Search NASA⌕ Search

SEARCH · Search NASA

Results for “network monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Path to Subsurface Closure: When Real and Predicted Data Don't Match, Central Nevada Test Area (CNTA) - 19560

The Central Nevada Test Area, Nevada, was the site of an underground nuclear test in 1968, which resulted in residual contamination at and near the detonation depth of 975 meters (3200 feet). The environmental corrective action strategy for the site was conducted in accordance with the Federal Facility Agreement and Consent Order and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The corrective action strategy initiated in 1999 included developing a conceptual site model, preparing a numerical flow and transport model, calculating contaminant boundaries, negotiating compliance boundaries with NDEP, performing model validation, and monitoring groundwater. This strategy was executed through the Corrective Action Decision Document/Corrective Action Plan phase, when it was determined that the flow and transport model could not be validated because it failed to adequately predict groundwater elevations in the monitoring/validation (MV) wells (MV-1, MV-2, and MV-3) drilled subsequent to the modeling effort. This led to a change in the corrective action strategy that is now designed to validate the compliance boundary through monitoring and institutional controls, rather than relying predominantly on a numerical flow and transport model. This new approach included enhancements to the monitoring well network and additional monitoring to confirm that data were sufficient to proceed to closure. The corrective action activities were completed in 2015, and the Closure Report, which established the long-term postclosure monitoring program, was approved in 2016. The postclosure monitoring program is designed to (1) assess the effectiveness of the compliance boundary by monitoring for the radionuclides of interest and (2) evaluate the effectiveness of monitoring locations within the groundwater flow system by monitoring water elevations to ensure that monitoring wells are located along the potential migration pathways. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Self-Synchronizing Underwater Acoustic Network for Mooring Load Monitoring of a Wave Energy Converter

This paper reports on the development of a self-synchronizing underwater acoustic network developed for remote monitoring of mooring loads in Wave Energy Converters (WECs). This network uses Time Division Multiple Access and operates self-contained with the ability for users to remotely transmit commands to the network as needed. Each node is a self-contained unit, consisting of a protocol adaptor board, an FAU-DPAM underwater acoustic modem and a battery pack. A node can be connected to a load cell, to a topside user or to the WEC. Every node is swapable. The protocol adaptor board, named Protocol Adaptor for Digital LOad Cell (PADLOC) supports a variety of digital load cell message formats (CAN, MODBUS, custom ASCII) and underwater acoustic modem serial formats. PADLOC enables topside users to connect to separate load cells through a user-specific command. This is especially important if the user is monitoring multiple load cells during deployment or maintenance, when the primary data system may be offline. Each PADLOC board handles formatting, buffering and has a one-on-one serial connection with each pair (node) of a digital load cell and acoustic modem. In addition, each PADLOC board handles the timekeeping and power saving features for each node. The only limitation is the data bit rate and delay limitations associated with the underwater acoustic modem. A four node self-synchronizing network has been developed to demonstrate the load cell monitoring capability using the PADLOC technology on the CalWave WEC.

acoustic↗

Model Based Optimal Sensor Network Design for Condition Monitoring in an IGCC Plant

This report summarizes the achievements and final results of this program. The objective of this program is to develop a general model-based sensor network design methodology and tools to address key issues in the design of an optimal sensor network configuration: the type, location and number of sensors used in a network, for online condition monitoring. In particular, the focus in this work is to develop software tools for optimal sensor placement (OSP) and use these tools to design optimal sensor network configuration for online condition monitoring of gasifier refractory wear and radiant syngas cooler (RSC) fouling. The methodology developed will be applicable to sensing system design for online condition monitoring for broad range of applications. The overall approach consists of (i) defining condition monitoring requirement in terms of OSP and mapping these requirements in mathematical terms for OSP algorithm, (ii) analyzing trade-off of alternate OSP algorithms, down selecting the most relevant ones and developing them for IGCC applications (iii) enhancing the gasifier and RSC models as required by OSP algorithms, (iv) applying the developed OSP algorithm to design the optimal sensor network required for the condition monitoring of an IGCC gasifier refractory and RSC fouling. Two key requirements for OSP for condition monitoring are desired precision for the monitoring variables (e.g. refractory wear) and reliability of the proposed sensor network in the presence of expected sensor failures. The OSP problem is naturally posed within a Kalman filtering approach as an integer programming problem where the key requirements of precision and reliability are imposed as constraints. The optimization is performed over the overall network cost. Based on extensive literature survey two formulations were identified as being relevant to OSP for condition monitoring; one based on LMI formulation and the other being standard INLP formulation. Various algorithms to solve these two formulations were developed and validated. For a given OSP problem the computation efficiency largely depends on the “size” of the problem. Initially a simplified 1-D gasifier model assuming axial and azimuthal symmetry was used to test out various OSP algorithms. Finally these algorithms were used to design the optimal sensor network for condition monitoring of IGCC gasifier refractory wear and RSC fouling. The sensors type and locations obtained as solution to the OSP problem were validated using model based sensing approach. The OSP algorithm has been developed in a modular form and has been packaged as a software tool for OSP design where a designer can explore various OSP design algorithm is a user friendly way. The OSP software tool is implemented in Matlab/Simulink© in-house. The tool also uses few optimization routines that are freely available on World Wide Web. In addition a modular Extended Kalman Filter (EKF) block has also been developed in Matlab/Simulink© which can be utilized for model based sensing of important process variables that are not directly measured through combining the online sensors with model based estimation once the hardware sensor and their locations has been finalized. The OSP algorithm details and the results of applying these algorithms to obtain optimal sensor location for condition monitoring of gasifier refractory wear and RSC fouling profile are summarized in this final report.

