Search NASA⌕ Search

SEARCH · Search NASA

Results for “linked open data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

403 records · Page 23

IDAES-PSE 2.6.0 Release

The Institute for the Design of Advanced Energy Systems (IDAES) Integrated Platform is a versatile computational environment offering extensive process systems engineering (PSE) capabilities for optimizing the design and operation of complex, interacting technologies and systems. IDAES enables users to efficiently search vast, complex design spaces to discover the lowest cost solutions while supporting the full process modeling lifecycle, from conceptual design to dynamic optimization and control. The extensible, open platform empowers users to create models of novel processes and rapidly develop custom analyses, workflows, and end-user applications. IDAES-PSE 2.6.0 Release Highlights Upcoming Changes IDAES will be switching to the new Pyomo solver interface in the next release. Whilst this will hopefully be a smooth transition for most users, there are a few important changes to be aware of. The new solver interface uses a different version of the IPOPT writer (“ipopt_v2”) and thus any custom configuration options you might have set for IPOPT will not carry over and will need to be reset. By default, the new Pyomo linear presolver will be activated with ipopt_v2. Whilst are working to identify any bugs in the presolver, it is possible that some edge cases will remain. IDAES will begin deploying a new set of scaling tools and APIs over the next few releases that make use of the new solver writers. The old scaling tools and APIs will remain for backward compatibility but will begin to be deprecated. New Models, Tools and Features New Intersphinx extension automatically linking Jupyter notebook examples to project documentation New end-to-end diagnostics example demonstrated on a real problem New complementarity formulation for VLE with cubic equations of state, backward compatibility for old formulation New solver interface with presolve (ipopt_v2) in support of upcoming changes to the initialization and APIs methods, with default set to ipopt to maintain backwards compatibility; this will deprecate once all examples have been updated New forecaster and parameterized bidder methods within grid integration library Updated surrogates API and examples to support Keras 3, with backwards compatibility for older formats such as TensorFlow SavedModel (TFSM) Updated costing base dictionary to include the 2023 cost year index value Updated ProcessBlock to include information on the constructing block class Updated Flowsheet Visualizer to allow visualize() method to return value and functions Bug Fixes Fixed bug in the Modular Property Framework that would cause errors when trying to use phase-based material balances with phase equilibria. Fixed bug in Modular Properties Framework that caused errors when initializing models with non-vapor-liquid phase equilibria. Fixed typos flagged by June update to crate-ci/typos and removed DMF-related exceptions Minor corrections of units of measurement handling in power plant waste/transport costing expressions, control volume material holdup expressions, and BTX property package parameters Fixed throwing >7500 numpy deprecation warnings by replacing scalar value assignment with element extraction and item iteration calls Testing and Robustness Migrated slow tests (>10s) to integration, impacting test coverage but also yielding a nearly 30% decrease in local test runtime Pinned pint to avoid issues with older supported Python versions Pinned codecov versions to avoid tokenless upload behavior with latest version Bumped extensions to version 3.4.2 to allow pointing to non-standard install location Deprecations and Removals Python 3.8 is no longer supported. The supported Python versions are 3.9 through 3.12 The Data Management Framework (DMF) is no longer supported. Importing idaes.core.dmf will cause a deprecation warning to be displayed until the next release The SOFC Keras surrogates have been removed. The current version of the SOFC surrogate model in the examples repository is a PySMO Kriging model.

