Search NASA⌕ Search

SEARCH · Search NASA

Results for “engineered wood”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

399 records · Page 23

Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period Phase 2

Lockheed Martin Aeronautics Company (LM), working in conjunction with General Electric Global Research (GE GR) and Stanford University, executed a 19 month program responsive to the NASA sponsored "N+2 Supersonic Validation: Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period" contract. The key technical objective of this effort was to validate integrated airframe and propulsion technologies and design methodologies necessary to realize a supersonic vehicle capable of meeting the N+2 environmental and performance goals. The N+2 program is aligned with NASA's Supersonic Project and is focused on providing system level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight. The N+2 environmental and performance goals are outlined in the technical paper, AIAA-2014-2138 (Ref. 1) along with the validated N+2 Phase 2 results. Our Phase 2 efforts built upon our Phase 1 studies (Ref. 2) and successfully demonstrated the ability to design and test realistic configurations capable of shaped sonic booms over the width of the sonic boom carpet. Developing a shaped boom configuration capable of meeting the N+2 shaped boom targets is a key goal for the N+2 program. During the LM Phase 1 effort, LM successfully designed and tested a shaped boom trijet configuration (1021) capable of achieving 85 PLdB under track (forward and aft shock) and up to 28 deg off-track at Mach 1.6. In Phase 2 we developed a refined configuration (1044-2) that extended the under 85 PLdB sonic boom level over the entire carpet of 52 deg off-track at a cruise Mach number of 1.7. Further, the loudness level of the configuration throughout operational conditions calculates to an average of 79 PLdB. These calculations rely on propagation employing Burger's (sBOOM) rounding methodology, and there are indications that the configuration average loudness would actually be 75 PLdB. We also added significant fidelity to the design of the configuration in this phase by performing a low speed wind tunnel test at our LTWT facility in Palmdale, by more complete modelling of propulsion effects in our sonic boom analysis, and by refining our configuration packaging and performance assessments. Working with General Electric, LM performed an assessment of the impact of inlet and nozzle effects on the sonic boom signature of the LM N+2 configurations. Our results indicate that inlet/exhaust streamtube boundary conditions are adequate for conceptual design studies, but realistic propulsion modeling at similar stream-tube conditions does have a small but measurable impact on the sonic boom signature. Previous supersonic transport studies have identified aeroelastic effects as one of the major challenges associated with the long, slender vehicles particularly common with shaped boom aircraft (Ref. 3). Under the Phase 2 effort, we have developed a detailed structural analysis model to evaluate the impact of flexibility and structural considerations on the feasibility of future quiet supersonic transports. We looked in particular at dynamic structural modes and flutter as a failure that must be avoided. We found that for our N+2 design in particular, adequate flutter margin existed. Our flutter margin is large enough to cover uncertainties like large increases in engine weight and the margin is relatively easy to increase with additional stiffening mass. The lack of major aeroelastic problems probably derives somewhat from an early design bias. While shaped boom aircraft require long length, they are not required to be thin. We intentionally developed our structural depths to avoid major flexibility problems. So at the end of Phase 2, we have validated that aeroelastic problems are not necessarily endemic to shaped boom designs. Experimental validation of sonic boom design and analysis techniques was the primary objective of the N+2 Supersonic Validations contract; and in this Phase, LM participated in four high speed wind tunnel tests. The first so-called Parametric Test in the Ames 9x7 tunnel did an exhaustive look at variation effects of the parameters: humidity, total pressure, sample time, spatial averaging distance and number of measurement locations, and more. From the results we learned to obtain data faster and more accurately, and made test condition tolerances easy to meet (eliminating earlier 60 percent wasted time when condition tolerances could not be held). The next two tests used different tunnels. The Ames 11 ft tunnel was used to test lower Mach numbers of 1.2 and 1.4. There were several difficulties using this tunnel for the first time for sonic boom including having to shift the measurement Mach numbers to 1.15 and 1.3 to avoid flow problems. It is believed that the 11 ft could be used successfully to measure sonic boom but there are likely to be a number of test condition restrictions. The Glenn 8x6 ft tunnel was used next and the tunnel has a number of desirable features for sonic boom measurement. While the Ames 9x7 can only test Mach 1.55 to 2.55 and the 11 ft can only test Mach 1.3 and lower, the Glenn 8x6 can test continuously from Mach 0.3 to 2.0. Unfortunately test measurement accuracy was compromised by a reference pressure drift. Post-test analysis revealed that the drift occurred when Mach number drifted slightly. Test measurements indicated that if Mach number drift is eliminated, results from the 8x6 would be more accurate, especially at longer distances, than results from the 9x7. The fourth test in the 9x7, called LM4, used everything we learned to comprehensively and accurately measure our new 1044-02 configuration with a full-carpet shaped signature design. Productivity was 8 times greater than our Phase 1 LM3 test. Measurement accuracy and repeatability was excellent out to 42 in. However, measurements at greater distances require the rail in the aft position and become substantially less accurate. Further signature processing or measurement improvements are needed for beyond near-field signature validation.

Morgenstern, John↗

Impact of Newly Measured 𝛽-Delayed Neutron Emitters around 78 Ni on Light Element Nucleosynthesis in the Neutrino Wind Following a Neutron Star Merger

Neutron emission probabilities and half-lives of 37 𝛽-delayed neutron emitters from 75 Ni to 92 Br were measured at the RIKEN Nishina Center in Japan, including 11 one-neutron and 13 two-neutron emission probabilities and six half-lives for the first time that supersede theoretical estimates. These nuclei lie in the path of the weak 𝑟 process occurring in neutrino-driven winds from the accretion disk formed after the merger of two neutron stars synthesizing elements in the 𝐴∼80 abundance peak. The presence of such elements dominates the accompanying kilonova emission over the first few days and have been identified in the AT2017gfo event, associated to the gravitational wave detection GW170817. Abundance calculations based on over 17,000 simulated trajectories describing the evolution of matter properties in the merger outflows show that the new data lead to an increase of 50%–70% in the abundance of Y, Zr, Nb, and Mo. This enhancement is large compared to the scatter of relative abundances observed in old very metal poor stars and thus is significant in the comparison with other possible astrophysical processes contributing to the light-element production. These results underline the importance of including experimental decay data for very neutron-rich 𝛽 -delayed neutron emitters into 𝑟 -process models.

59 ≤ A ≤ 89↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