Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Seeing the Future of Spaceflight: Applications of Extended Reality (XR) Technologies

INTRODUCTION Advances in Earth Independent Medical Operations (EIMO) focused capabilities will be crucial for completing successful beyond low-earth-orbit (LEO) missions, where traditional Earth-based medical support and near real-time communication are limited, intermittent, or absent. In such restricted or limited communication environments, emerging extended reality (ER or XR) technologies may play a vital role in ensuring crew health and safety. Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR) are common terms used to describe technologies that "generate or modify" while “extended reality” (ER or XR) is often used as an umbrella term for these technologies. This review explores how such cutting-edge “extended reality” information delivery systems are currently applied across various disciplines within NASA. The review focuses on their capabilities, limitations, and prospective future applications as they pertain to Earth-Independent Medical Operations and its components of pre-mission planning, medical decision making, resource management, and task load management. METHODS/DESIGN The review began with a literature search to identify relevant disciplines (e.g., medical education, austere environments) where XR technologies have been studied to highlight areas where evidence is lacking. Previous and current NASA XR projects and applications, as well as commercial partnerships, such as those with Small Business Innovation Research (SBIR), were identified. Discussions with technical experts involved in the design, development, and application of these technologies allowed for classification based on their respective spaceflight applications. RESULTS AND CONCLUSION This review highlights current and emerging XR technologies that have been developed, tested, and implemented both terrestrially and in spaceflight by NASA, its international partners, the U.S. Armed Forces, and various relevant commercial entities. While these novel information delivery systems vary in their respective technology readiness levels (TRL), they have the potential to be implemented on Earth, in LEO, and during deep space exploration. These systems have the potential for impacting and optimizing many aspects of EIMO.

Yevgeniy Zhivotovskiy↗

Supply and Resource Management to Progressively Enable EIMO

BACKGROUND: Current medical operations in Low Earth Orbit (LEO) allow for real-time audio-video communication with a flight surgeon at mission control, resupply, and medical evacuation to earth on the order of hours. As mission profiles change from LEO to the Moon, Mars, and beyond, medical risk as a contribution to overall mission risk is anticipated to rise substantially. Concurrently, due to the distance, the medical systems on board vehicles proposed for these mission types are expected to have reduced mass and volume allocation. Together, astronaut crews will be at a higher risk of major medical events, be required to perform a broader set of tasks, and have substantially reduced resources and support to do so. Earth Independent Medical Operations (EIMO) aims to identify and fill the gaps present in this progressively changing paradigm. OVERVIEW: Medical supplies, resources, and skills are central to spaceflight medical systems. Vehicles used for non-LEO missions are anticipated to be smaller and thus the medical system will also need to have reduced mass, volume, and power. Medical resources are another form of consumable and may need resupply or pre-deployment to meet crew needs. One particular concern is the degradation of medications which become less efficacious and potentially toxic with time, particularly given environmental conditions such as temperature, humidity, oxygen, and radiation which have not yet been fully studied. Supply and resource management in LEO is dependent on resupply, however the supply chain of transporting equipment does not yet have a clear infrastructure for missions beyond LEO. DISCUSSION: EIMO is intended to systemically identify and fill these gaps with forward-looking solutions. In mission monitoring of resources with technology like RFID, improving medical resource longevity, targeted resupply and careful pre-mission planning will be central to facilitate crew health and performance. One approach to optimizing resources is the Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool, which uses probabilistic risk assessment (PRA) to quantitatively predict medical risk and identify resources and skills that mitigate this risk. This evidence based, quantitative analysis prediction tool and several other approaches to meeting the challenge of supply and resource management are discussed.

Arian Anderson↗

Dawn Spacecraft Performance at Ceres: Results of Hybrid Control for Ceres Mapping