AS↗

Virtual Microscope Views of the Apollo 11 and 12 Lunar Samples

The Apollo virtual microscope is a means of viewing, over the Internet, polished thin sections of every rock in the Apollo lunar sample collections via software, duplicating many of the functions of a petrological microscope, is described. Images from the Apollo 11 and 12 missions may be viewed at: www.virtualmicroscope.org/content/apollo. Introduction: During the six NASA missions to the Moon from 1969-72 a total of 382 kilograms of rocks and soils, often referred to as "the legacy of Apollo", were collected and returned to Earth. A unique collection of polished thin sections (PTSs) was made from over 400 rocks by the Lunar Sample Curatorial Facility at the Johnson Spacecraft Center (JSC), Houston. These materials have been available for loan to approved PIs but of course they can't be simultaneously investigated by several researchers unless they are co-located or the sample is passed back and forward between them by mail/hand carrying which is inefficient and very risky for irreplaceable material. When The Open University (OU), the world's largest Distance Learning Higher Education Establishment found itself facing a comparable problem (how to supply thousands of undergraduate students with an interactive petrological microscope and a personal set of thin sections), it decided to develop a software tool called the Virtual Microscope (VM). As a result it is now able to make the unique and precious collection of Apollo specimens universally available as a resource for concurrent study by anybody in the world's Earth and Planetary Sciences community. Herein, we describe the first steps of a collaborative project between OU and the Johnson Space Center (JSC) Curatorial Facility to record a PTS for every lunar rock, beginning with those collected by the Apollo 11 and 12 missions. Method: Production of a virtual microscope dedicated to a particular theme divides into four main parts - photography, image processing, building and assembly of virtual microscope components, and publication on a website. Two large research quality microscopes are used to collect all the images required for a virtual microscope. The first is part of an integrated package that utilizes Leica PowerMosaic software and a motorised XYZ stage to generate large area mosaics. It includes a fast acquisition camera and depending on the PTS size normally is used to produce seamless mosaic images consisting of 100-500 individual photographs. If the sample is suitable, three mosaics of each sample are recorded - plane polarised light, between crossed polars and reflected light. In order for the VM to be a true petrological microscope it is necessary to recreate the features of a rotating stage and perform observations using filters to produce polarised light. Thus the petrological VM includes the capability of seeing changes in optical properties (pleochroism and birefringence) during rotation allowing mineral identification. The second microscope in the system provides the functions of the rotating stage. To this microscope we have added a robotically controlled motor to acquire seventy-two images (5 degree intervals) in plane polarised light and between crossed polars. To process the images acquired from the two microscopes involves a combination of proprietary software (Photoshop) and our own in-house code. The final stage involves assembling all the components in an HTML5 environment. Pathfinder investigations: We have undertaken a number of pilot studies to demonstrate the efficacy of the petrological microscope with lunar samples. The first was to make available on-line images collected from the Educational Package of Apollo samples provided by NASA to the UK STFC (Science and Technical Facilities Council) for loan as educational material e.g. for schools. The real PTSs of the samples are now no longer sent out to schools removing the risks associated with transport, accidental breakage and eliminating the possibility of loss. The availability of lunar sample VM-related material was further extended to include twenty-eight specimens from all of the Apollo missions. Some of these samples were made more generally available through an ibook entitled "Moon Rocks: an introduction to the Geology of the Moon," free from the Apple Bookstore. Research possibilities: Although the Virtual Microscope was originally conceived as a teaching aid and was later recognised as a means of public outreach and engagement, we now realize that it also has enormous potential as a high level research tool. Following discussions with the JSC Curators we have received Curation and Analysis Planning Team for Extraterrestrial Materials (CAPTEM) permission to embark on a programme of digitizing the entire lunar sample PTS collection for all three of the above purposes. By the time of the 47th Lunar and Planetary Science Conference (LPSC) we will have completed 81 rocks collected during the Apollo 11 and 12 missions and the data, with cross-links to the Lunar Sample Compendium will go live on the Web at the 47th LPSC. The VM images of the Apollo 11 (41 VM images) and 12 (40 VM images) missions can be viewed at: http:/www.virtualmicroscope.org/content/apollo. The lunar sample VM will enable large numbers of skilled/unskilled microscopists (professional and amateur researchers, educators and students, enthusiasts and the simply curious non-scientists) to share the information from a single sample. It will mean that all the PTSs already cut, even historical ones, could be available for new joint investigations or private study. The scientific return from the collection will increase exponentially as a result of further debate and discussion. Simultaneously the VM will remove the need for making unnecessary multiple samplings, avoid consignment of delicate/breakable specimens (all of which are priceless) to insecure mail/courier services and reduce direct labour and indirect costs, travel budgets and unproductive travelling time necessary for co-location of collaborating researchers. For the future we have already recognized further potential for virtual technology. There is nothing that a petrologist likes more than to see the original rock as a hand specimen. It is entirely possible to recreate virtual hand specimens with 3-D hard and software, already developed for viewing fossils, located within the Curatorial Facility, http://curator.jsc.nasa.gov/lunar/lsc/index.cfm.

