Search NASA⌕ Search

SEARCH · Search NASA

Results for “reference architectures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

NASA's Decadal Survey Observing System for Aerosols, Clouds, Convection, and Precipitation (ACCP): The Atmosphere Observing System

The observing system to be described today arose from NASA’s recent Earth Science Decadal Survey. In 2018, NASA funded a 2.5-year study to identify key science requirements and potential architecture solutions to address 2 of the 5 decadal survey recommended designated observables: aerosols and clouds, convection, and precipitation (or ACCP). A set of architectures was recommended to NASA HQ earlier this year, leading to a new mission that we have named the Atmosphere Observing System, or AOS, although that name may eventually change. In this presentation, when I refer to ACCP, I am speaking about the recent 2-year study and when I refer to AOS I am speaking of the new mission currently in its mission concept development phase. I will provide some background on the decadal survey and how it led to the ACCP and AOS goals. I will describe the architecture that was recommended to NASA HQ and summarize current activities as we work toward our mission concept review next spring.

Scott A. Braun↗

Human Exploration of Phobos

This study developed, analyzed, and compared mission architectures for human exploration of Mars' Moons within the context of an Evolvable Mars Campaign. METHODS: All trades assumed conjunction class missions to Phobos (approximately 500 days in Mars system) as it was considered the driving case for the transportation architecture. All architectures assumed that the Mars Transit Habitat would remain in a High Mars Orbit with crewmembers transferring between HMO and Phobos in a small crew taxi vehicle. A reference science / exploration program was developed including performance of a standard set of tasks at 55 locations on the Phobos surface. Detailed EVA timelines were developed using realistic flight rules to accomplish the reference science tasks using exploration systems ranging from jetpacks to multi-person pressurized excursion vehicles combined with Phobos surface and orbital (L1, L4/L5, 20km Distant Retrograde Orbit) habitat options. Detailed models of propellant mass, crew time, science productivity, radiation exposure, systems and consumables masses, and other figures of merit were integrated to enable quantitative comparison of different architectural options. Options for pre-staging assets using solar electric propulsion (SEP) vs. delivering all systems with the crew were also evaluated. Seven discrete mission architectures were evaluated. RESULTS: The driving consideration for habitat location (Phobos surface vs. orbital) was radiation exposure, with an estimated reduction in cumulative mission radiation exposure of up to 34% (vs. Mars orbital mission) when the habitat is located on the Phobos surface, compared with only 3-6% reduction for a habitat in a 20km DRO. The exploration utility of lightweight unpressurized excursion vehicles was limited by the need to remain within 20 minutes of Solar Particle Event radiation protection combined with complex GN&C systems required by the non-intuitive and highly-variable gravitational environment. Two-person pressurized excursion vehicles as well as mobile surface habitats offer significant exploration capability and operational benefits compared with unpressurized EVA mobility systems at the cost of increased system and propellant mass. Mechanical surface translation modes (i.e. hopping) were modeled and offer potentially significant propellant savings and the possibility of extended exploration operations between crewed missions. Options for extending the utilization of the crew taxi vehicle were examined, including use as an exploration asset for Phobos surface exploration (when combined with an alternate mobility system) and as an EVA platform, both on Phobos and for contingency EVA on the Mars Transit Habitat. CONCLUSIONS: Human exploration of Phobos offers a scientifically meaningful first step towards human Mars surface missions that develops and validates transportation, habitation, and exploration systems and operations in advance of the Mars landing systems.

Abercromby, Andrew F. J.↗

High-Speed and Hysteresis-Free Near-Infrared Optical Hydrogen Sensor Based on Ti/Pd Bilayer Thin Films

Palladium (Pd) and titanium (Ti) exhibit opposite dielectric responses upon hydrogenation, with stronger effects observed in the near-infrared (NIR) region. Leveraging this contrast, we investigated Ti/Pd bilayer thin films as a platform for NIR hydrogen sensing—particularly at telecommunication-relevant wavelengths, where such devices have remained largely unexplored. Ti/Pd bilayers coated with Teflon AF (TAF) and fabricated via sequential electron-beam and thermal evaporation were characterized using optical transmission measurements under repeated hydrogenation cycles. The Ti (5 nm)/Pd (x = 2.5 nm)/TAF (30 nm) architecture showed a 2.7-fold enhancement in the hydrogen-induced optical contrast at 1550 nm compared to Pd/TAF reference films, attributed to the hydrogen ion exchange between the Ti and Pd layers. The optimized structure, with a Pd thickness of x = 1.9 nm, exhibited hysteresis-free sensing behavior, a rapid response time (t90 < 0.35 s at 4% H2), and a detection limit below 10 ppm. It also demonstrated excellent selectivity with negligible cross-sensitivity to CO2, CH4, and CO, as well as high durability, showing less than 6% signal degradation over 135 hydrogenation cycles. These findings establish a scalable, room-temperature NIR hydrogen sensing platform with strong potential for deployment in automotive, environmental, and industrial applications.