Dawn is a low-thrust interplanetary spacecraft currently orbiting the dwarf planet Ceres, to better understand the early creation of the solar system. Launched in September 2007, Dawn arrived at Vesta in July 2011. After a 16-month successful science campaign at Vesta, Dawn departed for Ceres, arriving in early 2015. The Dawn spacecraft uses both reaction wheel assemblies (RWA) and a reaction control system (RCS) to provide 3-axis attitude control for the spacecraft. Reaction wheels were designed to be the primary system for attitude control, however two wheels have shown high friction anomalies and have been removed from service. The project has implemented a hybrid control algorithm using two reaction wheels and RCS thrusters. This hybrid control capability enabled Dawn to achieve very high science return, while significantly conserving remaining hydrazine propellant. With only two remaining healthy RWA’s, hybrid control became part of the baseline plan for Ceres science operations. The Dawn team developed specific operational approaches in which sequences were developed with careful consideration of science versus resource trades. Commanding and sequence planning also incorporated contingency planning, in the event that another reaction wheel may fail. Despite the differences in operational approach between Vesta and Ceres, both campaigns achieved very rich scientific data return. This paper highlights Dawn’s recent flight experience with hybrid attitude control during Ceres orbit operations. The discussion includes the approaches utilized by the Dawn team to address unique operational challenges presented by the hybrid approach, and reviews spacecraft performance under hybrid control in low orbit at Ceres. Additionally, methods used to optimize hydrazine use and thereby extend the science campaign will be presented. Finally, a preliminary assessment of an orbit transfer with two reaction wheels, during extended mission operations, is discussed.

Smith, Brett A.↗

VIPER: PATHFINDING IN-SITU RESOURCE UTILIZATION

With the Artemis Program, NASA plans to return humans to the Moon to stay. To help support extended stays on the moon, use of local materials - so-called in-situ resources could be invaluable. Since the moon’s polar regions have confirmed the presence of volatiles, as revealed by LCROSS, LRO and other lunar missions, the next step is to understand the nature and distribution of those candidate resources and how they might be extracted. Recent studies have even indicated that if those volatiles are practically available for harvesting, they could be processed into propellants and human life-support resources, significantly aiding in sustaining humans on the Moon, and eventually and later to sup-port missions to Mars

resource utilization↗

VIPER: Pathfinding Lunar Resource Understanding

With the Artemis Program, NASA plans to return humans to the Moon to stay. To help support extended stays on the moon, use of local materials -so-called in-situ resources could be invaluable. Since the moon’s polar regions have confirmed the presence of volatiles, as revealed by LCROSS, LRO and other lunar missions, the next step is to understand the nature and distribution of those candidate resources and how they might be extracted. Recent studies have even indicated that if those volatiles are practically available for harvesting, they could be processed into propellants and human life-support resources, significantly aiding in sustaining humans on the Moon, and eventually and later to sup-port missions to Mars.

Daniel Andrews↗

WWAO-WSWC Workshop Report 2019 Final

EXECUTIVE SUMMARY The Western States Water Council (WSWC) and the NASA Western Water Applications Office (WWAO) hosted a joint workshop on technology transfer for water management in the Western U.S. The goals of the workshop were to understand how different agencies approach the technology transfer and research to operations (R2O) process, identify best practices, and discuss existing barriers to successful technology infusion into operational water resource management systems at the state and federal level. The workshop took place August 7-9, 2019 in Irvine, CA. Key outcomes of the meeting include the following:• U.S. Rep. Grace Napolitano provided opening remarks for the workshop, where she highlighted the critical value of water data and the importance of collaboration between state and federal agencies in working to advance the use of water data in water management, planning and policy. • A total of 33 participants (including remote participants) were part of the workshop. They included principal investigators and project teams supported by NASA (Cyanobacteria Assessment Network, Evapotranspiration for Western States, Evaporative Stress Index, the Airborne Snow Observatory, Satellite-based Snow Water Equivalent in the Sierra Nevadas, and Fallowed Area Mapping) as well as representatives from federal (USGS, NOAA, USBR, EPA) and state (CA, WY, OR, NE) agency partners. • One main outcome of the meeting was the consensus that successful transitions of new applications and new technologies into operations require careful planning, effective communication within and across institutions, resources and considerable time investments. In addition, there was broad agreement that significant lead time is often required to allow for identification of financial and technical resources to sustain operational use of new data, information and tools.• The meeting included remarks from U.S. Rep. Napolitano and discussions during presentations and breakout groups about key opportunities to develop best practices and streamline the technology transfer process. • For example, one key set of best practices that emerged revolved around the the importance of building trust and establishing clear lines of communication between the research and operational institutions. The conversations led to defining two key components of trust-building. The first aspect is purely technical. It requires effectively demonstrating that the proposed application meets the end user’s needs in terms of accuracy, format, resolution, latency, metadata and documentation. The second aspect of building trust involves developing sustained, productive and mutually-beneficial relationships with the partner operational agency. The best practices presented here span both the technical as well as the relational aspects of cultivating trust. • This workshop served as a first step in developing a broader community discussion around R2O in western water management. Many of the best practices and lessons learned described in this report represent starting places for action within the WWAO, WSWC and our colleagues’ institutions. • Effective implementation of the best practices that emerged from this workshop will require sustained investments of time, resources and transition planning. In recognition of this, the WSWC and the WWAO proposed continuation of discussions begun at the workshop through a series of semi-annual or annual workshops.

