Search NASA⌕ Search

SEARCH · Search NASA

Results for “security verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Exploiting fission chain reaction dynamics to image fissile materials

Radiation imaging is one potential method to verify nuclear weapons dismantlement. In this work, we present a method to discriminate between non-multiplying and multiplying neutron sources using a neutron coded aperture imaging system. This method applies time-correlated pulse-height (TCPH) analysis to identify neutrons in fission chain reactions and recreate images using only these events. This analysis was applied to measurements of weapons-grade plutonium (WGPu) metal and 252 Cf performed at the Nevada National Security Site (NNSS) Device Assembly Facility in July 2015. The results demonstrate it is possible to eliminate the non-fissile 252 Cf source from the image while preserving the fissile WGPu source. TCPH analysis was also applied to additional scenes in which the WGPu and 252 Cf sources were measured individually. The results of these separate measurements further demonstrate the ability to remove the non-fissile 252 Cf source and retain the fissile WGPu source. Simulations performed using MCNPX-PoliMi indicate that in a one hour measurement, hollow WGPu spheres are retained at a 1σ level for neutron multiplications M ≃ 2:7 and above. This work has potential application to dismantlement verification where it may be valuable to verify that all neutron sources in an image are multiplying.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Critical and Subcritical Experiment NEA Benchmark Possibilities for Measurements at ORCEF and Other USDOE Facilities

This report documents a wide variety of critical and subcritical measurements that could be Nuclear Energy Agency (NEA) or International Criticality Safety Benchmark Program (ICSBEP) benchmarks. The list has omitted some few measurements. The experiments are divided into four classes: critical experiments only, critical and subsequent subcritical experiments, subcritical experiments (all performed in critical experiment facilities, and fourth subcritical measurements performed in Material Balance Areas at the Y-12 National Security Complex (NSC) for Y-12 nuclear criticality safety. This report documents to number of critical facility days utilized used for the measurements. Measurement at critical and subsequently subcritical in critical facilities at Oak Ridge National Laboratory (ORCEF), Los Alamos National Laboratory, Pacific Northwest National Laboratory, and Babcock and Wilcox at Lynchburg, Va, utilized ~350 operational days of critical facility time, Measurement only at subcritical at ORCEF utilized ~200 operational days in this critical facility, and subcritical measurements in Material Balance Areas of the Y-12 National Security Complex used 350 operational days, many were unattended measurements. In view of the high cost of critical facility time and the limitation of only one facility available for measurements in the United States, it is very cost-effective to mine the existing data to produce benchmarks such as those already in NEA and ICSBEP. For measurements at ORCEF the material descriptions from Y-12 NSC and the accuracy of the configurations should (bases on experience with existing NEA or ICSBEP of ORCEF measurement benchmarks) result in uncertainties in measured k eff values lower than ±0.001 and may be as low as ±0.0002; thus, allowing more accurate comparisons between measurements and calculations and thus more accurate verification of calculations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Module greenhouse with high efficiency of transformation of solar energy, utilizing active and passive glass optical rasters

Since the eighties of the 20th century, various types of linear glass rasters for architectural usage have been developed in the Czech Republic made by the continuous melting technology. The development was focused on two main groups of rasters - active rasters with linear Fresnel lenses in fixed installation and with movable photo-thermal and/or photo-thermal/photo-voltaic absorbers. The second group are passive rasters based on total reflection of rays on an optical prism. During the last years we have been working on their standardization, exact measuring of their optical and thermal-technical characteristics and on creation of a final product that could be applied in solar architecture. With the project supported by the Ministry of Environment of the Czech Republic we were able to build an experimental greenhouse using these active and passive optical glass rasters. The project followed the growing number of technical objectives. The concept of the greenhouse consisted of interdependence construction - structural design of the greenhouse with its technological equipment securing the required temperature and humidity conditions in the interior of the greenhouse. This article aims to show the merits of the proposed scheme and presents the results of the mathematical model in the TRNSYS environment through which we could predict the future energy balance carried out similar works, thus optimizing the investment and operating costs. In this article description of various technology applications for passive and active utilization of solar radiation is presented, as well as some results of short-term and long-term experiments, including evaluation of 1-year operation of the greenhouse from the energy and interior temperature viewpoints. A comparison of the calculated energy flows in the greenhouse to real measured values, for verification of the installed model is also involved. (author)

14 SOLAR ENERGY↗

International Energy Agency (IEA) Greenhouse Gas (GHG) Weyburn-Midale CO₂ Monitoring and Storage Project

The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring and verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered permanent storage.

