Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Distributed analysis with CRAB: The client-server architecture evolution and commissioning

CRAB (CMS Remote Analysis Builder) is the tool used by CMS to enable running physics analysis in a transparent manner over data distributed across many sites. It abstracts out the interaction with the underlying batch farms, grid infrastructure and CMS workload management tools, such that it is easily usable by non-experts. CRAB can be used as a direct interface to the computing system or can delegate the user task to a server. Major efforts have been dedicated to the client-server system development, allowing the user to deal only with a simple and intuitive interface and to delegate all the work to a server. The server takes care of handling the users jobs during the whole lifetime of the users task. In particular, it takes care of the data and resources discovery, process tracking and output handling. It also provides services such as automatic resubmission in case of failures, notification to the user of the task status, and automatic blacklisting of sites showing evident problems beyond what is provided by existing grid infrastructure. The CRAB Server architecture and its deployment will be presented, as well as the current status and future development. In addition the experience in using the system for initial detector commissioning activities and data analysis will be summarized.

99 GENERAL AND MISCELLANEOUS↗

CMS Jet and Missing $E_T$ Commissioning

We describe how jets and E{sub T} are defined, reconstructed, and calibrated in CMS, as well as how the CMS detector performs in measuring these physics objects. Performance results are derived from the CMS simulation application, based on Geant4, and also from noise and cosmic commissioning data taken before the first collision event was recorded by CMS in November 2009. A jet and E{sub T} startup plan is in place which includes a data quality monitoring and prompt analysis task force to identify and fix problems as they arise.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design, Installation, and Initial Commissioning of the MTA Beamline

A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for cryogenic tests of liquid-hydrogen absorbers for the MUCOOL R&D program and, now, for high-power beam tests of absorbers, high-gradient rf cavities in the presence of magnetic fields (including gas-filled cavities), and other prototype muon-cooling apparatus. The experimental scenarios being developed for muon facilities involve collection, capture, and cooling of large-emittance, high-intensity muon beams--{approx}10{sup 13} muons, so that conclusive tests of the apparatus require full Linac beam, which is 1.6 x 10{sup 13} p/pulse. To support the muon cooling facility, this new primary beamline extracts and transports beam directly from the Linac to the test facility. The design concept for the MuCool facility is taken from an earlier proposal [1], but modifications were necessary to accommodate high-intensity beam, cryogenics, and the increased scale of the cooling experiments. Further, the line incorporates a specialized section and utilizes a different mode of operation to provide precision measurements of Linac beam parameters. This paper reports on the technical details of the MuCool beamline for both modes.

43 PARTICLE ACCELERATORS↗

Improving compliance with Intersocietal Accreditation Commission (IAC) reporting standards: A serial comparison of 523 labs over seven years

Background: The aim of this study was to evaluate reporting compliance of laboratories applying for serial accreditation by the Intersocietal Accreditation Commission (IAC) and compare compliance based on laboratory characteristics. Methods: All laboratories applying for IAC accreditation for the first time in 2008 and then twice more (2011-2014) were evaluated for compliance with 18 reporting elements. The elements were ranked into three severity groups (high/moderate/low). Results: Reports from 523 laboratories were evaluated. The percentage of laboratories with reporting issues by cycle was 66.2% for cycle 1, 36.7% for cycle 2, and 43.8% for cycle 3 (p < .001). For most of the 18 elements, there was a significant decrease in the percentage of labs with issues. Less moderate and high severity errors were seen over time. Also, the mean non-compliant elements per laboratory decreased from 5.78 ± 2.72 at cycle 1, down to 1.25 ± 1.77 at cycle 3. Conclusions: In facilities applying for 3 consecutive IAC accreditation cycles, reporting compliance with IAC Standards improved between cycles 1-2 and 1-3. No significant improvement occurred between cycles 2-3. Although the quality of reports improved overall, problems remain in quantifying myocardial perfusion defects, documenting report approval date, and integrating stress and imaging reports.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Commissioning and first results of the reinstated JET ICRF ILA

