Search NASA⌕ Search

SEARCH · Search NASA

Results for “cooperations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Control and applications of cooperating disparate robotic manipulators relevant to nuclear waste management

Remote handling in nuclear waste management requires a robotic system with precise motion as well as a large workspace. The concept of a small arm mounted on the end of a large arm may satisfy such needs. However, the performance of such a serial configuration lacks payload capacity which is a crucial factor for handling a massive object. Also, this configuration induces more flexibility on the structure. To overcome these problems, the topology of bracing the tip of the small arm (not the large arm) and having an end effector in the middle of the chain is proposed in this paper. Also, control of these cooperating disparate manipulators is accomplished in computer simulations. Thus, this robotic system can have the accuracy of the small arm, and at the same time, it can have the payload capacity and large workspace of the large arm.

Lew, Jae Young↗

The National Resource Library for Science and Technology in Sweden: A Nordic model of cooperating technology libraries

The scope of this presentation is to give a state-of-the-art report on the present situation of Nordic technology libraries, to elaborate on a plan for national resource libraries in Sweden, and to share how the Royal Institute of Technology Library in Stockholm (KTHB) has fostered a network of cooperating libraries in order to optimize government funding for the system of resource libraries.

Lagar, Gunnar↗

Performance results of cooperating expert systems in a distributed real-time monitoring system

There are numerous definitions for real-time systems, the most stringent of which involve guaranteeing correct system response within a domain-dependent or situationally defined period of time. For applications such as diagnosis, in which the time required to produce a solution can be non-deterministic, this requirement poses a unique set of challenges in dynamic modification of solution strategy that conforms with maximum possible latencies. However, another definition of real time is relevant in the case of monitoring systems where failure to supply a response in the proper (and often infinitesimal) amount of time allowed does not make the solution less useful (or, in the extreme example of a monitoring system responsible for detecting and deflecting enemy missiles, completely irrelevant). This more casual definition involves responding to data at the same rate at which it is produced, and is more appropriate for monitoring applications with softer real-time constraints, such as interplanetary exploration, which results in massive quantities of data transmitted at the speed of light for a number of hours before it even reaches the monitoring system. The latter definition of real time has been applied to the MARVEL system for automated monitoring and diagnosis of spacecraft telemetry. An early version of this system has been in continuous operational use since it was first deployed in 1989 for the Voyager encounter with Neptune. This system remained under incremental development until 1991 and has been under routine maintenance in operations since then, while continuing to serve as an artificial intelligence (AI) testbed in the laboratory. The system architecture has been designed to facilitate concurrent and cooperative processing by multiple diagnostic expert systems in a hierarchical organization. The diagnostic modules adhere to concepts of data-driven reasoning, constrained but complete nonoverlapping domains, metaknowledge of global consequences of anomalous data, hierarchical reporting of problems that extend beyond a single domain, and shared responsibility for problems that overlap domains. The system enables efficient diagnosis of complex system failures in real-time environments with high data volumes and moderate failure rates, as indicated by extensive performance measurements.

Schwuttke, U. M.↗

Computer support for cooperative tasks in Mission Operations Centers

Traditionally, spacecraft management has been performed by fixed teams of operators in Mission Operations Centers. The team cooperatively: (1) ensures that payload(s) on spacecraft perform their work; and (2) maintains the health and safety of the spacecraft through commanding and monitoring the spacecraft's subsystems. In the future, the task demands will increase and overload the operators. This paper describes the traditional spacecraft management environment and describes a new concept in which groupware will be used to create a Virtual Mission Operations Center. Groupware tools will be used to better utilize available resources through increased automation and dynamic sharing of personnel among missions.

Fox, Jeffrey↗

Cooperative solutions coupling a geometry engine and adaptive solver codes

Follow-on work has progressed in using Aero Grid and Paneling System (AGPS), a geometry and visualization system, as a dynamic real time geometry monitor, manipulator, and interrogator for other codes. In particular, AGPS has been successfully coupled with adaptive flow solvers which iterate, refining the grid in areas of interest, and continuing on to a solution. With the coupling to the geometry engine, the new grids represent the actual geometry much more accurately since they are derived directly from the geometry and do not use refits to the first-cut grids. Additional work has been done with design runs where the geometric shape is modified to achieve a desired result. Various constraints are used to point the solution in a reasonable direction which also more closely satisfies the desired results. Concepts and techniques are presented, as well as examples of sample case studies. Issues such as distributed operation of the cooperative codes versus running all codes locally and pre-calculation for performance are discussed. Future directions are considered which will build on these techniques in light of changing computer environments.

