Search NASA⌕ Search

SEARCH · Search NASA

Results for “CORROSION TEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Microbiological and corrosion analysis of three urine pretreatment regimes with titanium 6A1-4V

One objective of the water recovery test (WRT) performed at NASA's Marshall Space Flight Center (MSFC) for the environmental control and life support systems (ECLSS) of Space Station Freedom is to determine the ability of the water recovery system to reclaim urine for crew reuse. In the process, raw urine is pretreated using a commercially available oxidant, Oxone (Dupont), and sulfuric acid (to reduce ammonia), and pumped into a urine processing subsystem. A combination of sodium hypochlorite and sulfuric acid were also considered as an alternative pretreatment. The ability of these pretreatments, plus a third pretreatment of ozone, to reduce microbial levels in urine generated during testing of the water recovery system at MSFC was examined. In addition, the corrosion rate of weld and base metal specimens of titanium 6A1-4V, a candidate material for the water system of Space Station Freedom, was monitored in the presence of these pretreatments. Specimen surfaces were examined at completion of the 21-day test using scanning electron microscopy. Change in pH, color, turbidity, and odor were recorded over the course of the test.

Huff, Timothy L.↗

The helical screw expander evaluation project

A positive-displacement helical-screw expander of the Lysholm type has been adapted for geothermal service and successfully demonstrated in a 50 kW prototype power system. Evaluation of the expander by tests of a new model in a 1 MW power system under wellhead conditions in selected liquid-dominated geothermal fields is proposed. The objectives are to determine the performance characteristics of the expander and power system over a broad range of operating conditions and also to examine the concept of wellhead power plants. Throttling and fractionation of the fluids from the test wells is planned to simulate a wide range of wellhead pressures and steam fractions. Variation in the expander exhaust pressure is also planned. The investigation will include expander efficiency, corrosion, erosion, scale formation and control, and endurance testing. Interaction studies with the wells and an electric grid are also proposed.

Mckay, R. A.↗

The 737 graphite composite flight spoiler flight service evaluation

The flight service experience of 111 graphite-epoxy spoilers on 737 transport aircraft and related ground based enviromental exposure of graphite-epoxy material specimens is reported. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Over 1,188,367 spoiler flight hours and 1,786,837 spoiler landings were accumulated by this fleet. Tests of removed spoilers and ground-based exposure specimens after the fifth year of service indicate modest changes in composite strength properties. Two incidents of trailing edge delamination with subsequent core corrosion were observed. Based on visual, ultrasonic, and destructive testing, there has been no evidence of moisture migration into the honeycomb core and no core corrosion.

Hoffman, D. J.↗

Experimental Design for the Evaluation of Detection Techniques of Hidden Corrosion Beneath the Thermal Protective System of the Space Shuttle Orbiter

The detection of corrosion beneath Space Shuttle Orbiter thermal protective system is traditionally accomplished by removing the Reusable Surface Insulation tiles and performing a visual inspection of the aluminum substrate and corrosion protection system. This process is time consuming and has the potential to damage high cost tiles. To evaluate non-intrusive NDE methods, a Proof of Concept (PoC) experiment was designed and test panels were manufactured. The objective of the test plan was three-fold: establish the ability to detect corrosion hidden from view by tiles; determine the key factor affecting detectability; roughly quantify the detection threshold. The plan consisted of artificially inducing dimensionally controlled corrosion spots in two panels and rebonding tile over the spots to model the thermal protective system of the orbiter. The corrosion spot diameter ranged from 0.100" to 0.600" inches and the depth ranged from 0.003" to 0.020". One panel consisted of a complete factorial array of corrosion spots with and without tile coverage. The second panel consisted of randomized factorial points replicated and hidden by tile. Conventional methods such as ultrasonics, infrared, eddy current and microwave methods have shortcomings. Ultrasonics and IR cannot sufficiently penetrate the tiles, while eddy current and microwaves have inadequate resolution. As such, the panels were interrogated using Backscatter Radiography and Terahertz Imaging. The terahertz system successfully detected artificially induced corrosion spots under orbiter tile and functional testing is in-work in preparation for implementation.