The JET ICRF ITER-like Antenna (ILA) has been operated at 33, 42 and 47 MHz in 2008–2009 but stopped operation in 2009 due to the failure of one of the tuning capacitors inside the antenna. Tests on a spare capacitor showed that a micro-leak was caused by the cycle wear of a capacitor’s internal bellows. The ILA was reinstated with a new operating scheme minimizing the full stroke requests of the capacitor. This contribution gives an overview of the works undertaken to reinstate the JET ILA up to the first results on plasma. The capacitors were replaced and high voltage tests of the capacitors were performed. An extensive calibration of all the measurements in the RF circuit was carried out. New simulation tools were created and control algorithms were implemented for the – toroidal and poloidal – phase control of the array as well as for the matching of the second stage. New protections are being implemented for the thermal and voltage protection of the capacitors. Low voltage matching tests were performed before the high power commissioning. Finally the first results on plasma are presented, showing that the new controls allow extending the range of the operation to lower (29 MHz) and higher (51 MHz) frequencies than previously achieved.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Vacuum commissioning and operation result after the KSTAR PFC upgrade

The first vacuum commissioning after the installation of new tungsten mono-block cassette divertor has been successfully conducted in KSTAR. The tungsten divertor has been installed in the lower divertor region to handle the high divertor heat loads up to 10 MW/m 2 . On the one hand, the plasma facing components except for the tungsten divertor in the KSTAR vacuum vessel still consists of graphite tiles. Thus, it was much more challenging to maintain high-quality vacuum condition mainly because of various possible impurity sources inside the vessel compared with previous experiment campaigns. In this paper, the detailed procedure for securing vacuum condition of the KSTAR tokamak after the installation of the new tungsten divertor is presented. The vacuum condition is also examined regarding the plasma start-up and the long-pulse high-performance quality.

KSTAR↗

Commissioning of the LaBr 3 (Ce) detector array at the National Superconducting Cyclotron Laboratory

The timing and energy resolution properties of LaBr 3 (Ce) scintillators are well suited for use in γγ fast-timing experiments. Here, using standard 60 Co, 88 Y, and 152 Eu sources, the 16-element array of 1.5 inch by 1.5 inch right-cylindrical LaBr 3 (Ce) detectors and the associated readout electronics at the National Superconducting Cyclotron Laboratory were commissioned by measuring the lifetimes of excited states and the angular correlations of γ rays emitted in cascade. Excited-state lifetimes in 152 Sm and 152 Gd were measured using the exponential slope of the decay and a method based on the centroids of time-difference spectra. Results for the lifetimes are consistent with the well-known literature values which cover a range from a few picoseconds to several nanoseconds. Finally, the γγ angular correlations for the 4 + → 2 + → 0 + cascade in 60 Ni and the 3 - → 2 + → 0 + cascade in 88 Sr were measured and shown to agree with GEANT4 simulations that take into account the expected angular correlations within the cascades as well as the geometry of the array.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The large-area hybrid-optics CLAS12 RICH: Assembling, commissioning and first data-taking

Here, the first module of a Ring Imaging Cherenkov detector has been recently installed on the CLAS12 spectrometer at the Jefferson Lab (JLab) to provide the experiment with kaon identification in the momentum range between 3 and 8 GeV/c. The detector adopts a hybrid optics solution with aerogel radiator, light planar and spherical mirrors and highly-segmented photon detectors. We report here on the assembly and installation of the RICH and we show the first preliminary results obtained during the commissioning of the detector and the first physics data taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the BRIKEN detector for the measurement of very exotic β -delayed neutron emitters