20 FOSSIL-FUELED POWER PLANTS↗

2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Correction Unit 447

The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.

54 ENVIRONMENTAL SCIENCES↗

Peeking Network States with Clustered Patterns

Network traffic monitoring has long been a core element for effec- tive network management and security. However, it is still a chal- lenging task with a high degree of complexity for comprehensive analysis when considering multiple variables and ever-increasing traffic volumes to monitor. For example, one of the widely con- sidered approaches is to scrutinize probabilistic distributions, but it poses a scalability concern and multivariate analysis is not gen- erally supported due to the exponential increase of the complexity. In this work, we propose a novel method for network traffic moni- toring based on clustering, one of the powerful deep-learning tech- niques. We show that the new approach enables us to recognize clustered results as patterns representing the network states, which can then be utilized to evaluate “similarity” of network states over time. In addition, we define a new quantitative measure for the similarity between two compared network states observed in dif- ferent time windows, as a supportive means for intuitive analysis. Finally, we demonstrate the clustering-based network monitoring with public traffic traces, and show that the proposed approach us- ing the clustering method has a great opportunity for feasible, cost- effective network monitoring.

97 MATHEMATICS AND COMPUTING↗

Neural network approach to Space Shuttle Main Engine health monitoring

A neural network was trained to distinguish anomalies in Space Shuttle Main Engine sensor data from noisy normal steady-state sensor data. Power spectra of successive windows of individual sensor data were presented to a neural network using Kohonen's topological feature map training algorithm. The trained network for each sensor was then tested to determine if it would detect anomalies in the sensor data, and if so, the time at which the anomaly would be detected. Power spectra from a few hundred seconds of actual test data from NASA tests 901-364 and 904-044 were used to test the network. In both cases, the neural network detected the onset of anomalous engine behavior at approximately the same time within each test as the onset times reported by NASA and Rocketdyne experts in their post-test analyses.

Whitehead, Bruce A.↗

Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments

This report summarizes technical progress on the program “Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments” funded by the National Energy Technology Laboratory of the U.S. Department of Energy, and performed by the Center for Photonics Technology at Virginia Tech. The objective of this project is to develop a first-of-a-kind technology for remote fiber optic generation and detection of acoustic waves for structural health monitoring in harsh environments. During the project period, which is from April 1, 2013 to Septemeber 30, 2016, three different acoustic generation mechanisms were studied in detail for their applications in building a fiber optic acoustic generation unit (AGU), including laser induced plasma breakdown (LIP), Erbium-doped fiber laser absorption, and metal laser absorption. By comparing the performance of the AGUs designed based on these three mechanisms and analyzing the experimental results with simulations, the metal laser absorption method was selected to build a complete fiber optic structure health monitoring (FO-SHM) system for the proposed high temperature multi-parameter structure health monitoring application. Based on the simulation of elastic wave propagation and fiber Bragg grating acoustic pulse detection, an FO-SHM element together with a completed interrogation system were designed and built. This system was first tested on an aluminum piece in the low-temperature range and successfully demonstrated its capability of multi-parameter monitoring and multi-point sensing. In the later stages of the project, the research was focused on improving the surface attachment design and preparing the FO-SHM element for high temperature environment tests. After several upgrades to the surface attachment methods, the FO-SHM element was able to work reliably up to 600oC when attached to P91 pipes, which are the target material of this project. In the final stage of this project, this FO-SHM sensing system was tested in the simulated harsh environment for its multi-parameter monitoring performance and high-temperature survivability.

20 FOSSIL-FUELED POWER PLANTS↗

Cybersecurity Intrusion Detection and Monitoring for Field Area Network: Final Report

This report summarizes the key technical accomplishments, industry impact and performance of the I2-CEDS grant entitled “Cybersecurity Intrusion Detection and Monitoring for Field Area Network”. Led by Applied Communication Sciences (ACS/Vencore Labs) in conjunction with its utility partner Sacramento Municipal Utility District (SMUD), the project accelerated research on a first-of-its-kind cybersecurity monitoring solution for Advanced Meter Infrastructure and Distribution Automation field networks. It advanced the technology to a validated, full-scale solution that detects anomalies, intrusion events and improves utility situational awareness and visibility. The solution was successfully transitioned and commercialized for production use as SecureSmart™ Continuous Monitoring. Discoveries made with SecureSmart™ Continuous Monitoring led to tangible and demonstrable improvements in the security posture of the US national electric infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized.

54 ENVIRONMENTAL SCIENCES↗