Search NASA⌕ Search

SEARCH · Search NASA

Results for “moving object detection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

406 records · Page 23

Corrective Action Decision Document/Closure Report for Corrective Action Unit 482: Area 15 U15a/e Muckpiles and Ponds Nevada Test Site

This Corrective Action Decision Document /Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 482 U15a/e Muckpiles and Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 482 is comprised of three Corrective Action Sites (CASs) and one adjacent area: CAS 15-06-01, U15e Muckpile; CAS 15-06-02, U15a Muckpile; CAS 15-38-01, Area 15 U15a/e Ponds; and Drainage below the U15a Muckpile. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further corrective action, by placing use restrictions on the three CASs and the adjacent area of CAU 482. To support this recommendation, a corrective action investigation (CAI) was performed in September 2002. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to determine appropriate corrective actions. The CAU 482 dataset from the CAI was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Tier 2 FALS were determined for the hazardous constituents of total petroleum hydrocarbons (TPH)-diesel-range organics (DRO) and the radionuclides americium (Am)-241, cesium (Cs)-137, plutonium (Pu)-238, and Pu-239. The Tier 2 FALs were calculated for the radionuclides using site-specific information. The hazardous constituents of TPH-DRO were compared to the PALs defined in the CAIP, and because none of the preliminary action levels (PALs) were exceeded, the PALs became the FALs. The radionuclide FALs were calculated using the Residual Radioactive (RESRAD) code (version 6.21). The RESRAD calculation determined the activities of all radionuclides that together would sum to an exposure dose of 25 millirem per year to a site receptor (based on their relative abundances at each CAS). Based on the field investigation, the following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) CAS 15-06-01 - None. (2) CAS 15-06-02 - Cs-137 and Pu-239. (3) CAS 15-38-01 - Am-241, Cs-137, Pu-238, and Pu-239. (4) Drainage below CAS 15-06-02 - Cs-137 and Pu-239. Based on the data and risk evaluations, the DQO data needs presented in the Corrective Action Investigation Plan were met, and the data accurately represent the radiological and chemical risk present at CAU 482. Based on the results of the CAI data evaluation, it was determined that closure in place with use restrictions is the appropriate corrective action for CAU 482 and that use restrictions will effectively control exposure to future land users. This is based on the fact that even though the FALs were exceeded in a few samples, this remote, controlled access site poses only limited risk overall to public health and the environment. Given the relatively low levels of contamination present, it would create a greater hazard to worker safety, public health, and the environment to remove the contamination, transport it, and bury it at another location. Therefore, DTRA provides the following recommendations: (1) Close COCs in place at CAS 15-06-02, CAS 15-38-01, and the drainage below CAS 15-06-02 with use restrictions. (2) No further action for CAU 482. (3) A Notice of Completion be issued to DTRA by the Nevada Division of Environmental Protection for closure of CAU 482. (4) Move CAU 482 from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observation Targeting for the Tehachapi Pass and Mid-Columbia Basin: WindSENSE Phase III Project Summary Report