Gibson, E. K.↗

Analysis of Benefits of an Energy Imbalance Market in the NWPP

The Northwest Power Pool (NWPP) Market Assessment Committee (MC) Initiative, which was officially launched on March 19, 2012, set out to explore a range of alternatives that could help the Balancing Authorities and scheduling utilities in the NWPP area address growing operational and commercial challenges affecting the regional power system. The MC formed an Analytical Team with technical representatives from each of the member Balancing Areas in the NWPP and with staff of Pacific Northwest National Laboratory (PNNL). This Analytical Team was instructed to conduct extensive studies of intra-hour operation of the NWPP system in the year 2020 and of the NWPP region with 14,671 MW of wind penetration. The effort utilized a sub-hourly production cost model (the PLEXOS® computer model) that inputs data from the Western Electricity Coordinating Council (WECC)-wide Production Cost Model (PCM) to evaluate potential production cost savings. The Analytical Team was given two general options to evaluate: •Energy Imbalance Market (EIM): establishment of an automated, organized NWPP area market for economically supplying energy imbalance within the hour. •Enhanced Market-Operational Tools (EMT) that might augment or replace an EIM. The Analytical The Analytical Team built on the WECC-wide PCM data from prior work done in the WECC and carried forward the evolution of the original WECC Transmission Expansion Planning Policy Committee (TEPPC) 2020 PC0 data base. A large number of modifications and improvements were made to this case and the data were subjected to extensive review by the team members to improve the model representation of the Northwest (NW). MC meetings that were open to the public were held for interested parties to review and provide input to the study. Results for the test, base, and sensitivity case studies performed by the MC Initiative Analytical Team indicate that there are a wide range of benefits that could be obtained from the operation of an EIM in the NWPP depending on what assumptions are made. The instructions from the MC were to determine a "minimum high confidence" range of potential benefits. The results for the Base Case indicate that the EIM benefits ranged from approximately $40 million to $70 million in annual savings from the operation of an EIM in the NWPP footprint. A number of additional relevant sensitivity cases were performed, including low and high water conditions, low and high natural gas prices, and various flex reserve requirements, resource operations, and amounts of resource capability held back during the preschedule period. Along with the results for the Base Case, the results for these studies yielded EIM benefits that clustered within the range of $70 to $80 million dollars per year with potential benefits ranging from approximately $125 million to as little as $17 million per year. Because the design and operation of an EIM could enable participating Balancing Authorities (BAs) to collectively lower the quantity of resources they must carry to meet within-hour balancing needs, a sensitivity case was also performed to analyze the impact that such reductions might have on the benefits from an EIM. The results for this sensitivity case indicate that such reductions could increase the benefits from the operation of an EIM in the NWPP into the range of approximately $130 million to $160 million per year. Also, a sensitivity case for a WECC-wide EIM was performed with the results indicating that the potential benefits to the NWPP could increase into the range of $197 million to $233 million per year. While there may be potential reliability benefits from the coordinated dispatch process underlying the operation of an EIM, reliability benefits from an EIM were out of the scope of this study. The EIM benefit analyses that were performed by the Analytical Team are provided in this report.

Power markets, NWPP, Energy Imbalance, EIM, Renewa↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

HydraGNN_Predictive_GFM_2024 - Ensemble of predictive graph foundation models for ground state atomistic materials modeling

