Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

National Solar Thermal Test Facility: Operations & Maintenance Report

The NSTTF O&M Project continues the operation and maintenance activities of the existing critical capabilities and infrastructure at the NSTTF. This project is to support and assure the success of Solar Heat for Industrial Process in the United States and the larger global community by ensuring the NSTTF is a safe and operational facility. The primary goal of this project will be to maintain the solar tower and heliostat field while also allowing NSTTF staff to improve processes for operations and maintenance. This includes expanding our preventative maintenance program, inventory systems, and our data sharing capabilities. Additionally, this will support an outreach program with regular seminars, sharing of data, and the release of open-source software to support heliostat metrology

14 SOLAR ENERGY↗

Generation and Analysis of Subpicosecond Double Electron Bunch at the Brookhaven Accelerator Test Facility

Two compressed electron beam bunches from a single 60-MeV bunch have been generated in a reproducible manner during compression in the magnetic chicane - 'dog leg' arrangement at ATF. Measurements indicate they have comparable bunch lengths ({approx}100-200 fs) and are separated in energy by {approx}1.8 MeV with the higher-energy bunch preceding the lower-energy bunch by 0.5-1 ps. Some simulation results for analyzing the double-bunch formation process are also presented.

43 PARTICLE ACCELERATORS↗

Linear Collider Test Facility: Twiss Parameter Analysis at the IP/Post-IP Location of the ATF2 Beam Line

At the first stage of the ATF2 beam tuning, vertical beam size is usually bigger than 3 {micro}m at the IP. Beam waist measurements using wire scanners and a laser wire are usually performed to check the initial matching of the beam through to the IP. These measurements are described in this paper for the optics currently used ({beta}{sub x} = 4cm and {beta}{sub y} = 1mm). Software implemented in the control room to automate these measurements with integrated analysis is also described. Measurements showed that {beta} functions and emittances were within errors of measurements when no rematching and coupling corrections were done. However, it was observed that the waist in the horizontal (X) and vertical (Y) plane was abnormally shifted and simulations were performed to try to understand these shifts. They also showed that multiknobs are needed in the current optics to correct simultaneously {alpha}{sub x}, {alpha}{sub y} and the horizontal dispersion (D{sub x}). Such multiknobs were found and their linearity and orthogonality were successfully checked using MAD optics code. The software for these multiknobs was implemented in the control room and waist scan measurements using the {alpha}{sub y} knob were successfully performed.

43 PARTICLE ACCELERATORS↗