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height (~80 m). In Phase III of the project, the focus was on the Mid-Columbia Basin region which encompasses the Bonneville Power Administration (BPA) wind generation area shown in Figure 1 that includes Klondike, Stateline, and Hopkins Ridge wind plants. The typical hub height of a wind turbine is approximately 80-m above ground level (AGL). So it would seem that building meteorological towers in the region upwind of a wind generation facility would provide data necessary to improve the short-term forecasts for the 80-m AGL wind speed. However, this additional meteorological information typically does not significantly improve the accuracy of the 0- to 6-hour ahead wind power forecasts because processes controlling wind variability change from day-to-day and, at times, from hour-to-hour. It is also important to note that some processes causing significant changes in wind power production function principally in the vertical direction. These processes will not be detected by meteorological towers at off-site locations. For these reasons, it is quite challenging to determine the best type of sensors and deployment locations. To address the measurement deployment problem, Ensemble Sensitivity Analysis (ESA) was applied in the Phase I portion of the WindSENSE project. The ESA approach was initially designed to produce spatial fields that depict the sensitivity of a forecast metric to a set of prior state variables selected by the user. The best combination of variables and locations to improve the forecast was determined using the Multiple Observation Optimization Algorithm (MOOA) developed in Phase I. In Zack et al. (2010a), the ESA-MOOA approach was applied and evaluated for the wind plants in the Tehachapi Pass region for a period during the warm season. That research demonstrated that forecast sensitivity derived from the dataset was characterized by well-defined, localized patterns for a number of state variables such as the 80-m wind and the 25-m to 1-km temperature difference prior to the forecast time. The sensitivity patterns produced as part of the Tehachapi Pass study were coherent and consistent with the basic physical processes that drive wind patterns in the Tehachapi area. In Phase II of the WindSENSE project, the ESA-MOOA approach was extended and applied to the wind plants located in the Mid-Columbia Basin wind generation area of Washington-Oregon during the summer and to the Tehachapi Pass region during the winter. The objective of this study was to identify measurement locations and variables that have the greatest positive impact on the accuracy of wind forecasts in the 0- to 6-hour look-ahead periods for the two regions and to establish a higher level of confidence in ESA-MOOA for mesoscale applications. The detailed methodology and results are provided in separate technical reports listed in the publications section below. Ideally, the data assimilation scheme used in the Phase III experiments would have been based upon an ensemble Kalman filter (EnKF) that was similar to the ESA method used to diagnose the Mid-Columbia Basin sensitivity patterns in the previous studies. However, running an EnKF system at high resolution is impractical because of the very high computational cost. Thus, it was decided to use a three-dimensional variational (3DVAR) analysis scheme that is less computationally intensive. The objective of this task is to develop an observation system deployment strategy for the mid Columbia Basin (i.e. the BPA wind generation region) that is designed to produce the maximum benefit for 1- to 6-hour ahead forecasts of hub-height (~80 m) wind speed with a focus on periods of large changes in wind speed. There are two tasks in the current project effort designed to validate the ESA observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Columbia basin region.

17 WIND ENERGY↗

Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet and ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 556. • Corrective Action Unit 556 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

VALENTInE: A Concept for a New Frontiers Class Long Duration In-Situ Balloon Mission to Venus