Dickens, Thomas P.↗

The development of the Final Approach Spacing Tool (FAST): A cooperative controller-engineer design approach

Historically, the development of advanced automation for air traffic control in the United States has excluded the input of the air traffic controller until the need of the development process. In contrast, the development of the Final Approach Spacing Tool (FAST), for the terminal area controller, has incorporated the end-user in early, iterative testing. This paper describes a cooperative between the controller and the developer to create a tool which incorporates the complexity of the air traffic controller's job. This approach to software development has enhanced the usability of FAST and has helped smooth the introduction of FAST into the operational environment.

Lee, Katharine K.↗

Enroute flight planning: Evaluating design concepts for the development of cooperative problem-solving systems

There are many problem-solving tasks that are too complex to fully automate given the current state of technology. Nevertheless, significant improvements in overall system performance could result from the introduction of well-designed computer aids. We have been studying the development of cognitive tools for one such problem-solving task, enroute flight path planning for commercial airlines. Our goal has been two-fold. First, we have been developing specific system designs to help with this important practical problem. Second, we have been using this context to explore general design concepts to guide in the development of cooperative problem-solving systems. These design concepts are described below, along with illustrations of their application.

Smith, Philip J.↗

Mir Cooperative Solar Array Project Accelerated Life Thermal Cycling Test

The Mir Cooperative Solar Array (MCSA) project was a joint U.S./Russian effort to build a photovoltaic (PV) solar array and deliver it to the Russian space station Mir. The MCSA will be used to increase the electrical power on Mir and provide PV array performance data in support of Phase 1 of the International Space Station. The MCSA was brought to Mir by space shuttle Atlantis in November 1995. This report describes an accelerated thermal life cycle test which was performed on two samples of the MCSA. In eight months time, two MCSA solar array 'mini' panel test articles were simultaneously put through 24,000 thermal cycles. There was no significant degradation in the structural integrity of the test articles and no electrical degradation, not including one cell damaged early and removed from consideration. The nature of the performance degradation caused by this one cell is briefly discussed. As a result of this test, changes were made to improve some aspects of the solar cell coupon-to-support frame interface on the flight unit. It was concluded from the results that the integration of the U.S. solar cell modules with the Russian support structure would be able to withstand at least 24,000 thermal cycles (4 years on-orbit). This was considered a successful development test.

Hoffman, David J.↗

Commercial Implementation of Ultrasonic Velocity Imaging Methods via Cooperative Agreement Between NASA Lewis Research Center and Sonix, Inc.

This article describes the commercial implementation of ultrasonic velocity imaging methods developed and refined at NASA Lewis Research Center on the Sonix c-scan inspection system. Two velocity imaging methods were implemented: thickness-based and non-thickness-based reflector plate methods. The article demonstrates capabilities of the commercial implementation and gives the detailed operating procedures required for Sonix customers to achieve optimum velocity imaging results. This commercial implementation of velocity imaging provides a 100x speed increase in scanning and processing over the lab-based methods developed at LeRC. The significance of this cooperative effort is that the aerospace and other materials development-intensive industries which use extensive ultrasonic inspection for process control and failure analysis will now have an alternative, highly accurate imaging method commercially available.

Roth, Don J.↗

Cooperative Research in High Energy Astrophysics

A joint agreement between NASA/Goddard and The University of Maryland currently supports cooperative research in Satellite Based Studies of Photons and Charged Particles in the following areas: 1) Detection of cosmic rays and studies of the solar modulation of galactic cosmic rays; 2) Research with several past and upcoming X-ray satellites; 3) High resolution gamma-ray spectroscopy of celestial sources; 4) Theoretical astrophysics.