Wilardson, Tony↗

ISS Payload Operations: The Need for and Benefit of Responsive Planning

International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

Nahay, Ed↗

RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning

RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

cloud computing↗

The earth resources experiment package on Skylab and proposed resource investigations.

In late 1973, NASA plans to launch a three-man experimental space station, the Skylab Workshop. Technical specifications regarding the instrumental facilities of the space station are presented, giving attention to the multispectral photographic facility, the IR spectrometer, the multispectral scanner, the L-band radiometer, and the S-193 sensor. The S-193 sensor will provide data applicable to studying varying ocean surfaces, wave conditions, sea and lake ice, ocean clouds, weather prediction, and soil types. All data from the sensors will be recorded on film and analog magnetic tape for return at the end of each manned period of Skylab.

Park, A. B.↗

Space Nuclear Thermal Propulsion Test Facilities Subpanel

On 20 Jul. 1989, in commemoration of the 20th anniversary of the Apollo 11 lunar landing, President George Bush proclaimed his vision for manned space exploration. He stated, 'First for the coming decade, for the 1990's, Space Station Freedom, the next critical step in our space endeavors. And next, for the new century, back to the Moon. Back to the future. And this time, back to stay. And then, a journey into tomorrow, a journey to another planet, a manned mission to Mars.' On 2 Nov. 1989, the President approved a national space policy reaffirming the long range goal of the civil space program: to 'expand human presence and activity beyond Earth orbit into the solar system.' And on 11 May 1990, he specified the goal of landing Astronauts on Mars by 2019, the 50th anniversary of man's first steps on the Moon. To safely and ever permanently venture beyond near Earth environment as charged by the President, mankind must bring to bear extensive new technologies. These include heavy lift launch capability from Earth to low-Earth orbit, automated space rendezvous and docking of large masses, zero gravity countermeasures, and closed loop life support systems. One technology enhancing, and perhaps enabling, the piloted Mars missions is nuclear propulsion, with great benefits over chemical propulsion. Asserting the potential benefits of nuclear propulsion, NASA has sponsored workshops in Nuclear Electric Propulsion and Nuclear Thermal Propulsion and has initiated a tri-agency planning process to ensure that appropriate resources are engaged to meet this exciting technical challenge. At the core of this planning process, NASA, DOE, and DOD established six Nuclear Propulsion Technical Panels in 1991 to provide groundwork for a possible tri-agency Nuclear Propulsion Program and to address the President's vision by advocating an aggressive program in nuclear propulsion. To this end the Nuclear Electric Propulsion Technology Panel has focused it energies; this final report summarizes its endeavor and conclusions.

Allen, George C.↗

NASA Information Technology Implementation Plan

NASA's Information Technology (IT) resources and IT support continue to be a growing and integral part of all NASA missions. Furthermore, the growing IT support requirements are becoming more complex and diverse. The following are a few examples of the growing complexity and diversity of NASA's IT environment. NASA is conducting basic IT research in the Intelligent Synthesis Environment (ISE) and Intelligent Systems (IS) Initiatives. IT security, infrastructure protection, and privacy of data are requiring more and more management attention and an increasing share of the NASA IT budget. Outsourcing of IT support is becoming a key element of NASA's IT strategy as exemplified by Outsourcing Desktop Initiative for NASA (ODIN) and the outsourcing of NASA Integrated Services Network (NISN) support. Finally, technology refresh is helping to provide improved support at lower cost. Recently the NASA Automated Data Processing (ADP) Consolidation Center (NACC) upgraded its bipolar technology computer systems with Complementary Metal Oxide Semiconductor (CMOS) technology systems. This NACC upgrade substantially reduced the hardware maintenance and software licensing costs, significantly increased system speed and capacity, and reduced customer processing costs by 11 percent.