Venus and Earth are similar in bulk composition, size, density, and approximate distance from the Sun, yet Venus’s modern-day climate and surface geology is distinctly different [1]. Previous missions to Venus revealed unusual volcanic features, possible continental crust, widespread volcanic plains, a weak magnetic field [2], and insights into the Venusian atmosphere [3,4]. Unfortunately, data from these missions were limited in spatial and temporal resolution and global extent. A future mission to Venus is critical to address fundamental questions surrounding the chemical composition and dynamics of the Venusian atmosphere [5], its geologic history [6,7], its internal structure [8,9], and its habitability throughout time [10,11]. We present the Venus Air and Land Expedition: a Novel Trailblazer for In situ Exploration (VALENTInE) mission to meet this need. VALENTInE is a variable altitude balloon that will passively float in Venus’s atmosphere between 45 and 55 km altitude. VALENTInE will acquire atmospheric data at varying latitudes and longitudes in addition to mapping the surface geomorphology and mineralogy across multiple terrains. Mission Objectives: The VALENTInE mission concept is driven by four main science objectives: 1. Determine whether the driving force of the superrotation of Venus’s atmosphere is caused by horizontal or vertical momentum transport. 2. Determine whether the atmospheric composition and noble gas inventory of the Venusian atmosphere is a product of outgassing from the initial protoplanetary source or if there are significant contributions from exogenic sources. 3. Determine whether the tesserae regions (particularly Aphrodite Terra) are felsic and relatively older than surrounding regions. 4. Determine if there is any evidence of a recent dynamo preserved in the rock record of Venus. Mission Overview: A balloon architecture provides a robust system that can survive long-term in the Venusian environment while taking accurate measurements of the lower cloud deck and surface. Two prior balloon missions to Venus, VEGA 1 and VEGA 2 in 1984, have demonstrated the potential for such planetary exploration; however, these missions were short-lived (46 hr), with limited range (54 km). Our spacecraft concept consists of a battery powered balloon with a gondola and flyby carrier stage (Fig. 1). Our novel design allows for at least 15 days of atmospheric exploration, including multiple ascents and descents in the Venus atmosphere. VALENTInE is baselined to launch in 2032, cruise on solar power for 128 days, enter, descend, and inflate (EDI) into Venus’s atmosphere above Aphrodite Terra, and float in Venus’s atmosphere for a total nominal mission duration of 15 days. The balloon, able to control its altitude by changing its buoyancy, will make one full circumnavigation every 4–8 days and move poleward ~1 o latitude per day; it will be passively directed by the horizontal air currents on Venus. The balloon can only be controlled in the z direction, and the expected latitude range is ±10° from EDI. The balloon itself will be a tracer for atmospheric structures such as zonal winds [5, 12]. During the 15-day operational period, there will be five dips to 45 km for a compositional study of the lower atmosphere and geological and magnetic mapping of the surface. Dips are used to take images and measurements closer to the surface and to obtain in situ vertical atmospheric profiles between 45 and 55 km. Instruments: The VALENTInE instrument payload will allow for extensive study of the geology, atmosphere, and interior of Venus. The instrument suite consists of six instruments. The mission profile for each instrument is shown in Fig. 2. Lower Atmosphere Meteorology Analyzer (LAMA) is an atmospheric structure instrument consisting of a thermometer, barometer, and accelerometer to continuously measure temperature and pressure as a function of altitude, longitude, and latitude. TracE and Noble Gas Investigator (TENGI) is aneutral mass spectrometer used to sample the dense atmosphere. TENGI will operate continuously at 45 km and 55 