01 COAL, LIGNITE, AND PEAT↗

AUTOMATIC GENERATION OF EVENT TREES AND FAULT TREES: A MODEL-BASED APPROACH

In the past few decades, increasing complexity in modern engineering systems has been driven by the integration of a large number of components and by the fact that the system operations involve many disciplines (e.g., thermal-hydraulics, plant operations, cyber-security). Current safety/reliability modeling approaches to such systems are labor intensive, difficult to learn, and rely heavily on simplistic Boolean logic to depict failure propagation and accident progression. While these methods serve well for simple systems (i.e., linear causal systems with limited small inter- and intra-system interactions), their results are difficult to verify when modeling complex systems (typically performed through the extensive use of modeling assumptions). The development of new methods is addressed to meet these challenges through a model-based system engineering (MBSE) lens. Under MBSE philosophy, every aspect of the system (form or function) is represented by a model that completely characterizes its architecture or behavior. MBSE approach greatly improves the management of design, analysis and verification of complex systems. An integration of Dynamic Probabilistic Risk Assessment (DPRA) methods with MBSE models is proposed to perform safety/reliability analyses of engineering systems. In particular, MBSE representation of the system (performed using Systems Modeling Language [SysML]) is coupled with DPRA methods to automatically generate event trees and fault trees.

97 - MATHEMATICS AND COMPUTING↗

eZeeKonfigurator v1.0

eZeeKonfigurator is a web application and supporting tools for configuring Zeek (formerly Bro) systems. Zeek is an open-source tool developed at LBNL that's used to secure computer networks. A recent version of Zeek introduced the configuration framework, where changes can be made while the system is running. However, the provided method is difficult to operationalize, as it requires a set of text files to be deployed and updated across all the Zeek systems. eZeeKonfigurator provides an easy-to-use web interface to this. Users can view and modify options in a web application, and then those changes are deployed to the desired Zeek systems. Additionally, users benefit from additional features, such as: * Logging and auditing, to determine who made what change and when * Automated expiration of changes (e.g. an exception is added for 2 weeks, after which time it will be removed) * Validation of changes and verification that the change has been applied * Fine-grained role-based access

Grigorescu, Vlad↗

A tamper-indicating quantum seal

Technical means for identifying when tampering occurs is a critical part of many containment and surveillance technologies. Conventional fiber optic seals provide methods for monitoring enclosed inventories, but they are vulnerable to spoofing attacks based on classical physics. We address these vulnerabilities with the development of a quantum seal that offers the ability to detect the intercept-resend attack using quantum integrity verification. Our approach represents an application of entanglement to provide guarantees in the authenticity of the seal state by verifying it was transmitted coherently. We implement these ideas using polarization-entangled photon pairs that are verified after passing through a fiber-optic channel testbed. Using binary detection theory, we find the probability of detecting inauthentic signals is greater than 0.9999 with a false alarm chance of 10 –9 for a 10 second sampling interval. In addition, we show how the Hong-Ou-Mandel effect concurrently provides a tight bound on redirection attack, in which tampering modifies the shape of the seal. Our measurements limit the tolerable path length change to sub-millimeter disturbances. As a result, these tamper-indicating features of the quantum seal offer unprecedented security for unattended monitoring systems.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Advanced software integration: The case for ITV facilities

The array of technologies and methodologies involved in the development and integration of avionics software has moved almost as rapidly as computer technology itself. Future avionics systems involve major advances and risks in the following areas: (1) Complexity; (2) Connectivity; (3) Security; (4) Duration; and (5) Software engineering. From an architectural standpoint, the systems will be much more distributed, involve session-based user interfaces, and have the layered architectures typified in the layers of abstraction concepts popular in networking. Typified in the NASA Space Station Freedom will be the highly distributed nature of software development itself. Systems composed of independent components developed in parallel must be bound by rigid standards and interfaces, the clean requirements and specifications. Avionics software provides a challenge in that it can not be flight tested until the first time it literally flies. It is the binding of requirements for such an integration environment into the advances and risks of future avionics systems that form the basis of the presented concept and the basic Integration, Test, and Verification concept within the development and integration life cycle of Space Station Mission and Avionics systems.