Trasco, John D.↗

Mir Cooperative Solar Array Flight Performance Data and Computational Analysis

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States (US) and Russia to provide approximately 6 kW of photovoltaic power to the Russian space station Mir. The MCSA was launched to Mir in November 1995 and installed on the Kvant-1 module in May 1996. Since the MCSA photovoltaic panel modules (PPMs) are nearly identical to those of the International Space Station (ISS) photovoltaic arrays, MCSA operation offered an opportunity to gather multi-year performance data on this technology prior to its implementation on ISS. Two specially designed test sequences were executed in June and December 1996 to measure MCSA performance. Each test period encompassed 3 orbital revolutions whereby the current produced by the MCSA channels was measured. The temperature of MCSA PPMs was also measured. To better interpret the MCSA flight data, a dedicated FORTRAN computer code was developed to predict the detailed thermal-electrical performance of the MCSA. Flight data compared very favorably with computational performance predictions. This indicated that the MCSA electrical performance was fully meeting pre-flight expectations. There were no measurable indications of unexpected or precipitous MCSA performance degradation due to contamination or other causes after 7 months of operation on orbit. Power delivered to the Mir bus was lower than desired as a consequence of the retrofitted power distribution cabling. The strong correlation of experimental and computational results further bolsters the confidence level of performance codes used in critical ISS electric power forecasting. In this paper, MCSA flight performance tests are described as well as the computational modeling behind the performance predictions.

Kerslake, Thomas W.↗

Pre-Flight Dark Forward Electrical Testing of the Mir Cooperative Solar Array

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States (US) and Russia to provide approximately 6 kW of photovoltaic power to the Russian space station Mir. After final assembly in Russia, the MCSA was shipped to the NASA Kennedy Space Center (KSC) in the summer of 1995 and launched to Mir in November 1995. Program managers were concerned of the potential for MCSA damage during the transatlantic shipment and the associated handling operations. To address this concern, NASA Lewis Research Center (LERC) developed an innovative dark-forward electrical test program to assess the gross electrical condition of each generator following shipment from Russia. The use of dark test techniques, which allow the array to remain in the stowed configuration, greatly simplifies the checkout of large area solar arrays. MCSA dark electrical testing was successfully performed at KSC in July 1995 following transatlantic shipment. Data from this testing enabled engineers to quantify the effects of potential MCSA physical damage that would degrade on-orbit electrical performance. In this paper, an overview of the principles and heritage of photovoltaic array dark testing is given. The specific MCSA dark test program is also described including the hardware, software, testing procedures and test results. The current-voltage (4) response of both solar cell circuitry and by-pass diode circuitry was obtained. To guide the development of dark test hardware, software and procedures, a dedicated FORTRAN computer code was developed to predict the dark 4 responses of generators with a variety of feasible damage modes. By comparing the actual test data with the predictions, the physical condition of the generator could be inferred. Based on this data analysis, no electrical short-circuits or open-circuits were detected. This suggested the MCSA did not sustain physical damage that affected electrical performance during handling and shipment from Russia to the US. Good agreement between the test data and computational predictions indicated MCSA electrical performance was amenable to accurate analysis and was well understood.

Kerslake, Thomas W.↗

Thermal Cycling of Mir Cooperative Solar Array (MCSA) Test Panels

The Mir Cooperative Solar Array (MCSA) project was a joint US/Russian effort to build a photovoltaic (PV) solar array and deliver it to the Russian space station Mir. The MCSA is currently being used to increase the electrical power on Mir and provide PV array performance data in support of Phase 1 of the International Space Station (ISS), which will use arrays based on the same solar cells used in the MCSA. The US supplied the photovoltaic power modules (PPMs) and provided technical and programmatic oversight while Russia provided the array support structures and deployment mechanism and built and tested the array. In order to ensure that there would be no problems with the interface between US and Russian hardware, an accelerated thermal life cycle test was performed at NASA Lewis Research Center on two representative samples of the MCSA. Over an eight-month period (August 1994 - March 1995), two 15-cell MCSA solar array 'mini' panel test articles were simultaneously put through 24,000 thermal cycles (+80 C to -100 C), equivalent to four years on-orbit. The test objectives, facility, procedure and results are described in this paper. Post-test inspection and evaluation revealed no significant degradation in the structural integrity of the test articles and no electrical degradation, not including one cell damaged early as an artifact of the test and removed from consideration. The interesting nature of the performance degradation caused by this one cell, which only occurred at elevated temperatures, is discussed. As a result of this test, changes were made to improve some aspects of the solar cell coupon-to-support frame interface on the flight unit. It was concluded from the results that the integration of the US solar cell modules with the Russian support structure would be able to withstand at least 24,000 thermal cycles (4 years on-orbit).

Hoffman, David J.↗

The Cooperative US/Ukrainian Experiment: An Overview

In this session, Session FA1, the discussion is focuses on the following topics: History of the Cooperative US/Ukrainian Experiment (CUE); The Collaborative Ukrainian Experiment, Science Overview; Double Fertilization of Inquiring Minds, Teachers and Students Investigating Plants in Space for the Collaborative Ukrainian Experiment; and Mission Operations for the Collaborative Ukrainian Experiment.