Kemmerer, Catherine C.↗

Measuring metallic concentrations in glycol solutions

A study of atomic absorption spectroscopy as a possible nonobtrusive corrosion indicator for solar-energy systems is described. Procedures were tested for determining low levels of metallic concentration in aqueous glycol formulations. Other methods for determining corrosion are suggested.

Source record↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Alternative to Nitric Acid for Passivation of Stainless Steel Alloys

Corrosion is an extensive problem that affects the Department of Defense (DoD) and National Aeronautics and Space Administration (NASA). The deleterious effects of corrosion result in steep costs, asset downtime affecting mission readiness, and safety risks to personnel. Consequently, it is vital to reduce corrosion costs and risks in a sustainable manner. The DoD and NASA have numerous structures and equipment that are fabricated from stainless steel. The standard practice for protection of stainless steel is a process called passivation. Typical passivation procedures call for the use of nitric acid; however, there are a number of environmental, worker safety, and operational issues associated with its use. Citric acid offers a variety of benefits including increased safety for personnel, reduced environmental impact, and reduced operational cost. DoD and NASA agreed to collaborate to validate citric acid as an acceptable passivating agent for stainless steel. This paper details our investigation of prior work developing the citric acid passivation process, development of the test plan, optimization of the process for specific stainless steel alloys, ongoing and planned testing to elucidate the process' resistance to corrosion in comparison to nitric acid, and preliminary results.

Lewis, Pattie L.↗

A review of nuclear thermal propulsion carbide fuel corrosion and key issues

Corrosion (mass loss) of carbide nuclear fuels due to their exposure to hot hydrogen in nuclear thermal propulsion engine systems greatly impacts the performance, thrust-to-weight and life of such systems. This report provides an overview of key issues and processes associated with the corrosion of carbide materials. Additionally, past pertinent development reactor test observations, as well as related experimental work and analysis modeling efforts are reviewed. At the conclusion, recommendations are presented, which provide the foundation for future corrosion modeling and verification efforts.

Pelaccio, Dennis G.↗

Design and development of a prototype wet oxidation system for the reclamation of water and the disposition of waste residues onboard space vehicles

Laboratory investigations to define optimum process conditions for oxidation of fecal/urine slurries were conducted in a one-liter batch reactor. The results of these tests formed the basis for the design, fabrication, and testing of an initial prototype system, including a 100-hour design verification test. Areas of further development were identified during this test. Development of a high pressure slurry pump, materials corrosion studies, oxygen supply trade studies, comparison of salt removal water recovery devices, ammonia removal investigation, development of a solids grinder, reactor design studies and bearing life tests, and development of shutoff valves and a back pressure regulator were undertaken. The development work has progressed to the point where a prototype system suitable for manned chamber testing can be fabricated and tested with a high degree of confidence of success.

Jagow, R. B.↗

Influence of precracked specimen configuration and starting stress intensity on the stress corrosion cracking of 4340 steel

Since the pioneer work of Brown (1966), precracked specimens and related fracture mechanics analyses have been extensively used to study stress corrosion cracking. Certain questions arose in connection with initial attempts to prepare standardized recommended practices by ASTM Committee G-1 on Corrosion of Metals. These questions were related to adequacy of test control as it pertains to acceptable limits of variability, and to validity of expressions for stress intensity and crack-surface displacements for both specimen configurations. An interlaboratory test program, was, therefore, planned with the objective to examine the validity of KIscc testing for selected specimen configurations, materials,and environmental systems. The results reported in the present paper include details of a single laboratory test program. The program was conducted to determine if the threshold value of stress intensity for onset and arrest of stress corrosion cracking was independent for the two specimen configurations examined.