Garman, John R.↗

A Robust Infrastructure Design for Gas Centrifuge Enrichment Plant Unattended Online Enrichment Monitoring

An online enrichment monitor (OLEM) is being developed to continuously measure the relative isotopic composition of UF6 in the unit header pipes of a gas centrifuge enrichment plant (GCEP). From a safeguards perspective, OLEM will provide early detection of a facility being misused for production of highly enriched uranium. OLEM may also reduce the number of samples collected for destructive assay and if coupled with load cell monitoring can provide isotope mass balance verification. The OLEM design includes power and network connections for continuous monitoring of the UF6 enrichment and state of health of the instrument. Monitoring the enrichment on all header pipes at a typical GCEP could require OLEM detectors on each of the product, tails, and feed header pipes. If there are eight process units, up to 24 detectors may be required at a modern GCEP. Distant locations, harsh industrial environments, and safeguards continuity of knowledge requirements all place certain demands on the network robustness and power reliability. This paper describes the infrastructure and architecture of an OLEM system based on OLEM collection nodes on the unit header pipes and power and network support nodes for groupings of the collection nodes. A redundant, self-healing communications network, distributed backup power, and a secure communications methodology. Two candidate technologies being considered for secure communications are the Object Linking and Embedding for Process Control Unified Architecture cross-platform, service-oriented architecture model for process control communications and the emerging IAEA Real-time And INtegrated STream-Oriented Remote Monitoring (RAINSTORM) framework to provide the common secure communication infrastructure for remote, unattended monitoring systems. The proposed infrastructure design offers modular, commercial components, plug-and-play extensibility for GCEP deployments, and is intended to meet the guidelines and requirements for unattended and remotely monitored safeguards systems.

On Line Enrichment Monitor GCEP↗

SU-G-JeP1-07: Development of a Programmable Motion Testbed for the Validation of Ultrasound Tracking Algorithms

Purpose: To develop an advanced testbed that combines a 3D motion stage and ultrasound phantom to optimize and validate 2D and 3D tracking algorithms for real-time motion management during radiation therapy. Methods: A Siemens S2000 Ultrasound scanner utilizing a 9L4 transducer was coupled with the Washington University 4D Phantom to simulate patient motion. The transducer was securely fastened to the 3D stage and positioned to image three cylinders of varying contrast in a Gammex 404GS LE phantom. The transducer was placed within a water bath above the phantom in order to maintain sufficient coupling for the entire range of simulated motion. A programmed motion sequence was used to move the transducer during image acquisition and a cine video was acquired for one minute to allow for long sequence tracking. Images were analyzed using a normalized cross-correlation block matching tracking algorithm and compared to the known motion of the transducer relative to the phantom. Results: The setup produced stable ultrasound motion traces consistent with those programmed into the 3D motion stage. The acquired ultrasound images showed minimal artifacts and an image quality that was more than suitable for tracking algorithm verification. Comparisons of a block matching tracking algorithm with the known motion trace for the three features resulted in an average tracking error of 0.59 mm. Conclusion: The high accuracy and programmability of the 4D phantom allows for the acquisition of ultrasound motion sequences that are highly customizable; allowing for focused analysis of some common pitfalls of tracking algorithms such as partial feature occlusion or feature disappearance, among others. The design can easily be modified to adapt to any probe such that the process can be extended to 3D acquisition. Further development of an anatomy specific phantom better resembling true anatomical landmarks could lead to an even more robust validation. This work is partially funded by NIH grant R01CA190298.

