Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM LINES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Understanding Critical Systematics on Neutrino Oscillation Experiments from Neutrino-Nucleus Interactions. Final report

This is a final report on the DOE grant DE-SC0017946: Understanding Critical Systematics on Neutrino Oscillation Experiments from Neutrino-Nucleus Interactions. The goal of this proposal was to better understand the complex many-body dynamics of neutrino-nucleus interactions in order to control the systematic uncertainties that will dominate current and future long-baseline neutrino experiments. This work was focused on a new and experimentally challenging aspect of the problem: measuring the abundance and kinematics of final state nucleons. The research leveraged two different detectors and beam energies: the Near Detector (ND) of the NOvA Experiment, off-axis on the NuMI beam- line, and the Accelerator Neutrino Neutron Interaction Experiment (ANNIE), on the Booster Neutrino Beam (BNB). The techniques developed will also help reject the dominant neutrino-induced backgrounds limiting future proton decay searches.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Time-of-Flight Calculations with Multiple Beam Phase Monitors: Calibration, Jitter Analysis & Energy Measurement

This report describes time-of-flight (ToF) beam energy measurements with multiple phase monitors in a beam line with no acceleration. Measurement uncertainty is quantified via rigorous treatment of beam-based phase monitor calibration and jitter analysis of the accelerator system. Experimental results in the Superconducting Linac (SCL) of the Spallation Neutron Source (SNS) are presented.

43 PARTICLE ACCELERATORS↗

Optics Studies for Multipass Energy Recovery at CEBAF: ER@CEBAF

Energy recovery linacs (ERLs), focus on recycling the kinetic energy of electron beam for the purpose of accelerating a newly injected beam within the same accelerating structure. The rising developments in the super conducting radio frequency technology, ERL technology has achieved several noteworthy milestones over the past few decades. In year 2003, Jefferson Lab has successfully demonstrated a single pass energy recovery at the CEBAF accelerator. Furthermore, they conducted successful experiments with IR-FEL demo and upgrades, as well as the UV FEL driver. This multi-pass, multi-GeV range energy recovery demonstration proposed to be carried out at CEBAF accelerator at Jefferson Lab focuses on demonstrating highest energy recovery in super conducting linac in the low-current range. Continuous electron beam accelerate up to 7.5 GeV within 5-passes and decelerate in the next 5-passes recovering RF energy and dumps at a low energy dump. The beamline optics design for recirculating linacs require special attention to avoid beam instabilities due to RF wakefields. Usually, multi-pass linac beam lines require stronger focusing at lower energies as that is necessary to avoid beam breakup (BBU) instabilities, even with this small beam current. The CEBAF linac optics optimization is focused on balancing over-focusing at higher energies and beta excursions at lower energies. The race-track-shaped geometry of CEBAF accelerator allows its linacs to accommodate multiple energy beams simultaneously, while individual recirculating arcs transporting one beam energy, are shared between accelerating/decelerating beams. For the linac optics optimization process, an extended strategy is used that is originally used in 6-pass Recirculating Linac design of the LHeC, to represent the ten passes through a single linac. Using proper mathematical expressions, linac optics optimization can be achieved with evolutionary genetic algorithms, with Multi-Objective optimization. This thesis introduces a CEBAF optics redesign tailored to accommodates the ER@CEBAF multi-pass ER scheme. The isochronous arcs were retuned to match into optics solutions for optimized 10-pass linacs. Within this work, a single bunch particle tracking analysis presented here focuses on the further improvements of the beamline and beam transportation.

Neththikumara, Isurumali↗

LINAC DESIGN FOR AN ARRAY OF SOFT X-RAY FREE ELECTRON LASERS

The design of the linac delivering electron bunches into ten independent soft x-ray free electron lasers (FELs) producing light at 1 nm and longer wavelengths is presented. The bunch repetition rate in the linac is 1 MHz and 100 kHz in each of ten FEL beam lines. Various issues regarding machine layout and lattice, bunch compression, collimation, and the beam switch yard are discussed. Particular attention is given to collective effects. A demanding goal is to preserve both a low beam slice emittance and low slice energy spread during acceleration, bunch compression and distribution of the electron bunches into the array of FEL beamlines. Detailed studies of the effect of the electron beam microbunching caused by longitudinal space-charge forces and coherent synchrotron radiation (CSR) have been carried out and their results are presented.