Source record↗

Sixth Goddard Conference on Mass Storage Systems and Technologies Held in Cooperation with the Fifteenth IEEE Symposium on Mass Storage Systems

This document contains copies of those technical papers received in time for publication prior to the Sixth Goddard Conference on Mass Storage Systems and Technologies which is being held in cooperation with the Fifteenth IEEE Symposium on Mass Storage Systems at the University of Maryland-University College Inn and Conference Center March 23-26, 1998. As one of an ongoing series, this Conference continues to provide a forum for discussion of issues relevant to the management of large volumes of data. The Conference encourages all interested organizations to discuss long term mass storage requirements and experiences in fielding solutions. Emphasis is on current and future practical solutions addressing issues in data management, storage systems and media, data acquisition, long term retention of data, and data distribution. This year's discussion topics include architecture, tape optimization, new technology, performance, standards, site reports, vendor solutions. Tutorials will be available on shared file systems, file system backups, data mining, and the dynamics of obsolescence.

Kobler, Benjamin↗

Ozone Research with Advanced Cooperative Lidar Experiment (ORACLE) Implementation Study

New technological advances have made possible new active remote sensing capabilities from space. Utilizing these technologies, the Ozone Research with Advanced Cooperative Lidar Experiment (ORACLE) will provide high spatial resolution measurements of ozone, clouds and aerosols in the stratosphere and lower troposphere. Simultaneous measurements of ozone, clouds and aerosols will assist in the understanding of global change, atmospheric chemistry and meteorology.

Stadler, John H.↗

Performance of the MIR Cooperative Solar Array After 2.5 Years in Orbit

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States and Russia to produce 6 kW of power for the Russian space station Mir. Four, multi-orbit test sequences were executed between June 1996 and December 1998 to measure MCSA electrical performance. A dedicated Fortran computer code was developed to analyze the detailed thermal-electrical performance of the MCSA. The computational performance results compared very favorably with the measured flight data in most cases. Minor performance degradation was detected in one current generating section of the MCSA. Yet overall, the flight data indicated the MCSA was meeting and exceeding performance expectations. There was no precipitous performance loss due to contamination or other causes after 2.5 years of operation. In this paper, we review the MCSA flight electrical performance tests, data and computational modeling and discuss findings from data comparisons with the computational results.

Kerslake, Thomas W.↗

Efficient GO2/GH2 Injector Design: A NASA, Industry and University Cooperative Effort

Developing new propulsion components in the face of shrinking budgets presents a significant challenge. The technical, schedule and funding issues common to any design/development program are complicated by the ramifications of the continuing decrease in funding for the aerospace industry. As a result, new working arrangements are evolving in the rocket industry. This paper documents a successful NASA, industry, and university cooperative effort to design efficient high performance GO2/GH2 rocket injector elements in the current budget environment. The NASA Reusable Launch Vehicle (RLV) Program initially consisted of three vehicle/engine concepts targeted at achieving single stage to orbit. One of the Rocketdyne propulsion concepts, the RS 2100 engine, used a full-flow staged-combustion cycle. Therefore, the RS 2100 main injector would combust GO2/GH 2 propellants. Early in the design phase, but after budget levels and contractual arrangements had been set the limitations of the current gas/gas injector database were identified. Most of the relevant information was at least twenty years old. Designing high performance injectors to meet the RS 2100 requirements would require the database to be updated and significantly enhanced. However, there was no funding available to address the need for more data. NASA proposed a teaming arrangement to acquire the updated information without additional funds from the RLV Program. A determination of the types and amounts of data needed was made along with test facilities with capabilities to meet the data requirements, budget constraints, and schedule. After several iterations a program was finalized and a team established to satisfy the program goals. The Gas/Gas Injector Technology (GGIT) Program had the overall goal of increasing the ability of the rocket engine community to design efficient high-performance, durable gas/gas injectors relevant to RLV requirements. First, the program would provide Rocketdyne with data on preliminary gas/gas injector designs which would enable discrimination among candidate injector designs. Secondly, the program would enhance the national gas/gas database by obtaining high-quality data that increases the understanding of gas/gas injector physics and is suitable for computational fluid dynamics (CFD) code validation. The third program objective was to validate CFD codes for future gas/gas injector design in the RLV program.

Tucker, P. K.↗