Source record↗

Improving Spacecraft Design and Operability for Europa Clipper through High-Fidelity, Mission-Level Modeling and Simulation

NASA’s planned Europa Clipper mission seeks to assess the habitability of Jupiter’s moon Europa, which exhibits strong evidence of an ocean of liquid water underneath its icy crust. The sheer number of unique instruments, all of which require quiescent environments in order to operate, compounded with Jupiter’s distance from the Sun and Earth, make this planned mission challenging and resource-constrained. High fidelity, mission-level simulations that model the spacecraft, ground, and environment from launch to end-of-mission with a given trajectory and mission plan have been employed early in the project lifecycle to better understand the interactions between various components of the mission and how design changes impact the entire system. These simulations have already resulted in tangible benefits to the project by providing vital input to key spacecraft trades, assessing impacts to operability, and quantifying how well the scientific objectives of the mission can be achieved. Improvements to simulation performance and to the process by which information defining the system is gathered and built into models used by simulations have the potential to further expand the scope of their use on Europa Clipper and future missions.

Lawler, C.R.↗

Balancing Predictive and Reactive Science Planning for Mars 2020 Perseverance

The design of the science planning process for a space science mission needs to find a balance between operational and resource constraints and scientific decision-making. Science planning has previously been characterized as either predictive or reactive. Predictive science planning is needed when constraints drive science activities to be planned far in advance. For example, a combination of long one-way light time plus high-stakes science decisions drove the Cassini-Huygens mission to Saturn to have an extremely predictive planning process. On the other extreme, reactive science planning is needed when constraints drive science activities to be planned based on the results of the previous plan. For example, the Mars Exploration Rover mission interacted with the surface of Mars, and so the planning team needed to know the state of the rover at the end of each planning cycle before starting the next cycle. Operational and resource constraints that require management on intermediate timescales has led to the development of a science planning process between these two extremes. For example, the Mars Science Laboratory is a technically complex rover and has a parallel predictive process that allows the operations team to manage engineering constraints several days in advance while maintaining the reactive tactical planning process similar to that of MER. The Mars 2020 Perseverance rover is a technically complex rover in the MSL style, but has an added layer of science complexity: it is tasked with collecting a returnable cache of scientifically valuable samples of Mars within prime mission. Thus, the science planning process also needs to accommodate high-stakes longer-term science decisions in the style of Cassini. In order to balance the push-pull of these constraints, we have developed a science campaign-focused operational paradigm for Mars 2020 Perseverance that allows for both predictive planning to accommodate technological complexity and high-stakes science decisions as well as reactive planning to accommodate the realities of interacting with the martian surface. This paradigm influenced the design of operational processes and operational tools.

Spanovich, Nicole↗

Robust and Opportunistic Autonomous Science for a Potential Titan Aerobot

We are developing onboard planning and execution technologies to provide robust and opportunistic mission operations for a potential Titan aerobot. Aerobot have the potential for collecting a vast amount of high priority science data. However, to be effective, an aerobot must address several challenges including communication constraints, extended periods without contact with Earth, uncertain and changing environmental conditions, maneuverability constraints and potentially short-lived science opportunities. We are developing the AerOASIS system to develop and test technology to support autonomous science operations for a potential Titan Aerobot. The planning and execution component of AerOASIS is able to generate mission operations plans that achieve science and engineering objectives while respecting mission and resource constraints as well as adapting the plan to respond to new science opportunities. Our technology leverages prior work on the OASIS system for autonomous rover exploration. In this paper we describe how the OASIS planning component was adapted to address the unique challenges of a Titan Aerobot and we describe a field demonstration of the system with the JPL prototype aerobot.

autonomous science↗

An inventory of state natural resources information systems

Data bases and information systems developed and maintained by state agencies to support planning and management of environmental and nutural resources were inventoried for all 50 states, Puerto Rico, and U.S. Virgin Islands. The information obtained is assembled into a computerized data base catalog which is throughly cross-referecence. Retrieval is possible by code, state, data base name, data base acronym, agency, computer, GIS capability, language, specialized software, data category name, geograhic reference, data sources, and level of reliability. The 324 automated data bases identified are described.

Martinko, E. A.↗

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.↗

Application of remote sensing for California irrigated lands assessment

Recognizing the need for land use data as an input to State water planning, the California Department of Water Resources (DWR) and its predecessor agencies have conducted land use surveys since the late 1940's. In 1957 the California Water Plan was established. A statewide assessment is compiled every four to five years to review overall water resource conditions. Satellite remote sensing imagery, such as available from Landsat, has been recognized by DWR as a potential source of land use data. Analysis of Landsat imagery in connection with 'calibrating' data from low altitude photography and/or field checks can provide an economical means for providing a large scale, single year base inventory of general land use. The purpose of the Applications Pilot Test is to develop and document the use of Landsat for such an inventory. Towards the overall goal of developing an operational methodology that DWR could cost effectively implement four tasks have been specified.

Tinney, L.↗