60 APPLIED LIFE SCIENCES↗

HPC-Enabled Optimization of High Temperature Heat Exchangers (CRADA Final Report)

This project was a collaborative effort between Lawrence Livermore National Security, LLC (LLNS) as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Materials Sciences, LLC, to develop a technology for design and optimization of heat exchangers using powerful desktop and laptop computers. The project was originally designated as a 12-month project, and consisted of 3# major tasks and the following 8# major deliverables: 1) CFD models of 3D heat exchangers based on existing and new geometry. 2) Validation against experimental data provided by MSC and published in the literature. 3) CFD models of 3D unit cells based on TPMS. 4) Surrogate models capable of delivering the gradients of the homogenized properties with respect to the parametrization. 5) 3D design methodology using TO algorithms. 6) Conventional reference and topology optimized designs. 7) 3D optimized designs stored in a 3D printer build format. 8) Verification of the improved performance. All of the deliverables for this project were successfully completed with two no-cost time extensions.

36 MATERIALS SCIENCE↗

HPC-Enabled Optimization of High Temperature Heat Exchangers (CRADA Final Report)

This project was a collaborative effort between Lawrence Livermore National Security, LLC (LLNS) as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Materials Sciences, LLC, to develop a technology for design and optimization of heat exchangers using powerful desktop and laptop computers. The project was originally designated as a 12-month project, and consisted of 3# major tasks and the following 8# major deliverables: 1) CFD models of 3D heat exchangers based on existing and new geometry. 2) Validation against experimental data provided by MSC and published in the literature. 3) CFD models of 3D unit cells based on TPMS. 4) Surrogate models capable of delivering the gradients of the homogenized properties with respect to the parametrization. 5) 3D design methodology using TO algorithms. 6) Conventional reference and topology optimized designs. 7) 3D optimized designs stored in a 3D printer build format. 8) Verification of the improved performance. All of the deliverables for this project were successfully completed with two no-cost time extensions.

13 HYDRO ENERGY↗

Evaluation of the concrete shield compositions from the 2010 criticality accident alarm system Benchmark experiments at the CEA VALDUC silene facility - 14454

In October 2010, a series of benchmark experiments were conducted at the French Commissariat a l'energie Atomique et aux energies Alternatives (CEA) Valduc SILENE facility. These experiments were a joint effort between the United States Department of Energy Nuclear Criticality Safety Program and the CEA. The purpose of these experiments was to create three benchmarks for the verification and validation of radiation transport codes and evaluated nuclear data used in the analysis of criticality accident alarm systems. This series of experiments consisted of three single-pulsed experiments with the SILENE reactor. For the first experiment, the reactor was bare (unshielded), whereas in the second and third experiments, it was shielded by lead and polyethylene, respectively. The polyethylene shield of the third experiment had a cadmium liner on its internal and external surfaces, which vertically was located near the fuel region of SILENE. During each experiment, several neutron activation foils and thermoluminescent dosimeters (TLDs) were placed around the reactor. Nearly half of the foils and TLDs had additional high-density magnetite concrete, high-density barite concrete, standard concrete, and/or BoroBond shields. CEA Saclay provided all the concrete, and the US Y-12 National Security Complex provided the BoroBond. Measurement data from the experiments were published at the 2011 International Conference on Nuclear Criticality (ICNC 2011) and the 2013 Nuclear Criticality Safety Division (NCSD 2013) topical meeting. Preliminary computational results for the first experiment were presented in the ICNC 2011 paper, which showed poor agreement between the computational results and the measured values of the foils shielded by concrete. Recently the hydrogen content, boron content, and density of these concrete shields were further investigated within the constraints of the previously available data. New computational results for the first experiment are now available that show much better agreement with the measured values. (authors)

42 ENGINEERING↗

Laser Diode Analysis and Verification (Professional Report)

The goal of this project at Lawrence Livermore National Laboratory (LLNL) was focused on analyzing and verifying laser diodes to ensure that the diodes meet requirements for LLNL mission applications. The different stages of this testing were documented in a process flow map which included location color coding so that each step was clearly defined in scope and location of appropriate testing facility. Data were collected and analyzed and compared to minimum acceptable values to see if requirements were met. The process map documents the initial receipt, inspection, and testing of the laser diodes. Initial inspections started with Keyence Microscope imaging and then moved on to High Potential, Ramp, and Burst Testing. Data from the diode testing were processed through MATLAB and Python codes to verify various metrics such as slope efficiency, threshold current, back irradiance, and beam divergence met requirements. These metrics were then recorded in Excel summary reports. Approximately 95% of the laser diodes passed all tests. Presentations were given to Lawrence Livermore’s internal leadership team, an external partner, and to a Lab-wide audience. The data released for this report was constrained by information protection considerations of LLNL’s national security missions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SILENE Benchmark Critical Experiments for Criticality Accident Alarm Systems

