Plants (Announcement), 266 Symposium of the Combined Effects on the Environment of Radioactive, Chemical, and Thermal Releases from the Nuclear Industry (Announcement), 271 Short Course on Engineering for Extreme Winds and Tornadoes (Announcement), 272 Three 1-Week Courses at MIT on Nuclear Power-Reactor Safety (Announcement), 272 Harvard University Short Courses (Announcement).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Coal Refuse Sites in West Virginia: Stream Loss, Volume Estimation, and Land Cover Analysis for Restoration Feasibility

Coal refuse disposal across Appalachia has resulted in widespread environmental degradation, including stream burial, landscape destabilization, and long-term hydrologic impacts. This study provides a GIS-based spatial characterization of 623 coal refuse sites in West Virginia, evaluating their potential for ecological and economic restoration. Stream loss was quantified through digitization of historic topographic maps, revealing over 194,500 meters of historically present streams lost, with 105,000 meters directly buried beneath refuse piles. Volume estimation using empirical Bayesian kriging and modern LiDAR surfaces indicated approximately 1.96 billion cubic meters of deposited refuse. Land cover analysis based on NAIP-derived classification showed that 48% of the total site area was forested, while 15% remained barren. These results highlight not only the environmental footprint of legacy refuse deposits but also their potential for restoration through stream daylighting and beneficial reuse. Emerging opportunities, including rare earth element recovery and mitigation banking, may offer economic incentives to facilitate reclamation. This work establishes a spatial framework to prioritize refuse sites for restoration, balancing ecological uplift with feasible material management strategies.

58 GEOSCIENCES↗