km and will measure D/H ratios, as well as Ne, Ar, and O isotopic ratios. Kilometer Scale Spectral Imager (KSSI) is amultispectral imager (850-1150 nm) used to resolve surface features on the order of km. Near InfraRed Multispectral Photometer (NIRMP) is an Infrared (IR) photometer used to image the surface through the clouds to characterize mineral assemblages at five different areas of the surface. NIRMP will be operated during dwell. ELevation REConnaissance (ELREC) is a light detection and ranging (LIDAR) instrument used for measuring topography at five different areas of the surface. The ELREC data will be combined with those of NIRMP to determine mineral assemblages and how they correlate to topography. Magnetic Exploration and Interior Detective (MEID) is a magnetometer used to detect any near-surface magnetic anomalies. The magnetometer will continuously operate at all altitudes. Mission Design: The spacecraft’s propulsion system will have a wet mass of 930 kg and will be launched on an Atlas V rocket. The spacecraft will jettison the payload upon arrival in Venus’s atmosphere before decelerating to orbital velocity. Figure 2. Notional power-dip profile while the balloon is on the dayside. Risks and Challenges: Raising and lowering the spacecraft to dip beneath the haze layer require a large amount of energy. This issue was partly compensated by limiting the number of dips over the 15 day prime mission. Power needs for pumping helium are reduced by slowing the descent speed, which consequently increases spatial resolution of in situ measurements between 45 and 55 km. The main limitation for the duration of the mission is the need to carry 15 days’ worth of batteries. The bus experiences external Venusian temperatures ranging from ~27°C at 55 km altitude to ~110°C at 45 km altitude. These high atmospheric temperatures require thermal protection for the bus (instruments, electronics, and flight systems) during its descent, dwell at 45 km, and ascent. The bus is maintained at a mechanically safe temperature range of -10°C to 50°C using white external paint, multi-layer insulation (MLI), mechanical/thermal isolation (e.g. Ti, composites), and ~57 kg of Phase Change Materials (PCM). Images and spectra taken below the haze dominate the available data transmission regardless of the time spent at 45 km. Therefore, less time at the lower altitude mainly reduces the coverage of in situ measurements there. Further, we assumed an unrealistically low-density material for the helium storage tanks on the gondola. However, this issue is partially resolved if we were to jettison 75% of the spent helium storage tanks. After the entry process, the balloon volume remains mostly inflated and storage tanks are required only for reducing balloon volume in dipping to 45 km. This mission was planned against an expected New Frontiers 5 (NF5) cost cap of $1B, as the NF5 call had not yet been released. The mission we describe fits within the predicted cost cap if the flyby carrier stage, responsible for powering the spacecraft during cruise and for relaying in situ measurements back to Earth, can be contributed by another space agency. Acknowledgments: We thank the JPL Planetary Science Summer School, especially A. Nash, J. Scully, K. Mitchell, L. Lowes, and J. Armijo, and our mentors from JPL Team X. Thank you to our review panel for their insightful review. References: [1] Kane, S. et al. (2019) JGR:Ps, 124 , 2015–2028. [2] Phillips, J. L., & Russell, C. T. (1987). JGR: Space Physics , 92 (A3), 2253-2263. [3] Nakamura, M. et al. (2018) Earth Planets Space, 70 (1), 144. [4] Svedhem, H. et al. (2009) JGR:P 114 (E5). [5] Limaye et al. (2009) Decadal Survey White Paper . [6] Ivanov, M. and Head, J. (2011) PSS, 59 (13) , 1559-1600. [7] Smrekar, S. et al. (2018) Space Sci Rev, 214 (5), 88. [8] O’Rourke, J. et al. (2018) EPSL, 502 , 46-56. [9] O’Rourke J. et al. (2019) GRL , (46), 5768–5777 [10] Way, M. et al. (2016) GRL, 43 (16), 8376-8383. [11] Way, M. et al. (2020) JGR:P, 125 (5), e2019JE006276. [12] Preston, R. A. et al. (1986) Science, 231 (4744), 1414-1416.