Chemistry↗

Current LISA Spacecraft Design

The Laser Interferometer Space Antenna (LISA) mission, a space based gravitational wave detector, uses laser metrology to measure distance fluctuations between proof masses aboard three spacecraft. LISA is unique from a mission design perspective in that three spacecraft and their associated operations form one distributed science instrument, unlike more conventional missions where an instrument is a component of an individual spacecraft. The design of the LiSA spacecraft is also tightly coupled to the design and requirements of the scientific payload; for this reason it is often referred to as a "sciencecraft." A detailed discussion will be presented that describes the current spacecraft design and mission architecture needed to meet the LISA science requirements.

Merkowitz, Stephen↗

Implementation and Evaluation of Multiple Adaptive Control Technologies for a Generic Transport Aircraft Simulation

Presented here is the evaluation of multiple adaptive control technologies for a generic transport aircraft simulation. For this study, seven model reference adaptive control (MRAC) based technologies were considered. Each technology was integrated into an identical dynamic-inversion control architecture and tuned using a methodology based on metrics and specific design requirements. Simulation tests were then performed to evaluate each technology s sensitivity to time-delay, flight condition, model uncertainty, and artificially induced cross-coupling. The resulting robustness and performance characteristics were used to identify potential strengths, weaknesses, and integration challenges of the individual adaptive control technologies

Campbell, Stefan F.↗

Multi-Objective Optimization of a Turbofan for an Advanced, Single-Aisle Transport

Considerable interest surrounds the design of the next generation of single-aisle commercial transports in the Boeing 737 and Airbus A320 class. Aircraft designers will depend on advanced, next-generation turbofan engines to power these airplanes. The focus of this study is to apply single- and multi-objective optimization algorithms to the conceptual design of ultrahigh bypass turbofan engines for this class of aircraft, using NASA s Subsonic Fixed Wing Project metrics as multidisciplinary objectives for optimization. The independent design variables investigated include three continuous variables: sea level static thrust, wing reference area, and aerodynamic design point fan pressure ratio, and four discrete variables: overall pressure ratio, fan drive system architecture (i.e., direct- or gear-driven), bypass nozzle architecture (i.e., fixed- or variable geometry), and the high- and low-pressure compressor work split. Ramp weight, fuel burn, noise, and emissions are the parameters treated as dependent objective functions. These optimized solutions provide insight to the ultrahigh bypass engine design process and provide information to NASA program management to help guide its technology development efforts.

Berton, Jeffrey J.↗

Cryogenic Pupil Alignment Test Architecture for Aberrated Pupil Images

A document describes cryogenic test architecture for the James Webb Space Telescope (JWST) integrated science instrument module (ISIM). The ISIM element primarily consists of a mechanical metering structure, three science instruments, and a fine guidance sensor. One of the critical optomechanical alignments is the co-registration of the optical telescope element (OTE) exit pupil with the entrance pupils of the ISIM instruments. The test architecture has been developed to verify that the ISIM element will be properly aligned with the nominal OTE exit pupil when the two elements come together. The architecture measures three of the most critical pupil degrees-of-freedom during optical testing of the ISIM element. The pupil measurement scheme makes use of specularly reflective pupil alignment references located inside the JWST instruments, ground support equipment that contains a pupil imaging module, an OTE simulator, and pupil viewing channels in two of the JWST flight instruments. Pupil alignment references (PARs) are introduced into the instrument, and their reflections are checked using the instrument's mirrors. After the pupil imaging module (PIM) captures a reflected PAR image, the image will be analyzed to determine the relative alignment offset. The instrument pupil alignment preferences are specularly reflective mirrors with non-reflective fiducials, which makes the test architecture feasible. The instrument channels have fairly large fields of view, allowing PAR tip/tilt tolerances on the order of 0.5deg.