Lisagor, W. B.↗

Life Test Approach for Refractory Metal/Sodium Heat Pipes

Heat pipe life tests described in the literature have seldom been conducted on a systematic basis. Typically one or more heat pipes are built and tested for an extended period at a single temperature with simple condenser loading. This paper describes an approach to generate carefully controlled data that can conclusively establish heat pipe operating life with material-fluid combinations capable of extended operation. Approximately 10 years of operational life might be compressed into 3 years of laboratory testing through a combination of increased temperature and mass fluence. Two specific test series have been identified and include: investigation of long term corrosion rates based on the guidelines contained in ASTM G-68-80 (using 7 heat pipes); and investigation of corrosion trends in a cross correlation sequence at various temperatures and mass fluences based on a central composite test design (using 9 heat pipes). The heat pipes selected for demonstration purposes are fabricated from a Mo-44.5%Re alloy with a length of 0.3 meters and a diameter of 1.59 cm(to conserve material) with a condenser to evaporator length ratio of approximately 3. The wick is a crescent annular design formed from 400-mesh Mo-Re alloy material hot isostatically pressed to produce a final wick core of 20 microns or less.

Martin, James J.↗

Hot corrosion of TD nickel and TD nickel chromium in a high velocity gas stream.

Results of cyclical tests of TD nickel (2% thoria-dispersed nickel) and TD nickel chromium (2% thoria-dispersed nickel-20% chromium alloy) 1.5 mm (60 mil) sheet specimens for susceptibility to hot corrosion in a Mach 0.5 gas stream of Jet A-1 fuel combustion products containing 2 ppm sea salt. Tests as long as 500 one-hour cycles between room temperature and specimen hot zone temperatures of 899 C (1650 F), 982 C (1800 F), and 1149 C (2100 F) were performed. Evidence of hot corrosion was found for both materials in the 899 C (1650 F) and 982 C (1800 F) tests, but not at 1149 C (2100 F). It was concluded that because of high metal thickness losses neither alloy in sheet form is suitable for long-time engine application in a hot corrosion environment at temperatures of 982 C (1800 F) or above.

Sanders, W. A.↗

Delayed fracture of silicon: Silicon sheet growth development for the large area silicon sheet task of the low cost silicon solar array project

Bar specimens were cut from ingots of single crystal silicon, and acid etched prior to testing. Artificial surface flaws were introduced in specimens by indentation with a Knoop hardness tester. The specimens were loaded in four-point bending to 95 percent of the nominal fracture stress, while keeping the surface area, containing the flaw, wet with test liquids. No evidence of delayed fracture, and, therefore stress corrosion, of single crystal silicon was observed for liquid environments including water, acetone, and aqueous solutions of NaCl, NH4OH, and HNO3, when tested with a flaw parallel to a (110) surface. The fracture toughness was calculated.

Chen, T. J.↗

The Prediction of Long-Term Coating Performance from Short-Term Electrochemical Data: Comparison of Electrochemical Data to Field Exposure Results for Coatings on Steel - Part 2

The pace of coatings development is limited by the time required to assess their corrosion protection properties. This study takes a step f orward from Part I in that it correlates the corrosion performance of organic coatings assessed by a series of short-term electrochemical measurement with 18-month beachside exposure results of duplicate pan els. A series of 19 coating systems on A36 steel substrates were test ed in a completely blind study using the damage tolerance test (DTT). In the DTT, a through-film pinhole defect is created, and the electro chemical characteristics of the defect are then monitored over the ne xt 4 to 7 days while immersed in 0.SM NaCl. The open circuit potentia l, anodic potentiostatic polarization tests and electrochemical imped ance spectroscopy were used to study the corrosion behavior of the co ating systems. The beachside exposure tests were conducted at the Ken nedy Space Center according to ASTM D610-01. It was found that for 79 % of the coatings systems examined, the 18 month beachside exposure r esults could be predicted by two independent laboratory tests obtained within 7 days.

Contu, F.↗