Mission Concept↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Syracuse University Test Report On Uptake Factor Resulting From A Dropped Storage Container

Under certain circumstances, powder from an accidently dropped container can become airborne and inhaled by people nearby such as those who are moving the containers. The inhaled fine particles can deposit on respiratory tracts and lungs, causing asthma, lung cancer, and other acute respiratory illnesses and chronic symptoms. The objective of this study was to develop a standard procedure to measure the airborne concentrations of different size particles within the vicinity of a dropped container where a significant portion of the contained powder is ejected. Tungsten oxide (WO{sub 3}) was selected in this study to represent relatively heavy powders (7.16 g/cm3 specific gravity for WO{sub 3}). A typical can with the outer dimensions of 4.25” diameter and 4.875” tall was used as the container. The powder was dropped in two different configurations: 1) contained within a can covered by a lid that has a 0.25” diameter hole, and 2) contained within a can without a lid. The packing volume of the powder was 51.4 in{sup 3} (842.7 cm{sup 3}) and the target mass was 1936 g. The tests were carried out in a full-scale stainless steel environmental chamber with an interior volume of 852 ft{sup 3} (24.1 m{sup 3}). The chamber system includes an internal recirculation loop with a rectangular air diffuser and 10 variable frequency drive fans to provide a typical room air recirculation flow pattern. Two air filters were installed in the chamber air supply duct and return duct to achieve the required low background particle concentration. The initial chamber air conditions were set at 70°F (± 5°F) and 50% (± 10%) RH. A supporting frame and releasing device were designed and built to trigger consistently the dropping of the can at a height of 8 feet from the bottom of the can to the impacting surface. The particle sampling inlet was placed 5 ft above the floor and 6 inches laterally away from the can’s falling path. Concentrations of particles between 0.5 μm and 20 μm were recorded in units of mass and number of particles per unit volume. The data acquisition rate was once every 2 seconds during the first 2 hours and every 20 seconds thereafter. A test procedure was developed and a total of nine drop tests were performed. In most cases (seven tests), the can tipped over after dropping. The can in Test 1 stayed upright. The can in Test 7 showed a special behavior: after the rebound, it turned upside down and stayed upright. Major findings are summarized below: The amount of spilled powder varied from 0.12 g to 252.35 g and the non-recovered powder varied from 0.11 g to 1.18 g. The corresponding percentage of the spilled powder ranged from 0.01% to 13%;The peak value of particle number concentration after the dropping of the can occurred at approximately 0.9 μm particle size per measured data of individual channels. The peak value of particle mass concentration occurred in the range of 4.3 - 10 μm particle size per grouped data calculated from the measured data with the exception of Test 4 where a different batch powder with unexpectedly different bulk density and particle size distribution; After the dropping of the can, the total airborne mass concentrations ranged from 0.03 to 0.35 mg/m{sup 3}, while the total airborne number concentrations ranged from 2 to 125 #/cm{sup 3} except for Test 4. The number concentration in Test 4 was 1 or 2 orders of magnitude less than those of other tests because the powder was from a different batch. However, its mass concentration was comparable to that in Test 7 because relatively more big airborne particles were detected in Test 4. In general, tests with lid (Test 5, 6, 7 and 8) had smaller concentrations than tests without lid (Test 0, 1, 2, and 3). The influence of lid was not as prominent as the powder (Test 4). However, this needs more tests for verification; The ratio of airborne mass to non-recovered mass ranged from 0.1% to 2%. This means that it is challenging to use this method to check the mass balance, while the uptake factor and associated inhalation exposure can be readily assesse; The calculated cumulative uptake mass within first 10 minutes after the dropping of the can for each test was within the range of 0.002 mg to 0.035 mg. Assuming a breathing rate of 1.2 m{sup 3}/h, the uptake factor during the first 10 minutes was calculated to be between 10{sup -9} and 2×10{sup -8} in reference to the amount loaded; or between 10{sup -8} and 6×10{sup -5} in reference to the amount spilled. The experimental results of this study will be useful for standardizing the test method and provide data for estimating the exposure and associated risk to building occupants in the case of an accidental dropping of heavy powder containers.