Bos, Brent↗

Current state of the mass storage system reference model

IEEE SSSWG was chartered in May 1990 to abstract the hardware and software components of existing and emerging storage systems and to define the software interfaces between these components. The immediate goal is the decomposition of a storage system into interoperable functional modules which vendors can offer as separate commercial products. The ultimate goal is to develop interoperable standards which define the software interfaces, and in the distributed case, the associated protocols to each of the architectural modules in the model. The topics are presented in viewgraph form and include the following: IEEE SSSWG organization; IEEE SSSWG subcommittees & chairs; IEEE standards activity board; layered view of the reference model; layered access to storage services; IEEE SSSWG emphasis; and features for MSSRM version 5.

Coyne, Robert↗

The precision segmented reflectors: Moderate mission figure control subsystem

A system concept for a space based segmented reflector telescope figure control subsystem is described. The concept employs a two phase architecture in which figure initialization and figure maintenance are independent functions. Figure initialization is accomplished by image sharpening using natural reference targets. Figure maintenance is performed by monitoring the relative positions and alignments of the telescope components using an optical truss. Actuation is achieved using precision positioners. Computer simulation results of figure initialization by pairwise segment coalignment/cophasing and simulated annealing are presented along with figure maintenance results using a wavefront error regulation algorithm. Both functions are shown to perform at acceptable levels for the class of submillimeter telescopes that are serving as the focus of this technology development effort. Component breadboard work as well as plans for a system testbed are discussed.

Sevaston, G.↗

The Development of a Data Archive and Analysis Tools for WIRE

Contents include the following: mission description and system identification; environment description; system architectural description; system security requirements; organization and resources; and ditscap plan. Appendix A, acronym list. Appendix B, definitions. Appendix C, references.

Buzasi, D.↗

Assessment of Model Outcomes between MEDPRAT and the IMM

- The Integrated Medical Model (IMM) is the accepted standard for quantifying spaceflight mission medical risk in NASA operations. - While MEDPRAT implemented a new, efficient architecture and new capability, it's basic functionality mimics that of the IMM. - How does the outcome for the same reference missions and input data compare between IMM and MEDPRAT V1 and MEDPRAT V2?

Clara Gasiewski↗

Lunar Logistics Drivers and Needs

For human exploration missions, it is critical to provide items such as food, water, air, spare parts, and other similar products required to sustain life, maintain systems, and allow for productive science and utilization activities. Together, these types of goods are referred to as logistics items. This white paper breaks down the different types of logistics items, explains the mission and architecture drivers that determine logistics item needs, and identifies the types of logistics items that tend to dominate overall needs.

Chel Stromgren↗

Equivalent-Circuit Models for Grid-Forming Inverters under Unbalanced Steady-State Operating Conditions: Preprint

Positive- and negative-sequence equivalent-circuit models are put forth to capture the operation of grid-forming (GFM) inverters in unbalanced steady-state operating conditions acknowledging the impact of current limiting. The particular control architecture examined adopts droop control (for primary control), nested inner-current and outer-voltage control (in the stationary reference frame), and it is adaptable to two different types of current limiting (current-reference saturation and virtual-impedance limiting). We anticipate the proposed models to be of interest in modeling, analysis, and simulation of GFM inverters in unbalanced settings that may arise, e.g., in the face of faults. Validation of the equivalent-circuit models is pursued via comparison with full-order electromagnetic-transient (EMT) simulations for representative balanced and unbalanced faults.

equivalent-circuit models↗

GGOS Bureau of Networks and Observations: Network Infrastructure and Related Activities

The GGOS Bureau of Networks and Observations works with the IAG Services (IVS, ILRS, IGS, IDS, IGFS, and PSMSL) to advocate for the expansion and upgrade of space geodesy networks for the maintenance and improvement of the reference frame and other applications, as well as for the integration with other techniques, including absolute gravity and sea level measurements from tide gauges. New sites are being established following the GGOS concept of “core” and co-location sites, and new technologies are being implemented to enhance performance in data yield as well as accuracy. The Bureau continues to meet with organizations to discuss possibilities, including partnerships, for new and expanded participation. The GGOS Network continues to grow as new stations join every year. The Bureau holds meetings frequently, providing the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. It also monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks and the forthcoming establishment of the new absolute gravity reference frame. The IAG Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-offs (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system for data products and a more comprehensive long-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate and improve procedures to determine systems’ reference points, a crucial aid in the detection of technique-specific systematic errors. We will give a brief update on the status and projection of the network infrastructure of the next several years, and the progress and plans of the Committees/Working Group in their critical role in enhancing data product quality and accessibility to the users.