A new detection system has been installed at the RIKEN Nishina Center (Japan) to investigate decay properties of very neutron-rich nuclei. The setup consists of three main parts: a moderated neutron counter, a detection system sensitive to the implantation and decay of radioactive ions, and -ray detectors. We describe here the setup, the commissioning experiment and some selected results demonstrating its performance for the measurement of half-lives and β-delayed neutron emission probabilities. Here, the methodology followed in the analysis of the data is described in detail. Particular emphasis is placed on the correction of the accidental neutron background.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Beta-decay Paul Trap Mk IV: Design and commissioning

Here, the Beta-decay Paul Trap is an open-geometry, linear trap used to measure the decays of 8 Li and 8 B to search for a tensor contribution to the weak interaction. In the latest 8 Li measurement of Burkey et al. (2022), β scattering was the dominant experimental systematic uncertainty. The Beta-decay Paul Trap Mk IV reduces the prevalence of β scattering by a factor of 4 through a redesigned electrode geometry and the use of glassy carbon and graphite as electrode materials. The trap has been constructed and successfully commissioned with 8 Li in a new data campaign that collected 2.6 million triple coincidence events, an increase in statistics by 30% with 4 times less β scattering compared to the previous 8 Li data set.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning results of the BNL Alternating Gradient Synchrotron booster AC dipole

Here, an AC dipole has been installed in the AGS booster as part of polarized beam developments for the future Electron Ion Collider (EIC). This will allow preserving helion beam polarization through two intrinsic resonances during acceleration to an energy corresponding to |$Gγ$| = 10.5. AC dipoles can preserve polarization by forcing the beam to undergo large amplitude vertical betatron oscillations. These coherent oscillations cause all particles to sample the strong horizontal fields of quadrupoles, and result in a full spin flip. In preparation for the AC dipole being used for polarized helions, it was first commissioned with polarized protons. The proton extraction energy was raised to allow protons to cross $Gγ$ = 0 + $v_y$ = 4.8087. As an artifact of the experiment using polarized protons, the booster settings for bunch extraction interfered with the coherent oscillations and limited the maximum coherent amplitude. This interference will be well separated in the case of polarized helions. Polarized protons crossed the $Gγ$ = 0 + $v_y$ intrinsic resonance with a full spin flip through use of the AC dipole. Simulations of the resonance crossing using Zgoubi accurately predict the polarization relative to the coherent amplitude.

43 PARTICLE ACCELERATORS↗

Commissioning a time-gated camera for fast neutron beamline spatial-energy characterization at LANSCE-WNR spallation source

An energy-resolved fast neutron beam imaging diagnostic has been successfully commissioned at the Weapons Neutron Research (WNR) spallation source within the Los Alamos Neutron Science Center (LANSCE) facility. This diagnostic replaces the existing analog phosphor image plates, which integrate across all neutron energies, as well as other particles, with a near-real-time energy-sensitive imaging capability. The system uses a fast plastic scintillator coupled with an intensified CCD camera. Specifically, the Teledyne Pi-MAX4 camera is coupled with either a 4 mm thick Eljen (EJ) 204 or 228 plastic scintillator. These scintillators are most sensitive to the fast neutrons (0.8-800 MeV) directly from the spallation source rather than low energy background radiation. Experimentally, these plastic scintillators were shown to have sufficiently fast decay to differentiate the bright gamma flash from the spallation neutrons. The spatial resolution is dominated by neutron beam divergence, with minimal additional contributions from scatter and light divergence. The system successfully resolved changes in neutron beam characteristics caused by intentional proton steering variations. Additionally, simulations of scintillator light yield as a function of thickness conducted using PHITS (with Scinful-QMD package) found that increasing scintillator thickness from 4 mm to 6 or 8 mm could potentially increase brightness ~ 3x. This may be explored if there is a need to reduce image acquisition time from several minutes to under one minute.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ground calibration and in-flight commissioning of the Gamma-Ray and Neutron Spectrometer (GRNS) for NASA’s Psyche mission