42 ENGINEERING↗

Final Scientific/Technical Report: Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Bottom Water Warming Along the Upper Continental Slope

The objective of this project is to understand the response of the WA margin gas hydrate system to contemporary warming of bottom water along the upper continental slope. Through pre-cruise analysis and modeling of archive and recent geophysical and oceanographic data, we (1) inventoried bottom simulating reflectors along the WA margin and defined the upper limit of gas hydrate stability, (2) refined margin-wide estimates of heat flow and geothermal gradients, (3) characterized decadal scale temporal variations of bottom water temperatures at the upper continental slope of the Washington margin, and (4) used numerical simulations to provide quantitative estimates of how the shallow boundary of methane hydrate stability responds to modern environmental change. These pre-cruise results provided the context for a systematic geophysical and geochemical survey of methane seepage along the upper continental slope from 48° to 46°N during a 10-day field program on the R/V Thompson from October 10-19, 2014. This systematic inventory of methane emissions along this climate-sensitive margin corridor and comprehensive sediment and water column sampling program provided data and samples for Phase 3 of this project that focused on determining fluid and methane sources (deep-source vs. shallow; microbial, thermogenic, gas hydrate dissociation) within the sediment, and how they relate to contemporary intermediate water warming. During the 2014 research expedition, we sampled nine seep sites between ~470 and 520 m water depth, within the zone of predicted methane hydrate retreat over the past 40 years. We imaged 22 bubble plumes with heights commonly rising to ~300 meters below sea level with one reaching near the sea surface. We collected 22 gravity cores and 20 CTD/hydrocasts from the 9 seeps and at background locations (no acoustic evidence of seepage) within the depth interval of predicted downslope retreat of the methane hydrate stability zone. Approximately 300 pore water samples were extracted from the gravity cores, and the pore water was analyzed for a comprehensive suite of solutes, gases, and stable isotope ratios. This comprehensive geochemical dataset was used to characterize the fluid and gas source(s) at each of the seep sites surveyed. The primary results of this project are: 1) Bottom simulating reflector-derived heat flow values decrease from 95 mW/m2 10 km east of the deformation front to ~60 mW/m2 60 km landward of the deformation front, with anomalously low values of ~25 mW/m2 on a prominent mid-margin terrace off central Washington. 2) The temperature of the incoming sediment/ocean crust interface at the deformation front ranges between 164-179 oC off central Washington, and the 350 oC isotherm at the top of the subducting ocean crust occurs 95 km landward of the deformation front. Differences between BSR-derived heat flow and modeled conductive heat flow suggest mean upward fluid flow rates of 0.4 cm/yr across the margin, with local regions (e.g. fault zones) exhibiting fluid flow rates up to 3.5 cm/yr. 3) A compilation of 2122 high-resolution CTD, glider, and Argo float temperature profiles spanning the upper continental slope of the Washington margin from the years 1968 to 2013 show a long-term warming trend that ranges from 0.006-0.008 oC/yr. Based on this long-term bottom water warming, we developed a 2-D thermal model to simulate the change in sediment temperature distribution over this period, along with the downslope retreat of the methane hydrate stability field. Over the 43 years of the simulation, the thermal disturbance propagated 30 m into the sediment column, causing the base of the methane hydrate stability field to shoal ~13 m and to move ~1 km downslope. 4) A preliminary analysis of seafloor observations and mid-water column acoustic data to detect bubble plumes was used to characterize the depth distribution of seeps along the Cascadia margin. These results indicate high bubble plume densities along the continental shelf at water depths <180 m and at the upper limit of methane hydrate stability along the Washington margin. 5) The majority of the seeps cored during the 2014 research expedition on the R/V Thompson contained abundant authigenic carbonate indicating that they are locations of long-lived seepage rather than emergent seep systems related to methane hydrate dissociation. Despite the evidence for enhanced methane seepage at the upper limit of methane hydrate stability along the Washington margin, we found no unequivocal evidence for active methane hydrate dissociation as a source of fluid and gas at the seeps surveyed. The pore fluid and bottom water chemistry shows that the seeps are fed by a variety of fluid and methane sources, but that methane hydrate dissociation, if occurring, is not widespread and is only a minor source (below the detection limit of our methods). Collectively, these results provide a significant advance in our understanding of the thermal structure of the Cascadia subduction zone and the fluid and methane sources feeding seeps along the upper continental slope of the Washington-sector of the Cascadia margin. Though we did not find unequivocal evidence for methane hydrate dissociation as a source of water and methane at the upper pressure-temperature limit of methane hydrate stability at present, continued warming of North Pacific Intermediate Water in the future has the potential to impact the methane hydrate reservoir in sediments at greater depths along the slope. Thus, this study provides a strong foundation and the necessary characterization of the background state of seepage at the upper limit of methane hydrate stability for future investigations of this important process.