Carey Noll↗

Parallel processing for digital picture comparison

In picture processing an important problem is to identify two digital pictures of the same scene taken under different lighting conditions. This kind of problem can be found in remote sensing, satellite signal processing and the related areas. The identification can be done by transforming the gray levels so that the gray level histograms of the two pictures are closely matched. The transformation problem can be solved by using the packing method. Researchers propose a VLSI architecture consisting of m x n processing elements with extensive parallel and pipelining computation capabilities to speed up the transformation with the time complexity 0(max(m,n)), where m and n are the numbers of the gray levels of the input picture and the reference picture respectively. If using uniprocessor and a dynamic programming algorithm, the time complexity will be 0(m(3)xn). The algorithm partition problem, as an important issue in VLSI design, is discussed. Verification of the proposed architecture is also given.

Cheng, H. D.↗

SUSAN Power/Propulsion System Emulation Test Predictions

The development of all-electric and hybrid-electric propulsion systems for transport aircraft presents an opportunity for new designs that can reduce fuel consumption and emissions from commercial aviation while enabling safer and more reliable aircraft. The SUbsonic Single Aft eNgine (SUSAN) is a conceptual design for a single-aisle transport aircraft with a series/parallel partial-hybrid propulsion system that is being developed by NASA as a reference design for single-aisle transport with a high degree of electrification. The SUSAN aircraft incorporates multiple tightly coupled power, propulsion, and flight control systems. This coupling leads to challenges in the aircraft control design process, requiring a hierarchical and more coordinated control architecture. This presentation will summarize the plans for a Hardware-in-the-Loop (HIL) test performed in the Hybrid Propulsion Emulation Rig (HyPER) facility at NASA Glenn Research Center (GRC). During this test, a real-time reference model of the full-scale SUSAN powertrain and controllers will be run alongside a sub-scale electro-mechanical system representing a portion of the electrified components in the SUSAN hybrid powertrain. This test will allow the performance of the SUSAN controllers to be evaluated using real powertrain components and allows side-by-side comparison between the real and modeled subsystems. This presentation will summarize the full-scale system model, steps towards integration of representative hardware for future control testing, and predicted results.

Jonah J. Sachs-Wetstone↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Lunar Outpost Life Support Architecture Study Based on a High Mobility Exploration Scenario

As scenarios for lunar surface exploration and habitation continue to evolve within NASA s Constellation program, so must studies of optimal life support system architectures and technologies. This paper presents results of a life support architecture study based on a 2009 NASA scenario known as Scenario 12. Scenario 12 represents a consolidation of ideas from earlier NASA scenarios and includes an outpost near the Lunar South Pole comprised of three larger fixed surface elements and four attached pressurized rovers. The scenario places a high emphasis on surface mobility, with planning assuming that all four crewmembers spend roughly 50% of the time away from the outpost on 3-14 day excursions in two of the pressurized rovers. Some of the larger elements can also be mobilized for longer duration excursions. This emphasis on mobility poses a significant challenge for a regenerative life support system in terms of cost-effective waste collection and resource recovery across multiple elements, including rovers with very constrained infrastructure resources. The current study considers pressurized rovers as part of a distributed outpost life support architecture in both stand-alone and integrated configurations. A range of architectures are examined reflecting different levels of closure and distributed functionality. Different lander propellant scavenging options are also considered involving either initial conversion of residual oxygen and hydrogen propellants to water or initial direct oxygen scavenging. Monte Carlo simulations are used to assess the sensitivity of results to volatile high-impact mission variables, including the quantity of residual lander propellants available for scavenging, the fraction of crew time away from the outpost on excursions, total extravehicular activity hours, and habitat leakage. Architectures are evaluated by estimating surpluses or deficits of water and oxygen per 180-day mission and differences in fixed and 10-year-total equivalent system mass (ESM) relative to a reference case. Results are presented based on current assumptions for Scenario 12 and based on Monte Carlo simulations with assumed probability distributions for the high-impact mission variables. The calculated probability of no water or oxygen resupply from Monte Carlo simulations provides a quantitative measure of system robustness that can be used for cost/benefit analyses to identify leading architecture candidates. Areas of technology improvement that are likely to have a significant impact are also suggested.

Lange, Kevin E.↗