43 PARTICLE ACCELERATORS↗

First e⁻/γ Commissioning Results for the GlueX Experiment/Hall D at CEBAF

Experimental Hall D, with flagship experiment GlueX, was constructed as part of the 12 GeV CEBAF upgrade. A new magnetically extracted electron beam line was installed to support this hall. Bremsstrahlung photons from retractable radiators are delivered to the experiment through a series of collimators following a long drift to allow for beam convergence. Coherent Bremsstrahlung generated by interaction with a diamond radiator will achieve a nominal 40% linear polarization and photon energies between 8.5 and 9 GeV from 12.1 GeV electrons, which are then tagged or diverted to a medium power 60kW electron dump. The expected photon flux is 10 7 -10 8 Hz. This paper discusses the experimental line design, commissioning experience gained since first beam in spring 2014, and the present results of beam commissioning by the experiment.

43 PARTICLE ACCELERATORS↗

Observation of Multiple Volume Reflection of Ultrarelativistic Protons by a Sequence of Several Bent Silicon Crystals

The interactions of 400 GeV protons with different sequences of bent silicon crystals have been investigated at the H8 beam line of the CERN Super Proton Synchrotron. The multiple volume reflection of the proton beam has been studied in detail on a five-crystal reflector measuring an angular beam deflection {theta}=52.96{+-}0.14 {mu}rad. The efficiency was found larger than 80% for an angular acceptance at the reflector entrance of 70 {mu}rad, with a maximal efficiency value of {epsilon}=0.90{+-}0.01{+-}0.03.

43 PARTICLE ACCELERATORS↗

EBIS Beam Intensity Online Optimization with GPTune and Offline Analysis with XGBoost

The application of machine learning techniques to accelerator research has led to significant breakthroughs in optimization strategies. This paper presents a pioneering study using a novel machine learning algorithm, GPTune, to optimize beam intensity by adjusting parameters in the EBIS injection and extraction beam lines. Our research demonstrates substantial improvements, achieving a remarkable 22% and 70% increase in beam intensity at two separate measurement locations.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

Cavity Beam Position Monitor System for ATF2

The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 38 C and S band resonant cavity beam position monitors (CBPM) with associated mixer electronics and digitizers. The current status of the BPM system is described, with a focus on operational techniques and performance. The ATF2 C-band system is performing well, with individual CBPM resolution approaching or at the design resolution of 50 nm. The changes in the CBPM calibration observed over three weeks can probably be attributed to thermal effects on the mixer electronics systems. The CW calibration tone power will be upgraded to monitor changes in the electronics gain and phase. The four S-band CBPMs are still to be investigated, the main problem associated with these cavities is a large cross coupling between the x and y ports. This combined with the large design dispersion in that degion makes the digital signal processing difficult, although various techniques exist to determine the cavity parameters and use these coupled signals for beam position determination.

43 PARTICLE ACCELERATORS↗

Cavity Beam Position Monitor System for ATF2

The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 38 C and S band resonant cavity beam position monitors (CBPM) with associated mixer electronics and digitizers. The current status of the BPM system is described, with a focus on operational techniques and performance.

43 PARTICLE ACCELERATORS↗

Interferometric adaptive optics for high power laser pointing, wave-front control and phasing

Implementing the capability to perform fast ignition experiments, as well as, radiography experiments on the National Ignition Facility (NIF) places stringent requirements on the control of each of the beam's pointing and overall wavefront quality. One quad of the NIF beams, 4 beam pairs, will be utilized for these experiments and hydrodynamic and particle-in-cell simulations indicate that for the fast ignition experiments, these beams will be required to deliver 50% (4.0 kJ) of their total energy (7.96 kJ) within a 40 {micro}m diameter spot at the end of a fast ignition cone target. This requirement implies a stringent pointing and overall phase conjugation error budget on the adaptive optics system used to correct these beam lines. The overall encircled energy requirement is more readily met by phasing of the beams in pairs but still requires high Strehl ratios, Sr, and rms tip/tilt errors of approximately one {micro}rad. To accomplish this task we have designed an interferometric adaptive optics system capable of beam pointing, high Strehl ratio and beam phasing with a single pixilated MEMS deformable mirror and interferometric wave-front sensor. We present the design of a testbed used to evaluate the performance of this wave-front sensor below along with simulations of its expected performance level.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SEN Ultra-High Energy Implanter (UHE) Developed for Next Generation Image Sensors

The UHE is an ultra-high energy implanter developed by SEN Corporation. It was derived from the NV-GSD-HE3 by adding six RF resonators to the beam line. This extends performance so that singly charged boron ions can reach 2 MeV with beam current of 0.75 mA. The maximum energy for triple charged boron is 5 MeV with beam current of 1p{mu}A. For phosphorus ions, the UHE can accelerate doubly charged ions up to 4.4 MeV with beam current of 0.35 mA and quadruply charged ions up to 8 MeV with beam current of 1 p{mu}A. The primary application of the UHE is the image sensor market where it is used to increase the depth of CCD photodiodes into the surface of the wafer and thereby permit higher pixel density for image sensors. The second purpose is to improve productivity for relatively high boron doses at energies around 3 MeV. In order to address certain CCD defects, the system includes a state-of-the-art beam profile controller which allows optimization of implant damage and micro-uniformity. The ULE is currently used in production of high-end CCD's.