NASA's Psyche spacecraft is currently enroute to the asteroid 16 Psyche, where it will perform an orbital investigation focused on determining the nature of the asteroid. A key part of this investigation is measurements of elemental composition to determine if the asteroid is rich in iron-nickel metal. To that end, the Psyche spacecraft payload includes a Gamma-Ray and Neutron Spectrometer (GRNS). GRNS is composed of two subsystems; a Gamma-Ray Spectrometer (GRS) with a high-purity germanium γ-ray sensor surrounded by a borated plastic scintillator Anti-Coincidence Shield (ACS), and a Neutron Spectrometer (NS) with three 3 He-filled gas proportional counters that are sensitive to different neutron energy regimes. We describe results from the pre-launch calibration campaign, along with early in-flight results from post-launch instrument commissioning. The information detailed here is focused on providing future users of GRNS data with the information needed to properly interpret the observations from the instrument.

Peplowski, Patrick N. [Johns Hopkins Univ., Baltim↗

On-Line Commissioning of the HRIBF Resonant Ionization Laser Ion Source

A highly-selective resonant ionization laser ion source has been successfully commissioned at the Holifield Radioactive Ion Beam Facility, Oak Ridge National Laboratory, for the production of pure beams of short-lived nuclei for spectroscopic studies. The laser ion source provided beams of neutron-rich Ga isotopes to the Low-energy Radioactive Ion Beam Spectroscopy Station for beta decay measurements. The radioactive Ga isotopes were produced by 50-MeV proton induced fission of 238U and ionized by laser radiation using a two-step resonant ionization scheme. Isobarically pure 83Ga, 85Ga, and 86Ga beams were delivered to the experiment at approximate rates of 12000 ions/s, 100 ions/s, and 3 ions/s, respectively.

Liu, Yuan↗

Simulation studies for beam commissioning at FRIB Advanced Rare Isotope Separator

The Facility for Rare Isotope Beams (FRIB) includes a powerful superconducting driver accelerator and an Advanced Rare Isotope Separator (ARIS). The ARIS collects and purifies the rare isotope fragments of interest for experiments in nuclear physics, nuclear astrophysics, fundamental symmetries, etc. ARIS consists of a vertical pre-separator and downstream horizontal separator section (C-Bend). Each section can provide a high-resolution separation alternatively. The resolution reduction due to the emittance induced by momentum compression can be avoided by isotope separation in different dispersive planes. Beam commissioning of ARIS for the first experiments was completed and demonstrated particle identification of fragments. The beam tuning in ARIS largely relies on numerical simulations since the limited space for diagnostics. Here, we report the result of the beam trajectory correction, transverse matching, and beam-based misalignment studies at ARIS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hydrokinetic tidal energy resource assessment following international electrotechnical commission guidelines

Marine renewable energy can be used as a viable energy source to alleviate the impact of the climate crisis and have a carbon-free electricity sector in the future. Especially the energetic tidal streams are an attractive source of clean energy due to the periodic occurrence of high tidal flows daily. However, before any deployment of tidal turbine farms, it is essential to perform a resource assessment depending on the scope and scale of the project. Here, the International Electrotechnical Commission has developed a technical standard for assessing the tidal stream resource "IEC 62600-201 TS" to aid in this effort: determine a particular site's feasibility and perform the project layout design. In this study, we implemented and validated a high-resolution three-dimensional numerical model and provided results following the IEC TS for a project layout design in a highly energetic tidal channel, Tacoma Narrows of Puget Sound, in the State of Washington, USA. Implementation of the guidelines has helped adequately identify the undisturbed theoretical and technical resources with less bias, where the latter included energy extraction from the flow field arranging a hypothetical tidal energy converter (TEC) array. Also, following the standard, we carefully assessed the changes to channel flow properties from TECs, such as the kinetic energy flux and annual energy production (AEP), to provide the detailed information required for a larger project layout design. Ultimately, this work has shown the important role of IEC TS in tidal stream resource assessment, which can simultaneously act as a benchmark for other studies worldwide.

13 HYDRO ENERGY↗