54 ENVIRONMENTAL SCIENCES↗

Product Quality Assurance for Off-Grid Lighting in Africa

Although the emergence of markets for high efficiency off-grid lighting technologies holds promise, realizing the potential of this opportunity on a long-term, sustainable basis requires careful attention to issues of product quality, consumer protection, and the potential for significant 'market spoiling', in anticipation of increases of sales of low cost, low performance off-grid lighting products. The goal of the Lighting Africa quality assurance workshop was to articulate strategies to mitigate the dangers of market spoiling and to explore ways to protect consumers from misleading advertising for sales of inferior, off-grid lighting products in the context of Lighting Africa's overarching objective to support the industry in developing a robust off-grid lighting market in Africa. The workshop resulted in the identification of two strategic approaches for meeting Lighting Africa quality assurance programmatic needs. The first strategy is intended to meet a short-term programmatic need for quality associated with requests for lighting products by bulk procurement agents, such as in a World Bank-financed project. The development of procurement specifications and test procedures that could be used in a quality/usability screening method in order to provide guidance for forthcoming large volume purchases emerged as the best solution to meet this need. Such approaches are used in World Bank-financed solar home systems (SHSs) projects in Bangladesh, Sri Lanka, and China, among others. However, unlike the SHSs which have multiple balance-of-system (BOS) components warranting the need for an array of specifications for individual components, stand alone lighting systems require specifications that are amenable to individual light points. To test this approach, Lighting Africa elected to use the technical specifications issued by the Photovoltaic Global Approval Program for solar lanterns that use CFL bulbs (PVRS11A) as the basis of qualifying such products. A contract has been competitively awarded to the Global Approval Program for Photovoltaics (PV GAP) under the Lighting Africa Program to select and test ten solar lantern product models. Lantern selection will be determined based on a number of criteria, among them, the ability to provide a daily duty cycle of at least 3 hours of light, the number of days of autonomy of battery, the volume of sales (especially in Africa), and whether or not the manufacturing facility is ISO 9000 certified. Those that are confirmed as meeting the specifications may be eligible to receive a PVGAP quality seal. The work is being carried out in partnership with the Photovoltaic and Wind Quality Test Center in Beijing, China and TUV Rhineland in Koeln, Germany. As off-grid LED-based stand-alone lighting products is in a nascent stage of development compared to CFL-based lanterns, Lighting Africa will support the development of a 'Quality Screening' approach to selecting LED lighting, in order not to delay consumers benefiting from such advances. The screening methodology could be used by procurement agencies to qualify LED lighting products for bulk or programmatic procurements. The main elements of this work comprises of developing a procurement specification and test procedure for undertaking a 'quick' quality/usability screening to be used for procuring LED lights and to test up to 30 LED-based lights to screen products that meet the requirement. The second strategy is intended to meet a longer-term need associated with creating a self-sustaining product quality assurance program that will effectively protect the African consumer, prevent significant market spoiling, adapt with expected technological advancements over the long-term--in other words, give consumers the ability to detect quality products and the information needed to find products that meet their specific needs from among the myriad of lighting products that become available commercially. Workshop discussions and the discussions evolving from the workshop led the Lighting Africa team to opt for an approach similar to that of the 'Fair Trade' model, involving the creation of a set of voluntary criteria which companies can elect to subscribe to in order to receive a product evaluation/certification. This solution was proposed as it has the widest capacity to incorporate the largest number of recommendations from the workshop sessions. This code of conduct will be made available for companies to comment on later in 2008. These workshop proceedings provide an overview of workshop discussions and a summary of the key points identified around various workshop topic areas, contributing to the two strategy approach Lighting Africa will take as it moves forward with developing its quality assurance program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tonopah Test Range Air Monitoring: CY2018 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.

54 ENVIRONMENTAL SCIENCES↗

Unraveling the Complex Behavior of Mrk 421 with Simultaneous X-Ray and VHE Observations during an Extreme Flaring Activity in 2013 April

Here we report on a multiband variability and correlation study of the TeV blazar Mrk 421 during an exceptional flaring activity observed from 2013 April 11 to 19. The study uses, among others, data from GLAST-AGILE Support Program (GASP) of the Whole Earth Blazar Telescope (WEBT), Swift, Nuclear Spectroscopic Telescope Array (NuSTAR), Fermi Large Area Telescope, Very Energetic Radiation Imaging Telescope Array System (VERITAS), and Major Atmospheric Gamma Imaging Cherenkov (MAGIC). The large blazar activity and the 43 hr of simultaneous NuSTAR and MAGIC/VERITAS observations permitted variability studies on 15 minute time bins over three X-ray bands (3–7 keV, 7–30 keV, and 30–80 keV) and three very-high-energy (VHE; >0.1 TeV) gamma-ray bands (0.2–0.4 TeV, 0.4–0.8 TeV, and >0.8 TeV). We detected substantial flux variations on multi-hour and sub-hour timescales in all of the X-ray and VHE gamma-ray bands. The characteristics of the sub-hour flux variations are essentially energy independent, while the multi-hour flux variations can have a strong dependence on the energy of the X-rays and the VHE gamma-rays. The three VHE bands and the three X-ray bands are positively correlated with no time lag, but the strength and characteristics of the correlation change substantially over time and across energy bands. Our findings favor multi-zone scenarios for explaining the achromatic/chromatic variability of the fast/slow components of the light curves, as well as the changes in the flux–flux correlation on day-long timescales. We interpret these results within a magnetic reconnection scenario, where the multi-hour flux variations are dominated by the combined emission from various plasmoids of different sizes and velocities, while the sub-hour flux variations are dominated by the emission from a single small plasmoid moving across the magnetic reconnection layer.

79 ASTRONOMY AND ASTROPHYSICS↗