In October 2010 a series of benchmark experiments was conducted at the Commissariat a Energie Atomique et aux Energies Alternatives (CEA) Valduc SILENE [1] facility. These experiments were a joint effort between the US Department of Energy (DOE) and the French CEA. The purpose of these experiments was to create three benchmarks for the verification and validation of radiation transport codes and evaluated nuclear data used in the analysis of criticality accident alarm systems (CAASs). This presentation will discuss the geometric configuration of these experiments and the quantities that were measured and will present some preliminary comparisons between the measured data and calculations. This series consisted of three single-pulsed experiments with the SILENE reactor. During the first experiment the reactor was bare (unshielded), but during the second and third experiments it was shielded by lead and polyethylene, respectively. During each experiment several neutron activation foils and thermoluminescent dosimeters (TLDs) were placed around the reactor, and some of these detectors were themselves shielded from the reactor by high-density magnetite and barite concrete, standard concrete, and/or BoroBond. All the concrete was provided by CEA Saclay, and the BoroBond was provided by Y-12 National Security Complex. Figure 1 is a picture of the SILENE reactor cell configured for pulse 1. Also included in these experiments were measurements of the neutron and photon spectra with two BICRON BC-501A liquid scintillators. These two detectors were provided and operated by CEA Valduc. They were set up just outside the SILENE reactor cell with additional lead shielding to prevent the detectors from being saturated. The final detectors involved in the experiments were two different types of CAAS detectors. The Babcock International Group provided three CIDAS CAAS detectors, which measured photon dose and dose rate with a Geiger-Mueller tube. CIDAS detectors are currently in use at Y-12 in the newly constructed Highly Enriched Uranium Materials Facility. The second CAAS detector used a 6 LiF TLD to absorb neutrons and a silicon detector to count the charge particles released by these absorption events. Lawrence Livermore National Laboratory provided four of these detectors, which had formerly been used at the Rocky Flats facility in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assurance Issues in Developing AI/ML Components (and their Standards) for Civil Aviation

Standards development activities require a keen and deep understanding of the problem being solved by the standard as well as the technologies being deployed in any reference implementation of the solution. It is important to understand the mechanisms and limits of the fundamental, underlying science of implementation and verification technologies used to realize and assure systems. We need to understand the limits of what current process and metrics can provide with respect to new technologies. US leadership is important in this endeavor, and it is vital that we have a measured approach that yields sound results. We wish to start with simple, well-defined, non-safety critical applications and then progress to functions which have (1) clearly defined requirements, (2) means of checking the answer/output, and (3) means of intervention and mitigation of incorrect answers/outputs.

Aviation Safety↗

Designing to Sample the Unknown: Lessons from OSIRIS-REx Project Systems Engineering

On September 8, 2016, the third NASA New Frontiers mission launched on an Atlas V 411. The Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) will rendezvous with asteroid Bennu in 2018, collect a sample in 2020, and return that sample to Earth in September 2023. The development team has overcome a number of challenges in order to design and build a system that will make contact with an unexplored, airless, low-gravity body. This paper will provide an overview of the mission, then focus in on the system-level challenges and some of the key system-level processes. Some of the lessons here are unique to the type of mission, like discussion of operating at a largely-unknown, low-gravity object. Other lessons, particularly from the build phase, have broad implications. The OSIRIS-REx risk management process was particularly effective in achieving an on-time and under-budget development effort. The systematic requirements management and verification and the system validation also helped identify numerous potential problems. The final assessment of the OSIRIS-REx performance will need to wait until the sample is returned in 2023, but this post-launch assessment will capture some of the key systems-engineering lessons from the development team.

Asteroid↗