We provide the ensemble of fifteen pre-trained graph foundation models (GFMs) for atomistic materials modeling applications. Each one of the fifteen GFMs has been trained on five open-source datasets that (once aggregated) amount to over 154 million atomistic structures, which cover over two-thirds of the natural elements of the periodic table and that comprises a broad set of organic and inorganic compounds. This vast set of atomistic structures comprises ground state configurations that are dynamically stable (i.e., equilibrated structures with atomic forces approximately close to zero values) as well as dynamically unstable structures (i.e., non-equilibrium structures with non-negligible non-zero values of atomic forces). The ensemble of datasets aggregated does NOT include excited states. The datasets have been curated to remove atomistic structures with spectral norm of the force tensor above 100 eV/angstrom. Moreover, a linear term of the energy was computed for each dataset using a linear regression model that uses the chemical concentration of each natural element as regressor. The linear term predicted by the linear regression model has been subtracted from each original energy value to perform a re-alignment of the energy values across different electronic structures approximation theories performed to generate the diverse multi-source, multi-fidelity datasets. The folder "ADIOS_files" contains the set of pre-processed datasets in Adaptable I/O System (ADIOS) format (https://www.exascaleproject.org/research-project/adios/) that have been used for the development and training of GFMs in this work. The "ADIOS_files" directory contains 6 sub-directories named as follows: - ANI1x-v3.bp - MPTrj-v3.bp - OC2020-20M-v3.bp - OC2020-v3.bp - OC2022-v3.bp - qm7x-v3.bp Each sub-directory contains the pre-processed datasets converted in Adaptable I/O System (ADIOS) format (https://www.exascaleproject.org/research-project/adios/) that have been used to the development, training, and performance testing of the ensemble go predictive graph foundation models. Each GFM was developed using HydraGNN (https://github.com/ORNL/HydraGNN) as underlying graph neural network (GNN) architecture. The multi-task learning (MTL) capability of HydraGNN was used to simultaneously train the GFMs on labeled values for direct predictions of energy (a total system property of an atomistic structure that measures the chemical stability) and atomic forces (an atomic level property of an atomistic structure that measures the dynamical stability). The hyper parameters of the GFM have been tuned using scalable hyperparameter optimization (HPO) algorithms implemented in the software DeepHyper (https://github.com/deephyper/deephyper). The pre-training of each HPO trial was performed using distributed data parallelism (DDP) to scale the training across 128 compute nodes of the exascale OLCF supercomputer Frontier. Each HPO trial was trained only for 10 epochs and an early stopping was performed to avoid wasting significant computational resources on GNN architectures that were clearly underperforming. For each HPO trial, the 'omnistat' tool developed by (AMD Research - Advanced Micro Device) was used to measure the total energy consumption in kWh. The ensemble of GFMs was obtained by selecting the fifteen best performing HPO trials. Four models have been selected for their clear advantage in accuracy, and these are the GFMs with IDs 229, 156, 147, 260. Additional eleven models have been selected based on judicious balance between accuracy and energy consumption needed for training, and these are the GFMs with IDs 165, 78, 137, 1, 175, 171, 181, 67, 179, 167, 351. Each selected GFM of the ensemble was continued to cumulate a total of at most 30 epochs. In some cases, the total number of epochs actually performed was les than 30 due to two combined factors: (1) the size of the GFM (i.e., the number of model parameters to train) and (2) the total wall-clock time for which the computational resources could be allocated on OLCF-Frontier. The "Ensemble_of_models" directory contains 15 sub-directories named as follows: - gfm_0.229 - gfm_0.156 - gfm_0.147 - gfm_0.260 - gfm_0.165 - gfm_0.78 - gfm_0.137 - gfm_0.1 - gfm_0.175 - gfm_0.171 - gfm_0.181 - gfm_0.67 - gfm_0.179 - gfm_0.167 - gfm_0.351 Each one of these sub-directories refers to one of the fifteen HPO trials that have been selected to continue the pre-training with at most 30 epochs. With each sub-directory associated with a specific HPO trial, the following files can be found: - config.json: file for argument parsing to develop and train an HydraGNN architecture - gfm_0.ID_epoch_N.pk: file with model parameters for HPO ID trial after N epochs of training The ensemble of fifteen GFM architectures was used for (1) ensemble averaging to stabilize the predictions of energy and atomic forces after pre-training for post-processing analysis and (2) ensemble uncertainty quantification (UQ). The code used to develop, pre-train, and load the pre-trained models for post-processing analysis is available on the ORNL-GitHub at the following link: https://github.com/ORNL/HydraGNN/tree/Predictive_GFM_2024

36 MATERIALS SCIENCE↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