43 PARTICLE ACCELERATORS↗

The Tandem-ALPI-PIAVE accelerator complex of LNL

Heavy ion beams are delivered at the Laboratori Nazionali di Legnaro by the accelerator complex Tandem-ALPI-PIAVE. The Tandem XTU is a Van de Graaff accelerator normally operated at terminal voltages of up to about 15 MV. The Tandem accelerator can be operated in stand-alone mode or as an injector for the linac booster ALPI. The linear accelerator ALPI is built of superconducting resonant cavities and consists of a low-beta branch, particularly important for the acceleration of the heavier mass ions, a medium-beta branch, and a high-beta branch. ALPI can be operated also with the PIAVE injector that consists of a superconducting linac and an ECR source. The PIAVE source was mainly used for the acceleration of intense noble gas beams but most recently also a first metallic beam was delivered to the users. The accelerator complex delivers beams of ions from protons to gold in three experimental areas on 11 different beam lines. A rich scientific activity is ongoing at the Tandem-ALPI-PIAVE accelerator complex, beam time being shared between nuclear physics research and applied and interdisciplinary physics research. An overview of the present status and perspectives of the Tandem-ALPI-PIAVE complex and its physics program is given in the present paper.

43 PARTICLE ACCELERATORS↗

Improvement Plans of Fermilab’s Proton Accelerator Complex

The flagship of Fermilab's long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

43 PARTICLE ACCELERATORS↗

Characterization of muon and electron beams in the Paul Scherrer Institute PiM1 channel for the MUSE experiment

The MUon Scattering Experiment, MUSE, at the Paul Scherrer Institute, Switzerland, investigates the proton charge radius puzzle, lepton universality, and two-photon exchange, via simultaneous measurements of elastic muon-proton and electron-proton scattering. The experiment uses the PiM1 secondary beam channel, which was designed for high precision pion scattering measurements. We review the properties of the beam line established for pions. We discuss the production processes that generate the electron and muon beams, and the simulations of these processes. Simulations of the π/μ/e beams through the channel using TURTLE and G4beamline are compared. The G4beamline simulation is then compared to several experimental measurements of the channel, including the momentum dispersion at the intermediate focal plane and target, the shape of the beam spot at the target, and timing measurements that allow the beam momenta to be determined. Finally, we conclude that the PiM1 channel can be used for high precision π, μ, and e scattering.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Measurements of forward proton production with incident protons and charged pions on nuclear targets at the CERN Proton Synchrotron

Measurements of the double-differential proton production cross-section d{sup 2{sigma}}/dpd{Omega} in the range of momentum 0.5 GeV/c{<=}p<8.0 GeV/c and angle 0.05 rad{<=}{theta}<0.25 rad in collisions of charged pions and protons on beryllium, carbon, aluminium, copper, tin, tantalum, and lead are presented. The data were taken with the large acceptance HARP detector in the T9 beam line of the CERN Proton Synchrotron. Incident particles were identified by an elaborate system of beam detectors and impinged on a target of 5% of a nuclear interaction length. The tracking and identification of the produced particles was performed using the forward spectrometer of the HARP experiment. Results are obtained for the double-differential cross-sections mainly at four incident beam momenta (3,5,8, and 12 GeV/c). Measurements are compared with predictions of the geant4 and mars Monte Carlo generators.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design and Testing of a Prototype Beam Absorber for the PXIE MEBT

One of the goals of the PXIE at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a spot with a ~2 mm rms radius. A design was developed to respond to the driving requirements: high surface power density of 17W/mm 2 and resistance to ion-induced surface blistering. A ¼ - size prototype of the absorber was manufactured, and its thermal properties were tested with an electron beam generating a peak power density similar to the one expected during normal operation of the PXIE beam line. The note describes the absorber concept, the prototype, the testing procedure with the electron beam, and the results of testing.

Baffes, Curtis M.↗